TECHNIPETROL HELLAS Presentation
January 2015
A Technip Company
Technip’s Key Differentiators
Leading integrated company in project management, engineering and construction for the energy industry 50 years of know-how and experience on land and at sea Deepest subsea developments Most advanced offshore infrastructures Largest onshore infrastructures
Client focus Long-term relationships Global footprint and local presence Leading edge technologies, offering the best solutions Absolute commitment to safety The best talents
Taking it further is what we do
Technip in Greece2
Technip TodayWith engineering, technologies and project management, on land and at sea, we safely and successfully deliver the best solutions for our clients in the energy business
Worldwide presence with 40,000 people in 48 countries
Industrial assets on all continents, a fleet of 27 vessels (6 of which under construction)
2013 revenue: €9.3 billion
Energy is at the core of Technip
Technip in Greece3
Engineering and fabrication of fixed platforms for shallow waters (TPG 500, Unideck®)
Engineering and fabrication of floating platforms for deep waters (Spar, semi-submersible platforms, FPSO)
Leadership in floatover technology
Floating Liquefied Natural Gas (FLNG)
Construction yard
Design, manufacture and supply of deepwater flexible and rigid pipelines, umbilicals and riser systems
Subsea construction, pipeline installation services and Heavy Lift
Six state-of-the-art flexible pipe and / or umbilical manufacturing plants
Five spoolbases for reeled pipeline assembly as well as four logistic bases
A constantly evolving fleet strategically deployed in the world's major offshore markets
Two Business Segments, One Technip
Gas treatment and liquefaction (LNG), Gas-to-Liquids (GTL)
Oil refining (refining, hydrogen and sulphur units)
Onshore pipelines
Petrochemicals (ethylene, aromatics, olefins, polymers, fertilizers)
Process technologies (proprietary or through alliances)
Biofuel and renewable energies (including offshore wind)
Non-oil activities (principally in life sciences, metals & mining, construction)
The best solutions across the value chain
Onshore/OffshoreSubsea
Technip in Greece4
5
A Unique Worldwide Footprint
Technip in Greece
3 700
Talented teams in 48 countries
Close to 40 000 people, 114 nationalities
9 500
4 900
3 800
4 300
2 7009 100
1 000
Flotte et divers
Employees: ~ +50 % in 4 years
0
10.000
20.000
30.000
40.000
2010 2011 2012 2013
39 000
6 Technip in Greece
TECHNIPETROL HELLAS(Technip in Athens)
7 Technip in Greece7
8
TECHNIPETROL HELLAS S.A. is a TECHNIP Operating Center, located in Athens – Greece and incorporated under the Greek law, offering multidisciplinary services in the Energy sector.
Activities
Departments Process Engineering Piping / Stress Materials Civil Pressure Vessels & Heat
Exchangers Machinery & Packages Instruments & Automation Electrical
Procurement
Services Project Management Planning and Cost Control Procurement Basic Design (BD) Front End Engineering &
Design (FEED) Detail Engineering &
Design (DED) Construction Management
and Supervision Staffing
Technip in Greece
9
Key figures
TECHNIP in ATHENS (TECHNIPETROL HELLAS S.A.) is an Engineering Operating Center since September 2003
Annual Production capacity: about 110,000 service manhours (in house)
Available workforce: 70 people at present
Engineering experience: more than 85 contracts executed: 64 in Greece 2 in Lybia 2 in Poland 2 in Bulgaria 15 in other countries (Algeria, Bosnia and Herzegovina, Egypt, Iraq, Italy,
Kuwait, Lithuania, Russia, Saudi Arabia, etc.)
From June 2010 the Center offers also Procurement of equipment & bulk materials.
Technip in Greece
10
Business Geographical areas (Greece)
: Projects
: Proposals
Technip in Greece
Over 50
Projects
11
Business Geographical areas (Europe/Africa/Asia)
: Projects
: Proposals
Technip in Greece
12
Our people
Personnel academic education 92% University Degree Holders
63% University & Master Degree Holders
0
2
4
6
8
10
12
14
16
18
20
<25 25‐29 30‐34 35‐39 40‐44 45‐49 50‐54 55‐59 60‐64 65‐69 >=70
Age
Female
Male
0
5
10
15
20
25
<5 5‐9 10‐14 15‐19 20‐24 25‐29 30‐34 35‐39 >=40
Seniority
FemaleMale
Taking our personnel further High-caliber engineers and project
managers
Selection of new employees of the highest qualification and talent
Continuous development of our personnel skills to their maximum potential
Technip in Greece
Construction Supervision Personnel:• HSE• QA/QC• Mechanical• Piping• Civil• Electrical• Bulk Materials• Subcontracting
Organization ChartManaging Director
QM & S
General Manager
HSE & Security
Proposals
Planning & Cost Control
Project Managers
Financial Human Resources
Manager of Operations
Document Control
IT & General Services
Engineering Manager(project dependent)Process Procurement
Project Engineer(s)(project dependent)
PDS Administrator(project dependent)
MechanicalPiping InstrumentCivil Electrical
Piping Design
Stress Analysis
Materials
Pressure Equipment
Machinery
Packages
13 Technip in Greece
14
Our Systems & Procedures We follow the Group Systems & Procedures: Gesqual (Quality Management) Enablon (Human Resources) Synergi (HSE) Sezame (Progress Measurement) xDB EDMS-PDB/DDB/FDB (Company Document Management) xDB EDMS-VDB (Vendor Document Management) IT (Technip Group Intranet, Security, Application Software, e-mail system) Full 3D Modeling and Administration (even for relatively small projects) SPEL (SmartPlant Electrical), SPI (SmartPlant Instrumentation) AIM Directa, MARIAN
We use local complementary systems that enhance our productivity: Es-Project (M/Hs detail statistics and reporting) TP NET - ATHENS (Local Intranet, Information Repository) Full material management from process definition stage, to classes of
materials development, procurement and site management via PUMA / ORDER / COSMO software (by CLA)
Technip in Greece
15
A state-of-the-art 3-D Modeling Approach Full 3-D capabilities in all department
(contemporary approach) 44 Modeling stations easily expandable 3D Model Administration and interface with
other engineering software On-line view of working model from any
place in the world through the web.
Effective 3-D modeling application even for relatively small projects
Models may cover needs from concept, to detail design, to construction, to operation & maintenanceTypical – HYDROCRACKING UNIT
Typical – CRUDE DISTILLATION UNIT
Technip in Greece
Technip in Greece16
Bidding Process
Ensure appropriate risk/reward achieved on each contract
Receipt ofInvitation to Bid
documents
Bid preparation:- Cost estimate- Project executionplan
- Contractual andfinancial review
RiskAssessment
Bidsubmission
Reviewwith Technip
management :Authorization to
Tender (ATT)
Authorizationto Commit (ATC)
by Technip management
Contractaward
Bid reviewwith client
Technip in Greece17
Control of Project Execution
Group SeniorManagement
Monitoring (Monthly Project Reviews)
Project Manager
Full authorityReportingHSE – Quality System
Plan Procedures Control
Project Controls Planning & scheduling Work progress &
productivity control Cost estimates &
controls
Engineering Plan Design approach Codes & standards Safety design criteria
Procurement Plan Purchasing strategy Expediting & inspection Subcontracting Packing, shipping
insurance and custom clearance
Construction & Start-up Plan
Constructability review Subcontracting strategy Site organization Safety policy
Staffing
Two principles are implemented concurrently: Project Manager: single point of accountability for each project Senior Management: hands-on policy, supported by central expertise
18
Quality Certification and Focus
Technipetrol Hellas is committed to enhance Customer and Stakeholder satisfaction by: Providing the right products according to
contractual, statutory and regulatory requirements. Delivering cost and time effective
services, using innovative methods. Continuously improving the IMS
(Quality, Health & Safety, Environmental System) effectiveness through systematic review and analysis of the results.
The Integrated Management System (IMS) of Technipetrol Hellas S.A. (TPLH) complies with the requirements of ISO 9001:2008, of ISO 14001:2004 and OHSAS 18001:2007 and conforms to standard operating procedures, striving to business excellence concepts of the Technip Group.
Technip in Greece
19
Fire Safety Course
First-Aid Course
Health, Safety & Environment (HSE)
Pulse week
Safety, our priority
Technip in Greece
TPLH implements a Health and Safety Management System (in accordance with the requirements of OHSAS 18001:2007) and an Environmental Management System (in accordance with the requirements of ISO 14001:2004).Technipetrol Hellas is committed to achieve sound environmental and occupational health and safety performance by: Continually striving with persistence and determination
to sustain health and prevent any injury of persons in the workplace, prevent environmental pollution and minimize any adverse effects to the environment.
Continually improving the performance of Occupational Health & Safety and Environmental systems.
Complying with all applicable statutory requirements. Fully endorsing all relevant documents of Technip.
20
Ethics, an Everyday Commitment
In the last decade, Greece has taken several measures in order to improve and update its national legislation on combating bribery, corruption & money laundering
At Technipetrol Hellas, we are: ‘Doing the right thing’ = acting
transparently and ethically Promoting ethics at every level Implementing Ethics-related
operational standards Complying with Technip Ethics
Charter & relevant documents Improving our knowledge and
developing a common culture through Ethics training courses and awareness-raising communications
Technip in Greece
Anti-Corruption Course
“Technip is committed to carrying out its business activities in an ethical manner and in strict compliance with the law, wherever it operates. In today’s world, there is no other option to do business”
Thierry Pilenko, Chairman and CEO
Technip in Greece21
Company Social Responsibility (CSR) Carrier Orientation
to students TPLH Basketball
Team Presentation to Higher
Education Institutes
22
Environmental Initiatives
TPLH participated in several environmental actions organized by local environmental – cultural associations.
Technip in Greece
Experience
23 Technip in Greece23
24
FPSO P76 Topsides and Integration Project Detail Design Module (M02 - M15)
Client: Technip Italy (TPIT) Owner: Petrobras Netherlands BV – PNBV, Brasil Detailed Engineering Services Production Capacity (Oil): 150,000 bbl/d Production Capacity (Gas): 7 MM m3 / d Number of wells: 20 including 6 WAG Approx. Contract Value: 350,000 € October 2014 – (April 2015)
The FPSO Topsides consists of 19 process plant systems - modules. TPLH main involvement is the piping Detail Design services for the modules M02 (C02 Compression) and M15 (Utilities) including technical and project management interfacing.
Technip in Greece
25
USGTL Project
Technip in Greece
Client: Technip Italy S.p.A (TPIT) Owner: SASOL Energy LLC, USA FEED & Cost Estimating Services GTL Diesel Production Capacity : 96,000 barrels/day Approx. Contract Value: 1,0 million € October 2014 – (November 2015)
TPLH main involvement is relevant to the development of FEED and Cost Estimating activities for the following Units:Rain & Effluent Water Collection Effluent Bio-treatmentIntermediate TankageProduct Storage & ExportLPG Storage & ExportParaffin extractionCatalyst & Chemical storage Flare SystemCooling waterSteam Condensate Recovery SystemInterconnecting (Partial)
26
Visbreaking Unit Revamping
Client: Motor Oil Hellas (MOH), Corinth Refineries S.A., Greece
Detailed Engineering, Procurement and Construction Support Services
Production Capacity: 170 Mt/h (Visbroken Residue)
Approx. Contract Value: 1,2 million € January 2013 – February 2014
Motor Oil Visbreaking Unit Revamping project consisted of revamping process and utilities, including interconnecting in the vicinity of existing unit U-100. New equipment included Visbreaking furnace, Soaker Reactor, Fractionator Trays, Pumps, Heat Exchangers, Pressure Vessels and ancillary Equipment.
Technip in Greece
27
Light Gasoline Isomerization Unit
Client: ZNSM – BLK d.o.o. Brod End user: Brod Oil Refinery FEED services, Detailed Engineering and
Procurement Services Production Capacity: 215.000 Tons/year Approx. Contract Value: 4,0 million € June 2012 – March 2013 (Project
terminated for Client Convenience)
New Gasoline Isomerization Unit designed to produce valuable products increasing the octane number of one naphtha cut and two reformate cuts coming from upstream Units.
Technip in Greece
28
New Gas Turbine Generator GT-5
Client: Motor Oil Hellas (MOH), Corinth Refineries S.A., Greece
Detailed Engineering, Procurement, and Construction Support Services
Production Capacity: 17.5 MW Approx. Contract Value: 11,3 million € May 2010 – December 2011
Motor Oil New Gas Turbine Generator GT-5 consists of a new 17.5 MWatt gas turbine driven power generator and associated Heat Recovery Steam Generator (HRSG) package B-7003, and ancillary equipment, piping and facilities, in the vicinity of existing unit U-7000.
Technip in Greece
29
Power Plant Re-Instrumentation
Client: Motor Oil Hellas (MOH), Corinth Refineries S.A., Greece
Detailed Engineering Services Production: 70MW of power supply
from 4 Gas Turbine Generators, 114 Tn/h HPS and 10 Tn/h LPS.
Approx. Contract Value: 150,000 €
May 2009 – July 2011
TPLH main involvement was the migration of all Power Plant’s equipment signals, controls and interlocks into a new DCS / ESD system. In detail:
Preparation of new DCS / ESD material requisition
Existing Interlock conversion from relay based logic
diagrams into binary logic diagrams
Junction boxes rewiring
New cable routing
New graphic displays
Technip in Greece
Technip in Greece30
CDU Complex
Client: Motor Oil Hellas (MOH), Corinth Refineries S.A., Greece
Detailed Engineering Services Production: 60,000 BPSD of crude oil
coming from a variety of different feed-stocks.
Approx. Contract Value: 2,5 million € March 2008 – July 2010
TPLH main involvement was regarding all revamping works , all process and utilities interconnecting throughout the entire refinery, including all Tie-ins. In detail: New Amine Regeneration Unit New Cooling Tower cell Unit (Revamping) New Instrument Air Drier / Air receiver inside existing unit
(Revamping) Flare Unit (Revamping) Fuel Oil Unit (Revamping) Flushing Oil Unit (Revamping) New Sulphur Solidification Unit
31
New LPG Bullets
Client: Motor Oil Hellas (MOH), Corinth Refineries S.A., Greece
Detailed Engineering and Procurement Services
Storage Capacity: 4,000 m3 LPG Approx. Contract Value: 820.000 € October 2007 – May 2010
Motor Oil New LPG Bullets project consists of addition of five 800 m3
mounded bullets, and associated pumps, piping and ancillary facilities.
Technip in Greece
32
Lubes Revamping
Client: Motor Oil Hellas(MOH), Corinth Refineries S.A., Greece
Detailed Engineering and Procurement Support Services
Capacity: 60 MT/h (deasphalt. oil feed) Approx. Contract Value:
1,9 million € October 2007 – July 2009
Motor Oil Lubes Revamping project consists of revamping of Lube Oil Units 300 (NMP) / 400 (MEK) / 500 (HFU) process and utilities, including relevant interconnecting. New equipment included a tower, heat exchangers, pumps, compressors, pressure vessels and ancillary facilities.
Technip in Greece
33
No. 7 Diesel Oil HDS Plant
Client: TPIT Owner: PK ORLEN, Poland Engineering Services Production: 45,000 BPSD Approx. Contract Value: 1,6 million € July 2007 – September 2010
HDS VII was designed using the latest process engineering technology. In combination with TPLH detail engineering knowledge and experience the performance of the unit reached 97% during the Performance Test.
Construction of the plant took 2,5 years to complete due to severe winter conditions. The major challenge was the transportation of the 450tons reactor throughout the Wisla river, and later its lift and installation in field.
Main Equipment: 1 Reactor, 1 Furnace, 2 Reciprocating Compressors, 1 Centrifugal, 4 Reciprocating Pumps, 1 Separator.
Piping materials weight: 1100 tons.
Technip in Greece
34
No. 3 New Storage Tanks (105.000 CUMT)
Client: Motor Oil Hellas (MOH), Corinth Refineries S.A., Greece
Engineering Services
Storage capacity of 105.000 cubic meters for different feed-stocks.
Approx. Contract Value: 200,000 €
November 2005 – July 2006
TPLH main involvement was regarding all engineering services for the design of the new storage tanks. In detail: Material Requisition Process Design Piping Design Civil Design Instrument Design Electrical Design
Technip in Greece
35
OKL2 Ethylene Plant – DOW/PIC
Client: Technip Italy (TPIT) Owner: Kuwait Olefins Company
(K.S.C.C.), Kuwait Engineering Services Production: 850,000 Tn/Yr Ethylene and
Propylene. Approx. Contract Value: 1,6 million € September 2005 – March 2007
TPLH main involvement was the detailed engineering of the new Ethylene production plant in Kuwait, for the following activities:
Civil works
Piping
Stress Analysis
Field instrumentation
Electrical
Mechanical
3D modeling
Technip in Greece
36
Mellitah Storage & Export System Upgrading
Client: Bentini S.p.A., Italy Owner: ENI OIL (Libyan Branch), Lybia Process, Engineering & Requisitioning
Services, DCS / ESD / F&G Commissioning services.
Production: 100,000 m³ Crude Oil Storage tank, 6,600m³/h Export metering station with prover, 1500 m³/h Fiscal metering stations with prover.
Approx. Contract Value: 1,0 million €
October 2005 – December 2006 TPLH main involvement was the engineering (piping / instrument / electrical) and material requisition preparation for the following new units, as well as the commissioning of new DCS/ESD/F&G systems:
Storage and Export Marine facilities Unit (100.000 m³ storage tank, 3 metering stations with provers, 3 export / transfer pumps of 8400 m³/h capacity)
Open drain system Unit
Closed drain system Unit
Fire Fighting system Unit
New substation and technical room
Technip in Greece
37
2005 Spec. Refinery Expansion
Client: Motor Oil Hellas(MOH), Corinth Refineries S.A., Greece
Engineering Services – Construction Supervision – Local Materials
Production: 65,000 Nm³/h Hydrogen, 200 Tn/h Naftha from Mild Hydrocraker.
Overall Cost Investment: 350,000,000 €
July 2003 – October 2005 TPLH main involvement was the engineering (civil / piping / instrument / electrical / stress analysis / mechanical) of new and revamped units as follows:
CDU (Revamping)
Debut. / Deethan. Unit (Revamping)
Diesel unit (Revamping)
Vacuum Unit (Revamping)
Tail gas Treatment Unit (Revamping)
Desalination Unit (New)
Cooling Tower Unit (New)
Utilities Units (New)
New GT4 in the refinery power plant
Technip in Greece
Technip in Greece38
Projects
S / N CLIENT LOCATION PROJECT TITLE DESCRIPTION START DATE
COMPLETIONDATE
90 MOH CORINTH, GREECE RE‐DESIGN OF LINES 8”‐FU‐3008, 8”‐FU‐3009 AND 6”‐FU‐3014 of U‐300 FEASIBILITY STUDY OCT 2014 (FEB 2015)
89 TPIT RIO DE JANEIRO, BRASIL
P76 TOPSIDES AND INTEGRATION PROJECT DETAIL DESIGN MODULE M15 ENGINEERING SERVICES OCT 2014 (APR 2015)
88 TPIT (SASOL ENERGY LLC) TEXAS, USA USGTL PROJECT ENGINEERING SERVICES OCT 2014 (NOV 2015)
87 MOH CORINTH, GREECE PROCESS SIMULATION C‐101 PROCESS STUDY SEP 2014 (JAN 2015)
86 MOH CORINTH, GREECE PROCESS STUDY FOR SPLITTER COLUMN C‐2152 UPGRADE PROCESS STUDY AUG 2014 NOV 2014
85 TPIT ALEXANDRIA, EGYPT ESTYRENICS COST ESTIMATION ENGINEERING SERVICES MAY 2014 JUN 2014
84 MOH CORINTH, GREECE PROCESS STUDY FOR LUBES FLARE STUDY PROCESS STUDY APR 2014 (APR 2015)
83 TPIT MOSCOW, RUSSIA COMBINED OIL REFINERY UNIT (CORU) FEED PROJECT ‐MATERIALS TAKE OFF ENGINEERING SERVICES APR 2014 MAY 2014
82 MOH CORINTH, GREECE STRESS ANALYSIS STUDY FOR 16"‐HYH‐7518003 STRESS ANALYSIS JAN 2014 FEB 2014
81 MOH CORINTH, GREECE FEASIBILITY STUDY FOR U‐1400 REVAMPING FEASIBILITY STUDY JAN 2014 MAR 2014
80 TPIT AL‐JUBAIL, SAUDI ARABIA AS‐BUILT DWGS FOR AL‐JUBAIL PROJECT AS‐BUILT DWGS DEC 2013 MAY 2014
79 TPIT MANGALORE, INDIA PURCHASING ACTIVITIES PROCUREMENT SERVICES NOV 2013 DEC 2013
78 MOH CORINTH, GREECE VISBREAKER FRACTIONATOR PROCESS STUDY SEP 2013 DEC 2013
77 KAVALA OIL KAVALA, GREECEE STUDY FOR GAS AMINE TREATMENT PLANT PROCESS STUDY AUG 2013 NOV 2013
Technip in Greece39
ProjectsS / N CLIENT LOCATION PROJECT TITLE DESCRIPTION START
DATECOMPLETION
DATE
76 MOH CORINTH, GREECE REVAMPING STUDY UNIT 6300 PROCESS STUDY JUL 2013 OCT 2013
75 MOH CORINTH, GREECE VISBROKEN RESIDUE COOLING CIRCUIT BASIC DESIGN JUN 2013 OCT 2013
74 MOH CORINTH, GREECE U‐200 VACUUM UNIT FURNACES REVAMP DETAIL ENGINEERING JUN 2013 MAR 2014
73 TPIT VIETNAM PETROVIETNAM – VIBRATION OF THE LINE 28"‐MD1302013 STRESS ANALYSIS JUN 2013 SEP 2013
72 GAP ANALYSIS CHANIA, GREECE TANK FARM EXPANSION FEED ENGINEERING SERVICES JUN 2013 DEC 2013
71 TPIT BOURGAS, BULGARIA HEAVY RESIDUE PROCESS COMPLEX STRESS CALCULATION MAY 2013 NOV 2013
70 MOH CORINTH, GREECE SIL STUDY FOR VARIOUS UNITS PROCESS & INSTRUMENTATIONSAFETY STUDY APR 2013 MAR 2014
69 TPIT IRAQ WEST QURNA 2 ‐ EARLY PRODUCTION FACILITIES FEED ENGINEERING SERVICES MAR 2013 OCT 2013
68 METRON SA SAUDI ARABIA CALCULATION REVIEW OF SA TRUCK LOADING CIVIL CALCULATION NOTE REVIEW MAR 2013 APR 2013
67 ANRPC ALEXANDRIA , EGYPT SPRING HANGERS FOR EXISTING CCR UNIT SITE ENGINEERING ACTIVITIES JAN 2013 JAN 2013
66 MOH CORINTH, GREECE VISBREAKER UNIT REVAMPING ENGINEERING & PROCUREMENT TECHNICAL SERVICES JAN 2013 FEB 2014
65 ZARUBEZHNEFT BOZANSKI BROD, BOSNIA & HERZEG. GASOLINE ISOMERIZATION UNIT (TITLE 101)
ENGINEERING & PROCUREMENT SERVICES
(TERMINATED FOR CLIENT CONVENIENCE)
JUN 2012 MAR 2013
64 MOH CORINTH, GREECE DRAIN LINES OF HP HEAT EXCHANGERS ‐ UNIT 75 STRESS ANALYSIS NOV 2011 DEC 2011
63 MOH CORINTH, GREECE HYDROGEN RECOVERY STUDY PROCESS STUDY OCT 2011 JUN 2012
62 TPIT BOURGAS, BULGARIA FEED DESIGN FOR UNITS 071 H2 PRODUCTION ENGINEERING SERVICES JUL 2011 MAY 2012
Technip in Greece40
ProjectsS / N CLIENT LOCATION PROJECT TITLE DESCRIPTION START
DATECOMPLETION
DATE
61 IG ALGERIA CIVIL PERSONNEL SECONDMENT ENGINEERING & DRAFTING SUPPORT MAR 2011 JUL 2011
60 MOH CORINTH, GREECE CDU STRESS ANALYSIS UPDATES STRESS ANALYSIS JAN 2011 FEB 2011
59 MOH CORINTH, GREECE SUPPORT OF THE INPUT LINE TO R‐7502 DETAILED ENGINEERING DEC 2010 DEC 2010
58 TPIT POLAND AS BUILT DOCUMENTATION DRAFTING SERVICES NOV 2010 DEC 2010
57 MOH CORINTH, GREECE LVGO SEPARATION AT PREFLASHER C‐3190 PROCESS STUDY SEPT 2010 NOV 2010
56 MOH CORINTH, GREECE INCREASE CAPACITY CDU TRANSFER LINE DETAILED ENGINEERING SEPT 2010 OCT 2010
55 TPIT CORINTH, GREECE CDU COMPLEX‐AS BUILT DOCUMENTATION DESIGN/DRAFTING MAY 2010 SEPT 2010
54 MOH CORINTH, GREECE 5th POWER PLANT TURBINE DETAIL ENGINEERING, PROCUREMENT & CONSTRUCTION SUPPORT SERVICES MAY 2010 DEC 2011
53 ETMER CORINTH, GREECE TEMPORARY ROOF SUPPORT FOR MOH TANK T‐756 SUPPORT STRUCTURAL DESIGN NOV 2009 NOV 2009
52 AF ATHENS, GREECE CRUDE FEED TO AIC‐EIC OPTIMIZATION PIPING DETAIL DESIGN AUG 2009 DEC 2009
51 EUROPEAN COMMISSION ATHENS, GREECE INDUCE RESEARCH ON SEISMIC RESISTANT
DESIGN OF STEEL STRUCTURES JUL 2009 DEC 2012
50 AF ATHENS, GREECE PIPING DESIGN CHECK PIPING STUDY JUL.2009 JUL 2009
49 MOH CORINTH, GREECE STRESS CHECK/SUPPORT CHECK FOR HPS LINES STRESS ENGINEERING JUN 2009 JUL 2009
48 MOH CORINTH, GREECE ELECTRICAL SUPPLY FOR NEW PUMPS ELECTRICAL ENGINEERING STUDIES JUL 2009 AUG 2009
47 MOH CORINTH, GREECE POWER PLANT RE‐INSTRUMENTATION DETAIL ENGINEERING MAY 2009 JUL 2011
Technip in Greece41
Projects
S / N CLIENT LOCATION PROJECT TITLE DESCRIPTION START DATE COMPLETIONDATE
46 MOH CORINTH, GREECE 5TH POWER PLANT TURBINE FEED SERVICES MAY 2009 OCT 2009
45 AF THESS/NIKIGREECE
PROCESS & UTILITY LINES INTERCONNECTING FOR TRUP (AF‐20‐0849) PIPING INTERCONNECTING MAY 2009 OCT 2009
44 AF ASPROPYRGOS GREECE
INTERCONNECTING AND PUMPING STATION FOR THE 5 NEW TANKS (AF‐14‐2132) PIPING INTERCONNECTING MAR 2009 DEC 2009
43 MOH CORINTH, GREECE NEW INCINERATOR H‐4701N ENGINEERING & PROCUREMENT SERVICES AUG 2008 JAN 2009
42 MOH CORINTH, GREECE NG HEATING & CONTROL TO GAS TURBINES ENGINEERING SERVICES SEPT 2008 MAY 2009
41 MOH CORINTH, GREECE VIBRATION STUDY FOR LINE 12 GAL 7520003 STRESS ENGINEERING JUL 2008 AUG 2008
40 AF ATHENS, GREECE LPG RECOVERY UNIT SIMULATION STUDY PRO II SIMULATION JUN 2008 JUL 2008
39 MOH CORINTH, GREECE PROCESS STUDY FOR C‐7504 OPERATION PROCESS STUDY APR 2008 JUN 2008
38 MOH CORINTH, GREECE CDU COMPLEX / AMINE, INTERCONNECTING, OFFSITES & UTILITIES DESIGN (2279) DETAILED ENGINEERING SERVICES MAR 2008 JUL 2010
37 MOH CORINTH, GREECE F‐7501 VIBRATION PROBLEM STRESS ENGINEERING FEB 2008 MAY 2008
36 MOH CORINTH, GREECE UOP FLUID CATALYTIC CRACKING COMPLEX SCOPING STUDY REPORT STUDY JAN 2008 JAN 2008
35 AF ATHENS, GREECE PRO II SIMULATION / CONDENSATE DISTILLATION UNIT PRO II SIMULATION JAN 2008 FEB 2008
34 MOH CORINTH, GREECE NEW LPG BULLETS (5324) DETAIL ENGINEERING & PROCUREMENT SERVICES OCT 2007 MAY 2010
33 MOH CORINTH, GREECE SIL ASSESMENT STUDY (5393) STUDY / ENGINEERING OCT 2007 OCT 2007
42
ProjectsS / N CLIENT LOCATION PROJECT TITLE DESCRIPTION START DATE COMPLETION
DATE
32 MOH CORINTH, GREECE MAINTENANCE BUILDING HVAC REDESIGN HVAC DESIGN SEP 2007 OCT 2007
31 MOH CORINTH, GREECE U‐5300 REVAMPING (REFU 5327) DETAIL ENGINEERING & PROCUREMENT SERVICES OCT 2007 MAY 2008
30 MOHCORINTH, GREECE LUBES MINI REVAMPING (RELU 4196) DETAIL ENGINEERING &
PROCUREMENT SERVICES OCT 2007JUL 2009
CORINTH, GREECE COOLING AND CHILLING OF INERT GAS PROCESS STUDY JUL 2008
29 ENOIA ATHENS, GREECE CHECK OF FINAL PIPING DESIGN ENGINEERING SERVICES JUL 2007 MAR 2008
28 MOH CORINTH, GREECE FIRE FIGHTING STUDY CDU ENGINEERING STUDY JUL 2007 AUG 2007
27 TPIT POLAND No.7 DIESEL OIL HDS PLANT ENGINEERING SERVICES JUL 2007 SEP 2010
26 CCC LYBIA EL. SAHARA OIL FIELD DEVELOPMENT/MTO MTO’s + MRs JUL 2007 JUL 2007
25 HELPE‐EIC THESSALONIKI GREECE
THESSALONIKI REFINERY UPGRADING PROJECT PRE‐ENGINEERING (TRUP 2300) FEED SERVICES MAY 2007 SEPT 2007
24 MOH CORINTH, GREECE LUBE EXTRACTION UNIT P&ID’s U‐300 AS BUILT P&Is APR 2007 JUN 2007
23 KTI ASPROPYRGOSGREECE 30578 – THERMAL REACTORS ENGINEERING SERVICES & C.O. MAR 2007 JUN 2007
22 KTI LITHUANIA 30570 – HYDROGEN GENERATION UNIT DETAILED ENGINEERING ‐ CIVIL MAR 2007 NOV 2007
21 MOH CORINTH, GREECE MODIFICATION OF THE REFINERY SATELLITEBUILDING INTO BLAST RESISTANT FRONT END ENGINEERING DESIGN MAR 2007 JUN 2007
20 TPIT SAUDI ARABIA ARAMCO – RIYADH REFINERY ISOMETRIC SKETCES ISOMETRICS FEB 2007 FEB 2007
19 MOH CORINTH, GREECE P&IDs VERIFICATION FOR UNIT 100 ENGINEERING STUDY JAN 2007 MAR 2007
18 DAMCO GREECE PREFEASIBILITY STUDY FOR A NEW REFINERY PREFEASIBILITY STUDY JAN 2007 MAR 2007
17 MOH CORINTH, GREECE NEW SEA WATER SUPPLY BASIC ENGINEERING STUDY NOV 2006 DEC 2006
Technip in Greece
43
ProjectsS / N CLIENT LOCATION PROJECT TITLE DESCRIPTION START DATE COMPLETION
DATE
16 KTI QATAR QATARGAS AGX PROJECT FRONT END ENGINEERING DESIGN SEP 2006 FEB 2007
15 MOH CORINTH, GREECE NEW CRUDE DISTILLATION UNIT COMPLEX FRONT END ENGINEERING DESIGN SEP 2006 MAR 2007
14 MOH CORINTH, GREECE LUBE OIL UPGRADING PROJECT FRONT END ENGINEERING DESIGN JUL 2006 NOV 2006
13 MOH CORINTH, GREECE LINE CONNECTING C‐2701 TO E3610 ENGINEERING SERVICES JUN 2006 JUL 2006
12 MOH CORINTH, GREECE E3214/A BYPASS LINE ENGINEERING SERVICES MAY 2006 JUN 2006
11 MOH CORINTH, GREECE No.3 NEW STORAGE TANKS ENGINEERING SERVICES NOV 2005 JUL 2006
10 MOH CORINTH, GREECE RELOCATION OF MACHINE SHOP & CENTRAL WAREHOUSE TO HELARCO
ENGINEERING SERVICES including ADDENDUM NOV 2005 FEB 2007
9 TPIT KUWAIT OLK2 ETHYLENE PLANT – DOW/PIC ENGINEERING SERVICES SEP 2005 MAR 2007
8 MOH CORINTH, GREECE BASIC, DETAILED DESIGN & REQUISITIONING FOR NATURAL GAS USE IN MOH REFINERY BASIC ENGINEERING STUDY FEB 2005 DEC 2006
7 MOH CORINTH, GREECE VACUUM UNIT (U‐200) P&ID’s RECONSTRUCTION PROCESS ENGINEERING SERVICES MAY 2005 JUL 2005
6 MOH CORINTH, GREECE SAFETY LOOPS SAFETY INTEGRITY LEVEL (SIL) EVALUATION RISK ANALYSIS STUDY MAY 2005 JUL 2005
5 MOH CORINTH, GREECE PROJECT 5190 – NEW PIPE‐RACK STUDY FOR PIER “A” DETAILED ENGINEERING JAN 2005 MAY 2005
4 BENTINI LYBIA MELLITAH STORAGE & EXPORT SYSTEM UPGRADING
PROCESS, ENGINEERING & REQUISITIONING SERVICES, DCS / ESD /
F&G COMMISSIONING SERVICESOCT 2005 DEC 2006
3 KTI PRIOLO, ITALY ERGMED‐UNITA CR‐41 NUOVO IMPIANTO RECUPERO ZOLFO
ENGINEERING SERVICES (CIVIL, ELECT.,INSTR) OCT 2004 AUG 2005
2 MOH CORINTH, GREECE RELOCATION OF MAINTENANCE WORKSHOP &CENTRAL WAREHOUSE BASIC ENGINEERING SUDY SEP 2004 JUL 2005
1 MOH CORINTH, GREECE 2005 SPEC. REFINERY EXPANSIONENGINEERING SERVICES
CONSTRUCTION SUPERVISION / LOCAL MATERIALS
JUL 2003 OCT 2005
Technip in Greece
Technip in Greece44
Our Offices
TECHNIPETROL HELLAS S.A.42 Pavlou Bakogianni Street144 52, Metamorfosis, Athens, GreeceTel: +30 210 2854 300 Fax: +30 210 2834 090Email: [email protected]
Web: www.technip.com
Technipetrol Hellas S.A. Engineering Office In Detail position of TPLH Building
TECHNIPETROL HELLASPresentation
January 2015
Technip in Greece45