TRAFFIC IMPACT STUDY FOR THE PROPOSED RENAISSANCE EAST PROJECT IN THE CITY OF RIALTO Prepared by: Kimley-Horn and Associates, Inc. 765 The City Drive, Suite 200 Orange, California 92868 August 2017

Transcript of TRAFFIC IMPACT STUDY FOR THE PROPOSED RENAISSANCE … · Level of Service Standards and Measure of...

  • TRAFFICIMPACTSTUDYFORTHEPROPOSED

    RENAISSANCEEASTPROJECTINTHECITYOFRIALTO

    Preparedby:

    Kimley-HornandAssociates,Inc.765TheCityDrive,Suite200

    Orange,California92868

    August2017

  • TABLEOFCONTENTSPage

    I. INTRODUCTION ........................................................................................................................... 1A. PurposeandObjectivesoftheStudy ...................................................................................... 1B. SitePlanLocationandStudyArea .......................................................................................... 1C. DevelopmentProjectIdentification ........................................................................................ 3D. DevelopmentProjectDescription ........................................................................................... 3E. AnalysisMethodology ............................................................................................................. 5

    1. Intersection Analysis – HCM Methodology .......................................................... 52. Level of Service Standards and Measure of Significance ...................................... 5

    II. AREACONDITIONS ...................................................................................................................... 8A. Identify Study Area and Intersections........................................................................................ 8B. DescriptionofExistingRoads,TrafficControlsandIntersectionGeometrics ....................... 9C. ExistingTrafficVolumes ....................................................................................................... 12D. ExistingDelayandLevelofService ...................................................................................... 15E. GeneralPlanCirculationElement ......................................................................................... 15F. TransitService ...................................................................................................................... 19

    III. PROJECTEDFUTURETRAFFIC .................................................................................................. 19A. ProjectTraffic........................................................................................................................ 19

    1. Project Trip Generation ...................................................................................... 192. Trip Distribution and Assignment ...................................................................... 21

    B. ExistingPlusGrowthPlusProjectTraffic(OpeningYear2018) .......................................... 211. Ambient Growth Rate ........................................................................................ 252. Opening Year 2018 Existing Plus Growth .......................................................... 253. Opening Year 2018 Existing Plus Growth Plus Project ....................................... 25

    C. CumulativeConditions(ExistingPlusGrowthPlusCumulativeProjects) ........................... 311. Cumulative Projects ........................................................................................... 312. Background Growth Rate ................................................................................... 313. Cumulative Projects Trip Generation.................................................................. 354. Cumulative Projects Trip Distribution and Assignment ...................................... 355. Opening Year 2018 Cumulative Without Project Conditions .............................. 356. Opening Year 2018 Cumulative Plus Project Conditions .................................... 40

    IV. MITIGATIONMEASURES ........................................................................................................... 44A. IntersectionImprovements .................................................................................................. 44B. RoadwayImprovements ....................................................................................................... 44C. SignificantImpacts–OtherImprovements .......................................................................... 44

    V. FINDINGSANDRECOMMENDATIONS....................................................................................... 46A. Improvements ....................................................................................................................... 46B. TrafficSignalWarrantAnalysis ............................................................................................ 46C. SiteCirculation ...................................................................................................................... 46D. SafetyandOperationalImprovements ................................................................................. 47E. FairShareCalculations ......................................................................................................... 47F. SpecificPlanSignalization .................................................................................................... 47G. GeneralPlanConformance ................................................................................................... 47H. RegionalFundingMechanisms ............................................................................................. 47

  • APPENDICES

    APPENDIXA: APPROVEDSCOPINGAGREEMENTAPPENDIXB: TRAFFICCOUNTDATASHEETSAPPENDIXC: PCEWORKSHEETSAPPENDIXD: INTERSECTIONANALYSISWORKSHEETSAPPENDIXE: CUMULATIVEPROJECTSINFORMATION

  • LISTOFFIGURES

    PageFigure1–VicinityMap ................................................................................................................................ 2Figure2–ProjectSitePlan .......................................................................................................................... 4Figure3–ExistingLaneConfigurationandTrafficControl ...................................................................... 10Figure4–StreetSection–AyalaDrive ..................................................................................................... 11Figure5–StreetSection–RenaissanceParkway ..................................................................................... 13Figure6–ExistingDailyandPeakHourTrafficVolumes ......................................................................... 14Figure7–RenaissanceSpecificPlanAmendmentVehicularCirculationPlan ......................................... 18Figure8–ProjectTripDistribution .......................................................................................................... 22Figure9–Project-RelatedTrafficVolumes............................................................................................... 23Figure10–OpeningYear2018LaneConfigurationandTrafficControl ................................................. 24Figure11–OpeningYear2018–ExistingPlusGrowthTrafficVolumes ................................................. 26Figure12–OpeningYear2018–ExistingPlusGrowthPlusProjectTrafficVolumes............................. 27Figure13–LocationofCumulativeProjects ............................................................................................. 34Figure14–CumulativeProjectsTrafficVolumes ..................................................................................... 36Figure15–OpeningYear2018CumulativeWithoutProjectTrafficVolumes ........................................ 37Figure16–OpeningYear2018CumulativePlusProjectTrafficVolumes ............................................... 41

    LISTOFTABLESPage

    Table1–SummaryofIntersectionOperation–ExistingConditions ....................................................... 16Table2–SummaryofRoadwayAnalysis–ExistingConditions .............................................................. 17Table3–SummaryofProjectTripGeneration ......................................................................................... 20Table4–SummaryofIntersectionOperation–OpeningYear2018–ExistingPlusGrowth .................. 28Table5–SummaryofRoadwayAnalysis–OpeningYear2018–ExistingPlusGrowth ......................... 29Table6–SummaryofIntersectionOperation–OpeningYear2018–Existing+GrowthPlusProject .. 30Table7–SummaryofRoadwayAnalysis–OpeningYear2018–Existing+Growth+Project............... 32Table8–SummaryofCumulativeProjects ............................................................................................... 33Table9–SummaryofIntersectionOperation–OpeningYear2018CumulativeWithoutProject ......... 38Table10–SummaryofRoadwayAnalysis–OpeningYear2018CumulativeWithoutProject .............. 39Table11–SummaryofIntersectionOperation–OpeningYear2018CumulativePlusProject ............. 42Table12–SummaryofRoadwayAnalysis–OpeningYear2018CumulativePlusProject ..................... 43Table13–SummaryofIntersectionOperationswithImprovements–OpeningYear2018Cumulative

    PlusProject ........................................................................................................................................ 45

  • RenaissanceEast -1- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    TRAFFICIMPACTSTUDYFORTHEPROPOSED

    RENAISSANCEEASTPROJECTINTHECITYOFRIALTO

    I. INTRODUCTIONA. PurposeandObjectivesoftheStudy

    This Traffic Impact Study has been prepared to address the traffic-related impacts of theproposedRenaissanceEastprojectintheCityofRialto.ThistrafficstudyhasbeenconductedinaccordancewiththetrafficstudyrequirementsoftheCityofRialto,basedon theCity’sTraffic ImpactAnalysisReportGuidelinesandRequirements(Date:December2013),and inaccordancewithSanBernardinoAssociationofGovernments(SANBAG)CongestionManagementProgram(CMP)requirements.Thisstudyaddressesexistingandshort-termfuturetrafficconditions,taking intoaccounttheproject trips to be generated by the project and potential project-related impacts on thesurroundingcirculationsystem.Thisreportincludesadescriptionofexistingtrafficconditionsinthesurroundingarea,estimatedproject trip generation anddistribution, future traffic growth, and an assessmentofproject-related impactson the roadwaysystem. Wherenecessary, circulationsystem improvementshavebeenidentifiedtoachieveacceptableintersectionoperationinthevicinityoftheproject.Theprojectwillbeevaluatedforthefollowingconditions:· ExistingConditions· OpeningYear2018–ExistingPlusGrowth· OpeningYear2018–ExistingPlusGrowthPlusProject· OpeningYear2018Cumulative–WithoutProject· OpeningYear2018Cumulative–WithProjectB. SitePlanLocationandStudyAreaTheprojectislocatedinthenorth-westernareaoftheCityofRialto,andisshowninitsregionalsettingonavicinitymaponFigure1.Theprojectsite(approximately7.7acres)isboundedbytheStateRoute210(SR-210)eastboundon-ramptothenorth,RenaissanceParkwaytothesouth,residentialusestotheeast,andAyalaDrivetothewest.TheprojectsiteislocatedwithintheRenaissanceSpecificPlanarea.

  • N Ayala D

    r

    N Linden Ave

    Alder Ave

    Sierra Ave

    Citrus Ave

    N C

    edar Ave

    N R

    iverside Ave

    N Pepper Ave

    Historic U.S. 66

    Baseline Rd

    Merrill Ave

    Randall Ave

    Foothill Fwy

    Arrow Blvd

    San Bernardino Ave

    Highland Ave

    Locust Ave

    Foothill Blvd

    Linden Ave

    Casmalia St

    Miro Way

    Cactus Ave

    Renaissance Pkwy Easton St

    Historic Route 66

    - 2 -

    PROJECTSITE

  • RenaissanceEast -3- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    C. DevelopmentProjectIdentification

    Pending

    D. DevelopmentProjectDescriptionTheprojectwill involve theconstructionofa108-roomhotelon theeastendof thesite, twobuildings for retailuse totaling9,100square feet, two fast-food restaurantbuildings totaling7,620squarefeet,anda9,170-square-footrestaurantbuildingonthewestendofthesite.AcopyoftheprojectsiteplanisprovidedonFigure2.VehicularaccessprovisionsfortheprojectsitewouldconsistofthreedrivewaysonRenaissanceParkway. All three driveways on Renaissance Parkway would restrict left turns out of thedriveway.Allentrancestothesitewouldbeunsignalized.Aspartoftheproject,theeastlegattheintersectionofAyalaDriveatRenaissanceParkwaywillbere-constructedtoincludetwoleft-turnlanes,twothroughlanes,andonededicatedright-turnlane.Inaddition,theroadwaysegmentofRenaissanceParkwayfromAyalaDrivetotheproject’seasternboundarywillbewidenedtofourlanes.Theseimprovementswillbeconstructedbeforetheprojectsiteisconstructed.TheproposedopeningyearfortheprojectisYear2018.Theprojectwillbedevelopedinasingleprojectphase.Theprojectsiteislocatedapproximately1½-milesfromtheCityofRialto’sborderwiththeCityofFontana.The site is locatedwithin theRenaissance Specific Plan,which is located generally betweenCasmaliaStreetonthenorth,BaselineRoadonthesouth,AyalaDriveontheeast,andTamarindandPalmettoAvenuesonthewest.TheRenaissanceSpecificPlanareacovers1,445acres,with81separatePlanningAreas,and isapproved for avarietyof landuses, including residential,commercial,industrial,andemploymentuses.TheSpecificPlanwasapprovedforbuild-outinthreeseparatephases,overa20-yearperiod.TheRenaissanceSpecificPlanevaluatedarangeoflandusedensitiesandcorrespondingtripsgeneratedbytheimplementationofdesignatedlanduseswithintheSpecificPlanboundariesthroughbuild-out.AnamendmenttotheSpecificPlanwasapprovedinDecember,2016.TheRenaissanceSpecificPlanAmendment(RSPA)includesanumberofchangesto,amongotherthings,theVehicularCirculationPlanandtheTruckRoutePlan.TheRenaissanceEastprojectsiteislocatedwithinPlanningArea29oftheRenaissanceSpecificPlan. The land use designation is Freeway Incubator. The specific floor-to-area-ratio (FAR)assignedtoPlanningArea29was0.25.Theproposedcommercialusesareeitherapermitteduseorneedaconditionaldevelopmentpermitwithinthislandusecategory,andtheproposedFARis0.24.

  • - 4 -

  • RenaissanceEast -5- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    E. AnalysisMethodology1. IntersectionAnalysis–HCMMethodologyPeakhour intersectionoperationsatsignalizedandunsignalizedintersectionswereevaluatedusingthemethodsprescribedintheHighwayCapacityManual(HCM)2010,consistentwiththerequirementsoftheCityofRialtoandtheSanBernardinoCountyCMP.TheCityofRialtoguidelinesrequireanalysisoftrafficoperationstobebasedonthevehiculardelaymethodologiesoftheHCM(TransportationResearchBoardSpecialReport209).TheCitydoesnotdesignateaspecificsoftware tobeused in theanalysis,butallows theuseofoneofseveralsoftwarepackages thatareconsistentwith theHCMmethodologies. The intersectionanalysisfortheproposedprojecthasbeenaccomplishedusingtheVistrosoftwareprogramandusing the specified input parameters outlined in the City’s Traffic Impact Analysis ReportGuidelinesandRequirements.PertheHCMMethodology,LevelofService(LOS)forsignalizedintersectionsisdefinedintermsofaveragevehicledelay,whichprovidesanindicationofdriverdiscomfort,frustration,andfuelconsumption. Specifically, LOS criteria are stated in terms of the average control delay pervehicle for thepeak 15-minuteperiodwithin thehour analyzed. The average controldelayincludesinitialdecelerationdelay,queuemove-uptime,andfinalaccelerationtimeinadditiontothe stop delay. The tables on the following page provide a description of the operatingcharacteristicsofeachLevelofServiceanddefinetheLOSintermsofaveragesecondsofdelayforsignalizedandunsignalizedintersections.2. LevelofServiceStandardsandMeasureofSignificanceTheCityofRialto,pertheCityofRialto2010GeneralPlanUpdate,establishesminimumLevelofServicestandards. AccordingtoPolicy4-1.20oftheGeneralPlandocument,theCityrequiresthatsignalized intersectionsoperateatLOSDorbetterduringthemorningandeveningpeakhours. TheCity’sTrafficStudyGuidelinesrequirenewdevelopment tomitigate impacts thatcausetheLevelofServicetofallbelowLOSD,orthepeakhourdelaytoincreaseasfollows:

    - LOSA/B–by10.0seconds- LOSC –by8.0seconds- LOSD –by5.0seconds- LOSE –by2.0seconds- LOSF –by1.0second

    TheCity’strafficstudyguidelinesrequireunsignalizedintersectionstooperatewithnovehicularmovementhavinganaveragedelayexceeding120secondsduringthemorningandeveningpeakhours.

  • RenaissanceEast -6- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    LEVELOFSERVICEDEFINITIONS

    LevelofService Description

    ANoapproachphaseisfullyutilizedbytrafficandnovehiclewaitslongerthanoneredindication.Typically,theapproachappearsquiteopen,turnsaremadeeasilyandnearlyalldriversfindfreedomofoperation.

    BThisservicelevelrepresentsstableoperation,whereanoccasionalapproachphaseisfullyutilizedandasubstantialnumberareapproachingfulluse.Manydriversbegintofeelrestrictedwithinplatoonsofvehicles.

    CThislevelstillrepresentsstableoperatingconditions.Occasionallydriversmayhavetowaitthroughmorethanoneredsignalindication,andbackupsmaydevelopbehindturningvehicles.Mostdriversfeelsomewhatrestrictedbutnotobjectionablyso.

    D

    Thislevelencompassesazoneofincreasingrestriction,approachinginstabilityattheintersection.Delaystoapproachingvehiclesmaybesubstantialduringshortpeakswithinthepeakperiod;however,enoughcycleswithlowerdemandoccurtopermitperiodicclearanceofdevelopingqueues,thuspreventingexcessivebackups.

    ECapacityoccursattheupperendofthisservicelevel.Itrepresentsthemostvehiclesthatanyparticularintersectionapproachcanaccommodate.Fullutilizationofeverysignalcycleisseldomattainednomatterhowgreatthedemand.

    F

    Thisleveldescribesforcedflowoperationsatlowspeeds,wherevolumesexceedcapacity.Theseconditionsusuallyresultfromqueuesofvehiclesbackingupfromarestrictiondownstream.Speedsarereducedsubstantiallyandstoppagesmayoccurforshortorlongperiodsoftimeduetothecongestion.Intheextremecase,bothspeedandvolumecandroptozero.

    LEVELOFSERVICECRITERIAFORSIGNALIZEDANDUNSIGNALIZEDINTERSECTIONS

    LevelofService

    SignalizedIntersection(Averagedelaypervehicle,

    inseconds)1

    UnsignalizedIntersections(Averagedelaypervehicle,

    inseconds)2

    A <10 0–10

    B >10–20 >10–15

    C >20–35 >15–25

    D >35–55 >25–35

    E >55–80 >35–50

    F >80 >50 1Source:HighwayCapacityManual(HCM2010),Exhibit18-4.

    2Source:HighwayCapacityManual(HCM2010),Exhibits19-1and20-2.

  • RenaissanceEast -7- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    RoadwaySegmentAnalysisTheroadwaysegmentanalysiswilladdresstheproject’simpactondailyoperatingconditionsonroadwaysegmentswithintheprojectvicinity.Roadwaysegmentsareevaluatedbycomparingthetrafficvolumeonaroadwaysegmenttothedailycapacityofthatsegment,todeterminethevolume-to-capacity(v/c)ratio.Dailycapacityisbasedontheroadwayclassification,asshowninthefollowingchart:

    CITYOFRIALTOROADWAYCAPACITY(1)

    RoadwayClassification No.ofLanesTwo-WayTrafficVolume(ADT)(2)

    ServiceLevelC ServiceLevelD ServiceLevelE

    Local 2 2,500-2,799 2,800-3,099 3,100+

    Collector(60'or64') 2 9,900-11,199 11,200-12,499 12,500+

    Industrial(45') 2 9,900-11,199 11,200-12,499 12,500+

    Arterial(3) 2 14,400-16,199 16,200-17,999 18,000+

    SecondaryHighway 4 16,900-19,399 19,400-21,999 22,000+

    ModifiedArterial(100') 4 26,200-29,599 29,600-32,999 33,000+

    Arterial(120') 6 38,700-44,099 44,100-49,499 49,500+

    Notes:(1) Allcapacityfiguresarebasedonoptimumconditionsandareintendedasguidelines

    forplanningpurposesonly(2) Maximum two-wayADT values arebased on the1999ModifiedHighwayCapacity

    ManualLevelofServiceTables.(3) Two-laneroadsdesignatedasfuturearterialsthatconformtoarterialdesignstandards

    forverticalandhorizontalalignmentsareanalyzedasarterials.Source:CityofRialtoTrafficImpactAnalysisReportGuidelinesandRequirements(2013)

  • RenaissanceEast -8- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    II. AREACONDITIONSA. Identify Study Area and IntersectionsThis trafficstudy includesdocumentationofexistingconditions,analysisofcumulative trafficconditions,andidentificationofproject-relatedimpactsatthefollowingstudyintersections:ExistingIntersections:

    1. AlderAvenueatRenaissanceParkway2. LocustAvenueatRenaissanceParkway3. LindenAvenueatRenaissanceParkway4. AyalaDriveatSR-210WestboundRamps5. AyalaDriveatSR-210EastboundRamps6. AyalaDriveatRenaissanceParkway7. AyalaDriveatBaselineRoad8. CactusAvenueatRenaissanceParkway

    FutureDrivewayIntersections:

    D1.RenaissanceParkwayatWestDrivewayD2.RenaissanceParkwayatMiddleDrivewayD3.RenaissanceParkwayatEastDriveway

    Inaddition,thefollowingroadwaysegmentswereanalyzed:

    · RenaissanceParkway:AyalaDrivetoCactusAvenue

    The study locations were established in conjunction with City staff through the ScopingAgreementprocess(ExhibitBoftheCityofRialtoTrafficImpactAnalysisReportGuidelinesandRequirements).AcopyoftheapprovedScopingAgreementisprovidedinAppendixA.

  • RenaissanceEast -9- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    B. DescriptionofExistingRoads,TrafficControlsandIntersectionGeometricsRegionalaccesstothesiteisprovidedprimarilybytheStateRoute210(SR-210)Freeway,justnorthoftheprojectsite.Inaddition,theI-215Freewayislocatedapproximately4.5milestotheeastofthesite;theI-15Freewayisapproximately6milestothewestofthesite,andaccesstotheI-10Freewayisapproximately4.5milestothesouth.Existing laneconfigurationsand intersectioncontrolsatthestudy intersectionsareshownonFigure3.Thefollowingprovidesadescriptionoftheroadwayssurroundingtheprojectsite.AlderAvenue–AlderAvenue iscurrently a four-lanedividedroadway. It isoriented in thenorth-southdirectionandprovidesaccesstotheSR-210Freeway.AlderAvenueisdesignatedasaMajorArterialintheGeneralPlan,withfourtravellanes,abikelaneineachdirection,araisedcentermedian,andsidewalkswithin100feetofright-of-way.AlderAvenueisadesignatedtruckrouteintheCity.LocustAvenue–LocustAvenueiscurrentlyatwo-tofour-laneroadway,orientedinthenorth-southdirection.Within theRenaissance SpecificPlan area,LocustAvenue isdesignated as aSecondaryArterial,whichwouldprovidefourtravellanes,parking/bikelanes,andsidewalkswithin84feetofright-of-way.LocustAvenueisdesignatedasatruckrouteintheCity.LindenAvenue–LindenAvenueiscurrentlyafour-laneroadwaynearthestudyarea,orientedin thenorth-southdirection andonly currentlybuiltnorthofRenaissanceParkway. LindenAvenueisdesignatedasaSecondaryArterial,andwouldprovidetwotravellanes,abikelane,andsidewalk ineachdirectionwithin80 feetofright-of-way. LindenAvenue isadesignatedtruckrouteonlywithintheRenaissanceSpecificPlanArea,withtruckaccessrestrictedtolocaldeliveriesbetweenRenaissanceParkwayandBaselineRoad.AyalaDrive–AyalaDriveiscurrentlyatwo-tofour-lanedividedroadway,whichbordersthewesternprojectfrontage.Itisorientedinthenorth-southdirectionandprovidesaccesstotheSR-210Freeway.AyalaDriveisdesignatedasaSecondaryArterial,withfourtravellanes,bikelanesineachdirection,apaintedorraisedcentermedian,andsidewalkswithin100feetofright-of-way.ThestandardstreetsectionforAyalaDriveintheRenaissanceSpecificPlanAmendmentisshownonFigure4.AyalaDriveisdesignatedasatruckrouteintheCity.

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 10 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    LEGEND:

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    PROJECTSITE

  • - 11 -

  • RenaissanceEast -12- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    RenaissanceParkway–RenaissanceParkwayiscurrentlyafour-laneundividedroadwaywestofAyalaDrive,with left-turn lanes at arterial intersections.EastofAyalaDrive,RenaissanceParkwaytransitionstoatwo-laneundividedroadway.RenaissanceParkwayextendsinaneast-westorientationthroughandbeyondtheboundariesoftheCityofRialto,changingtoHighlandAvenuetothewestandEastonStreettotheeast.RenaissanceParkwayconnectswithseveralnorth-southstreetsthathaveinterchangeswiththeSR-210Freewaytothenorth,andtheI-10Freeway to the south.Renaissance Parkway is designated as aMajorArterial,whichwouldprovidefourtravellaneswithbikelanesandaraisedmedianwithin108feetofright-of-way.ThestandardstreetsectionforRenaissanceParkwayintheRenaissanceSpecificPlanAmendmentisshownonFigure5.RenaissanceParkwayisatruckroutethroughtheRenaissanceSpecificPlanarea,withtruckaccessrestrictedtolocaldeliveriesbetweenLocustAvenueandAyalaDrive.BaselineRoad–BaselineRoadiscurrentlyatwo-tofour-laneroadwaythroughthestudyarea,withleft-turnlanesatarterialintersections.BaselineRoadisdesignatedasaMajorArterialinthe Renaissance Specific Plan,whichwould provide four travel lanes and sidewalk in eachdirectionwithin100 feetofright-of-way.Theultimateconfigurationwillalsoaccommodatearaisedmedian.BaselineRoadisadesignatedtruckrouteintheCity.C. ExistingTrafficVolumesExistingPeakHourTurningMovementVolumesForeachexistingintersectionexceptCactusAvenueatEastonStreet,morningandeveningpeakhourturningmovementvolumeswerecollectedinNovember2016.TheintersectionofCactusAvenue and Easton Street had data collected in July 2017. Copies of the traffic count dataworksheetsareprovidedinAppendixB.

    Intersectioncountdataincludedvehicleclassificationsforpassengervehiclesandtrucks.Vehicleclassifications arenecessary to computePassengerCarEquivalent (PCE)volumes,which areusedinthetrafficanalysistoaddresstheimpactsoftrucktrafficonintersectionandroadwayoperation.ThePCEvolumesweredevelopedbyapplyingaPCEfactorof1.5for2-axletrucks,2.0for3-axletrucks,and3.0fortruckswith4ormoreaxles.ThesefactorsareconsistentwiththeCityofRialto’sTrafficImpactAnalysisGuidelinesandRequirements.PCEvolumeworksheetsareprovidedinAppendixC.ExistingmorningandeveningpeakhourvolumeswiththePCEfactorsappliedarepresentedonFigure6.ExistingRoadwayDailyVolumesExistingdailyroadwayvolumesonRenaissanceParkwayeastofAyalaDriveandwestof theresidentialstreetconnectionswascollectedinJuly2017andincludedvehicleclassification

  • - 13 -

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 14 -

    LEGEND:

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    PROJECTSITE

  • RenaissanceEast -15- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    information.Liketheintersectionvolumes,PCEfactorswereappliedtothetruckvolumes.TheresultingexistingdailytrafficvolumeswithPCEareshownonFigure6.DailytrafficcountdatacollectionworksheetsareprovidedinAppendixB.ComparisonofExistingRoadwayDailyVolumeAtthetimeoftheJuly2017trafficcounts,constructionwasoccurringonRenaissanceParkwaywestofAyalaDrive.TodetermineifthecountdataeastofAyalaDrivecollectedseemstobeavalidrepresentationofexistingvolumesinthearea,thedailyvolumewascomparedtoapreviouscountcollectedonthesameroadwaysegment.ThisJuly2017countwascomparedtothecountcollectedin2015aspartofthetrafficanalysisfortheRenaissanceSpecificPlanAmendment(RSPA).Theexistingdailyvolumeforthisstudywascalculatedtobe6,042;thetrafficstudyfortheRSPAusedanexistingdailyvolumeof5,840.VolumesdonotseemtobesignificantlyaffectedbytheconstructionwestofAyalaDrive.Assuch,thevolumescollectedinJuly2017wereusedwithoutadjustments.D. ExistingDelayandLevelofServicePeak Hour Operating ConditionsIntersectionLevelofServiceanalysiswasconductedforthemorningandeveningpeakhoursusingtheanalysisproceduresandassumptionsdescribedpreviouslyinthisreport.Theresultsof the intersectionanalysis forExistingConditionsareshownonTable1. CopiesofExistingConditionsintersectionanalysisworksheetsareprovidedinAppendixD.ReviewofthistableindicatesthatallstudyintersectionsarecurrentlyoperatingatanacceptableLevelofService.Daily Roadway Operating ConditionsRoadwayLevelofServiceanalysiswasconductedbasedon theroadwaycapacitiespresentedpreviouslyinthisreport.TheresultsoftheroadwayanalysisforExistingConditionsareshownonTable2.ReviewofthistableindicatesthatthestudyroadwaysegmentiscurrentlyoperatingwithinitscurrentLevelofServiceDcapacity.E. GeneralPlanCirculationElement

    The General Plan Circulation Element references the Renaissance Specific Plan for roadwaydesignationsfortheprojectsiteandthesurroundingvicinity.TheoriginalRenaissanceSpecificPlanwasapprovedin2010.Anamendmenttothespecificplan–theRenaissanceSpecificPlanAmendment(RSPA)wasapproved inDecember,2016. AcopyoftheRSPACirculationPlan isprovidedonFigure7.

  • TABLE1SUMMARYOFINTERSECTIONOPERATION

    EXISTINGCONDITIONS

    TrafficControl Delay LOS Delay LOS

    1 AlderAvenueatRenaissanceParkway S 32.7 C 32.6 C2 LocustAvenueatRenaissanceParkway S 34.5 C 32.0 C3 LindenAvenueatRenaissanceParkway S 16.4 B 12.4 B4 AyalaDriveatSR-210WestboundRamps S 15.9 B 10.9 B5 AyalaDriveatSR-210EastboundRamps S 11.1 B 12.5 B6 AyalaDriveatRenaissanceParkway S 30.9 C 30.4 C7 AyalaDriveatBaselineRoad S 17.6 B 19.0 B8 CactusAvenueatEastonStreet U 9.6 A 10.2 B

    AMPeakHour PMPeakHour

    Notes:-BoldandshadedvaluesindicateintersectionsoperatingatLOSEorForsignificantimpacttointersectionperCitystandards.-Atasignalizedintersection,delayreferstotheaveragecontroldelayfortheentireintersection,measuredinsecondspervehicle.-Atatwo-waystop-controlledintersection,delayreferstotheaveragevehicledelayontheworstmovement.-Delayvaluesarebasedonthemethodologyoutlinedinthe2010HighwayCapacityManual.S=SignalizedU=Unsignalized

    IntersectionInt.#

    RenaissanceEastTrafficImpactStudy

    -16- Kimley-HornandAssociates,Inc.

  • RenaissanceParkway AyalaDrivetoCactusAvenue 12,499 6,402 Yes

    Notes:LOS=LevelofServiceADT=AverageDailyTrafficPCE=PassengerCarEquivalent

    TABLE2SUMMARYOFROADWAYANALYSIS

    EXISTINGCONDITIONS

    LOSDCapacity

    LOSDorBetter?SegmentRoadway

    ExistingADT

    w/PCE

    RenaissanceEastTrafficImpactStudy

    -17- Kimley-HornandAssociates,Inc.

  • - 18 -

  • RenaissanceEast -19- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    F. TransitService

    Transitservice to theprojectarea isprovidedvia theOmniTrans transit lines,whichserveanumberofSanBernardinocitiesinthearea.BusstopsintheprojectvicinityarelocatedalongBohnertAvenuetothenorthandBaselineRoadtothesouth. Adescriptionofthebusroutesservingtheprojectareaisprovidedbelow.OmniTransRoute10operatesbetween theCityofFontanaand theCityofSanBernardino,traveling through Rialto along Baseline Road in the project vicinity. Route 10 operates onweekdaysfrom5:10AMto8:15PMwithapproximately30-minuteto1-hourheadways(thetimeintervalbetweenbusarrivals),onSaturdaysfrom6:20AMto7:00PMwithapproximately1-hourheadways,andonSundaysfrom7:20AMto6:00PMwithapproximately1-hourheadways.OmniTransRoute22operatesbetweentheCityofRialtoandtheCityofColtonthroughBohnertAvenueintheprojectvicinity.Route22operatesonweekdaysfrom5:00AMto9:40PMwithapproximately30-minuteheadways,onSaturdaysfrom7:35AMto6:20PMwithapproximately1-hour headways, and on Sundays from 6:35 AM to 7:20 PM with approximately 1-hourheadways.Route22hasatransferpointwithRoute10attheintersectionofRiversideAvenueandBaselineRoad.

    III. PROJECTEDFUTURETRAFFICA. ProjectTraffic1. ProjectTripGenerationTripgenerationestimatesfortheRenaissanceEastprojectarebasedondailyandpeakhourlytrip generation rates obtained from the Institute of Transportation Engineers (ITE) TripGenerationManual(9thEdition).ITEtripgenerationestimatesfortheprojectarebasedontripgenerationratesforfollowingITELandUses:Hotel(LandUse310),SpecialtyRetailCenter(LandUse 826),High-TurnoverRestaurant (LandUse 932), and Fast-FoodRestaurantwithDrive-Through(LandUse934).Notalltripsfromtheprojectareanticipatedtobenew.Sometripsareexpectedtobecapturedbytheinternallanduses,orfromtheexistingflowoftrafficpassingthesite.An8%reductionfactorwasappliedtotheHotellandusetoaccountforinternalcapturetotheneighboringretailandrestaurantusesontheprojectsite.A10%reductionfactorwasappliedtotheSpecialtyRetailandFast-FoodRestaurant landusestorepresentpass-bytrips. Thesereductions innewtripswere implemented incoordinationwith input fromCitystaff.Daily,morningpeakhour, andevening peak hour trip generation estimates are summarized on Table 3. The project isestimatedtogenerate5,742dailynewtrips,with464trips(245inboundand219outbound)inthemorningpeakhourand395trips(210inboundand185outbound)intheeveningpeakhour.

  • TABLE3SUMMARYOFPROJECTTRIPGENERATION

    AYALASHOPPINGCENTER

    TripGenerationRates1

    ITE AMPeakHour PMPeakHour

    LandUse Code Unit Daily In Out Total In Out Total

    Hotel 310 Room 8.170 0.313 0.217 0.530 0.306 0.294 0.600

    SpecialtyRetailCenter 826 KSF 44.320 * * * 1.192 1.518 2.710

    High-Turnover(Sit-Down)Restaurant 932 KSF 127.150 5.946 4.865 10.810 5.910 3.940 9.850

    Fast-FoodRestaurantw/Drive-Through 934 KSF 496.120 23.164 22.256 45.420 16.978 15.672 32.650

    TripGenerationEstimates

    AMPeakHour PMPeakHour

    LandUse Quantity Unit Daily In Out Total In Out Total

    Hotel 108 Room 882 34 23 57 33 32 65

    SpecialtyRetailCenter 9.100 KSF 403 - - - 11 14 25

    High-Turnover(Sit-Down)Restaurant 9.170 KSF 1,166 55 45 100 54 36 90

    Fast-FoodRestaurantw/Drive-Through 7.620 KSF 3,780 177 170 347 129 119 248

    TotalBeforeInternalCaptureandPass-byReductions 6,231 266 238 504 227 201 428

    InternalCaptureforHotel(8%)2 71 3 2 5 3 3 6

    Pass-ByReductionforRetail(10%forDailyandPM)3 40 0 0 0 1 1 2

    Pass-ByReductionforFast-FoodRestaurant(10%)3 378 18 17 35 13 12 25

    TotalNetProjectTrips 5,742 245 219 464 210 185 395

    1Source:InstituteofTransportationEngineerspublication:TripGenerationManual,9thEdition2Source:InternalCaptureWorksheets(basedonInstituteofTransportationEngineersTripGenerationManual,

    9thEdition,Vol.1:User'sGuideandHandbook)3BasedonconsultationwithCitystaff,a10%pass-byreductionfactorwasappliedtoapplicablelanduses.

    RenaissanceEastTrafficImpactStudy

    -20- Kimley-HornandAssociates,Inc.

  • RenaissanceEast -21- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    2. TripDistributionandAssignmentTripdistributionassumptionsfortheprojectweredevelopedtakingintoaccounttheproposedsiteuses,andthesurroundingroadwaysystem.ProjecttripdistributionpatternsareshownonFigure8.Tripdistributionpercentagesateachstudyintersectionwereappliedtotheprojecttripgeneration to determine the project trips through each intersection. The resulting project-relatedpeakhourtripsatthestudyintersectionsareshownonFigure9.B. ExistingPlusGrowthPlusProjectTraffic(OpeningYear2018)

    TheprojectOpeningYear is anticipated tobeYear2018. ByYear 2018, local roadway andintersectionimprovementscurrentlyunderwayorconditionedonotherprojectsareexpectedtobecompleted.FortheOpeningYear2018analysisscenarios,thefollowinglocalroadwayandintersectionimprovementsareassumedtobeinplace:

    · WideningofLocustAvenuetofourlanesfromMiroWaytoRenaissanceParkway.TheprojectisexpectedtobecompletedbyOpeningYear2018.

    · Construction of the south leg at the intersection of Linden Avenue at RenaissanceParkway,andreconfigurationof the lanes toaccommodatemovements fora4-leggedintersection.

    · Re-constructionofthewestlegattheintersectionofAyalaDriveatRenaissanceParkwayto include two left-turn lanes, two through lanes, and one dedicated right-turn lane.ConstructionisunderwayandisexpectedtobecompletedbyOpeningYear2018.

    · WideningofAyalaDrivetofourlanesfromBaselineRoadtoRenaissanceParkway.The

    constructionofthisimprovementprojecthasbeenawarded,andtheprojectisexpectedtobecompletedbyOpeningYear2018.

    · Note:Aspartoftheproject,theeastlegattheintersectionofAyalaDriveatRenaissanceParkwaywillbere-constructedtoincludetwoleft-turnlanes,twothroughlanes,andonededicated right-turn lane. In addition, the roadway segment ofRenaissance ParkwayfromAyalaDrivetotheproject’seasternboundarywillbewidenedtofourlanesandthentransitionedtotwolanesbeforetheboxculvertontheeasternedgeofthepropertytomatchtheexistingroadway.TheseimprovementswillbeimplementedinthePlusProjectscenarios.

    Opening Year 2018 lane configurations and intersection controls with the addition of theimprovementsmentionedaboveatthestudyintersectionsareshownonFigure10.

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 22 -

    PROJECTSITE

    LEGEND:

    = Distribution Percentage

    = Study Intersection

  • Ayala Dr

    Linden Ave

    Renaissance

    Miro Way Fitzgerald Ave

    Leiske Dr

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    Baseline Rd

    Walnut Ave

    Casmalia St

    Cactus Ave

    - 23 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    D1. RenaissanceWest Driveway

    D2. RenaissanceMiddle Driveway

    D3. RenaissanceEast Driveway

    LEGEND:

    PROJECTSITE

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 24 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    *

    *

    *

    *

    *

    LEGEND:

    *

    PROJECTSITE

    **

    **

    ****

  • RenaissanceEast -25- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    1. AmbientGrowthRate

    BasedonconsultationwithCitystaff,anambientgrowthrateof2.0%peryeartoOpeningYear2018wasappliedtoexistingpeakhourtrafficvolumestodevelopExistingPlusGrowthforecasts.TheresultingdailyandpeakhourExistingPlusGrowthwithouttheproject(OpeningYear2018)trafficvolumesareshownonFigure11.ProjecttrafficwasthenaddedtodevelopExistingPlusGrowthPlusProject (OpeningYear2018) traffic forecasts.ExistingPlusGrowthPlusProjectvolumesareshownonFigure12.2. OpeningYear2018ExistingPlusGrowthPeak Hour Operating ConditionsIntersectionLevelofServiceanalysiswasconductedforthemorningandeveningpeakhoursforExistingPlusGrowthwithouttheproject(OpeningYear2018).TheresultsareshownonTable4.IntersectionanalysisworksheetsforthisscenarioareprovidedinAppendixD.Review of this table indicates that all study intersections would continue to operate at anacceptableLevelofService.Daily Roadway Operating ConditionsRoadwayLevelofServiceanalysiswasconductedbasedon theroadwaycapacitiespresentedpreviouslyinthisreport.TheresultsoftheroadwayanalysisforExistingPlusGrowthconditionsareshownonTable5.ReviewofthistableindicatesthatthestudyroadwaysegmentwouldoperatewithinitsLOSDcapacitywiththeadditionofambientgrowthtraffic.3. OpeningYear2018ExistingPlusGrowthPlusProject

    Peak Hour Operating ConditionsIntersectionLevelofServiceanalysiswasconductedforthemorningandeveningpeakhoursfortheExistingPlusGrowthPlusProject condition. The resultsof the intersection analysis areshownonTable6.Review of this table indicates that all study intersections would continue to operate at anacceptableLevelofService.ThesignalizedintersectionofAyalaDriveatRenaissanceParkwaywouldoperateatLOSDinthemorningpeakhourwiththeadditionofprojecttraffic.Althoughthe forecastedLevelof Servicewouldbe acceptable, theproject impact (14.9 seconds in themorning) would be considered a significant impact based on the significance sliding scalepresentedonpage5ofthisreport.

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 26 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    LEGEND:

    PROJECTSITE

  • Ayala Dr

    Linden Ave

    Renaissance

    Miro Way Fitzgerald Ave

    Leiske Dr

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    Baseline Rd

    Walnut Ave

    Casmalia St

    Cactus Ave

    - 27 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    D1. RenaissanceWest Driveway

    D2. RenaissanceMiddle Driveway

    D3. RenaissanceEast Driveway

    LEGEND:

    PROJECTSITE

  • TABLE4SUMMARYOFINTERSECTIONOPERATION

    OPENINGYEAR2018-EXISTINGPLUSGROWTH

    TrafficControl Delay LOS Delay LOS

    1 AlderAvenueatRenaissanceParkway S 32.6 C 32.4 C2 LocustAvenueatRenaissanceParkway S 34.6 C 32.3 C3 LindenAvenueatRenaissanceParkway S 17.5 B 13.4 B4 AyalaDriveatSR-210WestboundRamps S 16.9 B 11.0 B5 AyalaDriveatSR-210EastboundRamps S 11.3 B 12.9 B6 AyalaDriveatRenaissanceParkway S 22.3 C 17.8 B7 AyalaDriveatBaselineRoad S 18.1 B 19.6 B8 CactusAvenueatEastonStreet U 9.7 A 10.3 B

    AMPeakHour PMPeakHourIntersectionInt.#

    Notes:-BoldandshadedvaluesindicateintersectionsoperatingatLOSEorForsignificantimpacttointersectionperCitystandards.-Atasignalizedintersection,delayreferstotheaveragecontroldelayfortheentireintersection,measuredinsecondspervehicle.-Atatwo-waystop-controlledintersection,delayreferstotheaveragevehicledelayontheworstmovement.-Delayvaluesarebasedonthemethodologyoutlinedinthe2010HighwayCapacityManual.S=SignalizedU=Unsignalized

    RenaissanceEastTrafficImpactStudy

    -28- Kimley-HornandAssociates,Inc.

  • Roadway Segment LOSDCapacity

    ExistingADT

    w/PCE

    ExistingPlus

    GrowthADT

    LOSDorBetter?

    RenaissanceParkway AyalaDrivetoCactusAvenue 12,499 6,402 6,530 Yes

    Notes:LOS=LevelofService

    PCE=PassengerCarEquivalent

    TABLE5SUMMARYOFROADWAYANALYSIS

    OPENINGYEAR2018-EXISTINGPLUSGROWTH

    ADT=AverageDailyTraffic

    RenaissanceEastTrafficImpactStudy

    -29- Kimley-HornandAssociates,Inc.

  • Delay LOS Delay LOS Delay LOS Delay LOS

    1 AlderAvenueatRenaissanceParkway S 32.6 C 32.7 C 0.1 No 32.4 C 32.2 C -0.2 No

    2 LocustAvenueatRenaissanceParkway S 34.6 C 34.1 C -0.5 No 32.3 C 31.8 C -0.5 No

    3 LindenAvenueatRenaissanceParkway S 17.5 B 16.9 B -0.6 No 13.4 B 12.4 B -1.0 No

    4 AyalaDriveatSR-210WestboundRamps S 16.9 B 19.0 B 2.1 No 11.0 B 11.6 B 0.6 No

    5 AyalaDriveatSR-210EastboundRamps S 11.3 B 12.1 B 0.8 No 12.9 B 13.7 B 0.8 No

    6 AyalaDriveatRenaissanceParkway S 22.3 C 37.2 D 14.9 Yes 17.8 B 24.7 C 6.9 No

    7 AyalaDriveatBaselineRoad S 18.1 B 18.9 B 0.8 No 19.6 B 20.1 C 0.5 No

    8 CactusAvenueatEastonStreet U 9.7 A 10.0 A 0.3 No 10.3 B 10.6 B 0.3 No

    D1 RenaissanceParkwayWestDriveway U N/A - 11.0 B N/A - N/A - 10.9 B N/A -

    D2 RenaissanceParkwayMiddleDriveway U N/A - 10.6 B N/A - N/A - 10.6 B N/A -

    D3 RenaissanceParkwayEastDriveway U N/A - 9.9 A N/A - N/A - 10.0 A N/A -

    TABLE6SUMMARYOFINTERSECTIONOPERATION

    OPENINGYEAR2018-EXISTINGPLUSGROWTHPLUSPROJECT

    PMPeakHourAMPeakHour

    ImpactSig?

    WithoutProject WithProject ProjectImpact

    ImpactSig?

    Notes:-BoldandshadedvaluesindicateintersectionsoperatingatLOSEorForsignificantimpacttointersectionperCitystandards.-Atasignalizedintersection,delayreferstotheaveragecontroldelayfortheentireintersection,measuredinsecondspervehicle.-Atatwo-waystop-controlledintersection,delayreferstotheaveragevehicledelayontheworstmovement.-Delayvaluesarebasedonthemethodologyoutlinedinthe2010HighwayCapacityManual.S=SignalizedU=Unsignalized

    Int.# Intersection TrafficControlWithoutProject WithProject Project

    Impact

    RenaissanceEastTrafficImpactStudy

    -30- Kimley-HornandAssociates,Inc.

  • RenaissanceEast -31- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    Daily Roadway Operating Conditions

    AspartoftheprojectimprovementtowidenRenaissanceParkwaytofourlanesfromAyalaDrivetotheEastProjectBoundary,theroadwaysegmentofRenaissanceParkwayfromAyalaDrivetoCactus Avenue was separated into the following two roadway segments for Plus Projectscenarios:

    · RenaissanceParkway:AyalaDrivetoEastProjectBoundary(4-laneArterialcapacity)· RenaissanceParkway:EastProjectBoundarytoCactusAvenue(2-laneArterialcapacity)

    RoadwayLevelofServiceanalysiswasconductedbasedonthedailyLOSDcapacitiespresentedpreviously in this report.The results of the roadway analysis forExisting PlusGrowth PlusProjectconditionsareshownonTable7.Review of this table indicates that both study roadway segmentswill operate within theirOpeningYear2018PlusProjectLevelofServiceDcapacitywiththeadditionofprojecttraffic.C. CumulativeConditions(ExistingPlusGrowthPlusCumulativeProjects)

    1. CumulativeProjects

    Inadditiontoambientgrowth,trafficvolumesforCumulativeProjects(approvedandpendingprojects)areaddedtotheExistingPlusGrowthtrafficvolumes.CumulativeProjectsconsistofanyprojectthathasbeenapprovedandisnotyetoccupied,andprojectsthatareinvariousstagesof the application and approval process, but have not yet been approved. A summary ofCumulative Projects in the project vicinity and the trip generation associated with each isprovidedonTable8.ThelocationsoftheCumulativeProjectsareshownonFigure13.2. BackgroundGrowthRateAsdiscussedearlier,anambientgrowthrateof2.0%peryeartoOpeningYear2018wasassumedforthisanalysis.

  • Roadway SegmentLOSD

    CapacitywithProject

    ExistingADT

    w/PCE

    ExistingPlus

    GrowthADT

    DailyProjectTraffic

    Existing+Growth+

    ProjectVolume

    LOSDorBetter?

    AyalaDrivetoEastProjectBoundary 32,999 6,402 6,530 5,742 12,272 Yes

    EastProjectBoundarytoCactusAvenue 12,499 6,402 6,530 574 7,104 Yes

    Notes:LOS=LevelofServiceADT=AverageDailyTrafficPCE=PassengerCarEquivalent

    TABLE7SUMMARYOFROADWAYANALYSIS

    OPENINGYEAR2018-EXISTINGPLUSGROWTHPLUSPROJECT

    RenaissanceParkway

    RenaissanceEastTrafficImpactStudy

    -32- Kimley-HornandAssociates,Inc.

  • TABLE8SUMMARYOFCUMULATIVEPROJECTS

    TripGenerationEstimatesAMPeakHour PMPeakHour

    Project# LandUse Quantity Units Daily In Out Total In Out Total

    1 GoldenSprings 630 KSF 3,761 249 67 316 84 254 337

    2 I-210LogisticsIII 742.514 KSF 4,430 295 79 374 99 299 398

    3 CapRockII-Locust/Bohnert 609 KSF 2,782 189 49 238 64 190 254

    SaterBros

    Hotel 100 ROOMS 817 31 22 53 31 29 60

    High-Turnover(Sit-Down)Restaurant 2.000 KSF 254 12 11 23 13 9 22

    Pass-byHigh-Turn(Sit-Down)Restaurant -57 0 0 0 -2 -2 -4

    Fast-FoodRestaurantw/oD.T. 1.000 KSF 716 26 18 44 13 13 26

    Pass-byFast-FoodRestaurant -161 -6 -4 -10 -3 -3 -6

    Fast-FoodRestaurantw/D.T. 5.440 KSF 2,699 126 121 247 92 85 177

    Pass-byFast-FoodRestaurant -638 -31 -30 -61 -20 -20 -40

    GasolineStationw/Conv.Mkt.&CarWash 16 VFP 2,445 97 93 190 113 109 222

    Pass-byGasoline/ServiceStation -572 -21 -21 -42 -26 -26 -52

    SiteInternalCapture(10%) -693 -29 -27 -56 -26 -25 -51

    5 ShawDevelopmentWarehouse 175.900 KSF 1,050 70 18 88 23 70 93

    LytleCreekSP(10%ofCapacity)

    Single-FamilyDetachedHousing 504 DU 4,823 95 284 379 321 188 509

    Condominium 336 DU 1,952 25 123 148 117 58 175

    7 EmaarEnterpriseHomes 20.00 DU 191 4 11 15 13 7 20

    8 B+BPlastics 150.27 KSF 963 64 17 81 22 64 86

    9 PusanPipeManufacturing 39.000 KSF 149 22 6 28 10 18 28

    RialtoWalmart

    FreeStandingDiscountSuperstore 197.639 KSF 10,501 185 145 330 446 465 911

    ShoppingCenter 13.712 KSF 589 8 5 13 25 26 51

    High-Turnover(Sit-Down)Restaurant 12.856 KSF 1,635 77 71 148 85 59 144

    Gasoline/ServiceStation 16 VFP 2,697 99 95 194 111 111 222

    Pass-byGasoline/ServiceStation -1,019 -52 -50 -102 -42 -42 -84

    Fast-FoodRestaurantw/D.T. 5.948 KSF 2,951 138 132 270 101 93 194

    Pass-byFast-FoodRestaurant -1,328 -66 -63 -129 -48 -44 -92

    InternalCapture(10%) -1,837 -51 -45 -96 -77 -75 -152

    11 Prologis(LocustatStonehurst) 473.000 KSF 2,824 187 50 237 64 191 255

    12 Prologis(TamarindatWalnut) 384.000 KSF 2,292 152 39 191 52 154 206

    RenaissanceMarketplace(100%ofCapacity)

    NorthSideArea 65.756 KSF 4,441 89 70 159 115 203 318

    SouthSideArea 523.567 KSF 13,340 213 96 309 547 617 1,164

    14 I-210LogisticsIV 412.560 KSF 2,462 105 28 133 35 106 141

    15 I-210LogisticsV 203.639 KSF 1,197 79 22 101 27 81 108

    16 MonsterEnergy 1,094.900 KSF 6,533 434 115 549 148 411 589

    17 PA108Building5 614.848 KSF 4,252 364 55 419 292 370 662

    18 PA108Building6 649.800 KSF 5,542 93 532 625 535 32 567

    TotalProjectTrips 81,983 3,272 2,135 5,407 3,354 4,075 7,429

    13

    6

    10

    PROJECTTRIPGENERATION

    DU=DwellingUnits,KSF=1,000squarefeet,VFP=VehicleFuelingPositions

    4

    RenaissanceEastTrafficImpactStudy

    -33- Kimley-HornandAssociates,Inc.

  • N Ayala D

    r

    N Linden Ave

    Alder Ave

    Sierra Ave

    N C

    edar Ave

    N R

    iverside Ave

    Historic U.S. 66

    Baseline Rd

    Merrill Ave

    Randall Ave

    Arrow Blvd

    Valley Blvd

    San Bernardino Ave

    Renaissance Pkwy

    Locust Ave

    Maple Ave

    Foothill Blvd

    Linden Ave

    Laurel Ave

    Casmalia St

    Miro Way

    Cactus Ave

    Fontana

    Rialto

    Bloomington

    Cimmeron

    - 34 -

    LEGEND:

    PROJECTSITE

  • RenaissanceEast -35- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    3. CumulativeProjectsTripGenerationTripgenerationinformationfortheCumulativeProjectswasderivedeitherfromapprovedtrafficstudies,where available; or developed by Kimley-Horn if approved traffic studieswere notavailable. Project information and trip generation assumptions for Cumulative Projects areprovidedinAppendixE.4. CumulativeProjectsTripDistributionandAssignmentLikewise,tripdistributionandassignmentfortheCumulativeProjectswereeitherderivedfromapprovedtrafficstudies,whereavailable;orweredevelopedbyKimley-Hornifapprovedtrafficstudieswerenotavailable.TripdistributionassumptionsforCumulativeProjectsareprovidedinAppendixE. Morning and eveningpeakhour turningmovementvolumes forCumulativeProjectTrafficareshownonFigure14.5. OpeningYear2018CumulativeWithoutProjectConditionsPeak Hour Operating ConditionsMorningandeveningpeakhourturningmovementvolumesforOpeningYear2018CumulativeWithoutProjectConditionsareshownonFigure15.IntersectionLevelofServiceanalysiswasconducted for themorning and eveningpeak hours, and the results are shown onTable9.Reviewofthistableindicatesthat,withtheadditionofCumulativeProjectstraffic,thefollowingintersectionswouldoperateatanunacceptableLevelofService:

    · #6–AlderAvenueatRenaissanceParkway:PM–LOSECopiesofintersectionanalysisworksheetsforthisscenarioareprovidedinAppendixD.Daily Roadway Operating Conditions

    RoadwayLevelofServiceanalysiswasconductedbasedonthedailyLOSDcapacitiespresentedpreviouslyinthisreport.TheresultsoftheroadwayanalysisforOpeningYear2018CumulativewithoutProjectconditionsareshownonTable10.Reviewofthistable indicatesthatthestudyroadwaysegmentwilloperatewithin itsOpeningYear2018LevelofServiceDcapacitywiththeadditionofcumulativeprojecttraffic.

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 36 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    LEGEND:

    PROJECTSITE

  • Ayala Dr

    Linden Ave

    Baseline Rd

    Renaissance

    Casmalia St

    Miro Way

    Cactus Ave

    Fitzgerald Ave

    Leiske Dr

    Walnut Ave

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    - 37 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    LEGEND:

    PROJECTSITE

  • TABLE9SUMMARYOFINTERSECTIONOPERATION

    OPENINGYEAR2018CUMULATIVEWITHOUTPROJECT

    TrafficControl Delay LOS Delay LOS

    1 AlderAvenueatRenaissanceParkway S 40.8 D 57.0 E2 LocustAvenueatRenaissanceParkway S 32.2 C 32.6 C3 LindenAvenueatRenaissanceParkway S 24.4 C 35.5 D4 AyalaDriveatSR-210WestboundRamps S 25.9 C 16.8 B5 AyalaDriveatSR-210EastboundRamps S 13.5 B 22.9 C6 AyalaDriveatRenaissanceParkway S 23.1 C 25.6 C7 AyalaDriveatBaselineRoad S 23.0 C 37.4 D8 CactusAvenueatEastonStreet S 12.8 B 16.1 B

    Int.# IntersectionAMPeakHour PMPeakHour

    Notes:-BoldandshadedvaluesindicateintersectionsoperatingatLOSEorForsignificantimpacttointersectionperCitystandards.-Atasignalizedintersection,delayreferstotheaveragecontroldelayfortheentireintersection,measuredinsecondspervehicle.-Atatwo-waystop-controlledintersection,delayreferstotheaveragevehicledelayontheworstmovement.-Delayvaluesarebasedonthemethodologyoutlinedinthe2010HighwayCapacityManual.S=SignalizedU=Unsignalized

    RenaissanceEastTrafficImpactStudy

    -38- Kimley-HornandAssociates,Inc.

  • Roadway Segment LOSDCapacityExistingPlusGrowthADT

    CumulativeProjectsADT

    OpeningYear+Cum.Projects

    ADT

    LOSDorBetter?

    RenaissanceParkway AyalaDrivetoCactusAvenue 12,499 6,530 3,244 9,774 Yes

    Notes:LOS=LevelofServiceADT=AverageDailyTraffic

    TABLE10SUMMARYOFROADWAYANALYSIS

    OPENINGYEAR2018CUMULATIVEWITHOUTPROJECT

    RenaissanceEastTrafficImpactStudy

    -39- Kimley-HornandAssociates,Inc.

  • RenaissanceEast -40- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    6. OpeningYear2018CumulativePlusProjectConditionsPeak Hour Operating ConditionsProjecttrafficwasaddedtoOpeningYear2018CumulativetrafficvolumestodevelopOpeningYear 2018 Cumulative plus Project traffic forecast volumes. The resulting peak hour trafficvolumesareshownonFigure16.IntersectionLevelofServiceanalysiswasconductedforthemorningandeveningpeakhours,andtheresultsareshownonTable11.Asthistableindicates,thefollowingintersectionwouldoperateatanunacceptableLevelofService:

    · #1–AlderAvenueatRenaissanceParkway:PM–LOSEThisintersectionisforecastedtooperateatanunacceptableLevelofServiceunderOpeningYearCumulativewithoutProjectconditions.Theprojectwouldnotincreasedelayatthisintersectionby2secondsormore,andthereforewouldnothaveasignificantprojectimpact.ImprovementsidentifiedaspartoftheRenaissanceSpecificPlantoreturntheintersectiontoLOSDorbetterareidentifiedlaterinthereport.Inaddition,thefollowingintersectionwouldoperateatLOSDorbetter,butwouldexperienceasignificantimpactduetotheprojectbasedonthesignificancecriteriaestablishedbythecityanddiscussedonPage5ofthisreport.

    · #6–AyalaDriveatRenaissanceParkway:AM–LOSC,PM–LOSD

    CopiesofintersectionanalysisworksheetsforthisscenarioareprovidedinAppendixD.InthisPlusProjectanalysis,eachofthesitedrivewaysisalsoanalyzed.TheresultsindicatethateachdrivewaywilloperateatLevelofServiceBorbetterduringbothpeakhours.Daily Roadway Operating Conditions

    RoadwayLevelofServiceanalysiswasconductedbasedonthedailyLOSDcapacitiespresentedpreviouslyinthisreport.TheresultsoftheroadwayanalysisforOpeningYear2018CumulativePlusProjectconditionsareshownonTable12.Reviewofthistable indicatesthatthestudyroadwaysegmentwilloperatewithin itsOpeningYear2018LevelofServiceDcapacitywiththeadditionofprojecttraffic.

  • Ayala Dr

    Linden Ave

    Renaissance

    Miro Way Fitzgerald Ave

    Leiske Dr

    Pkwy

    Locust Ave

    Laurel Ave

    Maple Ave

    Alder Ave

    Baseline Rd

    Walnut Ave

    Casmalia St

    Cactus Ave

    - 41 -

    1. Alder Aveat Renaissance Pkwy

    4. Ayala Drat SR-210 WB Ramps

    6. Ayala Drat Renaissance Pkwy

    7. Ayala Drat Baseline Rd

    5. Ayala Drat SR-210 EB Ramps

    2. Locust Aveat Renaissance Pkwy

    8. Cactus Aveat Easton St

    3. Linden Aveat Renaissance Pkwy

    D1. RenaissanceWest Driveway

    D2. RenaissanceMiddle Driveway

    D3. RenaissanceEast Driveway

    LEGEND:

    PROJECTSITE

  • Delay LOS Delay LOS Delay LOS Delay LOS

    1 AlderAvenueatRenaissanceParkway S 40.8 D 41.5 D 0.7 No 57.0 E 58.6 E 1.6 No

    2 LocustAvenueatRenaissanceParkway S 32.2 C 32.2 C 0.0 No 32.6 C 33.0 C 0.4 No

    3 LindenAvenueatRenaissanceParkway S 24.4 C 25.0 C 0.6 No 35.5 D 36.5 D 1.0 No

    4 AyalaDriveatSR-210WestboundRamps S 25.9 C 30.1 C 4.2 No 16.8 B 18.1 B 1.3 No

    5 AyalaDriveatSR-210EastboundRamps S 13.5 B 15.9 B 2.4 No 22.9 C 28.1 C 5.2 No

    6 AyalaDriveatRenaissanceParkway S 23.1 C 34.7 C 11.6 Yes 25.6 C 36.4 D 10.8 Yes

    7 AyalaDriveatBaselineRoad S 23.0 C 24.6 C 1.6 No 37.4 D 41.1 D 3.7 No

    8 CactusAvenueatEastonStreet U 12.8 B 13.4 B 0.6 No 16.1 C 16.9 C 0.8 No

    D1 RenaissanceParkwayWestDriveway U N/A - 11.8 B N/A - N/A - 12.1 B N/A -

    D2 RenaissanceParkwayMiddleDriveway U N/A - 11.4 B N/A - N/A - 11.8 B N/A -

    D3 RenaissanceParkwayEastDriveway U N/A - 10.5 B N/A - N/A - 10.9 B N/A -

    TABLE11SUMMARYOFINTERSECTIONOPERATION

    OPENINGYEAR2018CUMULATIVEPLUSPROJECT

    Int.# Intersection TrafficControl

    AMPeakHour PMPeakHourWithoutProject WithProject

    Notes:-BoldandshadedvaluesindicateintersectionsoperatingatLOSEorForsignificantimpacttointersectionperCitystandards.-Atasignalizedintersection,delayreferstotheaveragecontroldelayfortheentireintersection,measuredinsecondspervehicle.-Atatwo-waystop-controlledintersection,delayreferstotheaveragevehicledelayontheworstmovement.-Delayvaluesarebasedonthemethodologyoutlinedinthe2010HighwayCapacityManual.S=SignalizedU=Unsignalized

    ProjectImpact

    ImpactSig?

    WithoutProject WithProject ProjectImpact

    ImpactSig?

    RenaissanceEastTrafficImpactStudy

    -42- Kimley-HornandAssociates,Inc.

  • Roadway SegmentLOSD

    CapacitywithProject

    OpeningYear+Cum.Projects

    ADT

    DailyProjectTraffic

    OpeningYear+Cum.Project+

    ProjectADT

    LOSDorBetter?

    AyalaDrivetoEastProjectBoundary 32,999 9,774 5,742 15,516 Yes

    EastProjectBoundarytoCactusAvenue 12,499 9,774 574 10,348 Yes

    Notes:LOS=LevelofServiceADT=AverageDailyTraffic

    TABLE12SUMMARYOFROADWAYANALYSIS

    OPENINGYEAR2018CUMULATIVEPLUSPROJECT

    RenaissanceParkway

    RenaissanceEastTrafficImpactStudy

    -43- Kimley-HornandAssociates,Inc.

  • RenaissanceEast -44- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    IV. MITIGATIONMEASURES

    A. IntersectionImprovementsBased on the impact criteria in the City’s Traffic Impact Analysis Report Guidelines andRequirements(ExhibitF),noproject-relatedimpactswouldbeconsideredsignificant.ThefollowingintersectionswasfoundtooperateatunacceptableLOS:

    · #1–AlderAvenueatRenaissanceParkway

    ImplementationofthefollowingimprovementswouldrestoreoperationsatthislocationtoLOSDorbetterduringbothpeakperiods:#1–AlderAvenueatRenaissanceParkway: Addasecondsouthbound left-turn lane.Addanexclusive westbound right-turn lane with overlap phases. These improvements to theintersection are consistent with the findings of the Renaissance Specific Plan. With theseimprovementsinplace,theintersectionwouldoperateatanacceptableLevelofServiceinthebothpeakhours.A summary of the intersection operation before and after implementation of thismitigationmeasureisprovidedonTable13.The project will contribute to this improvement through its fair share payment of theRenaissanceSpecificPlanTrafficFeeProgram.B. RoadwayImprovementsNotApplicable.C. SignificantImpacts–OtherImprovementsThefollowingintersectionswouldoperateatLevelofServiceC,buttheproject’simpactwouldbeconsideredtobesignificantonthebasisoftheslidingscale:

    · #6–AyalaDriveatRenaissanceParkway:AM–LOSC,PM–LOSD

    Note: TheprojectwillwidenRenaissanceParkway to4-laneswitharaisedmedianbetweenAyalaDriveand themiddledriveway,witha transition tomatch theexisting2-laneroadwayconfigurationneartheeasternboundaryoftheproject.Aspartofthismodification,theprojectwill re-configure thewestbound approach at the intersection ofAyalaDrive atRenaissanceParkway to include two left-turn lanes, two through lanes,andonededicatedright-turn lane.Theseimprovementsareassumedtoberequiredpriortoconstructionoftheprojectbuildings.Withtheseimprovements,theintersectionwouldcontinuetooperateatanacceptableLevelofService.Asaresult,nofurthermitigationwillbeneeded.

  • TABLE13SUMMARYOFINTERSECTIONOPERATIONSWITHPROPOSEDMITIGATIONMEASURES

    OPENINGYEAR2018CUMULATIVEPLUSPROJECT

    AMPeakHour PMPeakHour

    Int.# Intersection Delay LOS Delay LOS Delay LOS Delay LOS

    AlderAvenueatRenaissanceParkwayAdd2ndSBLeft-TurnLane,andWBRight-TurnLane 41.5 D 37.2 D 58.6 E 42.2 D

    Notes:-BoldandshadedvaluesindicateintersectionsoperatingatLOSEorForsignificantimpacttointersectionperCitystandards.-Atasignalizedintersection,delayreferstotheaveragecontroldelayfortheentireintersection,measuredinsecondspervehicle.-Atatwo-waystop-controlledintersection,delayreferstotheaveragevehicledelayontheworstmovement.-Delayvaluesarebasedonthemethodologyoutlinedinthe2010HighwayCapacityManual.

    WithoutMitigation WithMitigation WithoutMitigation WithMitigation

    1

    AyalaShoppingCenterTrafficImpactStudy

    -45- Kimley-HornandAssociates,Inc.

  • RenaissanceEast -46- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    V. FINDINGSANDRECOMMENDATIONSA. ImprovementsTheprojectwillwidenRenaissanceParkwayto4-laneswitharaisedmedian,transitioningtoconnectwiththeexisting2-lanesectionneartheeasternboundaryoftheprojectsite,andre-configurethewestboundapproachattheintersectionofAyalaDriveatRenaissanceParkwaytoinclude two left-turn lanes, two through lanes, and one dedicated right-turn lane prior toconstructionoftheproject.

    B. TrafficSignalWarrantAnalysisEachproposedsitedrivewaywasanalyzed,andallareforecastedtooperateatLOSBorbetterinbothpeakhours.Thedrivewayswouldnotrequiresignalization.

    C. SiteCirculationVehicularaccessprovisionsfortheprojectsitewouldconsistofthefollowing:

    · ThreedrivewaysonRenaissanceParkway.· Thewestdrivewaywillbe35’wide.Themiddleandeastdrivewayswillbe30’

    wide.· Allprojectdrivewaysrestrictleftturnsoutoftheprojectsite.· Allprojectdrivewayswillbeunsignalized.

    The cumulative intersection analysis for the Plus Project condition indicates that all projectdrivewayswouldoperateatanacceptableLevelofServiceduringbothpeakhourperiods.

  • RenaissanceEast -47- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    D. SafetyandOperationalImprovementsThesitedrivewaysandprojectimprovementsmustbedesignedsothatadequatesightdistancefordriversenteringandexiting thesite ismaintained.RenaissanceParkwayhasacompoundcurveacross theproject frontagesosightdistanceneeds tobeverifiedwith finalsitedesign.SpecifictotheEastdriveway,considerationneedstobegiventosightdistancelookingeastandpotentiallimitationsassociatedwiththeproposedretainingwall.Thelineofsight–astraightlinebetweenthedriver’seyeandoncomingvehiclesontheadjacentroadwaydefinestheLimitedUseArea. TheLimitedUseAreaforeachdrivewaymustbekeptclearofvisualobstructions,includingprojectsigns,buildingstructures,andlandscaping,inordertomaintainadequatesightdistance.Theproject’sWestdriveway is locatedapproximately300 feet from the intersectionofAyalaDriveandRenaissanceParkway.Duringthemorningpeak,westboundqueuesattheintersectionofAyalaDriveandRenaissanceParkwayareprojectedtoaverage315feet,potentiallyblockingthe driveway for vehicles inbound to the site. Queues in the afternoon peak hour are notanticipatedtoblockthedriveway.Duringthemorning,theproposedSonicisnotanticipatedtobeopenasSonicusestypicallyarenotopenuntil9:00a.m.,afterthemorningpeak.TheproposedCrackerBarrelwouldbeopenforbreakfastduringthemorningpeak.Itisanticipatedthatthevolumeoftrafficturningintothedriveway(98inonehour)wouldbeleftgapsinthequeuetoaccess thesite, findgaps in traffic to turn,oralternativelywoulduse theMiddledriveway toaccessthesite.A“KeepClear”pavementlegendonthewestboundlanesatthedrivewaymaybehelpfultoensurequeuesintheeastboundturnlaneareminimized.E. FairShareCalculationsNotApplicable.F. SpecificPlanSignalizationNotApplicable.G. GeneralPlanConformanceTheproposedRenaissanceEastprojectisinconformancewiththeRenaissanceSpecificPlanandthe City of Rialto General Plan. Neither a Specific Plan Amendment nor a General PlanAmendmentisrequiredfortheproject.H. RegionalFundingMechanismsThe project is located in the Renaissance Specific Plan area, and as such, is subject to theRenaissanceSpecificPlanTrafficFeeProgram,aswellastheCity’scity-widetrafficimpactfee

  • RenaissanceEast -48- Kimley-HornandAssociates,Inc.TrafficImpactStudy August2017

    program. Theproject’spaymentof impact feesareused tooffset thecostsof implementingneededimprovementstointersectionsinfutureyearconditions.Inaddition,theprojectmayberequiredtoconstructaneededimprovementinadvanceoftheCity’sreceiptoffullfunding,inwhichcasetheimprovementmaybesubjecttoareimbursementagreement,toallowtheprojecttorecoupcostsfromfuturedevelopment.

  • APPENDIXA

    APPROVEDSCOPINGAGREEMENT

  • APPENDIXB

    TRAFFICCOUNTDATASHEETS

  • ITM Peak Hour SummaryPrepared by:

    National Data & Surveying Services

    Lanes 0.5 0.5 2 City:

    AM 48 612 91 AM

    NOON 0 0 0 NOON

    PM 85 483 89 PM

    AM NOON PM AM NOON PM Lanes

    118 0 81 0

    172 0 54 2

    1 99 0 60 31 0 20 1

    2 104 0 120

    0 40 0 25

    Lanes AM NOON PM AM NOON PM

    AM 52 383 15 AM

    NOON 0 0 0 NOON

    PM 9 544 25 PM

    1 2 0 Lanes

    AM AM

    NOON NOON

    PM PM

    AM NOON PM AM NOON PM

    272 0 148 321 0 155

    243 0 205 210 0 234AM NOON PM AM NOON PM

    AM AM

    NOON NOON

    PM PM

    Date:

    210 0

    700 AM

    Peak Hour Summary

    Southbound Approach Project #:11/17/2016

    Renaissance Pkwy

    445 PM

    272 0 148

    NAl

    derA

    veAM Peak Hour

    Thursday

    Wes

    tbou

    ndA

    ppro

    ach

    RialtoDay:

    EastboundA

    pproach

    N Alder Ave and Renaissance Pkwy , Rialto

    PM Peak Hour

    234

    600

    0

    685

    Signalized

    CONTROL

    Count Periods

    AM

    Start

    4:00 PM

    16-6173-003

    NOON Peak Hour

    NOON

    PM

    7:00 AM

    NONE

    9:00 AM

    NONE

    1351

    0

    6:00 PM

    600

    0

    Total Volume Per Leg

    0

    West Leg

    389

    End

    Total Ins & Outs

    North Leg

    683

    0

    528

    Northbound Approach

    South Leg

    East Leg

    450

    0 0

    685657

    West Leg

    South Leg

    353515 0

    East Leg

    North Leg

    1342

    531

    1133

    0

    1106578

    751

    528

    683

    0

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 1 2 0 2 0.5 0.5 1 2 0 1 2 0

    7:00 AM 29 103 5 17 147 12 14 25 4 8 68 37 4697:15 AM 17 95 5 39 170 11 25 36 25 8 63 36 5307:30 AM 2 80 2 20 138 13 34 32 7 9 18 21 3767:45 AM 4 105 3 15 157 12 26 11 4 6 23 24 3908:00 AM 1 83 7 10 92 6 8 11 1 6 17 22 2648:15 AM 3 95 6 8 75 5 15 11 1 5 22 28 2748:30 AM 0 85 3 18 86 7 12 9 2 7 7 23 2598:45 AM 3 97 1 15 77 9 11 7 3 4 18 21 266

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 59 743 32 142 942 75 145 142 47 53 236 212 2828 0 0 0 0APPROACH %'s : 7.07% 89.09% 3.84% 12.25% 81.28% 6.47% 43.41% 42.51% 14.07% 10.58% 47.11% 42.32%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 700 AM TOTAL

    PEAK HR VOL : 52 383 15 91 612 48 99 104 40 31 172 118 1765

    PEAK HR FACTOR : 0.833

    CONTROL :

    N Alder Ave N Alder Ave

    AM

    Renaissance Pkwy

    NORTHBOUND

    Signalized

    UTURNS

    Renaissance Pkwy

    0.710

    WESTBOUND

    0.853 0.7060.821

    NS/EW Streets:

    ThursdayProject ID:

    City:

    16-6173-003

    Rialto

    EASTBOUND

    TOTALS11/17/2016

    SOUTHBOUND

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 1 2 0 2 0.5 0.5 1 2 0 1 2 0

    4:00 PM 2 109 2 19 108 23 5 17 2 2 18 33 3404:15 PM 4 103 3 19 113 14 15 15 1 4 8 24 3234:30 PM 1 138 7 20 112 15 14 12 3 6 12 13 3534:45 PM 1 122 6 22 128 28 21 22 5 4 9 20 3885:00 PM 3 141 6 23 113 20 16 26 4 6 18 24 4005:15 PM 4 129 7 21 113 24 11 30 6 7 11 23 3865:30 PM 1 152 6 23 129 13 12 42 10 3 16 14 4215:45 PM 4 123 6 23 138 20 11 34 5 3 4 14 385

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 20 1017 43 170 954 157 105 198 36 35 96 165 2996 0 0 0 0APPROACH %'s : 1.85% 94.17% 3.98% 13.27% 74.47% 12.26% 30.97% 58.41% 10.62% 11.82% 32.43% 55.74%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 445 PM TOTAL

    PEAK HR VOL : 9 544 25 89 483 85 60 120 25 20 54 81 1595

    PEAK HR FACTOR : 0.947

    CONTROL :

    Project ID: 16-6173-003

    City: Rialto

    UTURNS

    11/17/2016

    ThursdayTOTALS

    Signalized

    Renaissance PkwyNS/EW Streets: Renaissance Pkwy

    PM

    N Alder Ave N Alder Ave

    0.8010.909 0.807

    WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND

    0.923

  • ITM Peak Hour SummaryPrepared by:

    National Data & Surveying Services

    Lanes 1 0 2 City:

    AM 24 0 153 AM

    NOON 0 0 0 NOON

    PM 21 0 54 PM

    AM NOON PM AM NOON PM Lanes

    103 0 24 0

    139 0 89 2

    1 17 0 30 0 0 0 0

    2 118 0 178

    0 0 0 0

    Lanes AM NOON PM AM NOON PM

    AM 0 0 0 AM

    NOON 0 0 0 NOON

    PM 0 0 0 PM

    0 0 0 Lanes

    AM AM

    NOON NOON

    PM PM

    AM NOON PM AM NOON PM

    163 0 110 242 0 113

    135 0 208 271 0 232AM NOON PM AM NOON PM

    AM AM

    NOON NOON

    PM PM

    Date:

    271 0

    700 AM

    Peak Hour Summary

    Southbound Approach Project #:11/17/2016

    W Renaissance Pkwy

    445 PM

    163 0 110

    NLi

    nden

    Ave

    AM Peak Hour

    Thursday

    Wes

    tbou

    ndA

    ppro

    ach

    RialtoDay:

    EastboundA

    pproach

    N Linden Ave and W Renaissance Pkwy , Rialto

    PM Peak Hour

    232

    120

    0

    54

    Signalized

    CONTROL

    Count Periods

    AM

    Start

    4:00 PM

    16-6173-010

    NOON Peak Hour

    NOON

    PM

    7:00 AM

    NONE

    9:00 AM

    NONE

    297

    0

    6:00 PM

    120

    0

    Total Volume Per Leg

    0

    West Leg

    345

    End

    Total Ins & Outs

    North Leg

    0

    0

    0

    Northbound Approach

    South Leg

    East Leg

    0

    0 0

    5475

    West Leg

    South Leg

    318298 0

    East Leg

    North Leg

    129

    513

    0

    0

    00

    177

    0

    0

    0

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 0 0 0 2 0 1 1 2 0 0 2 0

    7:00 AM 0 0 0 53 0 4 8 25 0 0 46 72 2087:15 AM 0 0 0 73 0 5 3 38 0 0 41 23 1837:30 AM 0 0 0 14 0 6 4 35 0 0 24 3 867:45 AM 0 0 0 13 0 9 2 20 0 0 28 5 778:00 AM 0 0 1 7 1 6 3 24 1 0 21 11 758:15 AM 0 0 1 10 0 8 4 30 0 0 15 6 748:30 AM 0 0 0 18 0 4 3 17 0 0 10 6 588:45 AM 0 0 0 3 0 5 4 14 0 0 27 5 58

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 0 0 2 191 1 47 31 203 1 0 212 131 819 0 0 0 0APPROACH %'s : 0.00% 0.00% 100.00% 79.92% 0.42% 19.67% 13.19% 86.38% 0.43% 0.00% 61.81% 38.19%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 700 AM TOTAL

    PEAK HR VOL : 0 0 0 153 0 24 17 118 0 0 139 103 554

    PEAK HR FACTOR : 0.666

    CONTROL :

    N Linden Ave N Linden Ave

    AM

    W Renaissance Pkwy

    NORTHBOUND

    Signalized

    UTURNS

    W Renaissance Pkwy

    0.513

    WESTBOUND

    0.567 0.8230.000

    NS/EW Streets:

    ThursdayProject ID:

    City:

    16-6173-010

    Rialto

    EASTBOUND

    TOTALS11/17/2016

    SOUTHBOUND

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 0 0 0 2 0 1 1 2 0 0 2 0

    4:00 PM 0 0 0 3 0 4 7 26 0 0 22 3 654:15 PM 0 0 0 9 0 3 3 47 0 0 26 4 924:30 PM 0 0 0 12 0 11 5 33 0 0 26 9 964:45 PM 0 0 0 12 0 4 10 42 0 0 13 3 845:00 PM 0 0 0 15 0 7 5 51 0 0 20 9 1075:15 PM 0 0 0 14 0 5 5 45 0 0 32 6 1075:30 PM 0 0 0 13 0 5 10 40 0 0 24 6 985:45 PM 0 0 1 7 0 3 5 37 0 1 14 7 75

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 0 0 1 85 0 42 50 321 0 1 177 47 724 0 0 0 0APPROACH %'s : 0.00% 0.00% 100.00% 66.93% 0.00% 33.07% 13.48% 86.52% 0.00% 0.44% 78.67% 20.89%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 445 PM TOTAL

    PEAK HR VOL : 0 0 0 54 0 21 30 178 0 0 89 24 396

    PEAK HR FACTOR : 0.925

    CONTROL :

    Project ID: 16-6173-010

    City: Rialto

    UTURNS

    11/17/2016

    ThursdayTOTALS

    Signalized

    W Renaissance PkwyNS/EW Streets: W Renaissance Pkwy

    PM

    N Linden Ave N Linden Ave

    0.9290.000 0.743

    WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND

    0.852

  • ITM Peak Hour SummaryPrepared by:

    National Data & Surveying Services

    Lanes 0 2 0 City:

    AM 373 454 0 AM

    NOON 0 0 0 NOON

    PM 132 291 0 PM

    AM NOON PM AM NOON PM Lanes

    160 0 181 1.3

    2 0 6 0.3

    0 0 0 0 250 0 326 1.3

    0 0 0 0

    0 0 0 0

    Lanes AM NOON PM AM NOON PM

    AM 487 254 0 AM

    NOON 0 0 0 NOON

    PM 384 347 0 PM

    2 2 0 Lanes

    AM AM

    NOON NOON

    PM PM

    AM NOON PM AM NOON PM

    862 0 522 412 0 513

    0 0 0 0 0 0AM NOON PM AM NOON PM

    AM AM

    NOON NOON

    PM PM

    Date:

    0 0

    700 AM

    Peak Hour Summary

    Southbound Approach Project #:11/17/2016

    SR-210 WB Ramps

    430 PM

    862 0 522

    NAy

    ala

    DrAM Peak Hour

    Thursday

    Wes

    tbou

    ndA

    ppro

    ach

    RialtoDay:

    EastboundA

    pproach

    N Ayala Dr and SR-210 WB Ramps , Rialto

    PM Peak Hour

    0

    414

    0

    528

    Signalized

    CONTROL

    Count Periods

    AM

    Start

    4:00 PM

    16-6173-014

    NOON Peak Hour

    NOON

    PM

    7:00 AM

    NONE

    9:00 AM

    NONE

    1241

    0

    6:00 PM

    414

    0

    Total Volume Per Leg

    0

    West Leg

    513

    End

    Total Ins & Outs

    North Leg

    704

    0

    617

    Northbound Approach

    South Leg

    East Leg

    741

    0 0

    528423

    West Leg

    South Leg

    522862 0

    East Leg

    North Leg

    951

    412

    1445

    0

    1348731

    827

    617

    704

    0

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 2 2 0 0 2 0 0 0 0 1.3 0.3 1.3

    7:00 AM 129 71 0 0 113 88 0 0 0 68 0 64 5337:15 AM 134 71 0 0 161 101 0 0 0 68 1 35 5717:30 AM 104 52 0 0 99 90 0 0 0 52 0 27 4247:45 AM 120 60 0 0 81 94 0 0 0 62 1 34 4528:00 AM 98 43 0 0 80 81 0 0 0 35 3 28 3688:15 AM 133 60 0 0 66 69 0 0 0 44 0 30 4028:30 AM 95 35 0 0 66 51 0 0 0 52 0 14 3138:45 AM 83 38 0 0 41 42 0 0 0 61 0 10 275

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 896 430 0 0 707 616 0 0 0 442 5 242 3338 0 0 0 0APPROACH %'s : 67.57% 32.43% 0.00% 0.00% 53.44% 46.56% #DIV/0! #DIV/0! #DIV/0! 64.15% 0.73% 35.12%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 700 AM TOTAL

    PEAK HR VOL : 487 254 0 0 454 373 0 0 0 250 2 160 1980

    PEAK HR FACTOR : 0.867

    CONTROL :

    N Ayala Dr N Ayala Dr

    AM

    SR-210 WB Ramps

    NORTHBOUND

    Signalized

    UTURNS

    SR-210 WB Ramps

    0.780

    WESTBOUND

    0.789 0.0000.904

    NS/EW Streets:

    ThursdayProject ID:

    City:

    16-6173-014

    Rialto

    EASTBOUND

    TOTALS11/17/2016

    SOUTHBOUND

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 2 2 0 0 2 0 0 0 0 1.3 0.3 1.3

    4:00 PM 102 71 0 0 66 23 0 0 0 71 0 24 3574:15 PM 99 96 0 0 67 35 0 0 0 68 2 28 3954:30 PM 115 83 0 0 85 41 0 0 0 81 2 42 4494:45 PM 91 95 0 0 73 30 0 0 0 74 1 39 4035:00 PM 100 81 0 0 71 32 0 0 0 78 1 38 4015:15 PM 78 88 0 0 62 29 0 0 0 93 2 62 4145:30 PM 98 95 0 0 49 41 0 0 0 66 1 72 4225:45 PM 73 98 0 0 60 33 0 0 0 83 1 42 390

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 756 707 0 0 533 264 0 0 0 614 10 347 3231 0 0 0 0APPROACH %'s : 51.67% 48.33% 0.00% 0.00% 66.88% 33.12% #DIV/0! #DIV/0! #DIV/0! 63.23% 1.03% 35.74%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 430 PM TOTAL

    PEAK HR VOL : 384 347 0 0 291 132 0 0 0 326 6 181 1667

    PEAK HR FACTOR : 0.928

    CONTROL :

    Project ID: 16-6173-014

    City: Rialto

    UTURNS

    11/17/2016

    ThursdayTOTALS

    Signalized

    SR-210 WB RampsNS/EW Streets: SR-210 WB Ramps

    PM

    N Ayala Dr N Ayala Dr

    0.0000.923 0.817

    WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND

    0.839

  • ITM Peak Hour SummaryPrepared by:

    National Data & Surveying Services

    Lanes 0 2 2 City:

    AM 0 447 258 AM

    NOON 0 0 0 NOON

    PM 0 424 173 PM

    AM NOON PM AM NOON PM Lanes

    0 0 0 0

    0 0 0 0

    1.3 95 0 224 0 0 0 0

    0.3 4 0 8

    1.3 299 0 487

    Lanes AM NOON PM AM NOON PM

    AM 0 646 325 AM

    NOON 0 0 0 NOON

    PM 0 538 367 PM

    0 2 1 Lanes

    AM AM

    NOON NOON

    PM PM

    AM NOON PM AM NOON PM

    0 0 0 0 0 0

    398 0 719 587 0 548AM NOON PM AM NOON PM

    AM AM

    NOON NOON

    PM PM

    Date:

    587 0

    700 AM

    Peak Hour Summary

    Southbound Approach Project #:11/17/2016

    SR-210 EB Ramps

    415 PM

    0 0 0

    NAy

    ala

    DrAM Peak Hour

    Thursday

    Wes

    tbou

    ndA

    ppro

    ach

    RialtoDay:

    EastboundA

    pproach

    N Ayala Dr and SR-210 EB Ramps , Rialto

    PM Peak Hour

    548

    741

    0

    762

    Signalized

    CONTROL

    Count Periods

    AM

    Start

    4:00 PM

    16-6173-015

    NOON Peak Hour

    NOON

    PM

    7:00 AM

    NONE

    9:00 AM

    NONE

    1446

    0

    6:00 PM

    741

    0

    Total Volume Per Leg

    0

    West Leg

    548

    End

    Total Ins & Outs

    North Leg

    746

    0

    911

    Northbound Approach

    South Leg

    East Leg

    971

    0 0

    762597

    West Leg

    South Leg

    719398 0

    East Leg

    North Leg

    1359

    587

    1717

    0

    1816905

    705

    911

    746

    0

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 0 2 1 2 2 0 1.3 0.3 1.3 0 0 0

    7:00 AM 0 189 86 67 113 0 21 2 86 0 0 0 5647:15 AM 0 162 78 81 145 0 28 1 68 0 0 0 5637:30 AM 0 139 86 62 92 0 22 1 85 0 0 0 4877:45 AM 0 156 75 48 97 0 24 0 60 0 0 0 4608:00 AM 0 133 78 32 78 0 14 1 72 0 0 0 4088:15 AM 0 158 70 44 70 0 34 0 60 0 0 0 4368:30 AM 0 106 77 36 84 0 20 1 58 0 0 0 3828:45 AM 0 102 80 25 80 0 22 1 65 0 0 0 375

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 0 1145 630 395 759 0 185 7 554 0 0 0 3675 0 0 0 0APPROACH %'s : 0.00% 64.51% 35.49% 34.23% 65.77% 0.00% 24.80% 0.94% 74.26% #DIV/0! #DIV/0! #DIV/0!

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 700 AM TOTAL

    PEAK HR VOL : 0 646 325 258 447 0 95 4 299 0 0 0 2074

    PEAK HR FACTOR : 0.919

    CONTROL :

    N Ayala Dr N Ayala Dr

    AM

    SR-210 EB Ramps

    NORTHBOUND

    Signalized

    UTURNS

    SR-210 EB Ramps

    0.000

    WESTBOUND

    0.780 0.9130.883

    NS/EW Streets:

    ThursdayProject ID:

    City:

    16-6173-015

    Rialto

    EASTBOUND

    TOTALS11/17/2016

    SOUTHBOUND

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 0 2 1 2 2 0 1.3 0.3 1.3 0 0 0

    4:00 PM 0 134 59 46 92 0 33 0 135 0 0 0 4994:15 PM 0 134 94 34 101 0 59 4 113 0 0 0 5394:30 PM 0 143 92 45 119 0 57 0 117 0 0 0 5734:45 PM 0 125 83 47 101 0 63 2 124 0 0 0 5455:00 PM 0 136 98 47 103 0 45 2 133 0 0 0 5645:15 PM 0 116 90 36 118 0 53 1 104 0 0 0 5185:30 PM 0 142 95 26 91 0 55 0 129 0 0 0 5385:45 PM 0 113 75 35 110 0 58 0 127 0 0 0 518

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 0 1043 686 316 835 0 423 9 982 0 0 0 4294 0 0 0 0APPROACH %'s : 0.00% 60.32% 39.68% 27.45% 72.55% 0.00% 29.92% 0.64% 69.45% #DIV/0! #DIV/0! #DIV/0!

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 415 PM TOTAL

    PEAK HR VOL : 0 538 367 173 424 0 224 8 487 0 0 0 2221

    PEAK HR FACTOR : 0.969

    CONTROL :

    Project ID: 16-6173-015

    City: Rialto

    UTURNS

    11/17/2016

    ThursdayTOTALS

    Signalized

    SR-210 EB RampsNS/EW Streets: SR-210 EB Ramps

    PM

    N Ayala Dr N Ayala Dr

    0.9510.963 0.000

    WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND

    0.910

  • ITM Peak Hour SummaryPrepared by:

    National Data & Surveying Services

    Lanes 1 2 1 City:

    AM 71 542 134 AM

    NOON 0 0 0 NOON

    PM 54 637 219 PM

    AM NOON PM AM NOON PM Lanes

    307 0 188 0

    97 0 46 2

    1 70 0 73 7 0 12 1

    2 91 0 83

    0 113 0 67

    Lanes AM NOON PM AM NOON PM

    AM 69 586 10 AM

    NOON 0 0 0 NOON

    PM 25 619 24 PM

    1 2 1 Lanes

    AM AM

    NOON NOON

    PM PM

    AM NOON PM AM NOON PM

    237 0 125 411 0 246

    274 0 223 235 0 326AM NOON PM AM NOON PM

    AM AM

    NOON NOON

    PM PM 1384668

    747

    716

    662

    0

    South Leg

    348511 0

    East Leg

    North Leg

    1790

    646

    1327

    0

    South Leg

    East Leg

    665

    0 0

    880910

    West Leg

    0

    West Leg

    572

    End

    Total Ins & Outs

    North Leg

    662

    0

    716

    Northbound Approach

    9:00 AM

    NONE

    1710

    0

    6:00 PM

    963

    0

    Total Volume Per Leg

    Count Periods

    AM

    Start

    4:00 PM

    16-6173-016

    NOON Peak Hour

    NOON

    PM

    7:00 AM

    NONE

    Day:

    EastboundA

    pproach

    N Ayala Dr and W Renaissance Pkwy , Rialto

    PM Peak Hour

    326

    963

    0

    880

    Signalized

    CONTROL

    430 PM

    237 0 125

    NAy

    ala

    DrAM Peak Hour

    Thursday

    Wes

    tbou

    ndA

    ppro

    ach

    Rialto

    Date:

    235 0

    700 AM

    Peak Hour Summary

    Southbound Approach Project #:11/17/2016

    W Renaissance Pkwy

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 1 2 1 1 2 1 1 2 0 1 2 0

    7:00 AM 39 175 0 38 129 24 17 28 27 1 54 84 6167:15 AM 16 146 4 45 154 20 20 32 62 2 23 73 5977:30 AM 7 131 5 26 145 10 16 19 14 2 11 74 4607:45 AM 7 134 1 25 114 17 17 12 10 2 9 76 4248:00 AM 7 147 2 23 115 9 15 4 13 0 18 58 4118:15 AM 6 155 2 21 105 7 12 11 13 3 8 57 4008:30 AM 7 122 2 26 104 4 15 8 15 3 7 42 3558:45 AM 9 124 1 25 109 14 13 4 2 4 10 49 364

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 98 1134 17 229 975 105 125 118 156 17 140 513 3627 0 0 0 0APPROACH %'s : 7.85% 90.79% 1.36% 17.49% 74.48% 8.02% 31.33% 29.57% 39.10% 2.54% 20.90% 76.57%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 700 AM TOTAL

    PEAK HR VOL : 69 586 10 134 542 71 70 91 113 7 97 307 2097

    PEAK HR FACTOR : 0.851

    CONTROL :

    ThursdayProject ID:

    City:

    16-6173-016

    Rialto

    EASTBOUND

    TOTALS11/17/2016

    SOUTHBOUND UTURNS

    W Renaissance Pkwy

    0.739

    WESTBOUND

    0.853 0.6010.777

    NS/EW Streets: N Ayala Dr N Ayala Dr

    AM

    W Renaissance Pkwy

    NORTHBOUND

    Signalized

  • Intersection Turning MovementPrepared by:

    National Data & Surveying ServicesDay:

    Date:

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB LANES: 1 2 1 1 2 1 1 2 0 1 2 0

    4:00 PM 4 148 5 63 153 15 10 15 6 2 7 42 4704:15 PM 6 157 1 51 151 14 23 15 17 5 7 42 4894:30 PM 7 154 8 49 158 15 18 15 15 4 14 69 5264:45 PM 5 139 6 59 161 7 17 22 15 3 6 43 4835:00 PM 8 175 9 60 162 11 25 17 24 2 12 36 5415:15 PM 5 151 1 51 156 21 13 29 13 3 14 40 4975:30 PM 12 162 2 47 162 14 17 27 13 3 4 57 5205:45 PM 5 140 6 62 171 10 10 18 11 0 5 42 480

    NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WBTOTAL VOLUMES : 52 1226 38 442 1274 107 133 158 114 22 69 371 4006 0 0 0 0APPROACH %'s : 3.95% 93.16% 2.89% 24.25% 69.88% 5.87% 32.84% 39.01% 28.15% 4.76% 14.94% 80.30%

    nb a nb d sb a sb d eb a eb d wb a nb dPEAK HR START TIME : 430 PM TOTAL

    PEAK HR VOL : 25 619 24 219 637 54 73 83 67 12 46 188 2047

    PEAK HR FACTOR : 0.946

    CONTROL :

    0.707

    WESTBOUND NORTHBOUND SOUTHBOUND EASTBOUND

    0.976

    Signalized

    W Renaissance PkwyNS/EW Streets: W Renaissance Pkwy

    PM

    N Ayala Dr N Ayala Dr

    0.8450.870

    Project ID: 16-6173-016

    City: Rialto

    UTURNS

    11/17/2016

    ThursdayTOTALS

  • ITM Peak Hour SummaryPrepared by:

    National Data & Surveying Services

    Lanes 0 2 1 City:

    AM 50 421 37 AM

    NOON 0 0 0 NOON

    PM 69 502 71 PM

    AM NOON PM AM NOON PM Lanes

    36 0 41 0

    297 0 330 2

    1 99 0 91 102 0 104 1

    2 279 0 392

    0 75 0 58

    Lanes AM NOON PM AM NOON PM

    AM 62 397 43 AM

    NOON 0 0 0 NOON

    PM 76 436 123 PM

    1 1 1 Lanes

    AM AM

    NOON NOON

    PM PM

    AM NOON PM AM NOON PM

    409 0 475 435 0 475

    453 0 541 359 0 586AM NOON PM AM NOON PM