Workover Safety

download Workover Safety

of 18

Transcript of Workover Safety

  • 7/28/2019 Workover Safety

    1/18

    Workover Safety

    David Calvert, True Oil Enterprises Inc

  • 7/28/2019 Workover Safety

    2/18

    December 4 -5, 2012

    SAFETY..Safe operating practices and procedures are vitalin the drilling business because the work is hazardous,

    involving massive machinery, heavy tools and great physical

    strength.

    Yesterday Today

  • 7/28/2019 Workover Safety

    3/18

    December 4 -5, 2012

    Squeezing Cement

    Acidizing

    Wireline

    Casing Running or Pulling

    Snubbing Operations

    Workover Operations Safety

  • 7/28/2019 Workover Safety

    4/18

    December 4 -5, 2012

    Squeezing Cement

    A remedial cementing operation

    designed to force cement into leak pathsin wellbore tubular. The required

    squeeze pressure is achieved by

    carefully controlling pump pressure.

    Squeezing is performed to:

    1. repair poor primary cement jobs

    2. isolate perforations

    3. repair damaged casing or liner

    Formation

    Casing

    Mud Slurry

  • 7/28/2019 Workover Safety

    5/18

    December 4 -5, 2012

    Pressure is the main concern. Squeezing cement can require

    pressures that may supersede equipment used from the well

    service company.

    Care needs to be given to ensure all connections and equipment

    ratings are known and tested.

    Cement dust from the mixing process is an irritant. Proper PPE

    should be considered.

    Wet cement should be washed off of oneself ASAP.

    Wet cement in the eyes will cause serious if not permanent

    damage.

    Squeezing Cement Safety Concerns

  • 7/28/2019 Workover Safety

    6/18

    December 4 -5, 2012

    Acidizing

    The pumping of acid into the wellbore to remove near-well formationdamage and other damaging substances.

    This procedure commonly enhances production by increasing theeffective well radius.

    When performed at pressures above the pressure required tofracture the formation, the procedure is often referred to as acidfracturing.

  • 7/28/2019 Workover Safety

    7/18

    December 4 -5, 2012

    Same as Cementing J ob.

    Can be spotted in the well bore with no additional pressure required.

    Squeezing acids adds a whole new level of danger due to the risk fromfailure of equipment due to increased pressure.

    Also types of acid used can be very corrosive to the human body ifcontacted.

    Great degree of attention needs to be used in PPE selection

    Acidizing Safety Concerns

  • 7/28/2019 Workover Safety

    8/18

    December 4 -5, 2012

    Wireline

    Wireline - a cable conveyancetechnology where a current issent to downhole tools in oilwell exploration andcompletions.

  • 7/28/2019 Workover Safety

    9/18

    December 4 -5, 2012

    Many incidents were related to dropped tool strings resulting from pullingthe tool string into the top sheave or stuffing box causing the wire to part

    and while laying tools down.

    When the dropped tool string is contained within the well bore/lubricator,there is little risk to personnel.

    However, when it is dropped prior to being inserted into the lubricator orwell bore, there is the potential for serious or fatal injury to personnel.

    Significant underlying causes of the incidents were failures orinadequacies in:

    Risk Assessment Training and Competence Supervision Communication

    Wireline

  • 7/28/2019 Workover Safety

    10/18

    December 4 -5, 2012

    Perforating is the most dangerous wireline operation because of

    the use of explosives.

    Guns have gone off prematurely killing workers.

    High risk tool entrapment causing wireline parting.

    Well blow out after perforating due to inadequate/improper testing

    of or not using a lubricator

    Wireline operator dropping tool strings on floor when laying

    down or picking up

    Wireline Safety Concerns

  • 7/28/2019 Workover Safety

    11/18

    December 4 -5, 2012

    Steel pipe cemented in place during

    the construction process to stabilizethe wellbore to:

    prevent the formation wall fromcaving into the wellbore

    isolate the different formations toprevent the flow or cross flow offormation fluid

    provide a means of maintainingcontrol of formation fluids and pressureas the well is drilled.

    Casing Running or Pulling

  • 7/28/2019 Workover Safety

    12/18

    December 4 -5, 2012

    Odd pipe sizes make it an unusual operation on a workover rig.

    Cutting and pulling casing can subject the rig structure to high hookloads.

    Special care needs to taken to ensure weight indicators are properlycalibrated

    Workers should not be on the floor during excessive pulling operations.

    Casing Running or Pulling Safety Concerns

  • 7/28/2019 Workover Safety

    13/18

    December 4 -5, 2012

    The act ofpushing drill pipe into the wellbore when theblowout preventers (BOPs) are closed and pressure iscontained in the well.

    In ordinary operations, the pipe falls into the wellboreunder its own weight, and no additional downward force

    or pushing is required.

    In snubbing operations, the pressure in the wellboreacting on the cross-sectional area of the tubular canexert sufficient force to overcome the weight of the drill

    string, so the string must be pushed (or "snubbed") backinto the wellbore.

    Snubbing

  • 7/28/2019 Workover Safety

    14/18

    December 4 -5, 2012

    Snubbing Unit can be tall so

    the potential for falling parts orworkers are possible issues.

    Operations are done with thewell under pressure.

    Always need good supervision.

    Snubbing Safety Concerns

  • 7/28/2019 Workover Safety

    15/18

    December 4 -5, 2012

    We have come a long way from Yesterday

    Torpedoes of dynamite used to extinguish a well

    http://www.sjvgeology.org/history/lakeview/torpedos_tn.jpghttp://www.sjvgeology.org/history/lakeview/torpedos_tn.jpghttp://www.sjvgeology.org/history/lakeview/torpedos_tn.jpg
  • 7/28/2019 Workover Safety

    16/18

    December 4 -5, 2012

    REMEMBER..

    No job is so important

    No service is so urgent

    that we cannot take time to perform our work safely.

  • 7/28/2019 Workover Safety

    17/18

    December 4 -5, 2012

    Im ready to worksafe.

    Hello..Is anyone there?

  • 7/28/2019 Workover Safety

    18/18

    December 4 -5, 2012

    Questions?