THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217) Louis C. Herrin, III, P.E. Engineer, Water Quality Division 512-239-4552 [email protected] TCEQ TRADE FAIR 2017 MAY 16, 2017 AUSTIN, TEXAS

Transcript of TCEQ TRADE FAIR 2017 AUSTIN, TEXAS

THEDESIGNCRITERIAFORWASTEWATERSYSTEMS(30TACChapter217)

LouisC.Herrin,III,P.E.Engineer,[email protected]

TCEQTRADEFAIR2017MAY16,2017AUSTIN,TEXAS

CHAPTER217• AdministrativeRequirementsSubchapterA• TreatmentFacilityDesignRequirementsSubchapterB• ConventionalCollectionSystemsSubchapterC• AlternativeCollectionSystemsSubchapterD• PreliminaryTreatmentUnitsSubchapterE• ActivatedSludgeSystemsSubchapterF• FixedFilmandFiltrationUnitsSubchapterG• NaturalTreatmentFacilitiesSubchapterH• SludgeTreatmentUnitsSubchapterJ• ChemicalDisinfectionSubchapterK• UVLightDisinfectionSubchapterL• SafetySubchapterM

CHAPTER217

EffectiveDecember4,2015

CHAPTER217

• Checkthestatusofyoursummarytransmittalletter.http://www4.tceq.texas.gov/wwdp/

ThefirstconsolidateddesigncriteriawasadoptedbyTexasStateDepartmentofHealthon

9/18/1950.

Thisdocumentwasrevisedon9/11/1961,9/18/1968,9/13/1970,9/1/1974,6/1/1981,4/20/1990,8/28/2008,12/4/2015

HISTORYOFMAJORCHANGESOFTHEWASTEWATERTREATMENTDESIGN

CRITERIAINTEXAS

GeneralProcedure

• a. What’stheSummarytransmittalletterprocedureandwhatisneededintheletter

• b. Howtorequestavariance• c. Whattypeofprojectsgetcalledinandhowoften,

• d. What’smaintenanceandwhyitdoesn’tneedtobesubmittedforreview

• e. Regionswillbelookingforapprovallettersatinspection.

GeneralProcedure

• f. Review procedure regarding TWDB, EAPP• g. We approve on a project basis. We’ll meet with

suppliers/manufacturers to discuss new technology and approaches, but no carte blanche approval letters for technology

• h. We meet and provide feedback on pilot studies if requested

ReratingaWWTP• Informationnecessaryforreratingawwtp1. Atleasttwoofflowandinfluentdata2. Informationonhowthewwtp isoperating3. Designofthewwtp

WaterLinevs.WastewaterLine

• Whenaprojectistheinstallationofawaterlinethatmaycrossasewerline,thenstartwith290. Ifitisasewerlinethatmaycrossawaterline,thenstartwith217. But,coordinatewithbothrulestoensurethatthemoststringentdirectiveisfollowedincaseswheretherearedifferences

Prohibition

• Whataretheprohibitionsinthedesigncriteria?

• Howmanyprohibitionsareinthecriteria?

• HowcanIgetavariancetoaprohibition?

• Whatistheprohibitiondoweseethemost?

GeneralInformation

1. Liner certification requirements

2. Trend on small plants (sleds, MBR, IFAS, MBBR)

3. Closure plans

4. Let your permit expire

QUESTIONS?