USTC&TBA La Jolla, CA December, 8, 2003
1
Track Construction & Reconstruction: Asphalt Overlay Issues vs. Removal & Replacement
USTC&TBA La Jolla, CA December, 8, 2003
2
Session Overview
Defining Owner’s Goal & ObjectivesSite Assessment & Design ConsiderationsStructural Overlay / Reconstruction
USTC&TBA La Jolla, CA December, 8, 2003
3
Defining Owner’s Goal & Objectives
What is the most critical aspect in this step????SHUT-UP & LISTEN!!!
USTC&TBA La Jolla, CA December, 8, 2003
4
Defining Owner’s Goal & Objectives
Track rehabilitation represents a significant investment to the Owner Are their goals short term or long
term What is their budget –
How was it established Budget = Goals?
USTC&TBA La Jolla, CA December, 8, 2003
5
Defining Owner’s Goal & Objectives
You now know their budget & goals –address the following to establish the
relationship
Likes/Dislikes of Existing FacilityPerformanceAppearance / PrestigeServiceabilityDecision Makers – Business
Manger or Athletic Director
USTC&TBA La Jolla, CA December, 8, 2003
6
Site Assessment / Design Considerations
Historical How was it constructed When was it constructed How has it been maintained Modifications
USTC&TBA La Jolla, CA December, 8, 2003
7
Site Assessment / Design Considerations
Geotechnical Define various components Define soil conditions and suitability
Existing Conditions Track Layout / configuration of events Control Points-related to elevation
USTC&TBA La Jolla, CA December, 8, 2003
8
Site Assessment / Design Considerations
Existing Conditions (cont.) Control Points-related to structures
Failure Mode Cracking Distortion
USTC&TBA La Jolla, CA December, 8, 2003
9
Site Assessment / Design Considerations
Failure Mode (cont.)
Drainage Delamination caused by moisture Define drainage characteristics Subsurface drainage requirements
Climatic Considerations Temperature variations Freeze – thaw cycles Rainfall events
USTC&TBA La Jolla, CA December, 8, 2003
10
Structural Overlay or Reconstruction
Overlays are an option if-- Existing layout is satisfactory Track and field guidelines are met Removal of existing synthetic surface Increased elevation is acceptable Existing structure will survive
construction process
USTC&TBA La Jolla, CA December, 8, 2003
11
Structural Overlay or Reconstruction
Reconstruction is required if--- Significant modifications to layout is required Existing structure will not survive construction
process
Owner’s Goals Review of life cycle cost benefits
How well has this pavement structure performed Costs associated with rehab options vs. expected life Has life cycle cost objectives been met
USTC&TBA La Jolla, CA December, 8, 2003
12
Structural Overlay or Reconstruction
Constructability Issues
USTC&TBA La Jolla, CA December, 8, 2003
13
Conclusion
Put your knowledge to work for you!! Stress experience! Talk about successes! Talk about problem projects and how
issues were resolved! Stress your USTC&TBA Involvement! BE PROFESSIONAL!!!