Trulift presentation

63
Tru-lift: summary Self lifting, core forming system Formwork: Tru beams Faced with 19mm high quality plywood Backed by twin steel channel walers Proven, robust and efficient Designed for: Speed: forming up to 5m in a single lift Minimising construction cycle times Maximising safety

description

Trulift presentation

Transcript of Trulift presentation

Page 1: Trulift presentation

Tru-lift: summary Self lifting, core forming system

Formwork: Tru beams

• Faced with 19mm high quality plywood

• Backed by twin steel channel walers

Proven, robust and efficient

Designed for:

• Speed: forming up to 5m in a single lift

• Minimising construction cycle times

• Maximising safety

Page 2: Trulift presentation

System characteristics

• 4.1 m Stroke on long cylinder.

• 0.9m Stroke on small extension cylinder.

• Power supply 230v single phase 60 Hz.

• Maximum allowable working load on form support brackets = 155kN.

• Maximum allowable working load on cylinder brackets = 289kN.

• Taper Ties = 150kN (with FOS 2:1).

• Platform loading = 1.2kN/m2.

Page 3: Trulift presentation

Features & Benefits (1) • Complete system raised during the

lifting cycle MAXIMISING SYSTEM EFFECTIVENESS

• All sizes of core walls can be accommodated MAXIMISING SYSTEM VERSATILITY

• Controlled lifting of equipment using hydraulics ELIMINATING CRANAGE & MAXIMISING SAFETY

• Fully boarded working platform ENSURES SAFE WORKING AREA

• Trailing platforms allow access to previous pours MAXIMISING EFFICIENCY, ELIMINATING THE NEED FOR INDEPENDENT ACCESS SYSTEMS

Page 4: Trulift presentation

Features & Benefits (2)

• Minimal number of components ensures quick and easy erection MAXIMISING CONSTRUCTION CYCLE TIMES

• Unique striking corners QUICK AND EASY RELEASE OF FORMWORK

• Concrete placement from top platform MAXIMISING SAFE WORKING PRACTICES

• Reusable tapered tie system MINIMISING HARDWARE COSTS

• External panels supported from overhead beams SAFE ACCESS FOR PANEL CLEANING AND REBAR FIXING

Page 5: Trulift presentation

Raised position

• Forms fully extended to

subsequent pour position.

• Wall support brackets bolted to inserts cast in previous pour.

• Weight of system transferred to wall support brackets.

Page 6: Trulift presentation

Setting position

• Bolts securing cylinder brackets to wall

removed.

• Cylinder and bracket retracted and bolted to inserts cast in previous pour.

• Internal forms cleaned and reset into position.

• External forms cleaned whilst retracted.

Page 7: Trulift presentation

Pouring position

• External forms rolled back into

pouring position.

• Ties and external yokes installed.

• Concrete placed through hinged hatches on top platform.

Page 8: Trulift presentation

Safety features

Page 9: Trulift presentation

Safety: handrails

Full perimeter handrails for areas, including:

• Upper platforms.

• Lower platforms.

• Internal hanging platforms.

Page 10: Trulift presentation

Safety: Perimeter Screen

• Fully enclosed system.

• Welded loops for securing screen to perimeter framework.

• Screen:

• Reinforced PVC sheeting.

• Strong and puncture resistant.

• UV stabilised.

• Fully printable.

• Ideal for advertising.

• Optional.

Page 11: Trulift presentation

Safety: enclosed ladders

Full ladder access between platforms.

• Easy and safe accessibility at all times.

Page 12: Trulift presentation

Safety: inbuilt stair access

• Modular stair access tower system.

• Supported off internal platforms.

• Length of tower determined by

floor level egress/ingress required.

• Optional.

Page 13: Trulift presentation

Safety: Working Platforms

Safe, level working environment created using timber beams and plywood.

• Minimises trip hazards.

• Fully covered work areas.

• Ply hatches for concrete placement.

Page 14: Trulift presentation

Outer Corner Assembly

• External corners easily tied between

yoke blocks, using fast thread ties.

• Yoke blocks bolted to horizontal channel walers.

Page 15: Trulift presentation

Inner Corner Assembly

Corner pin used to strike internal forms:

• Drives through offset holes and reversed for ‘reset’.

Page 16: Trulift presentation

Trolley

• Designed to roll along lower flange of

overhead beam.

Supports the external form using threaded rod

for vertical adjustment.

Attached to brackets bolted to Tru Beams.

Page 17: Trulift presentation

Internal form hanging bracket

• Adjustable form support bracket head

and clamp plates bolted into wall

support frame.

• Facilitates the connection to the

overhead primary beam.

Page 18: Trulift presentation

Internal Corners

• Rigid, flexible and strippable corners

(depending on core profile).

• Where possible, flexible corners used in

conjunction with corner pins.

• Eliminates need to dismantle forms.

Page 19: Trulift presentation

Wall Bracket Assembly

• Brackets bolted into inserts cast in

previous pour.

• Connected to wall support frame,

supporting formwork once in lifted

position.

• Finite adjustment for levelling using

Threaded Bar (if required).

Page 20: Trulift presentation

Jack Bracket

• Supports and houses hydraulic cylinder.

• Bolted into inserts cast in previous pour.

• Supports the formwork system during

lifting sequence.

• Remain fixed to hydraulic cylinder

during retraction and relocation.

Page 21: Trulift presentation

Walkway Bracket

• Bolted to overhead beam system.

• Hanging below the bottom of the

formwork system.

• Facilitates retracting of forms, steel

reinforcement fixing and cleaning of

forms.

• Designed to be used in conjunction with

timber beams and plywood.

• Creating a level and hazard free working

platform.

Page 22: Trulift presentation

Internal Trailing Platform

• Supported from overhead steel beams.

• Provide safe access for operatives.

Page 23: Trulift presentation

Ducab EHV, UAE

155m

Page 24: Trulift presentation

Ducab EHV, UAE

Page 25: Trulift presentation

340 N. LaSalle Chicago, IL.

60 Floors

Page 26: Trulift presentation

J.W. Marriott Hotel Indianapolis, IN.

33 Floors

Page 27: Trulift presentation

The Revel Atlantic City, N.J.

65 Floors

Page 28: Trulift presentation

Queen City Square Cincinnati, OH.

47 Floors

Page 29: Trulift presentation

Trump Tower Chicago, IL.

95 Floors

Page 30: Trulift presentation

The Echelon Las Vegas, NV.

Page 31: Trulift presentation

Ducab VCV tower, Dubai - UAE

Project: Ducab-HV (400kV) Cable Factory - 1st Facility of it’s kind - Fast Track (12 month program) Sector: Industrial Details: RC Tower - 24 x 22m footprint - 44 storey – 153m high - Unique – large core structure, large openings, changing wall thickness Contractor: Khansaheb Civil Engineering

Page 32: Trulift presentation

Ducab VCV tower

Page 33: Trulift presentation

Ducab VCV tower

Page 34: Trulift presentation

Shutter assembly

Pre-assembly of many components greatly reduces the set up time onsite and can be started well in advance of the site being ready to install the formwork.

Page 35: Trulift presentation

Shutter assembly Pre-assembly of the formwork is carried out using fabrication jigs and can also be done well in advance of the actual site set up (on or off site).

Page 36: Trulift presentation

Shutter assembly

In some cases, by prior arrangement, the fabrication of the formwork panels can be assembled off site, then transported to site fully assembled and ready to install. This can save space on congested work sites.

Page 37: Trulift presentation

Shutter assembly

Larger panels that are too big to be transported by road can be assembled on site.

Page 38: Trulift presentation

Set Up

The formwork panels are then prepared and oiled prior to lifting into position.

Page 39: Trulift presentation

Set Up

The Internal Rigid Boxes are installed first and fixes the internal shape/dimensions of the core – this is a unique feature of the Tru-lift Self Climbing Formwork System.

Page 40: Trulift presentation

Set Up The Steel Walers are easily spliced to any length enabling very large panels such as this 4.2m high x 20m long panel to be fabricated and lifted into position in one piece.

Page 41: Trulift presentation

Set Up

Page 42: Trulift presentation

Set Up

Page 43: Trulift presentation

Set Up On completion of the rebar and formwork installation the steel grid beams are positioned.

Page 44: Trulift presentation

Set Up

Page 45: Trulift presentation

Set Up

Bolts and Grid Plates are used for the connections between the grid beams, the Formwork and Hydraulics.

Page 46: Trulift presentation

Set Up Top Decking and Edge Protection are added upon completion of the Grid Beam placement.

Page 47: Trulift presentation

Operation The Tru-lift Self Climbing System is operated from a central control room. Each of the Hydraulic Rams can be controlled individually or collectively with the flick of one switch.

Page 48: Trulift presentation

Operation The Tru-lift Self Climbing System is generally mounted to the walls of the first pour. However if the customer would prefer, it can be designed to form the first pour and push off the base slab as was done on this particular project.

Page 49: Trulift presentation

Operation The Tru-lift Self Climbing System is truly unique in that the whole system is jacked in one Jack stroke, eliminating the need for resetting the hydraulics throughout the lift saving a great deal of time. On this particular project the 3.8m typical floor height was easily accommodated by jack stoke and capacity.

Page 50: Trulift presentation

Operation The Tru-lift Self Climbing System is to be used to form the first pour. The Hydraulic Rams should be prevented from movement by setting brackets around the bottom of it into the base slab.

Page 51: Trulift presentation

Operation

External Hanging access brackets are added on the initial lifts until the desired length is achieved.

Page 52: Trulift presentation

Operation

Suspended access scaffolds can also be accommodated as seen here from below.

Page 53: Trulift presentation

Operation

Page 54: Trulift presentation

Operation

Rebar cages can be prefabricated and craned into position to speed up the cycle times if desired.

Page 55: Trulift presentation

Operation When the setup is complete the Tru-lift self climbing system is operated completely independently, without the need for a crane to handle the Formwork and easily out performs traditional Jump form systems.

Page 56: Trulift presentation

Operation The contractor using the Tru-lift System on this particular project was able to achieve a pour cycle of just 48 hours with 1,100m2 of formwork being jacked in 20-30 minutes.

Page 57: Trulift presentation

Dismantle

Upon completion of the structure the system is dismantled in the reverse order to that of the erection. The Hanging access platforms are removed first.

Page 58: Trulift presentation

Dismantle Followed by the external formwork.

Page 59: Trulift presentation

Dismantle Next the top decking is systematically removed.

Page 60: Trulift presentation

Dismantle

Page 61: Trulift presentation

Dismantle

The final step is the removal of the internal formwork and wall brackets.

Page 62: Trulift presentation

Methods

Detailed method statements are provided for assembly, erection, running and dismantle of the system. Site supervision is provided at all stages of the contract.

Page 63: Trulift presentation

RMD Australia - Tru-lift Self lifting, core forming system