1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

16
1 GONG Magnetogram pipeline

Transcript of 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

Page 1: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

1

GONG Magnetogram pipeline

Page 2: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

2

The GONG Data Processing Pipeline

http://gong.nso.edu/data/DMAC_documentation/

Page 3: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

3

Field Tape Reader (FTR)• Receive the (approximate) weekly DLT cartridge mailed to the

DMAC from each of the observing stations and make a copy.

• Extract from each image on the cartridge copy a subset of header parameters for the header database.

• Extract from each image on the cartridge copy the complete FITS header for the instrument header database.

• Extract the daily sequence of calibration images from the cartridge copy.

• Make the header parameter plots from the subset of header parameters.

• Ship the original cartridge to the offsite storage facility.

Page 4: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

4

FTR Parameter Plots

Page 5: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

5

Process Calibration Images (PROCCAL)

• Process each daily sequence of calibration images, identify and reject unacceptable sequences.

• Temporally average (60 days) the acceptable white-light modulation (wlm) and narrow-band correction (nbc) images

• Replicate dark and flat images to fill gaps so that there is a set of calibration correction images for each site day.

• Manually inspect the temporally-averaged calibration correction images and the parked solar images calibrated with the temporally-averaged correction images.

Page 6: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

6

Diffuser for flat field

Solar image

Dark Current Pinhole for image rotator center

Eastern solar quadrant

Western solar quadrant

- = Rotation

Raw Calibration images

Page 7: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

7

Flat Field

Dark Current

White Light Modulation –corrects for spurious modulation

Narrow Band Correction – fixes up field effects

Processed Calibration Images

Page 8: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

8

Calibrate Raw Data (VMBICAL)• Apply the camera corrections • Crop the images • Apply the optical calibration • Convert to velocity, intensity, modulation, magnetic field• Compute the image centroid to locate the center• Compute the solar limb parameters • Compute image statistics • Check image statistics, discard unacceptable images • Add ephemeris data to image headers • Apply intensity flat field image to all images • Recompute the solar limb parameters • Compute the Hankel geometry and the modulation transfer function

(MTF)

Page 9: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

9

Angular Registration (COPIPE)

• Instruments not exactly aligned north-south.• Perform cross-correlation between Doppler

images to get relative orientation at overlapping sites.

• Perform network-wide optimization to find best set of relative angles on daily basis.

• Use various measurements (all-day and noon drift scans, MDI images, planetary transits, Ronchi rulings) to set absolute angle.

Page 10: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

10

Magnetogram pipeline

Calibrated magnetograms

Polarity checkZero point correction

Image merge + restoration?

RemappingSynoptic map

generation

These two steps can be reversed

Page 11: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

11

The Image Merge• GONG's image merge is quite simple:

1. All of the site images for a given date are staged to disk.2. Each image then has the “OFFSET” keyword updated using our latest,

best estimate for the direction to Solar North. This keyword is both site and time dependent.

3. For magnetograms, the polarity (+1 or -1) for each site is found from our polarity table and it is applied to the site images as they are processed.

4. One can (optionally) apply a correction for the estimated MTF (Modulation Transfer Function), i.e., perform a deconvolution using a circularly symmetric point-spread function.

5. The site images are registered to a fixed size and shape. Choices are:A.Sky coordinates (i.e., circular) with Solar North at the top and Solar

East on the left orB.Heliographic coordinates: either latitude-longitude or sin(latitude)-

longitude.6. The final merged image is computed by simply summing the

contributing registered images for that minute then and dividing by the number of images in the sum.

Page 12: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

12

Sample merged magnetograms no restoration (left) and restored (right)

Page 13: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

13

GONG+ Merged Magnetograms• Non-filled calibrated magnetograms from all six GONG sites are used to create a

merged magneotgram per 10 minute time period• Processing performed on calibrated magnetograms:

– Corrected to flux assuming a radial field and apodized to remove the solar limb

– EMPHEMINTERP and CAMOFFSET are run on each magnetogram to update the current ephemeris values and add the camera offset angle in the image headers

– Re-mapped into heliographic coordinates in a 900 x 900 pixel grid using HGREMAP

– Shifted by the Carrington longitude of the disk center, L0, into a 1800 x 900

pixel grid– A 49-point Gaussian filter is applied– 10-minuted segments of individual magnetograms are summed and

normalized by the number of images contributing to each pixel of the merged magnetogram

– The final product is a FITS image that consists of a 1800 x 900 pixel grid with 16-bit integer pixels containing magnetic field strength measured in units of gauss

• Currently polar regions are handled as any other surface region

Page 14: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

14

Sample Merged Magnetogram

• For additional information on processing of GONG+ magnetograms feel free to browse the provided online documentation http://gong.nso.edu/data/DMAC_documentation/Magmap/index.html

Page 15: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

15

GONG+ Synoptic Maps• Non-filled calibrated magnetograms from all six GONG sites are used to create a

synoptic map per Carrington rotation• Processing performed on calibrated magnetograms:

– Corrected to flux assuming a radial field and apodized to remove the solar limb– EMPHEMINTERP and CAMOFFSET are run on each magnetogram to update

the current ephemeris values and add the camera offset angle in the image headers

– Re-mapped into heliographic coordinates in a 180 x 180 pixel grid using HGREMAP

– Shifted by the Carrington longitude of the disk center, L0, into a 360 x 180 pixel

grid

– A cos4 (L- L0 ) filter is applied

– Individual magnetograms are summed and normalized by the number of images contributing to each pixel of the synoptic map

– The final product is a FITS image that consists of a 360 x 180 pixel grid with 16-bit integer pixels containing magnetic field strength measured in units of gauss

• Currently polar regions are handled as any other surface region

Page 16: 1 GONG Magnetogram pipeline. 2 The GONG Data Processing Pipeline

16

Sample GONG+ Synoptic Map

• For additional information on processing of GONG+ magnetograms feel free to browse the provided online documentation http://gong.nso.edu/data/DMAC_documentation/Magmap/index.html