the elevation of highest if necessary . (3) Install approx. 1000 1b pretension in each guy-wire,...

1

Transcript of the elevation of highest if necessary . (3) Install approx. 1000 1b pretension in each guy-wire,...

Page 1: the elevation of highest if necessary . (3) Install approx. 1000 1b pretension in each guy-wire, keeping columns precisely vertical. Best accomplished by thirds @ opposite corners.