TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability...

43
TCEQ Construction TCEQ Construction General Permit Renewal General Permit Renewal TXR150000 TXR150000 April 23, 2008 April 23, 2008 Houston Land/Water Sustainability Houston Land/Water Sustainability Forum Forum

Transcript of TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability...

Page 1: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

TCEQ Construction General TCEQ Construction General Permit RenewalPermit Renewal

TXR150000TXR150000

April 23, 2008April 23, 2008Houston Land/Water Sustainability ForumHouston Land/Water Sustainability Forum

Page 2: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

The Important DatesThe Important Dates

• Old permit expired: March 5, 2008

• New permit effective: March 5, 2008– Good through March 5, 2013

• Notice of Intent (NOI) due date for existing sites: June 3, 2008

• NOI due date for new sites: prior to the commencement of construction activities

Page 3: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

The Important DatesThe Important Dates

• If you DO NOT need coverage after June 3, 2008, you may opt to allow your permit to expire on June 3, 2008. All existing permits active and not renewed on June 3, 2008, will be considered expired on that date. Submission of a Notice of Termination (NOT) is not necessary.

Page 4: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

New Application FeesNew Application Fees

• Paper NOI: $325– provisional coverage begins 7 days later

• Electronically (STEERS): $225– provisional coverage begins immediately

• No Annual Fee!

Page 5: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 6: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Big Definition UpdatesBig Definition Updates

• Common Plan of Development (1*)– Does not necessarily include all construction within

the jurisdiction of a public entity (city or university)– Discrete projects ¼ mile apart – can be treated as

separate plan of development or sale

• Operator (2*)– Primary– Secondary– Operators may include landowners, contractors,

subcontractors, homebuilders, etc. * Revised to be consistent with EPA

Page 7: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Primary OperatorPrimary Operator

• Persons having operational control over construction plans and specs

• Persons having day-to-day operational control of the activities at a construction site to ensure compliance with an SWP3

Page 8: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Primary OperatorPrimary Operator

• Requirements:– Submit NOI– Develop & Implement SWP3– Post NOI AND construction site notice– Submit copy of NOI to MS4 operator– Provide notification to the operator(s) of the

need to obtain coverage

Page 9: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Secondary OperatorSecondary Operator

• Persons whose operational control is limited to the employment of other operators or to the ability to approve/disapprove changes to plans

• Regulated by the CGP

Page 10: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Secondary OperatorSecondary Operator

• Requirements:– Not required to submit NOI– Must post a construction site notice– Provide notification to the operator(s) of the

need to obtain coverage

Page 11: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Operator ScenarioOperator Scenario

• Developer of a Retail Center – Hires a General Contractor to handle

everything (day-to-day operational control)

• General Contractor (GC) hires subcontractor

• Subcontractor has to meet the GCs plans & specs

• Subcontractor has no authority over design decisions

Page 12: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Operator ScenarioOperator Scenario

• Developer wants to develop a subdivision. The developer has hired contractors to install the roads and utilities.

Page 13: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Definition UpdatesOther Definition Updates

• Discharge – the drainage, release, or disposal of pollutants in storm water

• Commencement of Construction – initial disturbance of soils as well as other construction-related activities (stock piling of fill material and demolition) Must have obtained a CGP and developed a SWP3 before any of these activities take place.

Page 14: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Definition UpdatesOther Definition Updates

• Edwards Aquifer/Recharge Zone/Contributing Zone – central Texas issue

• Facility or Activity – construction site or construction support activity regulated by this permit

Page 15: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Definition UpdatesOther Definition Updates

• Final Stabilization – (b)(2) – added language that homeowner can

retain controls/BMPs– (d) arid, semi-arid, drought-stricken

• Hyperchlorination of waterlines– Disinfecting potable water

• Indian Country Land

• Indian Tribe

Page 16: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Definition UpdatesOther Definition Updates

• MS4 – added “discharges to surface water in the state”

• Notice of Change (NOC)

• Outfall – point where storm water associated w/construction activity discharges

• Pollutant- includes sediment

Page 17: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Definition UpdatesOther Definition Updates

• Replaced Runoff Coefficient with R factor

• Semiarid Areas – 10 to 20 inches rain

• Arid Areas – less than 10 inches annually

Page 18: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Limitations on Permit Coverage Limitations on Permit Coverage Part II-Sec CPart II-Sec C

• Agricultural activities – facility construction such as the construction of confined animal feeding operations (CAFO) may be regulated

• Included the Act of God, war, strike, riot, or other catastrophe, this event is not a violation of the permit

Page 19: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Authorization to DischargeAuthorization to DischargePosting RequirementsPosting Requirements

Part II-Sec E(1-3)Part II-Sec E(1-3)• Primary Operator

– Large site• NOI• Construction Site Notice (Attachment 4)

– Small Site • Construction Site Notice (Attachment 2)

• Secondary Operator– Construction Site Notice, Large Site (Attachment 3)– Construction Site Notice, Small Site (Attachment 2)

Page 20: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 21: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 22: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 23: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Municipal Separate Storm Sewer Municipal Separate Storm Sewer System Notification RequirementsSystem Notification Requirements

Part II-Sec E(1-3)Part II-Sec E(1-3)

• Primary Operator - Copy of NOI supplied to MS4 in which they discharge

• Primary & Secondary Operator – Copy of TCEQ site notice

Page 24: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Permit CoveragePermit CoveragePart II-Sec E(5)Part II-Sec E(5)

• Paper NOI– Provisional coverage 7 days after postmark

• Electronic– Immediate provisional coverage following

confirmation of receipt of the NOI by the TCEQ

Page 25: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

• Get Online Authorization: Storm Water Construction Activities

• You can fill out, pay for, sign, and submit your construction general permit applications for storm water online, and get immediate acknowledgment of coverage!

-Notice of Intent -Notice of Termination

• Questions on using STEERS: call support staff at 512- 239-6925 or e-mail [email protected]

Page 26: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

• The company/individual who developed your SWP3, can start the process of filling out the NOI on-line through STEERS.

• Then you can access the NOI to sign them and pay the fee.

Page 27: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Notice of Change Notice of Change Part II-Sec E(6)Part II-Sec E(6)

• Examples of reasons to submit NOC– Change in the description of the project– Increase disturbed area– Operator name change

• NOC not required for decreasing disturbed area

Page 28: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Terminating Coverage Terminating Coverage Part II-Sec F(3)Part II-Sec F(3)

• Small Construction Operators & Secondary Operators at Large Site– Can terminate if one of these conditions are met:

• Final stabilization• Transfer of operational control• Alternative authorization

• To do list:– Complete the applicable portion of site notice– Submit a copy of notice to MS4

Page 29: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 30: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 31: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Transfer of Operational ControlTransfer of Operational ControlPart II-Sec F(4)Part II-Sec F(4)

• Permit coverage not transferable

• Transfer includes company structure changes (ex: partnership to corp)

• Transfer occurs when:– Another operator assumes control over un-

stabilized areas– A homebuilder buys lots from developer

Page 32: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Waivers from CoverageWaivers from CoveragePart II-Sec GPart II-Sec G

• For low erosive sites

• Waiver certification form is not required to be posted

• Still must post site notice (attachment 1)

Page 33: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 34: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.
Page 35: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Sediment BasinsSediment BasinsPart III-Sec F(2)(c)(i)(A)Part III-Sec F(2)(c)(i)(A)

• Sediment basin required for a common drainage location that serves an area with 10+ acres disturbed

• If not used, must document the reason that sediment basins not feasible

• Determining factors: soil, slope, available area, public safety , precipitation patterns, site geometry, site vegetation, infiltration capacity, geotechnical factors, depth to groundwater, and other similar considerations.

Page 36: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Inspections Inspections Part III-Sec 7Part III-Sec 7

• (a) Added “discharge locations” to areas that must be inspected

• (e) list of inspector qualifications don’t have to be on each report, just in the SWP3

Page 37: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Concrete Batch PlantsConcrete Batch PlantsPart IV-Sec A Part IV-Sec A

• CGP Authorizes Storm Water Runoff from Concrete Batch Plants– On Site or Within One Mile– Operator may be Required to Obtain Alternative

Coverage if Not Allowed to Share SWP3• MSGP, TXG110000, or Individual Permit

• Requirements:– Benchmark Sampling (1x/quarter) for Oil &

Grease, TSS, pH, & Total Iron • Similar to TXR050000 and to storm water-only

provisions of TXG110000• Projects < 1 quarter must collect at least one sample

Page 38: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Concrete Batch PlantsConcrete Batch PlantsPart IV-Sec B, CPart IV-Sec B, C

• Requirements (cont.)– BMPs

• Potential pollutants• Measures & controls (housekeeping, spill

prevention etc.)• Comprehensive Compliance Eval (1x/year)

• Wastewater Must Be Discharged Under TXG110000 or Individual TPDES Permit

Page 39: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Concrete Truck WashoutConcrete Truck WashoutPart VPart V

• Disposal of Washout Water from Concrete Trucks Associated With Off-Site Concrete Production Facilities– If Concrete Plant is Located at Construction Site,

Need TXG110000 or Individual Permit

• No Direct Discharge Allowed• Designated area - lined bottom with perimeter• Identified on site map• No Other Wastewater Authorized

– Must Obtain Authorization Under TXG110000

Page 40: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Construction Support ActivitiesOther Construction Support ActivitiesPart II-Sec A(2)Part II-Sec A(2)

• Construction Support May Include– Concrete Batch Plants– Asphalt Batch Plants– Equipment Staging Areas– Material Storage Yards

• These activities authorized if:– Activities On Site or Within One Mile– SWP3 addresses controls for these activities– Support Activities do not operate beyond completion

date (then must get separate coverage)

• Wastewater Not Authorized

Page 41: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Other Requirements:Other Requirements:Non Storm WaterNon Storm Water

• Certain Non-Storm Water Flows Allowed:– Vehicle/Building/Structure Wash Water– Lawn Irrigation– Uncontaminated A/C Condensate– Uncontaminated Dust Suppression Water– Emergency Fire Fighting Activities– Uncontaminated Fire Hydrant Flushings– Potable Water Sources– Uncontaminated Groundwater

Page 42: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Contact InformationContact Information

• Permitting Information (Technical):

(512) 239-4671, [email protected]

• Storm Water NOI/NOT Status:

(512) 245-0130, [email protected]

Page 43: TCEQ Construction General Permit Renewal TXR150000 April 23, 2008 Houston Land/Water Sustainability Forum.

Regional Contact InformationRegional Contact Information

• Courtney Mize – [email protected]– (713) 422-8921 direct– (713) 767-3691 fax

• Michelle Ruckstuhl– [email protected]– (713) 767-3666 direct– (713) 767-3691