Traditional construction practices do not lend itself to savings

Page 3: Tiscon Readybuild Savings

How?

1. High manual labour involvement

• Manual cutting & bending rebars means high wastage due to arbitrary estimates

• Manual stock inventory

means more liable to errors

Page 4: Tiscon Readybuild Savings

2. High wastage means high scrap disposal

3. Increased number of transit vehicles to commute the material and scrap

4. Unplanned delays lead to extension on project completion

5. Safety precautions for labour to prevent mishaps, and delays due to mishaps at site

Page 5: Tiscon Readybuild Savings

Then, how does one save in the construction space?

Page 6: Tiscon Readybuild Savings

• Low labour involvement• Increased dependence on technology• Rebars cut & bent on computers• according to required measurements • Low transit vehicles cost as the cut &

bent rebars are sent in kits• Eliminating wastage as rebars are cut to

size• No wastage means no scrap disposal

Page 7: Tiscon Readybuild Savings

Introducing Tiscon Readybuild Savings

• Cut & Bend Technology• BBS (Bar Bending Schedule)• Couplers

To address saving needs in construction

Page 8: Tiscon Readybuild Savings

Tiscon Readybuild Savings

For more information on savings in the construction space log on to

http://readybuild.tatatiscon.co.in/