TELUS SIDCModular Data Center Program
Project Partners
Design/Build Approach
Collaborative Design Process
Integrated MEP with Manufacturing
Project CriteriaDevelop One Design for Two SitesDevelop One Design for Two SitesEast: Rimouski, QuebecWest: Kamloops, British Columbia
Create Flexible, Modular Deployment
Install Tier III Infrastructure
Support Variable Rack Densities8 – 40 kw per Rack8 40 kw per Rack
Provide up to 16.2 MW of Critical Power at 20 Year Ultimate Configuration
C t Hi h Effi i D iCreate High Efficiency DesignPUE < 1.2
Achieve LEED Gold Certification
Use Program to Drive IT Innovation and Standardization
The e-Comb® SystemPatented Modular CoolingPatented Modular Cooling System
Developed by Inertech in D b CTDanbury, CT
Can Cool up to 40 kw per Rack
Closed Loop System
Estimated Annual Average gPUE 1.18
The e-Comb® System
Pump Room &Pump Room & Electrical Distribution Electrical Spine
Mechanical Spine S P dp Server Pods
The Base Server ModuleEach Server Module Supports:
Up to 2 700 kw of Critical PowerUp to 2,700 kw of Critical PowerInitial IT Load of 1,135 kw
192 Racks
ServerCirculation Spine
Phase 3
Phase 5Phase 7
Phase 4
Phase 6
Server Modules
Server Modules
FluidCoolers
DRUPS Units
Phase 1 Phase 2FluidCoolers
Phase 1Phase 1
Switchgear RoomOffice/Admin. Area
Site Plan and Phasing
Up to 7 Possible PhasesUp to 7 Possible PhasesUp to 16.2 MW of Critical Power
192 Racks
Main Entrance
ConstructionRimouski, Quebec
Groundbreaking - August, 2011M d l F b i ti St t D b 2011Module Fabrication Starts - December, 2011
First Module Installed - March, 2012Building Completed - July, 2012
Commissioning Completed – August, 2012
Construction
Site Grading & Base Fill @ Module AreaThe Site Prior to Construction
Construction
Building Foundations
Foundation Insulation
Construction
Steel Framing at Switchgear RoomElectrical Duct Bank
Construction
Roof Framing Interior Ready for Slab Pour
Construction
First Module Section Installed DRUPS Fuel Cell
Construction
Module Roof Sections Setting Access and Server Modules
Construction
Roof Membrane Installation on Modules Switchgear Roomg
Construction
DRUPS U itDRUPS Units
Server Module “Hot” Aisle
Construction
Fi l T hServer Module “Cold” Aisle Final Touches
QuestionsQuestionsLeonard Ruff, AIA
Callison, LLCCallison, LLC206-623-4646
[email protected] comwww.callison.com