The GONG Farside Project (Status) Irene González Hernández and the GONG Farside team.
-
Upload
colleen-jennings -
Category
Documents
-
view
217 -
download
2
Transcript of The GONG Farside Project (Status) Irene González Hernández and the GONG Farside team.
The GONG Farside The GONG Farside ProjectProject(Status)(Status)
Irene González Hernández and the GONG Farside team
ContentsContents
Data acquisition: software Data acquisition: software improvementimprovement
Adding GONG magnetogramsAdding GONG magnetograms Predicting magnetic activity: AR1088Predicting magnetic activity: AR1088 Full hemisphereFull hemisphere Future workFuture work
GONG near-real-time dataGONG near-real-time data
Software running at the sites (quickreduce)Software running at the sites (quickreduce) Quick calibrationQuick calibration Generating 215x215 Gaussian-smoothed velocity Generating 215x215 Gaussian-smoothed velocity
imagesimages Transferred to Tucson in a daily basisTransferred to Tucson in a daily basis
GONG near-real-time dataGONG near-real-time data
Quickreduce process modificationsQuickreduce process modifications Image calibration: calculating XC, YC Image calibration: calculating XC, YC
parametersparameters Sky maskSky mask Site independent softwareSite independent software Magnetogram QA.Magnetogram QA. Emulator currently running in the Emulator currently running in the
DMACDMAC Self-contained distribution packageSelf-contained distribution package Version controlVersion control Move to the sitesMove to the sites
Farside websiteFarside website
Web site improvementWeb site improvement Archived dataArchived data
Include GONG magnetograms in Include GONG magnetograms in the farside mapsthe farside maps Sent to Tucson in a daily basisSent to Tucson in a daily basis About 7 magnetograms per site.About 7 magnetograms per site.
http://http://gong.nso.edu/data/farsidegong.nso.edu/data/farside
Holography of farsideHolography of farside
Carrington Longitude
sin
(lati
tud
e)
Active Region AR-10808
Aug 29 Sep 4 2005 (GONG)
AR10808
Farside project: full Farside project: full hemispherehemisphere
Courtesy of Doug Braun
Farside project: full Farside project: full hemispherehemisphere
Evolution of AR 9393 from March Evolution of AR 9393 from March 15 2001 to April 23 2001. (MDI)15 2001 to April 23 2001. (MDI)
Courtesy of P. Scherrer and K. Oslund
Future workFuture work Test new site code in TC and move Test new site code in TC and move
to all the production locations.to all the production locations. Move map calculation pipeline to Move map calculation pipeline to
linux box.linux box. Integrate full hemisphere.Integrate full hemisphere. Scientific calibrationScientific calibration
Relate phase-delay to magnetic Relate phase-delay to magnetic activityactivity
Full resolution GONG dataFull resolution GONG data 4 years of continuous data4 years of continuous data