Tampen Link Hot Tap ProjectJørund Fonneland, Technip Norge AS
Pipeline Repair System
FFU, January 29th, 2009
2
Future hot-tap technologyIV_
III Hot-tap animation for next hot-tap project_
Tampen LinkII_
_ What is hot-tap?I
Contents
3
What is Hot-Tap?
Connecting a branch pipe to a mother pipe whilst maintaining production in the mother pipe
Mother pipeline
Branch pipe
5
Tampen Link Field Layout
Tampen LinkSFC
From Snorre A
SF Satelites
LEGEND Existing Gas pipeline
New Gas pipeline
X-over
Brent A
SFC
SFA
SFB
Brent B
From Snorre B
Northern LegGas Pipeline(NLGP)
Gassled Area A(Statpipe)
FLAGS
10” export riser
Statfjord IntrafieldPipeline System(SIPS) 10” Gas
20” Oil
20” Oil12” NLGP Spur
Hot-tap on Flags
Hot-tap on Intrafield
New pipeline, ”Tampen Link”Statfjord – Flags, ~23 km, 32”
Inline Tee
Pipeline End Manifold(PLEM)
Pipeline End Manifold (PLEM)
X
X-over to Gassled Area A, to be closed
From Gullfaks
SIPS Hot Tap
New pipeline, “Tampen Link” Statfjord – Flags, 23 km, 32”
6
Tampen Link HistoryAugust 2007, the Tampen Link Hot-tap operation was aborted due to the diver operated Hot-tap tool failing. The Tampen Link project was “put on hold”.
February 2008, the Tampen Link project called for mobilisation of the PRS Remote Hot-tap tool.
The scope was to mobilise the never used PRS hot-tap prototype in six months.
7
Tampen Link Hot-tapTest programme:
Function testingSite Integration Tests“Dip test” (function test at 15 msw)Wet hot-tap test adjacent to Tampen Link location (145msw)
Lots of small problems discovered in every test. Very hectic period before mobilisation.
To save time offshore, divers were used for:
ObservationsSeabed preparationsSmall tasks (e.g. valve operations)
Some technical problems offshore resulted in jo-jo lifting of system
Hot Tap completed 20. August 2008 without problems
8
PRS hot-tap machineControlled via stab made from converted ROV winch:
Ethernet 2,4kV power3 X camera lines
Designed for 1000msw depth
Pipeline diameters: 16” – 42”
Equipped with:20 cameras10 lightsAbout 100 sensors
Weight: ca. 40 ton
Categories of CONTINGENCY:Base case according to operation procedureAlternative lines for power and communications using ROVOverride functions for ROV directly on cylinders (hydraulic hot stabs)Emergency Disconnect and Recover System (using e.g. hydraulic accumulators)All barriers rated for 12 month service
10
Future hot-taps:Ormen Lange Hot Tap, May 2009
Project data:
• Two hot-taps at Ormen Lange field
• 850 msw
• 100% remote operation
• Minus 5o Celsius outside pipe
• Plus 78o Celsius inside pipe
• Subsea trial is planned for in February 2009 in Sognefjorden, 940msw