Tabel Benda Uji & Time Schedule

download Tabel Benda Uji & Time Schedule

of 14

description

benda uji kastela

Transcript of Tabel Benda Uji & Time Schedule

  • No Variasi Jarak (e), mm

    Jarak (b), mm

    0,5d 0,42d 0,35d

    1 0,25d 25 100 50 42 35

    2 0,50d 50 100 50 42 35

    3 0,75d 75 100 50 42 35

    4 1,00d 100 100 50 42 35

    5 1,25d 125 100 50 42 35

    6 1,50d 150 100 50 42 35

    7 1,75d 175 100 50 42 35

    8 2,00d 200 100 50 42 35

    Jarak (d), mm

    45o 50o 55o

  • Jarak (b), mm

    0,29d 0,23d 0.18

    29 23 18

    29 23 18

    29 23 18

    29 23 18

    29 23 18

    29 23 18

    29 23 18

    29 23 18

    No Kode Benda Uji Jarak (e), mm

    1 A1 252 A2 253 A3 254 A4 255 A5 256 A6 25

    No Kode Benda Uji Jarak (e), mm

    7 B1 508 B2 509 B3 5010 B4 5011 B5 5012 B6 5013 C1 7514 C2 7515 C3 7516 C4 7517 C5 7518 C6 75

    60o 65o 70o

  • 19 D1 10020 D2 10021 D3 10022 D4 10023 D5 10024 D6 10025 E1 12526 E2 12527 E3 12528 E4 12529 E5 12530 E6 12531 F1 15032 F2 15033 F3 15034 F4 15035 F5 15036 F6 150

  • Jarak (b), mm Panjang Balok Total (L), mm Jarak Ofset, mmL = 13e + 12b50 925 15042 829 13435 745 12029 673 10823 601 9618 541 86

    Jarak (b), mm Panjang Balok Total (L), mmL = 13e + 12b50 1,250 20042 1,154 18435 1,070 17029 998 15823 926 14618 866 13650 1,575 25042 1,479 23435 1,395 22029 1,323 20823 1,251 19618 1,191 186

  • 50 1,900 30042 1,804 28435 1,720 27029 1,648 25823 1,576 24618 1,516 23650 2,225 35042 2,129 33435 2,045 32029 1,973 30823 1,901 29618 1,841 28650 2,550 40042 2,454 38435 2,370 37029 2,298 35823 2,226 34618 2,166 336

  • Jarak Beban, mm

    316.0725 292.855 925283.2693 262.4614 829254.5665 235.867 745229.9641 213.0718 673205.3617 190.2766 601184.8597 171.2806 541

    427.125 395.75 1250394.3218 365.3564 1154365.619 338.762 1070341.0166 315.9668 998316.4142 293.1716 926295.9122 274.1756 866538.1775 498.645 1575505.3743 468.2514 1479476.6715 441.657 1395452.0691 418.8618 1323427.4667 396.0666 1251406.9647 377.0706 1191

  • 649.23 601.54 1900616.4268 571.1464 1804587.724 544.552 1720563.1216 521.7568 1648538.5192 498.9616 1576518.0172 479.9656 1516760.2825 704.435 2225727.4793 674.0414 2129698.7765 647.447 2045674.1741 624.6518 1973649.5717 601.8566 1901629.0697 582.8606 1841871.335 807.33 2550838.5318 776.9364 2454809.829 750.342 2370785.2266 727.5468 2298760.6242 704.7516 2226740.1222 685.7556 2166

  • No Uraian Kegiatan Apr Mei Jun Jul Agust

    1 Penyusunan Proposal

    2 Seminar Proposal

    3 Analisis Abaqus

    4 Pengujian Eksperimen

    5 Pengolahan Data

    6 Seminar Data

    7 Revisi

    8 Ujian Akhir

    April 2015 Mei 2015 Juni 2015

    1 2 3 4 5 6 7 8 9 10

  • Sept Okt Nop

    Juni 2015 Juli 2015 Agustus 2015 September 2015

    11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

  • I daerah lubangb h A y

    1.0000 50.0000 7.0000 350.0000 146.50002.0000 5.0000 18.0000 90.0000 134.00003.0000 5.0000 18.0000 90.0000 16.00004.0000 50.0000 7.0000 350.0000 3.5000

    880.0000

    I fullb h A y

    1.0000 50.0000 7.0000 350.0000 146.50002.0000 5.0000 68.0000 340.0000 109.00003.0000 5.0000 68.0000 340.0000 41.00004.0000 50.0000 7.0000 350.0000 3.5000

    1,380.0000

    I teeb h A y

    1.0000 50.0000 7.0000 350.0000 21.50002.0000 5.0000 18.0000 90.0000 9.0000

    440.0000

    C bawah 18.9432C atas 6.0568

    Sf 794.2302 mm3Sw 2,484.0181 mm3I 416,666.6667 mm4

  • M=A*y Iy bagian In=A*y^2 M^251,275.0000 1,429.1667 7,511,787.500012,060.0000 2,430.0000 1,616,040.00001,440.0000 2,430.0000 23,040.00001,225.0000 1,429.1667 4,287.5000

    66,000.0000 7,718.3333 9,155,155.0000 4,356,000,000.0000

    M=A*y Iy bagian In=A*y^2 M^251,275.0000 1,429.1667 7,511,787.500037,060.0000 131,013.3333 4,039,540.000013,940.0000 131,013.3333 571,540.00001,225.0000 1,429.1667 4,287.5000

    103,500.0000 264,885.0000 12,127,155.0000 10,712,250,000.0000

    M=A*y Iy bagian In=A*y^2 M^27,525.0000 1,429.1667 161,787.5000

    810.0000 2,430.0000 7,290.00008,335.0000 3,859.1667 169,077.5000 69,472,225.0000

    mmmm

  • I lubang=In+Iy - M^2/A

    4,212,873.3333 mm4

    I lubang=In+Iy - M^2/A

    4,629,540.0000 mm4 416,666.6667

    I tee=In+Iy - M^2/A163,216.6667

    9,720.000015,045.2462 mm4 416,666.6667

  • Sheet1Sheet2Sheet3