University of Florida
Introduction
• About University of Florida
• Intent and Background on the Project
• UF Green and Growing
University of Florida
University of FloridaGainesville, FL
University of FloridaLake Nona
City within a City
Who We Are?
Facts About University of Florida
• ~ 51,000 students
• 8,100 staff
• 4,350 faculty
• 2,000 Acres
• Approximately 1,750 buildings on campus and across State of Florida
• Over 24M GSF of buildings
• 388 acres of conservation land
Facilities Planning and Construction
• Capital Construction Program• Project Management (Major & Minor)• Master Planning (Campus Master Plan)• Strategic Planning• Space Planning• LEED Program • Facility Data Reporting (Space Productivity, UF Stars)• Mapping, GIS, GPS (Campus Map, Carbon Footprint)• Grant and Fundraising Support• Lease and Easement Support
What is our Motivation?
People
Planet Savings
Project Locations
• 1999 - integrated sustainable building • 2001 - adopted LEED • 2006 - Silver• 2009 - Gold• 2015 - Platinum
UF at Lake NonaHow it started
Back in 2008, the University of Florida announced plans to locate an academic and research facility at Lake Nona Medical City. The 115,000 square-foot facility was completed in phases in Summer and Winter of 2012. This facility is located next to the Sanford-Burnham Medical Research Institute at Lake Nona.So.. .This will change to just two pictures Planning and > construction photos
Background• Closer to other institutions• Create collaborative efforts• Bring mix of science to the
community• Advance programs at UF
How it started• Work with Tavistock Group as
they were developing the area• Kick off research and
technology for their master plan• Bring Sanford-Burnham
Institute to Florida• Burnham required UF presence
next door as part of the agreement
Intents... which would enable the university to have direct collaboration opportunities with Sanford-Burnham Institute’s top scientists.
Here we need a picture of some type of collaboration....
Initial Planning• Auditorium & Atrium Picture• Food Services• Pathway from SBI to UFRAC
Picture• Facilities utilization• Flexibility and adaptability• LEED Platinum
Design Concepts• East side Academic Wing program was clear• West Side laboratory Wing Unknown occupants
Design startedWest Wing - Laboratories• 1st level – CDDC• 2nd level – Unknown• 3rd Level – Unknown• 4th Level - COP
Design EvolvedWest Wing - Laboratories• 1st level – IOA, CTSI• 2nd level – COM• 3rd Level – COM• 4th Level - COP
Budget Challenges• $54M Project Budget• $44M Construction
Donor $1MState $32MUFRF $18COP, IOA, CTSI $3M
Closing Statement