Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

17
Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1

Transcript of Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Page 1: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Upstream Business Unit

ROMPETROL DRILLING & WORKOVER

2010

1

Page 2: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Rompetrol Drilling & Workover Division (RDW) is a member of:

• International Association of Drilling Contractors (IADC) since 1985• Romanian Association of Drilling Contractors (RADC).

RDW, implemented an integrated management system for quality assurance, environmental protection and HSE, according to ISO 9001-2008, ISO 14001-2004 and OHSAS 18001-2007.

Page 3: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

• Drilling oil, gas and water wells.• Well completion and workover.• Running casing and tubing strings.• Mudlogging services.• Mud engineering and consultancy for drilling and workover.• Refurbishing and maintenance of rigs.• Equipment and tools rental.• Pumping, testing operations and water wells sand cleaning.• Rig management.• Manpower provider.

Services Portfolio

Page 4: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Brief History

• Over 35 years of experience in providing cost effective, expert labor and professional services to the international oil and gas industry.• Over 550 wells drilled in Syria, Algeria, Egypt, Iraq, Jordan, Libya, Sudan, Greece.• Over 210 workovered wells in Libya.• Mudlogging services in Holland, Tunisia, Moldova, Denmark, Hungary, Bulgaria, Libya, Offshore Black Sea, Romania.• Consultancy for drilling and workover in Algeria, Iraq, Jordan, Greece, Ecuador, India, Libya.• Consultancy for mudlogging in Kazakhstan, Senegal, United Kingdom, Sudan, Armenia.

Page 5: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Drilling and Workover Achievements Clients and Partners

• SONATRACH , Algeria• GENERAL PETROLEUM CO, Egypt• IRAQ NATIONAL OIL COMPANY• SYRIAN PETROLEUM CO• SOUTH OIL CO. , Iraq• NATURAL RESOURCES AUTHORITY, Jordan• REPSOL OIL OPERATIONS, Libya• KUWAIT OIL CO• PETROLEUM PRODUCTION & UTILIZATION PROJECT, Sudan• HELLENIC PETROLEUM, Greece• DATALOG TECHNOLOGY LTD., North Sea• LASMO GRAND MAGHREB, Libya• VEBA OIL OPERATIONS, Libya• BOSNA-S OIL SERVICES, Libya• PETROPRODUCCION, Ecuador• YPC, Yemen• ONGC, India

Page 6: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Locations

TW 125 Rig

KREMCO K160 Rig

AWBARI Base &KREMCO K100 Rig

TRIPOLI Headquarters

Page 7: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Drilling & Workover Assets

Description

Depth Maximum Hook Load

ManufacturerPresent locationWork

over Drilling

  m m tons    

FA - 25   350 20 UPET Romania- 1985 Libya

KREMCO 100

3,650 2,000 100National Oilwell - DRECO - CANADA - 1998

Libya

KREMCO 160

6,000 2,500 160National Oilwell - DRECO - CANADA - 1997

Libya

TW 125 - CA - A6

4,800  2,200 125UPET Romania – 2005 - 2006

Libya

WILSON 42 B 500

6,000 2,000 157 WILSON - USA Ecuador

WILSON 42 B 500

6,000 2,000 157 WILSON - USA Ecuador

COOPER 550 LTO

6,000 2,000 150 COOPER - USA - 1989 Ecuador

Offshore Mudlogging Unit

1 unit Datalog Technology Romania

Onshore Mudlogging Unit

2 units Datalog TechnologyRomania and abroad

Page 8: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Drilling equipment capabilities

Description

Depth Maximum Hook Load

Work over Drilling

  m m tons

FA - 25   350 20

KREMCO 100 3,650 2,000 100

KREMCO 160 6,000 2,500 160

TW 125 - CA - A6 4,800  2,200 125

WILSON 42 B 500 6,000 2,000 157

WILSON 42 B 500 6,000 2,000 157

COOPER 550 LTO 6,000 2,000 150

Kremco 160

Kremco 100

TW 125 – CA – A 6

Page 9: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Mudlogging equipment capabilities

Drilling parameters Monitoring• User configurable displays• User configurable screen plots• User configurable charts

Database Reporting• Automatic time and depth databases• User configurable logs• Export to remote QLOG databases• ASCII export to 3rd party databases

Real time monitoring and historical record of over 300 parameters

• All rig parameters and functions• Hydraulics • Trip monitoring• Pore pressure• Geological parameters such as normalized gas• LWD-MWD Data importing

Page 10: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Mudlogging screen

Page 11: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Operations and work experience

Item Denomination of project/ contract Client Completion period

1Drilling 2 wells with one F – 320 – 3 DH rig, maximum

depth 5,000 m.SYRIAN PETROLEUM CO.

Damascus-SYRIA1975 - 1977

2Drilling 180 onshore oil wells with10 (ten) F –320 – 3 DH

rigs, maximum depth 5,000 m.SONATRACH - Algiers,

ALGERIA1976 - 1984

3Drilling 22 onshore oil wells with one F –320 – 3 DH rig,

maximum depth 3,500 mGENERAL PETROLEUM CO.

Cairo - EGYPT1981 - 1987

4Drilling onshore oil wells with 4 (four) F –200 – 2 DH rigs,

maximum depth 2,500 m

IRAQ NATIONAL OIL CO. Baghdad - IRAQ and NORTH OIL COMPANY - Kirkuk - IRAQ

1982 - 1990

5Drilling onshore oil wells with 2 (two) F –320 – 3 DH rigs

(maximum depth 5,000 m) and work over services with 2 (two) F – 100 – DH rigs

SOUTH OIL CO. Basrah - IRAQ 1982 - 1990

Page 12: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Operations and work experience – cont’d

Item Denomination of project/ contract ClientCompletion

period

6 Drilling works with two F200 – 2 DH rigs DEP GREECE1976 - 19821986 - 1990

7 Drilling works with one F - 125 rig DEP GREECE 1982 - 1984

8Mud logging operations with one DATALOG mud logging

unit

NATIONAL WORKOVER AND DRILLING COTripoli, LIBYA

1996

9Association contract for carrying out work over operations

in Ecuador with 3 work over rigsGEOPETSA S.A., Quito, ECUADOR 1996 – until now

10Mud logging operations in Holland with one mud logging

unit type DATALOGDATALOG Technology Ltd. UK 1996

11 Mud logging operations in Moldova DATALOG Technology Ltd. UK 1996

12Mudlogging operations in DENMARK with one mudlogging

unit type DATALOG.DATALOG Technology Ltd., UK

October 1998 January 2002

Page 13: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Operations and work experience – cont’d

Item Denomination of project/ contract Client Completion period

13Drilling 3 water source wells & 2 exploratory wells with KREMCO K160 rig, with the depth range of 1,200 m to

1830 m.

REPSOL OIL OPERATION, Tripoli, LIBYA

Dec.24, 2000 – Sept.30, 2001

14Drilling 3 water wells & worked over 2 water wells with

KREMCO K 160 rig, with the depth of 600 m.

LASMO GRAND MAGHREB LTD.,

Tripoli, LIBYA

April 21, 2002 – June 21, 2002

15Drilling & completion of ground beds for cathodic

protection system, 5 wells with FA 25 rig, with depth of 230 m.

BOSNA - S OIL SERVICES Co., Tripoli, LIBYA

2002

16Work over services performed with KREMCO K 100 rig

with depth of 2,150 m.REPSOL OIL OPERATIONS,

Tripoli, LIBYAJanuary 24, 2002

In progress

17Drilling of 6 water wells with T 50 rig, with maximum

depth of 600 m.TASHRIKIAT EL YANABIA,

Tripoli, LIBYA

Started in December 2001 –

May 2003

18Work over services performed with KREMCO K 160 at

wells with total depth of 4,500 – 5,000 mVEBA OIL OPERATIONS,

Tripoli, LIBYA

Started in 28 February 2003;

In progress

19Running casing services, as Baker Oil Tools

SubcontractorRepsol Oil Operations &

REMSA

Started in November 2005;

In progress

Page 14: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Operations and work experience – cont’d

Item Denomination of project/ contract ClientCompletion

period

20 Mudlogging services with Rompetrol’s unit STERLING RESOURCES, UK 2005

21 Mudlogging services with Rompetrol’s unit EXXOIL, Tunisia 2005

22 Mudlogging services with Rompetrol’s unit TOREADOR RESOURCES CORPORATION, USA

2006, now in progress

23 Manpower Consultancy Agreement to provide Data Engineers and Mudloggers on Saturn Jack Up

DATALOG Technology Ltd. UK 2005-2008

24 Mudlogging services with own units OMV Petrom; Ascent Resources; 2008-now in progress

Page 15: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

• For the achievement of the goals and objectives, established through the contract and the company status, DRILLING & WORKOVER DIVISION management aims to consolidate the leader position in performing drilling & work over services and other special operations at the oil, gas and water wells and also as a reliable partner for its traditional clients from the country and from abroad. In this meaning, we aim to act for:

• Anticipation and fulfilment of the client’s requirements, as well as overcoming their expectations each time.

• Permanent improvement of the working way in order to deliver the best products and services, fast and with efficient costs compared to those of our competitors.

• For that matter we promote a quality policy that aims:

• Process management, focusing on results and permanent improvement, with accent on the client-supplier relationship.

• Measuring and monitoring the satisfaction degree of our clients, regarding the products/services that we give, thus being always prepared to act towards the increasing of their satisfaction.

Quality Policy Statement

Page 16: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

Strengths

• Strong relationship with our customers.• Highly professional, competent and motivated staff.• Perform quality drilling, workover and oilfield services at competitive prices.• Sustainable policy of investments to upgrade the rigs and related equipment.• ISO 9001, ISO 14001 and OHSAS 18001 certification.

Page 17: Upstream Business Unit ROMPETROL DRILLING & WORKOVER 2010 1.

Drilling & Workover Division

• To continue and develop the relationship with the traditional clients, making efforts to continuously improve our performance;

• To earn new clients through our excellent performance, quality and safe services;

• To upgrade our fleet with new rigs, in order to satisfy the market demands.

Future Plans