Technical data*: Combi T Thermo Hollow Floor Combi T Thermo …€¦ · The MERO Combi T Thermo is...
Transcript of Technical data*: Combi T Thermo Hollow Floor Combi T Thermo …€¦ · The MERO Combi T Thermo is...
Innovative solutions from one source
Development
Consulting
Planning
Manufacturing
Installation
AccessFloor
HollowFloor
Floorcoveringand
Installation
Services
EnEV-proved
06.1
3/C
ombi
TT
herm
oSu
bjec
tto
tech
nica
lcha
nges
with
outp
riorn
otic
e
Hollow Floor Combi T ThermoHeating Pipe grid 100 Pipe grid 150
HeatflowdensityqGacc.toDINEN1264-2(withoutcovering,Rλ=0,00m²K/W)
77W/m² 60W/m²
atstandardheatingliquidovertemperature∆θH 12K 12K
HeatflowdensityqGacc.toDINEN1264-2(withcovering,R=0,15m²K/W)
89W/m²
78W/m²
atstandardheatingliquidovertemperature∆θH 26K 29K
Rλ,Bcarpet 0,07–0,23m²K/W 0,07–0,23m²K/W
Rλ,Bceramictile/stone 0,02m²K/W 0,02m²K/W
Rλ,BPVC 0,01m²K/W 0,01m²K/W
Cooling
Specificcoolingcapacityacc.toDINEN1264-5
38,2W/m² 28,7W/m²
Coolingliquidtemperature∆θH 8K 8K
Heating and cooling
Anadequatetemperatureisimportantforacomfortableindoorclimateandagoodplacetowork.Afurtheradvan-tageinofficesistheinvisibleinstalla-tionofsupplylines.TheMEROhollowfloorCombiTTher-mocombinesthesetwocharacteris-tics.TheMEROCombiTThermocanbeusedinalmostallareas,whetherit
concernsnewbuildingsortherefur-bishmentofoldbuildings.Thesystemdoesnotrequireanyspecificheatingcircuitconnections.Allfloorcoveringssuitableforunderfloorheatingasstoneandceramictiles,textilefloorcover-ings,dimensionallystablefloorcover-ingsanddifferenttypesofparquetcanbeappliedonMEROCombiTThermo.
TÜVcertifiedsince1997
Ourco-operationpartner:
TheMEROhollowfloorCombiTThermoistestedacc.toDINEN1264-2/3/4no.7F249-Fand7F250-Fandcertifiedbyindependentinstitutes.
Technicaldata*: Combi T ThermoAccessories: Drillingisdoneatfactoryoronsitefor:Powersupplyandtwist-airoutletsExpansionjoints/constructionjoints/jointsRevisionopeningsAccessfloorductsCutoutsSpecialwallconnectionsFasciaBridgingAdditionalinsulation(heat,impactsound)Stairs,rampsFloorcoveringsasstone,parquetetc.
*For further detailed technical datapleaseaskforourproductdatasheets.
Bearing layer:
Dimensions: 600x600Systemweight: 56kg/m²to66kg/m²Panelmaterial: Calciumsulphatepanel(fiber-reinforcedcalciumsulphate)Adhesive: Highqualitysolvent-freeadhesiveforthe
adhesionofthetoothing
Substruction
Module: 600x600mmPedestalmaterial: GalvanizedsteelConstructionheight: From50mmPedestalbonding: Normallygluedwiththesubfloorandthe
panel;continuouslyadjustabletoheight
Floor coverings
Textileundelasticfloorcoverings,parquet,naturalstone,artificialstone,liquidcoating
Load values Pointload:Valuedacc.toDINEN13213:Ultimateload:
3.000–5.000NClass2–5>6.000–10.000N
Fire protection
BuildingmaterialclassbearingpanelAcc.toEN13501T1: A1Fireresistanceclassacc.toDIN4102T2: F30possible
Acoustic values
(dependingonsystemandfloorcovering)
SoundreductionindexRL,w,P 39–54dBNormalizedimpactsoundpressurelevelLn,w,P 42–91dBImprovementofsoundpressurelevel∆Lw,P 10–29dB
NewdenominationaccordingtoDINENNormalizedflankleveldifferenceDn,f,w,P
NormalizedflankimpactsoundpressureLn,f,w,P
ImprovementofsoundpressurelevelΔLw,P
Heat flow density of the FH at pipe grid galv. = 100 mm
Hea
t flo
w d
ensi
ty q
[W/m
]
Limiting curve living zone 9K
Limiting curve perimeter area 15K stone 18 mm
Heating liquid over temperature [K]
Heat flow density of the FH at pipe grid galv. = 150 mm
Limiting curve living zone 9K
Limiting curve living zone 15K stone 18 mm
Limiting curve living zone 9K
Stone 18 mm
Limiting curve living zone 15K stone 18 mm
Heating liquid over temperature [K]
Hea
t flo
w d
ensi
ty q
[W/m
]
Cooling capacity of the FH at pipe grid galv. = 100 mm
0
5
10
15
20
25
30
35
40
0 2 4 6 8 10Cooling liquid under temperature T [K]
Coo
ling
flow
den
sity
q [W
/m2 ]
0,000
0,050
0,100
0,150
Stone 18 mm
Nominal cooling capacity at 8K
Coo
ling
flow
den
sity
q [W
/m2 ]
Cooling capacity of the FH at pipe grid galv. = 150 mm
0
5
10
15
20
25
30
35
40
0 2 4 6 8 10
0,000
0,050
0,100
0,150
Stone18 mm
Nominal cooling capacity 8 K
Cooling liquid under temperature T [K]
Headoffice:
MERO-TSKInternational GmbH & Co. KG
Max-Mengeringhausen-Str.5
97084Würzburg,Germany
Postaladress:
MERO-TSKInternational GmbH & Co. KG
ProductDivisionFloorSystems
LauberStraße11
97357Prichsenstadt,Germany
Phone.:+49(0)9383203-603
Fax:+49(0)9383203-629
E-mail:[email protected]
Internet:www.mero.de
PBS Hollow Floor Thermo
Fields of application
• stoneandceramictiles
• textilefloorcoverings
• dimensionallystableelasticfloorcoverings
• differenttypesofparquet
Advantages
• Especially suitable for low tem-perature plants according to EnEV
• Extremelyshortconstructiontime
• MaximumsystemsafetyduetotightnesstestaccordingtoDINUponorPE-Xatube
• Variousgridsandvariableconstructionheightsarepossible
• Verygoodstructural-physicalcha-racteristics
• Favourablecooling,especiallywithgroundwaterheatpumps
• Healthyindoorclimatethroughra-diantheat
TheMEROdryhollowfloorwithpre-fabricatedgroovesfortheheatingpipesisinstalledaccordingtothelayoutdrawing.
Theplasticpipeisplacedintothegrooves.
Thecutoutsareprefabricated(e.g.forelectricunderfloortankswhicharein-stalledonsite)
Priortothegroutingofthebodyfiller,allpipesaretestedforleaks.
Theprotrudingbodyfillerwillbere-movedfromthesupportingpanel.
AftertheoperationalheatingtheMEROCombiTThermoisreadyfortheappli-cationofthefloorcovering.
System floor
Planning instructions
Theplanningandsettingofthehea-tingandcoolingcircuitsiscarriedouttogetherwiththeTGAplanner.Onrequest,thecalculationofthepipenetworkcanbedonebyMERO.TheMEROCombiTThermocanalsobeoperatedalongthemethodofTi-chelmann.Withafewstandardpa-nelswemeetallstructuralrequire-ments.
Construction principle
Thesupportingpanelsconsistofin-combustiblefiber-reinforcedcalciumsulphate,whichguaranteeanopti-malheattransmission.Specialmilledgroovesfortheinstallationandfix-ingofthepipeworkintegratethefloorheatingintothefloorpanel.Aftertheinstallationoftheheatingpipe,thegroovesarefilledwithbodyfillerflushwiththesurface.Thermallyinsulatedconnectingpipesensureanoptimalenergysupply.Duetothedewpointcontroltheac-cumulationofcondensedwatercanbeavoided.
5
2
1
54
31.Supportingpanelwith groovesfortheheatingpipes2.Heatingpipe3.Bodyfiller4.Pedestal5.Perimeterstrip
Weuseplasticpipesconsistingofhigh-lycross-linkedpolyethylene.Thepipestructurehasanoxygenbarrierwhichexceedsbyfarthestandardrequire-mentsregardingoxygentightness.Thesubstructureconsistsofsteelpedes-tals.Theirheightcanbeexactlyadjus-ted.Allpedestalsareprotectedagainstcorrosionbygalvanizationandpassiva-tion.Thepedestalbaseplatesaregluedtotherawsubfloor.Dependingontherequirements,variouspaneltypesareavailable.
Construction process
2 4MERO-TSK International GmbH & Co. KG
For economic and ecological reasons, rooms today are more and more heated and cooled by activated spaces. The larger the heated part of the space, the lower the energy required. This reduces the cost of heating and cooling. The PBS Thermo is a dry hollow floor with a floor heating and cooling system.
The PBS Thermo can be used in almost all area’s, whether it concerns new buildings or the refurbishment of old buildings. In principle, all floor coverings suitable for floor heating can be installed on PBS Thermo:
• Thermo is proved as heating and cooling system acc. to DIN and certified
Foreconomicandecologicalreasons,roomstodayaremoreandmoreheatedandcooledbyactivatedspaces.Thelargertheheatedpartofthespace,thelowertheenergyrequired.Thisredu-cesthecostofheatingandcooling.TheMEROCombiTThermoisadryhollowfloorwithafloorheatingandcoolingsystem.
Fields of application
TheMEROCombiTThermocanbeusedinalmostallareas,whetheritconcernsnewbuildingsortherefur-bishmentofoldbuildings.Inprinci-ple,allfloorcoveringssuitableforfloorheatingcanbeinstalledonMEROCombiTThermo:
• stoneandceramictiles
• textilefloorcoverings
• dimensionallystableelasticfloorcoverings
• differenttypesofparquet
Advantages
• Especially suitable for low tem-perature plants according to EnEV
• Extremelyshortconstructiontime
• MaximumsystemsafetyduetotightnesstestaccordingtoDINUponorPE-Xatube
• CombiTThermoisprovedashea-tingandcoolingsystemacc.toDINandcertifiedacc.toDINCertco
• Variousgridsandvariableconstructionheightsarepossible
• Verygoodstructural-physicalcha-racteristics
• Favourablecooling,especiallywithgroundwaterheatpumps
• Healthyindoorclimatethroughra-diantheat
TheMEROdryhollowfloorwithpre-fabricatedgroovesfortheheatingpipesisinstalledaccordingtothelayoutdrawing.
Theplasticpipeisplacedintothegrooves.
Thecutoutsareprefabricated(e.g.forelectricunderfloortankswhicharein-stalledonsite)
Priortothegroutingofthebodyfiller,allpipesaretestedforleaks.
Theprotrudingbodyfillerwillbere-movedfromthesupportingpanel.
AftertheoperationalheatingtheMEROCombiTThermoisreadyfortheappli-cationofthefloorcovering.
System floor
Planning instructions
Theplanningandsettingofthehea-tingandcoolingcircuitsiscarriedouttogetherwiththeTGAplanner.Onrequest,thecalculationofthepipenetworkcanbedonebyMERO.TheMEROCombiTThermocanalsobeoperatedalongthemethodofTi-chelmann.Withafewstandardpa-nelswemeetallstructuralrequire-ments.
Construction principle
Thesupportingpanelsconsistofin-combustiblefiber-reinforcedcalciumsulphate,whichguaranteeanopti-malheattransmission.Specialmilledgroovesfortheinstallationandfix-ingofthepipeworkintegratethefloorheatingintothefloorpanel.Aftertheinstallationoftheheatingpipe,thegroovesarefilledwithbodyfillerflushwiththesurface.Thermallyinsulatedconnectingpipesensureanoptimalenergysupply.Duetothedewpointcontroltheac-cumulationofcondensedwatercanbeavoided.
5
2
1
54
31.Supportingpanelwith groovesfortheheatingpipes2.Heatingpipe3.Bodyfiller4.Pedestal5.Perimeterstrip
Weuseplasticpipesconsistingofhigh-lycross-linkedpolyethylene.Thepipestructurehasanoxygenbarrierwhichexceedsbyfarthestandardrequire-mentsregardingoxygentightness.Thesubstructureconsistsofsteelpedes-tals.Theirheightcanbeexactlyadjus-ted.Allpedestalsareprotectedagainstcorrosionbygalvanizationandpassiva-tion.Thepedestalbaseplatesaregluedtotherawsubfloor.Dependingontherequirements,variouspaneltypesareavailable.
Construction process
2MERO-TSK International GmbH & Co. KG
4MERO-TSK International GmbH & Co. KG
Foreconomicandecologicalreasons,roomstodayaremoreandmoreheatedandcooledbyactivatedspaces.Thelargertheheatedpartofthespace,thelowertheenergyrequired.Thisredu-cesthecostofheatingandcooling.TheMEROCombiTThermoisadryhollowfloorwithafloorheatingandcoolingsystem.
Fields of application
TheMEROCombiTThermocanbeusedinalmostallareas,whetheritconcernsnewbuildingsortherefur-bishmentofoldbuildings.Inprinci-ple,allfloorcoveringssuitableforfloorheatingcanbeinstalledonMEROCombiTThermo:
• stoneandceramictiles
• textilefloorcoverings
• dimensionallystableelasticfloorcoverings
• differenttypesofparquet
Advantages
• Especially suitable for low tem-perature plants according to EnEV
• Extremelyshortconstructiontime
• MaximumsystemsafetyduetotightnesstestaccordingtoDINUponorPE-Xatube
• CombiTThermoisprovedashea-tingandcoolingsystemacc.toDINandcertifiedacc.toDINCertco
• Variousgridsandvariableconstructionheightsarepossible
• Verygoodstructural-physicalcha-racteristics
• Favourablecooling,especiallywithgroundwaterheatpumps
• Healthyindoorclimatethroughra-diantheat
Theplasticpipeisplacedintothegrooves.
Thecutoutsareprefabricated(e.g.forelectricunderfloortankswhicharein-stalledonsite)
Priortothegroutingofthebodyfiller,allpipesaretestedforleaks.
System floor
Planning instructions
Construction principle
Thesupportingpanelsconsistofin-combustiblefiber-reinforcedcalciumsulphate,whichguaranteeanopti-malheattransmission.Specialmilledgroovesfortheinstallationandfix-ingofthepipeworkintegratethefloorheatingintothefloorpanel.Aftertheinstallationoftheheatingpipe,thegroovesarefilledwithbodyfillerflushwiththesurface.Thermallyinsulatedconnectingpipesensureanoptimalenergysupply.Duetothedewpointcontroltheac-cumulationofcondensedwatercanbeavoided.
5
2
1
54
31.Supportingpanelwith groovesfortheheatingpipes2.Heatingpipe3.Bodyfiller4.Pedestal5.Perimeterstrip
Weuseplasticpipesconsistingofhigh-lycross-linkedpolyethylene.Thepipestructurehasanoxygenbarrierwhichexceedsbyfarthestandardrequire-mentsregardingoxygentightness.Thesubstructureconsistsofsteelpedes-tals.Theirheightcanbeexactlyadjus-ted.Allpedestalsareprotectedagainstcorrosionbygalvanizationandpassiva-tion.Thepedestalbaseplatesaregluedtotherawsubfloor.Dependingontherequirements,variouspaneltypesareavailable.
Construction process
2MERO-TSK International GmbH & Co. KG
4MERO-TSK International GmbH & Co. KG
The PBS dry hollow floor with pre-fabricated grooves for the heating pipes is installed according to the layout drawing
Theprotrudingbodyfillerwillbere-movedfromthesupportingpanel.
After the operational heating the PBS Thermo is ready for the application of the floor covering
The planning and setting of the heating and cooling circuits is carried out together with the TGA planner. On request, the calculation of the pipe network can be done by PBS. The PBS Thermo can also be operated along the method of Tichelmann. With a few standard panels we meet all structural requirements.
Floor Systems
MERO Hollow Floor Combi T ThermoInnovative solutions from one source
Development
Consulting
Planning
Manufacturing
Installation
AccessFloor
HollowFloor
Floorcoveringand
Installation
Services
EnEV-proved
06.1
3/C
ombi
TT
herm
oSu
bjec
tto
tech
nica
lcha
nges
with
outp
riorn
otic
e
Hollow Floor Combi T ThermoHeating Pipe grid 100 Pipe grid 150
HeatflowdensityqGacc.toDINEN1264-2(withoutcovering,Rλ=0,00m²K/W)
77W/m² 60W/m²
atstandardheatingliquidovertemperature∆θH 12K 12K
HeatflowdensityqGacc.toDINEN1264-2(withcovering,R=0,15m²K/W)
89W/m²
78W/m²
atstandardheatingliquidovertemperature∆θH 26K 29K
Rλ,Bcarpet 0,07–0,23m²K/W 0,07–0,23m²K/W
Rλ,Bceramictile/stone 0,02m²K/W 0,02m²K/W
Rλ,BPVC 0,01m²K/W 0,01m²K/W
Cooling
Specificcoolingcapacityacc.toDINEN1264-5
38,2W/m² 28,7W/m²
Coolingliquidtemperature∆θH 8K 8K
Heating and cooling
TÜVcertifiedsince1997
Ourco-operationpartner:
TheMEROhollowfloorCombiTThermoistestedacc.toDINEN1264-2/3/4no.7F249-Fand7F250-Fandcertifiedbyindependentinstitutes. MERO-TSK International GmbH & Co. KG
Accessories: Drillingisdoneatfactoryoronsitefor:Powersupplyandtwist-airoutletsExpansionjoints/constructionjoints/jointsRevisionopeningsAccessfloorductsCutoutsSpecialwallconnectionsFasciaBridgingAdditionalinsulation(heat,impactsound)Stairs,rampsFloorcoveringsasstone,parquetetc.
Bearing layer:
Dimensions: 600x600Systemweight: 56kg/m²to66kg/m²Panelmaterial: Calciumsulphatepanel(fiber-reinforcedcalciumsulphate)Adhesive: Highqualitysolvent-freeadhesiveforthe
adhesionofthetoothing
Substruction
Module: 600x600mmPedestalmaterial: GalvanizedsteelConstructionheight: From50mmPedestalbonding: Normallygluedwiththesubfloorandthe
panel;continuouslyadjustabletoheight
Floor coverings
Textileundelasticfloorcoverings,parquet,naturalstone,artificialstone,liquidcoating
Load values Pointload:Valuedacc.toDINEN13213:Ultimateload:
3.000–5.000NClass2–5>6.000–10.000N
Fire protection
BuildingmaterialclassbearingpanelAcc.toEN13501T1: A1Fireresistanceclassacc.toDIN4102T2: F30possible
Acoustic values
(dependingonsystemandfloorcovering)
SoundreductionindexRL,w,P 39–54dBNormalizedimpactsoundpressurelevelLn,w,P 42–91dBImprovementofsoundpressurelevel∆Lw,P 10–29dB
NewdenominationaccordingtoDINENNormalizedflankleveldifferenceDn,f,w,P
NormalizedflankimpactsoundpressureLn,f,w,P
ImprovementofsoundpressurelevelΔLw,P
Heat flow density of the FH at pipe grid galv. = 100 mm
Hea
t flo
w d
ensi
ty q
[W/m
]
Limiting curve living zone 9K
Limiting curve perimeter area 15K stone 18 mm
Heating liquid over temperature [K]
Heat flow density of the FH at pipe grid galv. = 150 mm
Limiting curve living zone 9K
Limiting curve living zone 15K stone 18 mm
Limiting curve living zone 9K
Stone 18 mm
Limiting curve living zone 15K stone 18 mm
Heating liquid over temperature [K]
Hea
t flo
w d
ensi
ty q
[W/m
]
Cooling capacity of the FH at pipe grid galv. = 100 mm
0
5
10
15
20
25
30
35
40
0 2 4 6 8 10Cooling liquid under temperature T [K]
Coo
ling
flow
den
sity
q [W
/m2 ]
0,000
0,050
0,100
0,150
Stone 18 mm
Nominal cooling capacity at 8K
Coo
ling
flow
den
sity
q [W
/m2 ]
Cooling capacity of the FH at pipe grid galv. = 150 mm
0
5
10
15
20
25
30
35
40
0 2 4 6 8 10
0,000
0,050
0,100
0,150
Stone18 mm
Nominal cooling capacity 8 K
Cooling liquid under temperature T [K]
Headoffice:
MERO-TSKInternational GmbH & Co. KG
Max-Mengeringhausen-Str.5
97084Würzburg,Germany
Postaladress:
MERO-TSKInternational GmbH & Co. KG
ProductDivisionFloorSystems
LauberStraße11
97357Prichsenstadt,Germany
Phone.:+49(0)9383203-603
Fax:+49(0)9383203-629
E-mail:[email protected]
Internet:www.mero.de
Technical data: Thermo
An adequate temperature is important for a comfortable indoor climate and a good place to work. A further advantage in offices is the invisible installation of supply lines. The PBS hollow floor Thermo combines these two characteristics. The PBS Thermo can be used in almost every area, whether is
concerns new buildings or the refurbishment of old buildings. The system does not require any specific heating circuit connections. All floor coverings suitable for under floor heating as stone and ceramic tiles, textile floor coverings, dimensionally stable floor coverings and different types of parquet can be applied on PBS Thermo
Floor Systems
MERO Hollow Floor Combi T ThermoInnovative solutions from one source
Development
Consulting
Planning
Manufacturing
Installation
AccessFloor
HollowFloor
Floorcoveringand
Installation
Services
EnEV-proveHeating Pipe grid 100 Pipe grid 150
HeatflowdensityqGacc.toDINEN1264-2(withoutcovering,Rλ=0,00m²K/W)
77W/m² 60W/m²
atstandardheatingliquidovertemperature∆θH 12K 12K
HeatflowdensityqGacc.toDINEN1264-2(withcovering,R=0,15m²K/W)
89W/m²
78W/m²
atstandardheatingliquidovertemperature∆θH 26K 29K
Rλ,Bcarpet 0,07–0,23m²K/W 0,07–0,23m²K/W
Rλ,Bceramictile/stone 0,02m²K/W 0,02m²K/W
Rλ,BPVC 0,01m²K/W 0,01m²K/W
Cooling
Specificcoolingcapacityacc.toDINEN1264-5
38,2W/m² 28,7W/m²
Coolingliquidtemperature∆θH 8K 8K
Heating and cooling
Anadequatetemperatureisimportantforacomfortableindoorclimateandagoodplacetowork.Afurtheradvan-tageinofficesistheinvisibleinstalla-tionofsupplylines.TheMEROhollowfloorCombiTTher-mocombinesthesetwocharacteris-tics.TheMEROCombiTThermocanbeusedinalmostallareas,whetherit
concernsnewbuildingsortherefur-bishmentofoldbuildings.Thesystemdoesnotrequireanyspecificheatingcircuitconnections.Allfloorcoveringssuitableforunderfloorheatingasstoneandceramictiles,textilefloorcover-ings,dimensionallystablefloorcover-ingsanddifferenttypesofparquetcanbeappliedonMEROCombiTThermo.
TÜVcertifiedsince1997
Ourco-operationpartner:
MERO-TSK International GmbH & Co. KG
Technicaldata*: Combi T ThermoAccessories: Drillingisdoneatfactoryoronsitefor:Powersupplyandtwist-airoutletsExpansionjoints/constructionjoints/jointsRevisionopeningsAccessfloorductsCutoutsSpecialwallconnectionsFasciaBridgingAdditionalinsulation(heat,impactsound)Stairs,rampsFloorcoveringsasstone,parquetetc.
*For further detailed technical datapleaseaskforourproductdatasheets.
Bearing layer:
Dimensions: 600x600Systemweight: 56kg/m²to66kg/m²Panelmaterial: Calciumsulphatepanel(fiber-reinforcedcalciumsulphate)Adhesive: Highqualitysolvent-freeadhesiveforthe
adhesionofthetoothing
Substruction
Module: 600x600mmPedestalmaterial: GalvanizedsteelConstructionheight: From50mmPedestalbonding: Normallygluedwiththesubfloorandthe
panel;continuouslyadjustabletoheight
Floor coverings
Textileundelasticfloorcoverings,parquet,naturalstone,artificialstone,liquidcoating
Load values Pointload:Valuedacc.toDINEN13213:Ultimateload:
3.000–5.000NClass2–5>6.000–10.000N
Fire protection
BuildingmaterialclassbearingpanelAcc.toEN13501T1: A1Fireresistanceclassacc.toDIN4102T2: F30possible
Acoustic values
(dependingonsystemandfloorcovering)
SoundreductionindexRL,w,P 39–54dBNormalizedimpactsoundpressurelevelLn,w,P 42–91dBImprovementofsoundpressurelevel∆Lw,P 10–29dB
NewdenominationaccordingtoDINENNormalizedflankleveldifferenceDn,f,w,P
NormalizedflankimpactsoundpressureLn,f,w,P
ImprovementofsoundpressurelevelΔLw,P
Heat flow density of the FH at pipe grid galv. = 100 mm
Hea
t flo
w d
ensi
ty q
[W/m
]
Limiting curve living zone 9K
Limiting curve perimeter area 15K stone 18 mm
Heating liquid over temperature [K]
Heat flow density of the FH at pipe grid galv. = 150 mm
Limiting curve living zone 9K
Limiting curve living zone 15K stone 18 mm
Limiting curve living zone 9K
Stone 18 mm
Limiting curve living zone 15K stone 18 mm
Heating liquid over temperature [K]
Hea
t flo
w d
ensi
ty q
[W/m
]
Cooling capacity of the FH at pipe grid galv. = 100 mm
0
5
10
15
20
25
30
35
40
0 2 4 6 8 10Cooling liquid under temperature T [K]
Coo
ling
flow
den
sity
q [W
/m2 ]
0,000
0,050
0,100
0,150
Stone 18 mm
Nominal cooling capacity at 8K
Coo
ling
flow
den
sity
q [W
/m2 ]
Cooling capacity of the FH at pipe grid galv. = 150 mm
0
5
10
15
20
25
30
35
40
0 2 4 6 8 10
0,000
0,050
0,100
0,150
Stone18 mm
Nominal cooling capacity 8 K
Cooling liquid under temperature T [K]
Postaladress:
System floor
The PBS hollow foor Thermo is tested acc. toDIN EN 1264-2/3/4 no. 7F249-F and 7F250-F and certifed by independentinstitutes.
PBS HOLLAND BV
Product Division Floor Systems
Griekenweg 6-8,
5342 PZ, Oss
Phone.: +31 (0) 412 65 33 00
Fax: +31 (0) 412 63 25 95
E-mail: [email protected]
Internet: www.pbsholland.com