Turvey Retirement Village finals.pdf · retirement. The Retirement Village will be built and...

4

Transcript of Turvey Retirement Village finals.pdf · retirement. The Retirement Village will be built and...

Page 1: Turvey Retirement Village finals.pdf · retirement. The Retirement Village will be built and operated by IVG. Planning permission was granted for a Retirement Village on the site
Page 2: Turvey Retirement Village finals.pdf · retirement. The Retirement Village will be built and operated by IVG. Planning permission was granted for a Retirement Village on the site
Page 3: Turvey Retirement Village finals.pdf · retirement. The Retirement Village will be built and operated by IVG. Planning permission was granted for a Retirement Village on the site

Turvey Retirement Village Development Scheme

the site

Welcome to the consultation on the proposals being put forward for the development of the Turvey Retirement Village.

The proposals are put forward by Inspired Villages Group (IVG) who are one of the leading operators in the UK for providing senior living retirement. The Retirement Village will be built and operated by IVG.

Planning permission was granted for a Retirement Village on the site in 2011 and the detailed design was subsequently approved in 2014.

The scheme, however, is now ‘out of date’ and does not reflect current senior living care requirements. IVG are now refining the proposals to

reflect the current care delivery model and to provide a modern, bespoke development.

Page 4: Turvey Retirement Village finals.pdf · retirement. The Retirement Village will be built and operated by IVG. Planning permission was granted for a Retirement Village on the site

Indicative Master Plan for Care Village

In particular the scheme will:• Provide a range of purpose designed, high quality apartments suited to lifetime living;

• Provide additional wellness facilities to the scheme that will include a sauna, steam room, gym and a fitness studio which will also be available to be used by local residents over the age of 65.

• Provide a bistro dining and bar and social area,which will also be available to be used by local residents;

• Provide onsite hairdresser / beauty salon, which will also be available to be used by local residents;

• Work with local GP’s to provide onsite care;• Create full time and part time jobs;• Highway improvements to Bedford Road through improvements to road markings and signage;

• Enhance links to the village by improving the existing public right of way that runs from the site and connects to Turvey through the countryside.

The master plan has evolved over time and has been informed by discussions with Council Officers and a range of technical assessments. When built, the development will provide both high quality residential accommodation and a broad range of facilities for both its residents and also the existing community of Turvey Station and Turvey.

Elevation along East Site Road

Elevation from the East higher adjacent �eld

Gable & East Village Core Square Elevation at Main Entrance North Village Core Square Elevation at Main Entrance North Court Elevation on South Wing

© Copyright Inspired Villages Group

P R E L I M I N A R YVillage Core - Neighbourhood Plan - Selected ElevationsTurvey Station Care VillagesInspired Villages GroupScale: 1:100@A0 Date: March 2019 Drawn/Checked: SC/MC Drg No: 2723_VC_010 Rev: -

Copyright © Tyack Architects Ltd

Tyack Architects Ltd The Mann InstituteOxford Street Moreton-in-Marsh Gloucestershire, GL56 0LA

t: 01608 650 490 f: 01608 651 863e: [email protected] w: tyackarchitects.com

This drawing has been prepared for workstages up to planning application purposes only and is not intended “for construction”. The ‘scale bar’ should only be used to check the drawing has been reproduced to the correct size. No responsibility can be accepted for errors made by others in “scaling” from this drawing.

Tyack Architects Ltd own copyright of the original design work in the drawings, documents and digital �les which cannot be copied, loaned or disclosed without written agreement. Please refer to our Standard Terms of Business.

Planning

Elevation along East Site Road

Elevation from the East higher adjacent �eld

Gable & East Village Core Square Elevation at Main Entrance North Village Core Square Elevation at Main Entrance North Court Elevation on South Wing

© Copyright Inspired Villages Group

P R E L I M I N A R YVillage Core - Neighbourhood Plan - Selected ElevationsTurvey Station Care VillagesInspired Villages GroupScale: 1:100@A0 Date: March 2019 Drawn/Checked: SC/MC Drg No: 2723_VC_010 Rev: -

Copyright © Tyack Architects Ltd

Tyack Architects Ltd The Mann InstituteOxford Street Moreton-in-Marsh Gloucestershire, GL56 0LA

t: 01608 650 490 f: 01608 651 863e: [email protected] w: tyackarchitects.com

This drawing has been prepared for workstages up to planning application purposes only and is not intended “for construction”. The ‘scale bar’ should only be used to check the drawing has been reproduced to the correct size. No responsibility can be accepted for errors made by others in “scaling” from this drawing.

Tyack Architects Ltd own copyright of the original design work in the drawings, documents and digital �les which cannot be copied, loaned or disclosed without written agreement. Please refer to our Standard Terms of Business.

Planning

Indicative master plan drawing North Court Elevation

on South WingNorth Village Core Square Elevation at main entrance

Elevation along East site Road

North

3

2

1 2

13