Ferrostaal Industrieanlagen GmbH
Ferrostaal Industrieanlagen GmbH - GermanyFerrostaal Christof Romania SRL - RomaniaA Joint Venture of Ferrostaal and the Christof Group
OMV PETROM Hurezani Gas Delivery Project
Compressor Station Bulbuceni
![Page 2: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/2.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 2
Gas Compressor Station Bulbuceni
General Project Information
Initial situation:Seasonal fluctuation (between 14 and 20 barg) in gas delivery to major consumers especially in summertime was causing significant production losses for OMV Petrom, due to the pressure increase in the National Transport System.
Project Objective: The new Hurezani Gas Delivery System will ensure OMV Petrom to deliver gas continuously to National Transport System with a constant pressure of 40barg.
![Page 3: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/3.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 3
Gas Compressor Station Bulbuceni
Ferrostaal’s Scope of Work
Front End Engineering Design (Feed) Completion
Basic Engineering
Detail Engineering
Authority Engineering
Site Clearance from underground pipes & facilities
Procurement, (Turbo Compressor packages provided by OMV Petrom)
Construction
Commissioning
Two (2) months operation assistance
Maintenance Contract for 8 months
![Page 4: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/4.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 4
Gas Compressor Station Bulbuceni
Project Overview
![Page 5: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/5.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 5
Gas Compressor Station Bulbuceni
Project Key Data
Project Configuration:Three (3) identical Compressor trains consisting of one (1) Solar Gas Turbines, 7MW each
(Taurus 70) with Solar Centrifugal Compressors C50. Two trains being in operation and the third one in stand-by.
Each train comprises an inlet filter scrubber, a centrifugal compressor driven by a gas turbine of 7 MW power and a gas cooler. In addition, one finger type slug catcher, LP & HP fuel gas skids, an open & closed drain system, a flare system, instrument air & Nitrogen gas generation, emergency diesel generation, well water treatment, fire fighting system and control & emergency shutdown system (ESD & DCS) are provided.
Type of Contract: Fast Track (EPCC)• Feb 2009 - Nov 2009 (Open Book)• From Dec 2009 Lump Sum Turn Key
Execution Period: Feb 2009 – Aug 2010 (PAC issued)Construction Start: Nov 2009 First Gas Delivery: 29th Mai 2010Special Agreements: Solar Turbo-compressor packages furnished by Client
![Page 6: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/6.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 6
Gas Compressor Station Bulbuceni
Project Key Data
Station Configuration: Design pressure: 64 barg
Operating pressure: 45 barg
Capacity, normal 5.500.000 Ncm/d.
Capacity, max. 6.050.000 Ncm/d
Capacity, min. 1.200.000 Ncm/d
Capacity per train 2.750.000 Ncm/d
![Page 7: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/7.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 7
Gas Compressor Station Bulbuceni
Project Milestones
![Page 8: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/8.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 8
Gas Compressor Station Bulbuceni
Project Features
March 2009 – Initial Situation
![Page 9: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/9.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 9
Gas Compressor Station Bulbuceni
Project Features
August 2009 - Site Clearance
![Page 10: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/10.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 10
Gas Compressor Station Bulbuceni
Project Features
November 2009 - Start Construction
![Page 11: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/11.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 11
Gas Compressor Station Bulbuceni
Project Features
Civil Works – TUCO foundations
![Page 12: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/12.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 12
Gas Compressor Station Bulbuceni
Project Features
Installation of 1st compressor
![Page 13: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/13.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 13
Gas Compressor Station Bulbuceni
Project Features
TUCO’s on foundation
![Page 14: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/14.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 14
Gas Compressor Station Bulbuceni
Project Features
Two shift system installed
![Page 15: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/15.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 15
Gas Compressor Station Bulbuceni
Project Features
Winter measures for concrete works
![Page 16: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/16.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 16
Gas Compressor Station Bulbuceni
Project Features
Gas cooler installation
![Page 17: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/17.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 17
Gas Compressor Station Bulbuceni
Project Features
Steel structure compressor building
![Page 18: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/18.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 18
Gas Compressor Station Bulbuceni
Project Features
Fire water tanks under construction
![Page 19: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/19.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 19
Gas Compressor Station Bulbuceni
Project Features
Simultaneous construction activities
![Page 20: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/20.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 20
Gas Compressor Station Bulbuceni
Project Features
Lift of 1st flare section by 500 to mobile crane
![Page 21: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/21.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 21
Gas Compressor Station Bulbuceni
Project Features
View from the flare during construction
![Page 22: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/22.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 22
Gas Compressor Station Bulbuceni
Project Features
75 m high flare
![Page 23: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/23.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 23
Gas Compressor Station Bulbuceni
Project Features
2 x 1.100 m3 fire water tanks
![Page 24: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/24.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 24
Gas Compressor Station Bulbuceni
Project Features
Gas cooler and suction scrubber
![Page 25: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/25.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 25
Gas Compressor Station Bulbuceni
Project Features
TUCO package train #1
![Page 26: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/26.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 26
Gas Compressor Station Bulbuceni
Project Features
Control Room
![Page 27: Thomas Heitepriem Ferrostaal](https://reader034.fdocuments.in/reader034/viewer/2022051211/55337afb4a7959ae4b8b490d/html5/thumbnails/27.jpg)
Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 27
Gas Compressor Station Bulbuceni
Project Features
Station overview after completion of all works