Stacy and Witbeck

• Valley Metro System

• Project overview

• Utilities & roadway

• Track construction

• Noise & vibration reducing products

• Other innovative products

Key Presentation Take-Aways

Valley Metro Map/Future Extensions

Northwest Extension

Project Schedule

• $161 Million

• CM@Risk Contract

• Ground Breaking January 2013

• 1st Track Pour July 2014

• Start Integrated Testing January 2016

• Revenue Service March 19, 2016

Project Stats

• 3.24 Miles

• Utility Relocation

• Roadway Widening (average 40 foot)

• Embedded Double Track

1 Double Crossover

2 Single Crossovers

• 3 Traction Power Substations/3 Signal Buildings

• 3 Stations

• 1 Park and Ride

Utility Construction

15,000LF 12” Waterline

6,200LF 18” VCP Sewer

4,400LF 15” RCP Storm

1,500LF 18” Casing

5,800LF 6” Waterline

2,300LF 12” VCP Sewer

2,000LF 48” RCP Storm

1,300LF 20” Casing

2,600LF 36” Waterline

2,000LF 8” VCP Sewer

1,900LF 36” RCP Storm

1,700LF 16” Waterline

Pri

vate

Irri

gati

on

:1

8-i

nch

(R

GR

CP

) =

3,0

00

-fe

et

Sou

thw

est

Gas

:2

-in

ch P

E =

1,1

00

-fe

et

4-i

nch

PE

= 1

2,0

65

-fe

et

8-i

nch

Ste

el H

P =

9,1

00

-fe

et

SRP Water (Irrigation):24-inch RGRCP = 7,100-feet30-inch RGRCP = 5,100-feet36-inch RGRCP = 900-feet

Roadway Construction

115 RE Rail Unloading

Initial Layout

Constructing Embedded Track

Rebar Mat Welding/Track to Earth Testing

Track slab ready to pour

Finished Track Slab

Rubber Boot

Encapsulated Special Track

Flange Bearing Frogs

Elastomeric Grout

HDPE Track Drain

Polymer Concrete Electrical Boxes

• Questions?