TQM (Mid Sem)

209
Five Phases of TQM Portion Phase 1 – History of Quality Phase 2 – Foundations of Quality Phase 3 – Tools for Implementation of Quality Phase 4 – Organising for Quality Phase 5 – New Trends in Management of Quality

Transcript of TQM (Mid Sem)

Page 1: TQM (Mid Sem)

Five Phases of TQM Portion

Phase 1 – History of QualityPhase 2 – Foundations of QualityPhase 3 – Tools for Implementation of QualityPhase 4 – Organising for QualityPhase 5 – New Trends in Management of Quality

Page 2: TQM (Mid Sem)

Five Phases of TQM PortionPhase 1 – History of QualityDefinitions of Quality – Evolution of Managing for Quality as a Science : QC,CWQC,TQC,TQM – Definition of TQM

Phase 2 – Foundations of QualityWorks of the Quality Pioneers : Dr. W. Edwards Deming – Dr. Deming’s System of Profound Knowledge and Dr. Deming’s 14 points for Management Dr. Joseph M. Juran – The Juran Trilogy , Cost of Quality

Phase 3 – Tools for Implementation of QualityApplication of the 7 QC Tools and Management Tools

Phase 4 – Organising for QualityCorporate Quality and the Quality Director , Quality Council and Quality Circle Implementation , Kaizen and Gemba Kaizen Implementation , ISO 9000 Implementation , Six Sigma Implementation , Models for Quality

Phase 5 – New Trends in Management of QualityBusiness Process Reengineering Implementation , Quality in the Supply Chain , JIT and Quality , Status of TQM in India

Page 3: TQM (Mid Sem)

The first ever article on Quality as we know it today : The Control of Quality in Manufacturing – 1917 by George S. Radford

The first ever book on Quality as we know it today : The Control of Quality in Manufacturing – 1922 by George S. Radford

The Second Book : The most seminal book – Economic Control of Quality of Manufactured Product – 1931 by Walter A. Shewhart

The second book by Shewhart : Statistical Methods from the Viewpoint of Quality Control – 1938 edited by W. Edwards Deming

Evolution of Quality

Page 4: TQM (Mid Sem)

1900s – Inspection1920s – Process Control1950s – Process Improvement1960s – Organisational ( Systems ) Improvement1970s – Business Improvement1980s – Business Excellence1990s – Customer Value Excellence2000 – Environmental Excellence

Many now associate Continual Improvement of Quality with ‘Meaningful Sustainable Development’

Evolution of Quality

Page 5: TQM (Mid Sem)

The total composite product and service characteristics of marketing , engineering , manufacture , and maintenance through which the product and the service in use will meet the expectations of the customer - Armand V. Feigenbaum

A product or a service possesses Quality if it helps someone live better materially and /or otherwise and enjoys a large and sustainable market

- W. Edwards Deming

Quality is defined as fitness for purpose . To be fit for purpose , the product/service must have features that satisfy customer needs and must be delivered free of deficiencies. - Joseph M. Juran

Quality is conformance to requirements - Phillip B. Crosby

Different Definitions of Quality

...degree to which a set of inherent characteristics fulfils requirements- ISO 9000 : 2008

Page 6: TQM (Mid Sem)

Quality of Design / Redesign

Quality of Conformance

Quality of Performance

Customer

Design Product / Service

Purpose – Creating Customer

Value

“Fundamental” Quality Management

Page 7: TQM (Mid Sem)

Deming : The Early Years• Influence of Walter Shewhart – 1920s• Shewhart enlists the 2 types of mistakes and

develops the “Control Theory” to reduce effects of these mistakes

• Deming organises a landmark seminar in 1938 on Statistics at NYU where Shewhart delivers his 4 day lecture on his “Control Theory”

• Application of this theory to 1940 US census by Deming results in savings to the tune of $200 million

• Improvement in productivity during the war in America using Shewhart’s Control Chart

• Sent to lead the 1947 census taking in Japan

Page 8: TQM (Mid Sem)

Deming : The Later Years

• American Response to the use of the Control Chart ( 1942 – 44 ) and afterward

• Japanese experience – 1950 onwards• How the West finally took notice – 1980 onwards• Teachings between 1979 – 1987• Teachings between 1989 – 1993

Page 9: TQM (Mid Sem)

• The marketplace is now global. Basis for trade between countries will be defined by Quality

• The customer is all-important. Seek to cultivate long-term relations with your customers. Seek to continuously understand consumer needs when designing products.

• Quality is determined by managers. The Quality of products and services must reflect consumer needs. Products must be uniform, be consistent, and perform dependably. The Quality of the product cannot be better than the intentions and specifications of management. Quality results from the way managers lead.

• Production is a system. The supplier is your partner. Make the supplier a partner and an integral part of the system. The customer is also part of the system, the most important part of the system.

• The chain reaction. If you improve your processes and product, your costs will decrease and you will capture the market with better Quality and lower prices, thus allowing you to stay in business and provide jobs and more jobs.

• Japan must see itself as a system. There must be trust and cooperation throughout all of industry along with government , education and healthcare in Japan. A common commitment to cooperation must sweep through Japan “like a Prairie fire”

Deming in Japan – 1947 to 1950

Page 10: TQM (Mid Sem)

Production Viewed as a System

CustomerCustomerss

Suppliers of Materials and Equipment

Receipt and Test of Materials

Consumer FeedbackDesign and Re - design

Distribution

Production Assembly Inspection

Tests of Processes , Machines , Methods , Costs

“ I believe this Diagram made the difference in Japan….the greatest way I accomplished anything there was through this diagram ” W. Edwards Deming

Page 11: TQM (Mid Sem)

Improve Quality

Costs Decrease because of less rework , fewer mistakes , fewer delays , snags ; better use of machine time and materials

Productivity Improves

Expand the Market withbetter Quality , LowerPrice , Diversification ,

Innovation

Stay in Business Provide Jobs and more Jobs

Deming Chain Reaction – 1950 ( revised 1988 )

Improve Qualityfurther

And so on…

Page 12: TQM (Mid Sem)

THE DEMING PRIZE ESTABLISHED IN 1950 BY THE JAPANESE UNION OF

SCIENTISTS AND ENGINEERSPeace and happiness through prosperity was in fact at the root of my thoughts when in 1950, in Japan, I wrote the following inscription on the medal for the Deming Prize, given annually by the Deming Prize Committee to a company that has successfully and effectively advanced the Quality of their systems : ‘The right Quality and Uniformity are the foundations of Commerce, Prosperity, and Peace.’ “Quality brings commerce. It brings people together from different parts of the world, makes friends, and brings respect. . . . Quality does not stand still, however. Invention and design of new products are essential parts of Quality. Design, manufacture, marketing, service, testing, all go on forever in a cycle.”

Page 13: TQM (Mid Sem)

Deming’s view of Quality

• Begins with meeting real needs of customers ( in use )

• High degree of Uniformity , predictability• Beyond mere conformance ( to

requirements / specifications )• Joy in Ownership through Joy in Work

Page 14: TQM (Mid Sem)

Four prongs of Quality

• Innovation in products and services• Innovation in process• Improvement of existing products and

services• Improvement of existing processes

Page 15: TQM (Mid Sem)

People are the most important part of a System . They must work in a System to create value for the Customer . The Manager’s Job is

to work on the System and continually improve it with help from the people and the Customer

A Manager’s Job

Page 16: TQM (Mid Sem)
Page 17: TQM (Mid Sem)

System of Profound Knowledge

• Culmination of Dr. Deming’s philosophy• A Theory of Leadership and Management founded in four

different but deeply interconnected sciences• Systems Theory• Human Psychology• Statistical Thinking and Methods• Learning how we learn and Improve

A “tool” for the quest of wisdom

Page 18: TQM (Mid Sem)

System of Profound Knowledge

A different view of events and happenings around us• Not as incidences – rather – as outcomes• Not isolated – rather – deeply connected

Helps us get the “complete” picture

A “lens” with which we view the landscape

To see things we normally wouldn’t see

Page 19: TQM (Mid Sem)

Appreciation for a System

Understanding Variation

Understanding a Theory of

Knowledge

Understanding Psychology

Page 20: TQM (Mid Sem)

What Is A System?

A System is a Network of Interdependent components that work together to achieve the

Aim of the System . Every System must have an Aim , Without an Aim

there is no System

The Three most important words are• Network• Interdependent• Aim

Page 21: TQM (Mid Sem)

System Thinking

• Cause and Effect are not closely related in time or space

• Outputs are a result of a myriad of inputs• Inputs affect each other also• The extent to which inputs affect each other need to

be determined• Effect of environment on the inputs need to be

studied• Effect of the inputs on the environment need to be

studied

Page 22: TQM (Mid Sem)

System Thinking

Important points about a system :• Should have an aim . Without an aim there

is no system ( as before )• Aim is for all the components to gain –

over the long term• Aim is to make life better for everyone

impacted by the System

Page 23: TQM (Mid Sem)

System Thinking

Pattern – Relationships that determine the System’s Characteristics

Structure – The Physical Layout of the System

Processes – Activities that take place in the Structure

Meaning – The Purpose of existence of the system

Page 24: TQM (Mid Sem)

Danger of Sub-optimisation

• Interdependence – knowledge of relationships – need for communication and co-operation

• Efforts to improve a system without considering effect on all outputs may result in sub-optimisation

Page 25: TQM (Mid Sem)

Action Required to Avoid Sub-optimisation

• Co-ordinate activities to optimise whole system• Evaluate performance on basis of contribution

to whole system• Look for opportunities to widen boundaries• Break down barriers – e.g. get together and list

all inputs and outputs

Page 26: TQM (Mid Sem)

• Win – Win : Everyone feels a Winner

• Building trust, gaining commitment

• Making the pie bigger

• Not Mandatory Action , Patience or Collusion

Meaning of Co-operation

Page 27: TQM (Mid Sem)

A Better Way to Compete ?

Co-operation an integral partLittle room for co-operation

Focus on improvement of own work, skills, team work

Focus on other team/person/group

Stress on skills, enjoying, acquiring mastery

Stress on winning

Competing withCompeting against

Fear of losing No such fear

Fight for market share – be no.1

Focus on customers – improve standard of living

Compare performance with others

Continual improvement of product, process

Page 28: TQM (Mid Sem)

Harmful Effects of Competing Against

• Causes conflict and destroys desire to help• Kills intrinsic motivation• Results in Sub-optimisation• Means greater effort to get credit• Implies long-term losses

Page 29: TQM (Mid Sem)

Benefits of Co-operation

• Encourages intrinsic motivation• Results in each department working for

overall good of organisation• Results in huge financial benefits• Produces unprecedented results if no one

cares who gets the credit

Page 30: TQM (Mid Sem)

What should management do?

• Practice co-operation as a system• Provide leadership which nurtures teamwork e.g.

create conditions in which people work in teams with their ‘Suppliers’ and ‘Customers’

• Remove various manifestations of win – lose philosophy

• Extend “all one team” outside the organisation• Build Trust

Page 31: TQM (Mid Sem)

Areas and their

options

Effects of Options

Effect on Area A

Effect on Area B

Effect on Area C

Net Effect on the

Company

Area A

i + - - -

ii + - + +

iii + - - -

Net effect on the company = ‘ - ’Net effect on the company = ‘ - ’

Page 32: TQM (Mid Sem)

Areas and their

options

Effects of Options

Effect on Area A

Effect on Area B

Effect on Area C

Net Effect on the

Company

Area B

i - + - -

ii + + - +

Net effect on the company = ‘ 0 ’Net effect on the company = ‘ 0 ’

Page 33: TQM (Mid Sem)

Areas and their

options

Effects of Options

Effect on Area A

Effect on Area B

Effect on Area C

Net Effect on the

Company

Area C

i + + + +++

ii - - + -

iii - - + -

Net effect on the company = ‘ + ’Net effect on the company = ‘ + ’

Page 34: TQM (Mid Sem)

Areas and their options

Effects of Options

Effect on Area A

Effect on Area B

Effect on Area C

Net Effect on the

Company

Area A

i + - - -

ii + - + +

iii + - - -

Area B

i - + - -

ii + + - +

Area C

i + + + +++

ii - - + -

iii - - + -

Net Effect of Adopted Options

++ -- 0 0

Page 35: TQM (Mid Sem)

Areas and their

options

Effects of Options

Effect on Area A

Effect on Area B

Effect on Area C

Net Effect on the

Company

Area A

i + - - -

ii + - + +

iii + - - -

Area B

i - + - -

ii + + - +

Area C

i + + + +++

ii - - + -

iii - - + -

Net Effect of Adopted Options

+++ + + +++++

Page 36: TQM (Mid Sem)

Areas and their options

Effects of Options

Effect on Area A

Effect on Area B

Effect on Area C

Net Effect on the Company

Area A

i + - - -

ii + - + +

iii + - - -

iv - + + +

v - + + +

vi - - + -

Area B

i - + - -

ii + + - +

iii + - + +

iv + - + +

Area C

i + + + +++

ii - - + -

iii - - + -

iv + + - +

v + - - -

Net Effect of Adopted Options ++++ ++ ++++

++++++++++

Page 37: TQM (Mid Sem)

Appreciation for a System

Understanding Variation

Understanding a Theory of

Knowledge

Understanding Psychology

Page 38: TQM (Mid Sem)

Questioning

Confirming

ExperimentingActing

Hypothesis

ExplorationVerification

Improvement

System of Learning

Page 39: TQM (Mid Sem)

Appreciation for a System

•Understanding that cause and effect are not closely related in time and space

•Understanding that outputs are the results of a myriad of inputs .

•Understanding the importance of a common aim or purpose for the system.

Understanding a Theory of Knowledge

•Understanding the importance of theory to interpret observations ( experience ) .

•Understanding the importance of theory and practice .

•Understanding how to learn faster .

Understanding Variation

•Awareness of the distinction between Common and Special Causes of Variation and how to interpret Control Charts

•Learning how to think statistically•Understanding that reducing variation is

synonymous to increasing Quality .

Psychology• Understanding that people are inherently good -

they want to do a good job . • Understanding that people learn differently , and

hence think differently . Working on peoples’ learning processes rather than exhorting them would be better .

• Understanding that ranking destroys people .

Peter Scholtes’ portrayal of Dr. Deming’s System of

Profound Knowledge

Page 40: TQM (Mid Sem)

Viewing an event with Theory 1

Page 41: TQM (Mid Sem)

Viewing an event with Theories 1 & 2

Page 42: TQM (Mid Sem)

Viewing an event with Theories 1 , 2 & 3

Page 43: TQM (Mid Sem)

The “true” picture – What was your guess ?

Page 44: TQM (Mid Sem)
Page 45: TQM (Mid Sem)

• Important points to keep in mind:– Not his philosophy but 14 consequences of his

philosophy– Not a list of instructions, techniques, check list or

prescription.– Vehicles for opening up the mind to new thinking –

radically different ways of managing. – Lay the foundation for the transformation – a change of

magnitude never imagined

"The 14 points all have one aim : to make it possible for people to work with joy."

Deming’s 14 points for management.

Page 46: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Deming’s 14 points for management.

Point 1 Create a statement of the aim and purpose of the organisational system.

It must bring out the long term vision of the organisation preferably stating how it intends to stay in business through creating value for all those impacted in any way .

Page 47: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 2

Adopt the new philosophy of win – win where everybody wins . Teach and practise this philosophy with all customers , suppliers and competitors . Focus on expanding the market rather than capturing it .

Deming’s 14 points for management.

Page 48: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 3

Use the system of inspection to understand the gaps in how you perceive a Customer requirement and how the Customer actually perceives it .

Try to reduce these gaps by first trying to understand customer requirements thoroughly – then deploy this learning throughout the organisation .

Design Quality in .

Deming’s 14 points for management.

Page 49: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 4 Work towards having an ‘arms-around’ relationship with your suppliers . Invest in them through education and training so they can contribute effectively towards the organisation . When purchasing , do not focus on price alone without a measure of Quality . Reduce Variation by practising co-operation with your suppliers .

Deming’s 14 points for management.

Page 50: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 5

Look for better ways of understanding and analysing the processes/systems you work in . Keep improving and innovating continually . Systemise this philosophy . Find out problems before they find you out .

Deming’s 14 points for management.

Page 51: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 6

Training must not only focus on how the job is done but also the purpose of the job being carried out . Everyone must know how they are contributing to the entire system . Training must also aim at creating learners . This forms the basis for continual improvement and motivates intrinsically .

Deming’s 14 points for management.

Page 52: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 7

Create Leaders . Managers are no longer just planners/instruction-givers . They must be leaders . People are the most important part of a System . They must work in a System to create value for the Customer . The Manager’s Job is to work on the System and continually improve it with help from the people and the Customer by leading people , coaching them and counselling them in  a non-judgmental manner .

Deming’s 14 points for management.

Page 53: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 8

Create a climate of openness , trust and two-way communication .

People must not be afraid to voice their problems / constraints they are facing thatprevent them from doing a better job .

Deming’s 14 points for management.

Page 54: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 9

Encourage systems thinking in the organisation where everybody focuses on creating value for the customer and not just meeting departmental/sectional objectives .

Optimise the efforts of everyone – do not maximise individual efforts .

Deming’s 14 points for management.

Page 55: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 10 Do not create a superficial leadership culture by using impressive-sounding but shallow slogans, posters and exhortations and arbitrary numerical targets.A genuine leadership culture focuses on improving the work environment so that people are intrinsically motivated to do productive work and, if useful, createtheir own slogans and posters .

Deming’s 14 points for management.

Page 56: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 11

Do not attempt to manage the organisational systems and processes solely by irrelevant and arbitrary measures such as quotas and targets . These are merely single dimensional aspects of very multi-dimensional entities

Instead, encourage systems thinking – i.e. understanding and establishing interdependencies between the different parts of the system and thus looking beyond theblinkered view presented by quotas, numerical targets and objectives.

Deming’s 14 points for management.

Page 57: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 12

Develop a sense of ownership in every employee working in the system so that s/he could take pride and joy in the work they do .

They must feel ‘one’ with their work thus creating results themselves .

Deming’s 14 points for management.

Page 58: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 13

Encourage learning . Develop learners . People are the only living parts of an organisation . For an organisation to grow fast and move in the right direction , it is essential that people are growing and learning . Pay is not as much a motivator as learning is . Continual learning leads to Continual innovation and improvement .

Deming’s 14 points for management.

Page 59: TQM (Mid Sem)

Appreciation for a SystemUnderstanding VariationUnderstanding PsychologyUnderstanding a Theory of Knowledge

Point 14

Create a structure and a system in the organisation that embodies all of the above principles . Nurture relationships . Extend the boundaries of the organisation to include all those impacted . This will result in long term profits beyond measures and long term survival .

Deming’s 14 points for management.

Page 60: TQM (Mid Sem)

•Appreciation for a System

• Knowledge of Psychology

• Knowledge of Variation

• A Theory of Knowledge

Create a constancy of purpose toward improvement of product and service, with the aim to become competitive and to stay in business, and to provide jobs.

Break down barriers between departments. People in research, design, sales, and production must work as a team, to foresee problems of production and in use that may be encountered with the product or service.

Remove barriers that rob people of pride of workmanship.

Adopt the new philosophy of win – win. We are in a new economic age. Western management must awaken to the challenge, must learn their responsibilities, and take on leadership for change.

Cease dependence on mass inspection to achieve quality. Eliminate the need for inspection on a mass basis by building quality into the product in the first place.

a) Eliminate work standards (quotas) on the factory floor. Substitute leadership.

b) Eliminate management by objective. Eliminate management by numbers, numerical goals. Substitute leadership.

Institute training on the job.

Eliminate slogans, exhortations, and targets for the work force demanding zero defects and new levels of productivity.

Drive out fear so that everyone can work effectively for the company.

Adopt and institute leadership. The aim of leadership should be to help people and machines do a better job.

Institute a vigorous programme of education and self-improvement.

Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease costs.

End the practice of awarding business on the basis of price tag alone. Instead, minimise total cost. Move toward a single supplier for any one item, in a long-term relationship of loyalty and trust.

Take action to accomplish the transformation.

Page 61: TQM (Mid Sem)

The Product . Your own tests of the Product

in the laboratory and in simulations of use .Test of the

Product in service .

Training of Customer . Instructions for use . Training of Repairmen . Service . Replacement of Defective Parts . Availability of Parts . Advertising and Warranty : What did you lead the Customer to expect ? What did your Competitor lead him to expect ?

The Customer and the way he uses the Product . The way he

installs it and maintains it . For many products , what the

Customer will think about your Product a year , three years ,

five years from now is important .

The Three Corners of Quality

Page 62: TQM (Mid Sem)

The Cycle for Executives

The Cycle for Engineers

1

2

3

45

6

7

8

1. Idea for placing importance on Quality

2. Responsibility for Quality3. Research4. Standards for Designing and Improvement of Products5. Economy of Manufacturing6. Inspection of Products7. Expansion of Sales Channels8. Improvement

Page 63: TQM (Mid Sem)

Customer

1.Design the Product (with appropriate Tests)

2.Make it, test it in the Production Line and in the Laboratory

3. Put it on the Market

4.Test it in Service, through Market Research, find out what the user thinks of it, and why the non-user ha snot bought it

THE DEMING WHEEL

manufacturer the user andthe non user

Page 64: TQM (Mid Sem)

Plan a change or a test aimed at improvement

Do - Carry out the change or test ( preferably on a small scale )

Study the results . What went wrong? What did we learn?

Act - Adopt the change , or abandon it , or run through the cycle again

Page 65: TQM (Mid Sem)

Impact Traditional view of quality Enlightened view of Quality

Products Manufactured Goods All products and services whether for sale or not

Processes Manufacturing or visible processes

All processes

Viewed as A technological opportunity A Business opportunity

Customer Clients who buy products All those impacted

Evaluation Conformance to specifications, procedures, standards

Responsiveness to Customer needs, extent to which Customer value is created

Improvement Departmental Companywide

Initiatives led by

The Quality Manager Top Management

Page 66: TQM (Mid Sem)

Freedom from Deficiencies

Less Waste ,

Less Scrap

Lower Costs

Less Warranty

Costs

Less Cycle Time

Increase in Profits

Features that lead to Customer Satisfaction

Increased Demand

Increased Market Share

Increased Price

Page 67: TQM (Mid Sem)

Freedom from Deficiencies

• Reduction in errors• Reduction in wastes• Reduction in failures at

the Customers’ end ( field failures )

• Reduction in inspection and tests

• Reduction in Response times

• Increase in yield and capacity

• Increase in delivery performance

Features that enhance Customer satisfaction

• Increased Customer Base• Increased Market Share• Premium Price

Page 68: TQM (Mid Sem)

Qu

ality

Imp

rovem

en

t

%

of

Def

ects

5

10

15

20 Quality Planning Sporadic SpikeSporadic Spike

Quality Control

Lessons Learned

Dete

rmin

ing

the

Cost

of

Qualit

y ,

W

here

are

w

e ri

ght

now

?W

hat

do w

e need to

develo

p ?

Original Zone ofQuality Control

Original Zone ofQuality Control

New Zone ofQuality Control

The Juran Trilogy

Time

Page 69: TQM (Mid Sem)

Revenue : All the money that a company takes in , in any given year

Costs : All the items which use or take a company’s cash to run the business

Assets : Company owned items which can be converted into cash

Page 70: TQM (Mid Sem)

Return on Assets =

Revenue minus Costs

Assets

Page 71: TQM (Mid Sem)

Cost of Quality = Cost of Conformance + Cost of Non – Conformance +

Cost of Lost Opportunities

Cost of Conformance = Cost of Prevention +

Cost of Appraisal

Page 72: TQM (Mid Sem)

Cost of Non – Conformance = Cost of Internal Failure +

Cost of External Failure +

Cost of Exceeding Requirements

Cost of Lost Opportunities = Cost of Lost Opportunities

Page 73: TQM (Mid Sem)

Costs of Prevention

Cost of activities that prevent failure from happening• Planning for Quality• Reviews• Process Design• Process Control • Quality Audits• Supplier Evaluation• Training for Quality

Page 74: TQM (Mid Sem)

Cost of Appraisal

Cost incurred to determine conformance with Customer requirements after the work has been completed

• Inspection and Tests ( Incoming , Inprocess and Final stages )

• Document Reviews• Accounts Reconciliation• Maintaining accuracy of Test Equipment• Reconciliation of Stocks , Equipment , etc

Page 75: TQM (Mid Sem)

Cost of Internal Failure

Cost of correcting products or services which do not conform to internal customer requirements or are identified prior to delivery as not meeting the requirements of external customersFailure to meet Customer Requirements and Needs

• Scrap• Rework• Missing Information• Failure Analysis• 100 % Sorting• Reinspection , retests• Changing Processes• Redesign of Hardware and Software• Downgrading

Page 76: TQM (Mid Sem)

Cost of Internal Failure

Cost of Inefficient Processes• Variability in Product Characteristics• Unplanned Downtime of equipment• Inventory Shrinkage• Non value added activities

Page 77: TQM (Mid Sem)

Costs of External Failure

Costs to correct products or services after delivery to the Customer

• Warranty Charges• Complaint Adjustments• Returned Material• Allowances• Penalties• Rework

Cost of Exceeding Requirements

Cost of providing Information or Services which are not necessary or for which no requirements have been established

Page 78: TQM (Mid Sem)

Cost of Lost Opportunities

Lost Profits due to the company not satisfying or being able to satisfy , the requirements of external customers

Page 79: TQM (Mid Sem)

Implementation of the Quality Initiative through time

LO

C

NC

LO

C

NCLO

C

NC

Evolution of the Cost of Quality over time

Page 80: TQM (Mid Sem)

APPLY MEASUREMENTS

THROUGHOUT

Quality Goals Identify Customers

Identify NeedsTranslate Needs

Establish Measures Develop Product

Develop ProcessOptimise Process

Transfer to Operations

QUALITY PLANNING

Page 81: TQM (Mid Sem)

QUALITY PLANNING

1. Define the Project What do we need to build ?2. Identify the Customers . Who will be impacted by our efforts ?3. Discover Customer Needs . What benefit do the Customers want ?4. Develop the Product / Service . What Product features will create that benefit ?5. Develop the Processes . How will we produce the product features? 6. Develop Controls / Transfer to Operations . How do we ensure it works as designed ?

Page 82: TQM (Mid Sem)

Cust

om

ers

Cust

om

er

Needs

Product Features

Pro

duct

Fe

atu

res

Pro

cess

Fe

atu

res

Process Controls

Customer Needs

ProcessFeatures

UnderstandingMatrix

DesignMatrix

ProcessMatrix

OperationsMatrix

Spreadsheets in Quality Planning

Page 83: TQM (Mid Sem)

PRODUCT QUALITY

PLANNING TIMING CHART

Planning

ConceptInitiation / Approval

PLAN AND DEFINE

PROGRAMME

Page 84: TQM (Mid Sem)

Plan and Define Programme

Inputs

•Voice of the Customer―Market Research―Historical Warranty and Quality Information―Team Experience

•Business Plan / Marketing Strategy•Product / Process Benchmark Data•Product / Process Assumptions•Product Reliability Studies•Customer Inputs

Page 85: TQM (Mid Sem)

Plan and Define Programme

Outputs

•Design Goals•Reliability and Quality Goals•Preliminary Listing of Special Product and Process Characteristics

Page 86: TQM (Mid Sem)

Interrelationships

Counterpart Characteristics

Relationships between Attributes and

Counterpart Characteristics

Attrib

ute

s

Voice

of th

e

Custo

mer

Prio

rity

Com

petitiv

e

Evalu

atio

n

Priorities of Characteristics

Page 87: TQM (Mid Sem)

PRODUCT QUALITY

PLANNING TIMING CHART

Planning

Product Design and Development

ConceptInitiation / Approval

ProgrammeApproval

PLAN AND DEFINE

PROGRAMME

Page 88: TQM (Mid Sem)

Product Design and Development

Inputs

•Design Goals•Reliability and Quality Goals•Preliminary Listing of Special Product and Process Characteristics

Page 89: TQM (Mid Sem)

Product Design and Development

Outputs

• Design for Manufacturability ( Realisation ) and Assembly• Design Verification• Design Reviews• Sketches / Drawings or “Feelers”• New Equipment and Facilities Requirements• Special Product/Service and Process Characteristics• Testing/Simulation Requirement• Team Feasibility Commitment

Page 90: TQM (Mid Sem)

PRODUCT QUALITY

PLANNING TIMING CHART

Planning

Product Design and Development

Process Design and Development

ConceptInitiation / Approval

ProgrammeApproval Prototype

PLAN AND DEFINE

PROGRAMME

PRODUCT DESIGN AND DEVELOPMENT

VERIFICATION

PROCESS DESIGN AND DEVELOPMENT

VERIFICATION

Page 91: TQM (Mid Sem)

Process Design and Development

Inputs

• Design for Manufacturability ( Realisation ) and Assembly• Design Verification• Design Reviews• Sketches / Drawings or “Feelers”• New Equipment and Facilities Requirements• Special Product/Service and Process Characteristics• Testing/Simulation Requirement• Team Feasibility Commitment

Page 92: TQM (Mid Sem)

Outputs

•Packaging Standards and Specifications•Product / Process Quality System Review•Process Flow Chart•Floor Plant Layout•Characteristics Matrix•Process Instructions•Preliminary Process Capability Study Plan

Process Design and Development

Page 93: TQM (Mid Sem)

PRODUCT QUALITY

PLANNING TIMING CHART

Planning

Product Design and Development

Process Design and Development

Product and Process Validation

ConceptInitiation / Approval

ProgrammeApproval Prototype Pilot Launch

PLAN AND DEFINE

PROGRAMME

PRODUCT DESIGN AND DEVELOPMENT

VERIFICATION

PROCESS DESIGN AND DEVELOPMENT

VERIFICATION

PRODUCT AND

PROCESS VALIDATION

Page 94: TQM (Mid Sem)

Product and Process Validation

Inputs

•Packaging Standards and Specifications•Product / Process Quality System Review•Process Flow Chart•Floor Plant Layout•Characteristics Matrix•Process Instructions•Preliminary Process Capability Study Plan

Page 95: TQM (Mid Sem)

Outputs

•Production Trial Run•Preliminary Process Capability Study•Production Part Approval•Production / Service Validation Testing•Packaging Evaluation•Team Sign-off

Product and Process Validation

Page 96: TQM (Mid Sem)

PRODUCT QUALITY

PLANNING TIMING CHART

Planning

Product Design and Development

Process Design and Development

Product and Process Validation

Production

Feedback Assessment and Corrective Action

ConceptInitiation / Approval

ProgrammeApproval Prototype Pilot Launch

PLAN AND DEFINE

PROGRAMME

PRODUCT DESIGN AND DEVELOPMENT

VERIFICATION

PROCESS DESIGN AND DEVELOPMENT

VERIFICATION

PRODUCT AND

PROCESS VALIDATION

FEEDBACK ASSESSMENT AND CORRECTIVE

ACTION

Page 97: TQM (Mid Sem)

Feedback , Assessment and Corrective Action

Inputs

•Production Trial Run•Preliminary Process Capability Study•Production Part Approval•Production / Service Validation Testing•Packaging Evaluation•Team Sign-off

Page 98: TQM (Mid Sem)

Feedback , Assessment and Corrective Action

Outputs

•Reduced Variation•Customer Satisfaction•Delivery and Post Delivery Service

Page 99: TQM (Mid Sem)

PRODUCT QUALITY

PLANNING TIMING CHART

Planning

Product Design and Development

Process Design and Development

Product and Process Validation

Production

Feedback Assessment and Corrective Action

Planning

ConceptInitiation / Approval

ProgrammeApproval Prototype Pilot Launch

PLAN AND DEFINE

PROGRAMME

PRODUCT DESIGN AND DEVELOPMENT

VERIFICATION

PROCESS DESIGN AND DEVELOPMENT

VERIFICATION

PRODUCT AND

PROCESS VALIDATION

FEEDBACK ASSESSMENT AND CORRECTIVE

ACTION

Page 100: TQM (Mid Sem)

The Control Pyramid

Informational Controls

Supervisory Control

Operator Control

Automatic Controls

Error Proofing

Page 101: TQM (Mid Sem)

Choose the control subject – What do we want to regulate ?

A Negative Approach :A Control Subject emerges out of a “Bitter Experience” or Catastrophic Failure

A Positive Approach : ( A Deliberate Effort to “unearth” Control Subjects moving up the Control Pyramid )

•Highly Repetitive Activities ( Fool Proofing and / or Automation )•Effect of failures are “obvious” and localised and losses occurring are minor ( Operator Control )•Coordination , Discipline , Fluidity of Operations , High Risk Factors ( Supervisory Control )•Matters of Company Performance , Hierarchal or Geographic factors , Extensive Analysis , Great Risks ( Informational Control )

Page 102: TQM (Mid Sem)

Establish Measures – How can these be expressed in terms of units , ratios , indexes etc. ?

Create a Sensor – How can these measures be captured in a timely manner ?

Establish Standards – What are the instances which will • warrant concern ( indicators ) ? • indicate normalcy ?

Measure continual performance ( frequency ) – Decide where , who , when and how to measure actual performance

Compare to Established Standards – Decide on who does this and how this is to be done

Take action on the difference – Is the difference pronounced so as to precipitate a systemic change , process change , task change , etc ?

Page 103: TQM (Mid Sem)

Process Sensor Goal

Actuator Umpire

1

2 3

4

5

1 – Sensor plugged into the Process to evaluate actual performance

2 – Sensor ‘reports’ performance to the Umpire

3 – Umpire compares performance to Goal

4 – Umpire reports difference to the Actuator

5 – Actuator alters process to bring output in line with goals

Page 104: TQM (Mid Sem)

Set standards for Control and Improvement

Input Transformation OutputCustomer Value

( other stakeholders )

P

DS

A

Preliminary Control

Concurrent C

ontrol

Rew

ork C

ontro

l

Feed back information on performance , study relationships among measures of performance throughout the system , and take action to improve

Communicate Standards

Information on value delivered and unmet Customer needs

Loss

Con

trol

Page 105: TQM (Mid Sem)

Control Subject

Nominal Measure Unit SensorFrequency of measurement

Location of Measurement

Criteria for action

Action taken

Page 106: TQM (Mid Sem)

12

3

45

6

7

8

1. Form a Quality Council2. Analyse the Symptoms3. Theorise as to the causes4. Test the Theories5. Establish the causes6. Stimulate the establishment of a

remedy7. Test the Remedy under Operating

conditions8. Establish controls to hold the gains

1 – 5 : The Diagnostic Journey6 – 8 : The Remedial Journey

Page 107: TQM (Mid Sem)

Project Definition and Organisation

Diagnostic Journey

Remedial Journey

Holding the Gains

•Breakthrough in Attitude

•Breakthrough in Organisation

Demonstrated Control at the new level

Mission Statement and Team Charter

Identified Root Causes

•Breakthrough in Cultural Patterns

Implemented Solutions

•Breakthrough in Results

Juran on Quality Improvement

Page 108: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 109: TQM (Mid Sem)

Interrelationships

Counterpart Characteristics

Relationships between Attributes and

Counterpart Characteristics

Attrib

ute

s

Voice

of th

e

Custo

mer

Com

petitiv

e

Evalu

atio

n

Priorities of Characteristics

Pri

ori

ty

Page 110: TQM (Mid Sem)

Cust

om

er

Needs Design Attributes

Features ProcessSteps Operational

ConditionsQualityPlan

House of QualityDesignMatrix Process

MatrixOperationalMatrix

ControlMatrix

Page 111: TQM (Mid Sem)

The Progression from Philosophy to Action

Philosophy – W. Edwards Deming

Structure and Approach – Joseph M. Juran

Frameworks – Just in Time , ISO 9000 , Baldrige Criteria

Methods – SPC , QFD , DOE , QIT

QC Tools and Management Tools

Page 112: TQM (Mid Sem)

Deming’s contribution to the Field of Statistics

Distinguishing between Enumerative and Analytical Studies

Enumerative Number crunching exercises – data collection , assimilation and presentation

AnalyticalApplication of the Control Theory , Scientific Method and Subject Matter Knowledge to understand the situations which led to the data being generated – in other words study of the causal systems .

Page 113: TQM (Mid Sem)

Common & Special Cause Variation

Common Causes VariationVariation that exists in a system due to inherent properties of the system itself ( it’s design ) or the way it’s managed...

Special Cause VariationVariation that exists in a system due to some external factors – factors not a part of the system but alien to it...

Page 114: TQM (Mid Sem)

Conventional Data Interpretation

• Common approaches are :•comparison to specifications or managing by

the last data point• Common Traps in use of Figures alone :

•Too little attention to matters for which figures are not available.

•Forcing wrong figures (due to fear).•Misuse and abuse of figures

Page 115: TQM (Mid Sem)

Data presentationShewhart’s Rule One when presenting Data :

Data should always be presented in such a way that preserves the evidence in the data for all the predictions that might be made from these data .

In short the following questions need to be asked :

• Who collected the data ?• How were the data collected ?• When were the data collected ?• Where were the data collected ?• What do these values represent ?• And if the data are computed values , how were the

values computed from the raw inputs ?• Has there been a change in formula over time ?

Page 116: TQM (Mid Sem)

Shewhart’s Rule Two when presenting data

Whenever an average , range or histogram is used to summarise data , the summary should not mislead the user into taking any action that the user would not take if the data were presented in a time series .

In short :

• No comparisons must be made between pairs of values except as a part of a broader comparison .

• Use time Series graphs to present values in their context .

Data presentation

Page 117: TQM (Mid Sem)

Shewhart’s control chart approach

• Control chart : a time series graph with a central line (average), UCL & LCL

• Shewhart gave a simple practical way of calculating limits

• Focus on process instead of each value – hence yields insight and understanding.

Page 118: TQM (Mid Sem)

Shewhart’s control chart approach

• The Control Chart is an “Operational Definition” of a process in a state of Statistical Control

• Not based on laws of probability• Not a test of Statistical significance• Empirical laws laid down by Shewhart on May 16th

1924 that have stood the test of time

Page 119: TQM (Mid Sem)

Control Charts:Some Relevant Points

• Different types of charts for different situations but XmR & XbarR are most used.

• Unstable processes : unpredictable changes; no significant changes in stable processes.

Page 120: TQM (Mid Sem)

Control ChartThe methodology.

• A) The XmR chart.– Useful for ‘one – at – a – time’ data– Can be used with 15 – 20 observations– Can also be used with 7 observations – but

to interpret with care !!

Page 121: TQM (Mid Sem)

Control ChartThe methodology

• A) The XmR chart (continued).– For X chart (individual values).

• Upper Natural Process Limit=Xbar+2.66*Rbar.• Lower Natural Process Limit=Xbar-2.66*Rbar.

Page 122: TQM (Mid Sem)

16.0 15.8 15.7 15.9 16.2

16.2 16.4 16.5 16.2 16.0

15.7 16.1 15.5 15.1 16.0

16.1 15.7 16.0 16.0 15.5

16.4 15.9 16.3 16.2 16.6

15.9 16.1 15.6 15.8 15.8

Page 123: TQM (Mid Sem)

Chart for Weights of Yarn used

15.0

15.2

15.4

15.6

15.8

16.0

16.2

16.4

16.6

16.8

17.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Shift data

Gra

ms

16.84

15.11

15.97

Page 124: TQM (Mid Sem)

1999 2000

Jan 5 Jan 4

Feb 4 Feb 6

Mar 6 Mar 5

Apr 7 Apr 4

May 6 May 7

Jun 5 Jun 4

Jul 6 Jul 7

Aug 6 Aug 5

Sep 5 Sep 4

Oct 14 Oct 5

Nov 6 Nov 17

Dec 7 Dec 4

Page 125: TQM (Mid Sem)

Chart for absenteeism

0

2

4

6

8

10

12

14

16

18

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Month

% o

f abs

ente

eism

16.04

6.21

0.00

Page 126: TQM (Mid Sem)

The XbarR chart• For Xbar chart • Make Subgroups• Calculate Average and Range for each sub

group• Calculate grand average of average ( X double

bar ) and range ( R bar ) Upper Natural Process Limit=Xdbar+A2*Rbar.

Lower Natural Process Limit=Xdbar-A2*Rbar.

Control ChartThe methodology

Page 127: TQM (Mid Sem)

99.7 99.0 99.7 99.1 100.2 99.1 100.2 99.2 99.2 100.3

99.8 100.3 99.6 100.4 100.0 99.3 100.1 99.6 99.8 100.1

99.9 100.1 99.4 99.3 99.9 99.5 100.0 99.5 99.7 100.0

99.9 100.0 100.4 99.9 99.9 99.6 99.9 99.3 99.6 99.9

100.0 99.9 99.3 100.2 99.8 99.7 99.7 99.7 99.5 99.9

100.1 99.9 99.1 99.8 99.8 99.8 99.6 99.8 99.4 99.8

99.4 99.8 100.1 99.9 99.7 100.1 99.5 100.0 100.2 99.7

99.5 99.7 99.9 100.0 99.6 100.0 99.3 99.9 99.9 99.6

99.6 99.6 99.9 99.8 99.5 99.9 99.2 100.2 100.0 99.5

100.3 99.6 100.0 99.7 99.3 99.8 99.8 100.1 100.1 99.4

Page 128: TQM (Mid Sem)

99.76

99.28

100.25

Page 129: TQM (Mid Sem)

7 10 11

4 2 5

6 3 8

9 8 12

7 8 6

5 5 8

6 3 6

8 4 6

5 5 6

10 9 12

6 12 10

7 9 10

4 6 7

6 5 5

5 7 7

4 4 3

7 4 8

15 18 19

7 5 3

6 6 6

A2 for n = 3 is 1.02

Page 130: TQM (Mid Sem)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

10.14

4.02

7.08

Page 131: TQM (Mid Sem)

Total Rejection Percentage

Page 132: TQM (Mid Sem)

Percentage of Shifting

Page 133: TQM (Mid Sem)

Total Rejection Percentage

Page 134: TQM (Mid Sem)

Percentage of Shifting

Page 135: TQM (Mid Sem)

Total Rejection Percentage

Page 136: TQM (Mid Sem)

Percentage of Shifting

Page 137: TQM (Mid Sem)

Trend Analysis

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

Month

Page 138: TQM (Mid Sem)

Chart for Shifting percentages

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Month

Page 139: TQM (Mid Sem)

Contribution made in Dollar/manhour

300

400

500

600

700

800

900

1000

1100

1 2 3 4 5 6 7

Driver no

Page 140: TQM (Mid Sem)

Chart for faults per 5000 welds

0

5

10

15

20

25

30

1 2 3 4 5 6 7 8 9 1 11

Welder No.

Welder No. 6 in need of attention .Upon examination it was found that

his eyes needed treatment

Page 141: TQM (Mid Sem)

Purchase Costs over Time

1.95

2

2.05

2.1

2.15

2.2

Month

Valu

e in

La

khs

Page 142: TQM (Mid Sem)

Rejection Percentages over time

0

2

4

6

8

10

12

14

16

18

Month

Va

lue

in

La

kh

s

Page 143: TQM (Mid Sem)

XmR chart for failures of Lube Oil System on Load Box/Road Trial for rebuilt locomotives of DCW/PTA

(Limits are calculated based on values from Jan 2004-Dec 2005)

Page 144: TQM (Mid Sem)

50

55

60

65

70

75

80

85

90

95

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Use of beta blocker 2

Use of beta blocker 1

Page 145: TQM (Mid Sem)

8.7 9.6 12.6 9.5

11.3 9.9 8.9 10.6

8.5 8.4 9.0 9.3

7.8 10.2 8.3 8.6

10.4 9.2 10.3 10.1

8.8 9.1 9.4 9.6

The following data were collected by an Production Manager in a Fertilizer Company . The data represent pH values of a certain chemical used to make the fertilizer . Compute the Control Limits of the process if the XmR method is used . If the Specification Limits are set at 9 ± 4.5 , what will be the values of Cp , Cpl and Cpu ? Suppose the Manager wants to implement the Six Sigma approach in this process , what will the limits become ? The Flow of the data collected is from left to right .

The following data were collected by an Production Manager in a Fertilizer Company . The data represent pH values of a certain chemical used to make the fertilizer . Compute the Control Limits of the process if the XmR method is used . If the Specification Limits are set at 9 ± 4.5 , what will be the values of Cp , Cpl and Cpu ? Suppose the Manager wants to implement the Six Sigma approach in this process , what will the limits become ? The Flow of the data collected is from left to right .

Page 146: TQM (Mid Sem)

What are the instances in a Control Chart that warrant attention?

•One point outside the control limits

•Seven points in a row all above/ below average

•Seven points in a row all increasing/ decreasing.

THE CONTROL CHART IS NO SUBSTITUTE FOR THE BRAIN

Page 147: TQM (Mid Sem)

Benefits of Control Charts

• For all levels – worker to CEO• Prediction of performance• Assessing effect of improvements• Common language• Local or management action• Immense benefits by use at top levels

Page 148: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 149: TQM (Mid Sem)

Cost of Quality Example

The following costs were recorded in an organisation . Arrange them under different heads of the Cost of Quality as appropriate .

Defective Stock Returned from Customer – Rs 1,50,000Repairs to Product – Rs 4,50,000Collect Scrap – Rs 10,000Waste Scrap – Rs 2,00,000Consumer Adjustments – Rs 6,00,000Downgrading Products – Rs 1,00,000Incoming Inspection – Rs 1,00,000Laboratory Testing – Rs 1,75,000Spot Check Inspection – Rs 3,50,000Local Plant Training – Rs 5,00,000Corporate Training – Rs 2,00,000

Page 150: TQM (Mid Sem)

SolutionCost of Non conformanceExternal FailureDefective Stock Returned from Customer – Rs 1,50,000Repairs to Product – Rs 4,50,000Internal FailureConsumer Adjustments – Rs 6,00,000Downgrading Products – Rs 1,00,000Collect Scrap – Rs 10,000Waste Scrap – Rs 2,00,000Cost of ConformanceAppraisalIncoming Inspection – Rs 1,00,000Laboratory Testing – Rs 1,75,000Spot Check Inspection – Rs 3,50,000PreventionLocal Plant Training – Rs 5,00,000Corporate Training – Rs 2,00,000

Page 151: TQM (Mid Sem)
Page 152: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 153: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 154: TQM (Mid Sem)

Scatter Plots of Data with Various Correlation Coefficients

Page 155: TQM (Mid Sem)

A Manager in Britannia wanted to find out the relationship between heat and compressed air pressure for the process of curing “cookies” . He decided to investigate this using a Scatter Plot . He gathered the following data . Draw a Scatter plot for him and state your conclusions .

Heat ( Temp) Pressure

22.6 85

21.5 111

23.3 79

24.5 73

24.4 79

25.1 68

20.4 113

22.7 90

24.3 85

21.7 95

22.2 110

21.0 110

20.8 106

Heat ( Temp) Pressure

22.1 107

20.5 119

22.3 103

22.5 91

23.2 90

22.6 86

22.6 98

22.6 104

24.6 81

22.9 94

22.8 96

22.4 91

25.4 62

Page 156: TQM (Mid Sem)
Page 157: TQM (Mid Sem)
Page 158: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 159: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 160: TQM (Mid Sem)

EFFECT

Cause Branch

Cause Twig

Cause Twiglet

Page 161: TQM (Mid Sem)

Tap Leaking

Doesn’t closeproperly

Washer of wrong size

Tap closed too tight

People not aware of problem

Wrong size of tap with respect to pipe

Wrong dimensions of diameter given

Tap does not rotate properly

Threads of tap damaged

Bad Quality tap

Bad Quality Pipe

Page 162: TQM (Mid Sem)

Potato Wada Ready

Potatoes washed , peeled , steamed , and mashed to form paste

Gram ground , and batter prepared

Salt , spices added for taste

Chillies , onion , garlic cut to small pieces and added

Oil boiled and kept ready for frying

All ingredients mixed together and paste put in oil for frying

Page 163: TQM (Mid Sem)

The following components of Product Quality were listed under the different heads by a Quality Circle in an organisation implementing TQM . Draw a Cause and Effect Diagram to indicate the same .

Production : Testability , Repairability , ProducibilityEnvironment : Toxicity , Flamability , DisposabilityTime : Availability , Durability , Dependability , Reliability , MaintainabilityPhysical : Appearance , Size , WeightSensory : Odour , Taste , TouchUse : Transportability , Accessibility , Functionality , Portability , Adaptability , Operability

Page 164: TQM (Mid Sem)
Page 165: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 166: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 167: TQM (Mid Sem)

Shifting 103660 103660 71%

Open Underlayer 18367 122027 84%

Thread Break 10405 132432 91%

Loose Stitches 8990 141422 97%

Wrong Stitches 2822 144244 99%

Needle Breakages 1583 145827 100%

Total 145827

Page 168: TQM (Mid Sem)

Pareto of Rejects - J uly 96

71%

84% 91

% 97%

99%

100%

0

20000

40000

60000

80000

100000

120000

SHIFTING OPEN THREAD LOOSE WRONG NEEDLE

Rejec tion types

Tota

l num

ber

of r

ejec

ts

0%

20%

40%

60%

80%

100%

120%

% o

f tot

al

Cum Line

Page 169: TQM (Mid Sem)

A manager of Pizza Hut collects data concerning customer complaints about delivery and Quality of the Pizza being delivered

Problem FrequencyTopping stuck to box lid 17Pizza is cold 35Wrong topping or combination 09Wrong style of crust 06Wrong size 04Pizza is partially eaten 03Pizza never showed up 06

Use a Pareto chart to identify the “vital few" delivery problems.

A manager of Pizza Hut collects data concerning customer complaints about delivery and Quality of the Pizza being delivered

Problem FrequencyTopping stuck to box lid 17Pizza is cold 35Wrong topping or combination 09Wrong style of crust 06Wrong size 04Pizza is partially eaten 03Pizza never showed up 06

Use a Pareto chart to identify the “vital few" delivery problems.

Page 170: TQM (Mid Sem)
Page 171: TQM (Mid Sem)

The following data as reasons for a damaged automobile were collected by the ARAI to be given to the Automobile Industry to facilitate designing of the Automobile . Draw a Cause-and-Effect Diagram and a Pareto Diagram for the same and state your conclusions .

Driver Error : Reckless Driving , Poor Judgment , Poor Reflexes , Poor TrainingMechanical Failure : Stuck Accelerator , Ceased Engine , Brake FailureSlippery Road : Oil , WaterFlat Tyre : Nails , Blow out

Reckless Driving : 15 Water on Road : 4Poor Judgment : 11 Nails on Road : 7Poor Reflexes : 25 Blow Out : 2Poor Training : 14Stuck Accelerator : 5Ceased Engine : 6Brake Failure : 9Oil on Road : 2

Page 172: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 173: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 174: TQM (Mid Sem)

Late coming to College

Tyre Punctured

Too many potholes

Left house late

Watch not properly set

Carelessness

Stepney also punctured

Bad Roads

Traffic Jam

Clutch wire broken

Too many gear changes

Page 175: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 176: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 177: TQM (Mid Sem)
Page 178: TQM (Mid Sem)
Page 179: TQM (Mid Sem)

A

A1 A2

a1 a2 a3 a4 a5

B

B1

B2

b1

b2

b3

b4

Page 180: TQM (Mid Sem)

Interrelationships

Counterpart Characteristics

Relationships between Attributes and

Counterpart Characteristics

Attrib

ute

s

Voice

of th

e

Custo

mer

Com

petitiv

e

Evalu

atio

n

Priorities of Characteristics

Pri

ori

ty

Page 181: TQM (Mid Sem)

Cust

om

er

Needs Design Attributes

Features ProcessSteps Operational

ConditionsQualityPlan

House of QualityDesignMatrix Process

MatrixOperationalMatrix

ControlMatrix

Page 182: TQM (Mid Sem)

PROJECT DEFINITION AND ORGANISATION

1. List and prioritise problems

2. Define project and teams

DIAGNOSTIC JOURNEY

3. Analyse symptoms

4. Formulate theories of causes

5. Test theories

6. Identify root causes

REMEDIAL JOURNEY

7. Consider alternative solutions

8. Design solutions and controls

9. Address resistance to change

10. Implement solutions and controls

HOLDING THE GAINS11. Check performance

12. Monitor control system

Juran on Quality Improvement

Page 183: TQM (Mid Sem)

Quality Tools

•Flow Diagram

•Pareto Charts

•Cause & Effect Diagrams

•Run Charts

•Control Charts

•Scatter Diagram

Management Tools

•Inter – relationship Diagram

•Matrix Charts

•Failure Modes and Effects Analysis

•Flow Diagram

• ( Cost of Quality )

• ( 5 Why )

Page 184: TQM (Mid Sem)

Three Ways to Reduce Variation and Improve Quality

Control the Process :Eliminate SpecialCause Variation

Improve the System :Reduce effect of CommonCause Variation

Anticipate Variation :Design RobustProcesses and Products

QualityImprovement

Page 185: TQM (Mid Sem)

Robustness – An Underused Concept

•Reduce the effects of uncontrollable variation in

-Product design

-Process design

-Management practices

•Anticipate variation and reduce its effects

Page 186: TQM (Mid Sem)

Robust Products are Designed in Anticipation of Customer Use

•User-friendly computers and software

•Low – maintenance automobiles

•Speed Breakers

•Instruments for home use

Page 187: TQM (Mid Sem)

Product and Process Robustness

• Product Performance is insensitive to variations in conditions of manufacture, distribution, use and disposal.

• Process Performance is insensitive to uncontrollable variations in process

- Inputs

- Transformations – activities – steps

- External factors

Page 188: TQM (Mid Sem)

Process Robustness Analysis

•Identify Those Uncontrollable Factors that Affect Process Performance

- Weather

- Customer Use of Products

- Employee Knowledge, Skills, Experience, Work Habit

- Age of Equipment ( Can be controlled through TPM )

•Design the Process to be Insensitive to the Uncontrollable Variations in the Factors

Page 189: TQM (Mid Sem)

Robustness in Management•Develop strategies that are insensitive to economic trends and

cycles

•Design a project system that is insensitive to

- Personnel changes

- Changes in project scope

- Variation in business conditions

•Respond to differing employee needs

- Adopt flexible work hours

- Provide “customised” benefits

•Enable personnel to adapt to changing business needs

Page 190: TQM (Mid Sem)

Why FMEA ?

• Helps to recognise and evaluate the potential failure of a product / process and it’s effects

• Helps to identify actions which could eliminate or reduce the chance of a potential failure occurring

• Helps to document the process better

Page 191: TQM (Mid Sem)

Definition of FMEA

FMEA is an Analytical Technique utilised as a means to assure that , to the extent possible , Potential Failure Modes and their associated causes / mechanisms have been considered and addressed .

Page 192: TQM (Mid Sem)

Important Terms

•Analytical TechniqueMethod of analysing and understanding

•Potential Failure ModeThe manner in which a Component , Subsystem or System could potentially fail to meet the design / process intent

•Causes / MechanismsIndication of Design / Process weakness , the consequence of which is the Failure Mode

Page 193: TQM (Mid Sem)

Purpose of FMEAFMEA seeks to :•Identify the possible failure modes and mechanisms•Effects or Consequences that Failure Modes may have on performance•Methods of detecting the identified Failure Modes•Subsequent possible means for Prevention

The net results of an FMEA study are action plans for elimination or possible mitigation of the Failure Modes

Page 194: TQM (Mid Sem)

Two types of FMEA

• Design FMEA – Primarily used when designing / formulating

• Process FMEA – Primarily used when creating a process

Page 195: TQM (Mid Sem)

Features of Design FMEA

• Aiding in the objective evaluation of Design requirements and Design alternatives.

• Increasing the probability that Potential Failure modes and their effects on System and End Use have been considered in the Design / Development Process.

• Developing a list of Potential Failure modes ranked according to their effect on the “ Customer ” thus establishing a priority system for design improvements and development testing.

• Providing future reference to aid an analysing field concerns , design changes and developing advanced designs.

Page 196: TQM (Mid Sem)

Features of Process FMEA

• Identifies potential product related process failure modes.

• Identifies the potential manufacturing or assembly process variables on which to focus controls for occurrence,reduction or detection of the failure conditions.

• Documents the results of the manufacturing or assembly process.

Page 197: TQM (Mid Sem)

The First Step• Draw a Block Diagram of the System , Subsystem or

Component being analysed

A Block Diagram indicates • the flow of inputs into the Block , the function performed

in the Block and the outputs from the Block• the Primary relationship between the items covered in

the analysis• establishes a logical order to the analysis

Page 198: TQM (Mid Sem)

The Second Step• Describe the function of each component/step in the

process• Determine the failure modes of each component or

operation . Failure Modes refer to the ways in which the component/process fails to perform its intended function

• Identify the failure mechanisms for each failure . Failure Mechanisms refer to the root causes of failure or the sequence of events that lead to the failure

• Identify the current controls which address/detect these causes . Controls must be established to pre-empt causes

Page 199: TQM (Mid Sem)

The Second Step• * Controls are of two types :

• Design Controls – these are features of the product itself that prevent or pre-empt the failure

• Process Controls – these are various checks/indicators built into the process steps that prevent the failure

• Determine the severity of the failure ( refer guidelines here )

• Determine the occurrence of the failure ( refer guidelines here )

• Determine extent to which the prevention/detection methods are effective ( refer guidelines here )

• Calculate the Risk Priority Number ( RPN ) accordingly• Determine Corrective Action to be taken

Page 200: TQM (Mid Sem)

The Third Step• Carry out the Corrective / Preventive Action• Determine the new Risk Priority Number ( RPN )• Document your findings in a systematic manner ( refer

suggested format )

Page 201: TQM (Mid Sem)

DETECTION PREVENTION

SEVCLASS

ITEM FUNCTIONPOTENTIAL

FAILURE MODE

POTENTIAL EFFECTS OF

FAILURE

POTENTIAL CAUSE(S) / MECHANISM(S) OF

FAILURE

OCCUR

DETEC

R.P.N

OCCUR

DETEC

R.P.N

CURRENT DESIGN CONTROLSRECOMMENDED ACTION(S)

RESPONSIBILITY & TARGET

COMPLETION DATE

ACTIONS TAKEN

SEV

ACTION RESULTS

Page 202: TQM (Mid Sem)
Page 203: TQM (Mid Sem)

Critical Safety hazard

Causes or can cause injury or death.

MajorRequires immediate attention. System is non-operational

MinorRequires attention in the near future or as soon as possible. System performance is degraded but operation can continue

Insignificant No immediate effect on system performance

Page 204: TQM (Mid Sem)

1 NoneEffect will be undetected by customer or regarded as insignificant.

2 Very minor A few customers may notice effect and may be annoyed.

3 Minor Average customer will notice effect.

4 Very low Effect recognized by most customers.

5 LowProduct is operable, however performance of comfort or convenience items is reduced.

6 ModerateProducts operable, however comfort or convenience items are inoperable.

7 HighProduct is operable at reduced level of performance. High degree of customer dissatisfaction.

8 Very highLoss of primary function renders product inoperable. Intolerable effects apparent to customer. May violate non-safety related governmental regulations. Repairs lengthy and costly.

9Hazardous –with warning

Unsafe operation with warning before failure or non-conformance with government regulations. Risk of injury or fatality.

10Hazardous –withoutwarning

Unsafe operation without warning before failure or non conformance with government regulations. Risk of injury or fatality.

Page 205: TQM (Mid Sem)

1 Unlikely 1 in 1.5 million (= .0001%)

2Low

1 in 150, 000 (= .001%)

3 1 in 15, 000 (= .01%)

4

Moderate

1 in 2,000 (0.05%)

5 1 in 400 (0.25%)

6 1 in 80 (1.25%)

7High

1 in 20 (5%)

8 1 in 8 (12.5%)

9Very high

1 in 3 (33%)

10 1 in 2 (50%)

Page 206: TQM (Mid Sem)

1 Excellent control mechanisms are foolproof

2 Very high some question about effectiveness of control

3 High

unlikely cause or failure will go undetected4 Moderately high

5 Moderatecontrol effective under certain conditions

6 Low

7 Very lowcontrol is insufficient and causes or failures extremely unlikely to be prevented or detected.

8 Poor

9 Very poorcauses or failures almost certainly not be prevented or detected.

10 Ineffective

Page 207: TQM (Mid Sem)

Guide / Reference / Interference Rod or Pin

A solid piece of material such as a peg that positions or orients a part, tool or fixture and guarantees its correct placement. When called an interference pin, it blocks, obstructs or prevents the incorrect positioning of a part, tool or fixture. This peg can be fixed onto the part itself or on the tool or fixture.

Template

A pattern used to represent an accurate copy of an object or to guarantee accurate reproduction / position .

Limit Switch / Microswitch

An electrical device or instrument that, upon light contact can confirm the presence, position, dimension, breakage or degree of use (wear) of a part, tool or fixture.

Error Proofing Devices

Page 208: TQM (Mid Sem)

Odd Part Out Method

The odd part out method isolates parts visually and the visual display itself tells us if all of the parts are not used.

Sequence Restriction

A sequence is the following of one thing after another in an unchangeable preset order where change or omission in that order can result in costly errors. Sequence restriction devices guarantee that operations will happen only in the predetermined order.

Detect Delivery Chute

This is a passageway down which a unit (piece, part or volume) is slid, sent, transported or dropped on its way to some pre-set destination . The chute itself , with fairly minor modifications, can also be used to detect and/or sort out errors before the unit reaches the next operation.

Error Proofing Devices

Page 209: TQM (Mid Sem)

Error Proofing DevicesSensorThis is an electrical device or instrument that detects and responds to fluctuations in characteristics related to quality, safety or productivity. • Beam Sensors – Detect linear interruptions through electron beams.• Fiber Sensors – Detect linear interruptions through fiber optic beams.• Area Sensors – Detect random interruptions over a fixed area.• Positioning Sensors – Detect positioning.• Displacement Sensors – Detect warping, thickness, level, height.• Metal Passage Sensors – Detect if products made of metal have passed

by the sensor.• Colour Marking Sensors – Detect differences in colour or coloured marks.• Vibration Sensors – Detect good passage, weld position, snapped wires,

etc.• Double-Feed Sensors – Detect two products fed at the same time.• Timetrons – Detect or exclude pre-set measurement values via a gauge

that can set value limits on the plus or minus side as well as at true value.