Sustainability Management Plan (SMP)
855-869 Ferntree Gully Road
Wheelers Hill
Residential Development
For Town Planning Purposes
Report No: 2017-693-SMP
Date: 17th February 2017 | Updated 4th May 2017
Total number of pages: 56
EcoResults consultants: Yvonne Hill, Samuel Thomson and Marius Andrasciuc
P 1300 66 45 32 [email protected] 2 | S M P
Table of Contents Report No: 2017-693-SMP ................................................................................................................................. 1
Table of Contents ............................................................................................................................................... 2
Project Information ............................................................................................................................................ 3
Introduction ....................................................................................................................................................... 4
Clause 22.13-1 Policy Basis ................................................................................................................................ 5
Clause 22.13.2 | Objectives ............................................................................................................................... 5
Clause 22.13-3 & 22.13-4 | Policy and Application Requirements ................................................................... 7
Clause 22.13-5 | Decision guidelines ................................................................................................................. 7
ESD Schedule ...................................................................................................................................................... 8
Implementation Schedule .................................................................................................................................. 9
10 Key Sustainable Building Principles Addressed: ......................................................................................... 12
1. Indoor Environment Quality (IEQ) ............................................................................................................... 12
2. Energy Efficiency .......................................................................................................................................... 14
3. Water Resources .......................................................................................................................................... 17
4. Stormwater Management ........................................................................................................................... 18
Explanation of the STORM assessment scoring system .................................................................................. 19
5. Building Materials (not listed in Clause 22.13) ............................................................................................ 20
6. Transport ...................................................................................................................................................... 22
7. Waste Management .................................................................................................................................... 24
8. Urban Ecology .............................................................................................................................................. 25
9. Innovation (not in Clause 22.13) .................................................................................................................. 27
10. Ongoing Building & Site Management (not in Clause 22.05) .................................................................... 28
Conclusion ........................................................................................................................................................ 29
Legal statement ............................................................................................................................................... 29
Appendix .......................................................................................................................................................... 30
Why is sustainable development needed? ...................................................................................................... 30
STORM assessment tool .................................................................................................................................. 30
Maintenance program for WSUD measures rainwater tanks ......................................................................... 32
Maintenance program for WSUD measures for Enviss Sentinel pits .............................................................. 32
Preliminary NatHERS Thermal Performance Assessment ............................................................................... 33
Wind Frequency Analysis ................................................................................................................................ 35
Walk Score Information ................................................................................................................................... 36
Commuting to Melbourne by car .................................................................................................................... 36
Travel Time Maps ............................................................................................................................................. 37
Energy Ratings | Preliminary Thermal Performance Assessments ................................................................. 39
STORM printout (1 page) ................................................................................................................................. 47
Melbourne Water Rainwater Tank Fact Sheet (2 pages)................................................................................. 48
Enviss Sentinel Brochure (4 pages) .................................................................................................................. 51
Enviss Sentinel Raingarden Equivalency Table (2 pages)…………………………………………………………………………… 55
P 1300 66 45 32 [email protected] 3 | S M P
Project Information Planning Permit Applicant
Jells Hill Pty Ltd ATF Jells Hill Unit Trust
Project Description
Residential Development
Property Address
855-869 Ferntree Gully Road, Wheelers Hill, Victoria, 3150
No. of dwellings
133
Total no. of carparking spaces for residents | Total no. of carparking spaces for visitors
193 | 30
Bike parking spaces for residents
130
Client Contact
Peyman Jadidi, Louisa Chen, Matt Close @ LUVARC
Eco Results Consultants | Contact info
Samuel Thomson | Yvonne Hill | Kirstie Rogerson | [email protected]
P 1300 66 45 32 [email protected] 4 | S M P
Introduction EcoResults has been engaged as sustainability consultants for the proposed development to ensure that
the development adequately responds to the City of Monash Environmentally Sustainable Development
Policy 22.13 (ESD) The purpose of this report is to detail how the proposed design and operation of the
building, as detailed in the town planning drawings and our comments and recommendations listed in this
report, satisfies both of the Clauses.
The report also explains how the design and operation addresses the 10 key sustainable building categories
identified by the Municipal Association of Victoria’s SDAPP (Sustainable Design Assessment in the Planning
Process) program.
Please note that the City of Monash cannot yet be selected within the BESS assessment tool. To ensure that the project at 855-869 Ferntree Gully Road, Wheelers Hill will comply with SDAPP standards and BESS requirements, EcoResults drew on the outcomes of BESS assessments for similar projects as a reference. We were therefore able to conclude that the development is likely to meet current benchmarks EcoResults has consulted extensively with the designer, planning consultant and other relevant sub-
consultants on how best to incorporate sustainability principles in the proposed design, and to comply with
the current benchmarks required.
The STORM and WalkScore calculators as well as FirstRate5 Thermal Performance software have been
used as benchmark assessment tools. The proposed development meets, and in most areas exceeds by a
considerable margin, the benchmarks set out by STORM.
The development is likely to meet the current benchmarks set out by SDAPP. This will be enabled by the
careful selection of water efficient taps and fittings, energy efficient heating and cooling appliances,
building materials with low embodied energy and other sustainability features as outlined under the 10
sustainability categories.
This report should be attached to and read in conjunction with the town planning drawings as well as
the WalkScore printouts in appendix, including the preliminary Thermal Performance Assessments
(energy ratings)
P 1300 66 45 32 [email protected] 5 | S M P
Clause 22.13-1 Policy Basis Monash City Council is committed to make Monash a more sustainable place to live, work and play. Critical to achieving this commitment is for development to meet appropriate environmental design standards. This policy aims to integrate environmental sustainability into land use planning, new developments and redevelopment of existing infrastructure. This policy provides a framework for early consideration of environmental sustainability at the building design stage in order to achieve the following efficiencies and benefits:
Easier compliance with building requirements through passive design;
Reduction of costs over the life of the building;
Improved affordability over the longer term through reduced running costs;
Improved amenity and liveability;
More environmentally sustainable urban form; and
Integrated water management.
If environmentally sustainable design is not considered at the time of planning approval, the ability to achieve environmentally sustainable development may be compromised by the time these matters are considered as part of a building approval. In addition, there may be difficulties or extra costs associated with retrofitting the development to implement environmentally sustainable design principles. This policy does not prescribe performance outcomes. The policy enables the provision of information and provides decision guidelines, which will assist in the assessment of whether development meets environmentally sustainable development objectives. This policy complements a range of non-statutory measures aimed at encouraging environmentally sustainable development. These measures include educating residents and applicants, assisting applicants to use Environmentally Sustainable Development (ESD) tools, leading by example with Council projects, promotion of exemplary private projects and promotion of use of materials with favourable life cycle impacts.
Clause 22.13.2 | Objectives The development should achieve best practice in environmentally sustainable development from the design stage through to construction and operation. In the context of this policy best practice is defined as a combination of commercially proven techniques, methodologies and systems, appropriate to the scale of development and site specific opportunities and constraints, which are demonstrated and locally available and have already led to optimum ESD outcomes. Best practice in the built environment encompasses the full life of the build. It is a policy to encourage innovative technology, design and processes in all development, which positively influence the sustainability of buildings. The following objectives should be satisfied where applicable:
P 1300 66 45 32 [email protected] 6 | S M P
Energy performance
To improve the efficient use of energy, by ensuring development demonstrates design potential for ESD initiatives at the planning stage.
To reduce total operating greenhouse gas emissions.
To reduce energy peak demand through particular design measures (eg. Appropriate building orientation, shading to glazed surfaces, optimise glazing to exposed surfaces, space allocation for solar panels and external heating and cooling systems).
Water resources
To improve water efficiency.
To reduce total operating potable water use.
To encourage the collection and reuse of stormwater.
To encourage the appropriate use of alternative water sources (eg. greywater). Indoor Environment Quality
To achieve a healthy indoor environment quality for the wellbeing of building occupants, including the provision of fresh air intake, cross ventilation, and natural daylight.
To achieve thermal comfort levels with minimised need for mechanical heating, ventilation and cooling.
To reduce indoor air pollutants by encouraging use of materials with low toxic chemicals.
To reduce reliance on mechanical heating, ventilation, cooling and lighting systems.
To minimise noise levels and noise transfer within and between buildings and associated external areas.
Stormwater Management
To reduce the impact of stormwater run-off.
To improve the water quality of stormwater run-off.
To achieve best practice stormwater quality outcomes.
To incorporate the use of water sensitive urban design, including stormwater re-use. Transport
To ensure that the built environment is designed to promote the use of walking, cycling and public transport, in that order.
To minimise car dependency.
To promote the use of low emissions vehicle technologies and supporting infrastructure. Waste management
To promote waste avoidance, reuse and recycling during the design, construction and operation stages of development.
To ensure durability and long-term reusability of building materials.
To ensure sufficient space is allocated for future change in waste management needs, including (where possible) composting and green waste facilities.
Urban Ecology
To protect and enhance biodiversity within the municipality.
To provide environmentally sustainable landscapes and natural habitats, and minimise the urban heat island effect.
To encourage the retention of significant trees.
To encourage the planting of indigenous vegetation.
To encourage the provision of space for productive gardens, particularly in larger residential
developments.
P 1300 66 45 32 [email protected] 7 | S M P
Clause 22.13-3 & 22.13-4 | Policy and Application Requirements It is policy that applications for the types of development listed in Table 1 be accompanied by information, which demonstrates how relevant policy objectives, will be achieved.
Table 1 requires an SMP for a development of 10 or more dwellings
A Sustainability Management Plan as specified in Table 1, as appropriate, must accompany an application. A Sustainability Management Plan should:
provide a detailed assessment of the development. It may use relevant tools from the examples listed in the table or an alternative assessment approach to the satisfaction of the responsible authority; and
identify achievable environmental performance outcomes having regard to the objectives of this policy (as appropriate); and
demonstrate that the building has the design potential to achieve the relevant environmental performance outcomes, having regard to the site’s opportunities and constraints; and
document the means by which the performance outcomes can be achieved.
Various assessment tools have been listed in Table 1, which may be used to assess how the proposed development addresses the objectives of this policy, as appropriate
Example tools listed include BESS, STORM and FirstRate5. See introduction for explanation of
which tools were used in the production of this report.
Clause 22.13-5 | Decision guidelines In determining an application, the responsible authority will consider as appropriate:
The extent to which the development meets the objectives and requirements of this policy from the design stage through to construction and operation.
Whether the proposed environmentally sustainable development performance standards are functional and effective to minimise environmental impact.
Whether the proposed environmentally sustainable development initiatives are reasonable having regard to the type and scale of the development and any site constraints.
Whether an appropriate assessment method has been used.
Whether an ESD plan or framework has previously been approved by the responsible authority (whether under a planning control or otherwise).
P 1300 66 45 32 [email protected] 8 | S M P
ESD Schedule
The ESD measures and commitments listed below are to be noted on plans
Lighting LED downlights and other high efficiency light fittings to be used throughout
(Not incandescent or halogen) Energy Efficiency Commitment
Minimum average 6 star NatHERS rating for dwellings sampled
Appliances
5 star gas instantaneous hot water system
5 star electric heating and cooling systems
Water 5 star WELS rated basin taps and 4 star rated toilets
3 star WELS rated shower heads (flow between 7.5 and 9.0 L/min)
Stormwater Quality
(WSUD)
Apartments: 4 x 45,000L rainwater tanks
Townhouses: 3,500L rainwater tank per dwelling (total 77,000L)
Show source of runoff and usage as per appendix of SMP
Transport 130 bike parking spaces
Glazing Treatments Aluminium frames with double-glazing
Shading Devices Refer to Section 2 of SMP for external shading to be shown on plans
Materials Low VOC paints
Waste Management An 80% commitment to recycle or reuse of demolition or construction waste
P 1300 66 45 32 [email protected] 9 | S M P
Implementation Schedule
The ESD initiatives set out in this report will be coordinated by the Development Manager in conjunction
with the following project design team members:
Architect
Thermal Performance Assessor
Building Services Consultant
Structural Engineer
Waste Management Consultant
An implementation schedule is set out in the following table:
# Initiative Requirement Responsibility Stage
1 Coordination of Initiatives
Full implementation Development Manager All
2 Energy Ratings Full First Rate Assessments for all dwellings
Thermal Performance Assessor (EcoResults)
Design Development
3 Heating & Cooling
Specification of units in accordance with nominated energy ratings 5 star rated heating and cooling systems
Development Manager Design Development
4 Energy Efficient Appliances
Specification of 4 star Dishwashers (Energy and WELS ratings)
Architect Design Development
5 Lighting Specification of nominated energy efficiency lighting types and automated controls
Building Services Engineer
Design Development
6 Renewable Energy System
Not proposed Building Services Engineer
Design Development
7 Rainwater Harvesting
Design and specify rainwater harvesting system including toilet flushing and automated irrigation system
Services Engineer(s) and Landscape Consultant
Design Development
P 1300 66 45 32 [email protected] 10 | S M P
8 Water Efficiency Specify fixtures in accordance with nominated WELS star rating
Development Manager Design Development
9 Bicycle Facilities Specify on plans Architect Design Development
10 Operational Waste Management
Specify bin and associated waste management equipment in line with WMP and SMP
Architect Design Development
11 Construction Waste Minimisation
Prepare construction waste minimisation plan
Builder Pre-Construction
12 Environmentally Preferable Materials
Specify materials in accordance with nominated schedule
Architect Design Development
13 Commissioning & Maintenance
Commission and tune all equipment in accordance with performance standards and targets Building Users Guide to be prepared for the building occupants and management to implement Building User’s Guide to be given to all residents as part of “welcome packs”
Builder ESD Consultant (EcoResults)
Construction
/Occupancy
Construction
14 Operational Waste Management
Building to operate in accordance with WMP
Owners Corporation Occupancy
P 1300 66 45 32 [email protected] 11 | S M P
Snapshot of ESD principles and objectives within the design
Average NatHERS energy ratings for sample dwellings rated is 6 stars
This has been achieved for the sample of preliminary energy ratings conducted
The highest rating is 6.8 stars and the lowest is 5.4 stars
Natural ventilation to all habitable rooms in dwellings
Natural ventilation allows for passive cooling in summer – openable windows
Design maximizes habitable room usable space
Efficient floor plans minimize materials required for building and total volume of area to be heated
and cooled – average net conditioned area of sample dwellings rated is 104.8m2
Site designed to reduce water usage and increase stormwater quality
All runoff from building roofs is to be drained into rainwater tank(s) with a total combined capacity
of 257,000L dedicated to reuse toilet flushing
STORM score is 100%, meeting the current best practice benchmark for urban pollutant loads
Efficient lighting features
LED or other high efficiency lighting to be used throughout dwellings
Transport
Development is 250m to the nearest bus stop and is near bike and walking paths
Close proximity to amenities such as parks, schools, shopping centre and medical facilities
This encourages occupants to minimize the use of cars, thus reducing CO2 emissions
130 secure bicycle parking spaces located on the basement level
P 1300 66 45 32 [email protected] 12 | S M P
10 Key Sustainable Building Principles Addressed:
1. Indoor Environment Quality (IEQ)
Clause 22.13-2 Objectives:
to achieve a healthy indoor environment quality for the wellbeing of building occupants, including the provision of fresh air intake, cross ventilation, natural daylight, external views and appropriate levels of lighting
to achieve thermal comfort levels with minimised need for mechanical heating, ventilation and cooling
to reduce indoor air pollutants by use of materials with low toxic chemicals, minimal off-gassing and production of allergens
to reduce reliance on mechanical heating, ventilation, cooling and lighting systems
to minimise noise levels and noise transfer within and between buildings and associated external areas
Issue Design Response Drawing reference
Natural Ventilation
All habitable rooms feature windows/doors with openability to enable good ventilation and passive cooling for the occupants
Show window openings on elevation drawings
Thermal Comfort
Refer to comments on BCA energy efficiency/energy rating below in Section 2. The NatHERS energy rating is a measure of thermal comfort, i.e. how much energy is required to heat or cool to keep a dwelling comfortable
Refer to comments on efficient shading, passive solar design and glazing treatments below in Section 2
Show eaves/shading devices on plans and elevations
Acoustics Acoustic rating will apply to timber floors and party walls
Concrete flooring on the ground level reduces noise from neighbouring dwellings
Natural Daylight
Refer to natural daylight comments below in Section 2
Describe glazing colour on elevation drawings
Hazardous Materials & VOC
Low VOC paints to be used throughout the development
Note on plans
External Views Townhouses On the ground level the townhouses feature external views onto a landscaped courtyard area providing a pleasant outdoor space for the residents to enjoy On the first level townhouses feature external views onto a private balcony which has the potential to host potted vegetation, providing a pleasant space for residents to enjoy (See example below)
P 1300 66 45 32 [email protected] 13 | S M P
Source: www.houzz.com
Loft Style Dwellings On the ground level the dwellings feature external views onto a landscaped area providing a pleasant outdoor space for the residents to enjoy On the first level dwellings feature external views onto a private balcony providing a pleasant space for residents Some of the loft dwellings feature external views from the roof terrace onto the surrounding parks and neighbourhood with the Dandenong Ranges in the distance Apartments On the ground level the dwellings feature external views onto a landscaped area providing a pleasant outdoor space for the residents to enjoy On the first level dwellings feature external views onto a private balcony providing a pleasant space for residents
P 1300 66 45 32 [email protected] 14 | S M P
2. Energy Efficiency
Clause 22.13-2 Objectives:
To improve the efficient use of energy, by ensuring development demonstrates design potential for ESD initiatives at the planning stage
To reduce total operating greenhouse gas emissions
To reduce energy peak demand through particular design measures (eg. appropriate building orientation, shading to glazed surfaces, optimise glazing to exposed surfaces, space allocation for solar panels and external heating and cooling systems)
Issue Design Response Drawing reference
BCA Energy Efficiency requirements exceeded
Each dwelling will provide a 5 star instantaneous gas hot water system, 5 star electric cooling and heating and LED lighting throughout. EcoResults also recommends a dishwasher with minimum WELS and Energy Ratings of 4 stars to be installed The dwellings will meet the BCA requirement of an average NatHERS rating of 6 stars per dwelling. Based on initial NatHERS modelling of 9 dwellings, EcoResults has determined the specifications required to achieve an average of 6 stars, meeting the minimum required by the BCA. The lowest rating in the sample group is 5.4 stars and the highest is 6.8 stars Please note that the sample ratings included are from dwellings with an earlier internal design layout. The Masterplan is largely unchanged. EcoResults is confident that the design as shown on the current drawings for submission are thermally similar to the design at the time that the sample ratings were conducted
Final ratings will be completed at building approval stage, once construction information has been finalised, however a minimum average of 6 stars will be achieved. Refer to the appendix for the results of the energy ratings conducted on these dwellings, and the specifications required to achieve the ratings
Note these appliance types, ratings and other info on plans
Passive Solar Design The ground floors will be concrete slabs, which has a high thermal mass and will therefore store passively gained heat from daytime sun and release it during evening hours
Large glazed doors to the private open spaces will facilitate passive ventilation cooling in summer
Insect screens are recommended to encourage natural ventilation by occupants
Show doors on elevation drawings
P 1300 66 45 32 [email protected] 15 | S M P
Efficient Shading
North facing glazing Most of the north facing glazing features an overhang/balcony reducing unwanted solar heat gains during the summer months whilst allowing passive solar heat gains during the winter months EcoResults recommends that all remaining north facing glazing to all habitable rooms feature an eave like device to effectively reduce unwanted solar heat gains during the summer months whilst allowing passive solar gains during the winter months
When installed directly above the window head, the projection of the eave-like device should be equal to 45% of the window height, and extend past the opening for an equal distance in both directions
Source: Your Home Technical Manual
West facing glazing EcoResults recommends all west facing glazing feature internal blinds with a reflective outer coating to reduce unwanted solar heat gains from the setting sun during the summer months (see image below)
Source: www.helioscreen.com.au
Show on plans
P 1300 66 45 32 [email protected] 16 | S M P
Glazing Treatments The precise specifications of the window frames and glazing will be finalised in conjunction with the energy ratings or building approval
Aluminium frames with double glazing to be used as a minimum to ensure the rating meets the BCA requirements
These windows reduce heat loss through the windows in the cooler seasons and nights
Efficient Building Geometry
Efficient floor plans minimize the materials required for construction as well as the total volume of area to be heated and cooled – the average net conditioned floor area of the sample dwellings thermally assessed is 104.8m2
Hot Water System
A 5 star gas instantaneous hot water system will be provided. These produce lower emissions compared to conventional hot water services
Indicate plant location, size and minimum energy rating on plans
Energy Sub-Metering All of the dwellings will feature their own electricity and gas meter, which incentivises energy efficiency for occupants
Show location of meters on plans
Natural Daylight
All habitable rooms feature direct (not borrowed) openings for natural daylight
Describe glazing colour on elevation drawings
Efficient Lighting LED downlights and other high efficiency light fittings will be used throughout (not incandescent or halogen)
Note on plans
Efficient HVAC system Minimum 5 star room specify heating and cooling systems will be used for HVAC for dwellings
Indicate HVAC location, type and energy rating on plans
P 1300 66 45 32 [email protected] 17 | S M P
3. Water Resources
Clause 22.13-2 Objectives:
to improve water efficiency
to reduce total operating potable water use
to encourage the collection and reuse of stormwater
to encourage the appropriate use of alternative water sources (e.g. grey water)
Issue Design Response Drawing reference
Minimising Main Water Demand
The development will provide the following:
5 star WELS rated basin taps
4 star rated toilets
Water efficient shower heads (flow between 7.5 and 9.0 L/min)
Indicate tap, toilet and shower head specs on plans
Water Re-use (e.g. Stormwater and Greywater)
Rainwater tanks (RWTs) with a total capacity of 257,000L will store stormwater for re-use in the flushing of all toilets and, if practicable, irrigation system (Refer to Appendix for detailed breakdown)
Show tank(s) on plans, as per detailed requirement in Appendix
Water for Toilet Flushing
All toilets to dwellings to be provided with water from RWTs
4 star WELS rated toilets will reduce mains flushing demand
Indicate rain water tank’s location and size on plan
Provision of Water Meter
All dwellings are to have individual water meters, which will have the effect of incentivising water efficiency for occupants
Indicate water meter location on plans
Landscape Irrigation EcoResults recommends that any external taps for irrigation be supplied with water from the rainwater tanks, however this is not required to achieve the STORM score
Show on landscaping plan if applicable
P 1300 66 45 32 [email protected] 18 | S M P
4. Stormwater Management
Clause 22.13-2 Objectives:
to reduce the impact of stormwater run-off
to improve the water quality of stormwater run-off
to achieve best practice stormwater quality outcomes
to incorporate the use of water sensitive urban design, including stormwater re- use
Issue Design Response Drawing reference
Minimise Watercourse Pollution (STORM rating)
Please note that the proposed stormwater treatment and Water Sensitive Urban Design (WSUD) measures as outlined below shows a series of measures that could be used to achieve compliance. However this may change once a detailed Civil design has been done later in the project. Best practice for Stormwater Quality will be achieved and verified by STORM or MUSIC. This may be done in part, by payment of a contribution or levy for WSUD treatment to the relevant Water Authority Stormwater quality for this project is assessed as performing at 100%, meeting the current best practice design for urban pollutant loads See appendix for details of treatment requirements
Enclose STORM printout
Discharge to Sewer Rainwater tanks with a total capacity of 257,000L ensures that most water is used onsite, including in all toilet flushing. This subsequently receives sewerage treatment prior to discharge
Stormwater Diversion/Filtration
Runoff from the building roofs provide adequate run-off to rainwater tanks, therefore providing a reliable water supply. This will reduce the amount of pollution reaching local creeks and rivers, and ultimately Port Phillip Bay
STORM calculation shows reliability of tank water supply of over 80%
In addition some driveway runoff may be filtered/treated by Enviss Sentinel pits which as raingarden replacements
Show tank location, source, capacity & usage
Stormwater Detention & Re-use
Treatment of stormwater may be through onsite detention in rainwater tanks and subsequent re-use in toilets. (See Appendix for breakdown)
Show tank location, source, capacity & usage
Stormwater Treatment
The roofs provide adequate run-off to rainwater tank(s), therefore providing a reliable water supply. Water may be reused in toilet flushing and, if possible, irrigation
Site Permeability The proposed development will cover a large percentage of the site and will implement WSUD features, where possible, which will reduce the effects of site impermeability
P 1300 66 45 32 [email protected] 19 | S M P
Explanation of the STORM assessment scoring system The information from the development plans that relates to stormwater runoff (impermeable areas and
actual or potential treatment measures) is analysed by the STORM assessment rating tool.
The assessment tool then compares the proposal against the Urban Stormwater Best Practice
Environmental Management Guidelines (BPEG), CSIRO/Victoria Stormwater Committee 1999.
STORM scores are scored on a scale from 0 to 100, where:
0 means that the development provides no treatment for stormwater that falls on impermeable
areas on the site
100 means that the development meets the best practice performance objectives for suspended
solids, total phosphorus and total nitrogen, as set out in the Urban Stormwater Best Practice
Environmental Management Guidelines, Victoria Stormwater Committee 1999 as amended.
Currently, these water quality performance objectives require:
Suspended Solids - 80% retention of typical urban annual load
Total Nitrogen - 45% retention of typical urban annual load
Total Phosphorus - 45% retention of typical urban annual load
Litter - 70% reduction of typical urban annual load
P 1300 66 45 32 [email protected] 20 | S M P
5. Building Materials (not listed in Clause 22.13)
Objectives:
to minimise the environmental impact of materials used by encouraging the use of materials with a favourable lifecycle assessment based on fate of material, recycling/reuse, embodied energy, biodiversity, human health, environmental toxicity, environmental responsibility
Issue Design Response Dwg
reference
Embodied Energy (EE) of Materials
The following will be used based on discussions with the architect and the materials shown on the planning drawings:
Timber used for internal wall framing is selected. See notes under sustainable timber below regarding timber used in framing
Concrete as specified for some of the floors, contains high embodied energy, which has a negative impact, however the passive design benefits, e.g. thermal mass, can offset this by reducing energy usage during the life of the structure
Steel sheet, such as that specified for the roofs, also has a high embodied energy, however it lends itself to recycling at the end of the building life cycle, and Colorbond/Zincalume contains 20% recycled content and is 100% recyclable
Light weight cladding, such as fibre cement sheeting contains low embodied energy is highly durable and requires low maintenance
Refer to the Greenlist for examples of products and suppliers that are considered sustainable. The Greenlist can be found at: www.sustainablesteps.com.au/pdf/MorelandGreenlist.pdf
Note on plans
Maintenance/ Durability
Aluminium framed windows, steel sheet roofing, FC sheeting and concrete are considered to be low maintenance. Durability reduces the need for replacement of materials during the lifecycle of the building
Note on plans
Sustainable Timber
Timber used in framing is generally sourced from sustainably managed Australian plantations. Timber framing produces much less greenhouse gas emissions during processing than other framing materials. It can have a negative embodied energy (its production and transportation has resulted in a net reduction in atmospheric carbon dioxide
Timber used for cladding, lining and fitouts should be FSC certified or equivalent. A list of suitable timbers can be found at: www.sustainablesteps.com.au/pdf/MorelandGreenlist.pdf
Note on plans
Reuse of recycled materials
Concrete containing 20% recycled or industrial by-product content (refer to Greenlist for examples) is recommended Colorbond/Zincalume roof sheeting as will most likely be used contains 20% recycled content and is 100% recyclable
Note on plans
Toxicity Low VOC paints to be used throughout the development Note on plans
P 1300 66 45 32 [email protected] 21 | S M P
PVC Minimisation Not proposed for this development
Refer to the materials Greenlist for examples of products and suppliers that are considered sustainable. The Greenlist can be found at: http://www.sustainablesteps.com.au/pdf/MorelandGreenlist.pdf
P 1300 66 45 32 [email protected] 22 | S M P
6. Transport
Clause 22.13-2 Objectives:
to ensure that the built environment is designed to promote the use of walking, cycling and public transport in that order
to minimise car dependency
to promote the use of low emissions vehicle technologies and supporting infrastructure
Issue Design Response Drawing reference
Proximity to amenities, public transport and other offsite facilities
The location is in the Wheelers Hill neighbourhood in Melbourne. The nearest bus stop is Stop 754 located 250m from the site
The following are within 1km of the site:
o Numerous restaurants, cafes and bars o Woolworths Wheelers Hill (supermarket) o Columbia Park o Jells Park Preschool o Jells Park Primary School o Caulfield Grammar School o National Pharmacies o Australia Post –Wheelers Hill LPO o CBA ATM (branch)
The following are within 2.4km of the site:
o Coles (supermarket) o ALDI (supermarket) o Maria Montessori Preschool Centre o Wheelers Hill Primary School o NAB ATM o ANZ Branch Brandon Park o Westpac Bank
Chadstone Shopping Centre is located 9.6 km away:
o Reading Cinemas o ABC Shop o Health insurance providers o Coles Supermarket o Escape Travel o Homewares, fashion, sports and electrical
retailers o Kmart | Myer | David Jones | Target |Harris
Scarfe department stores o Optus | Foxtel | Telstra | RACV o Banks | Financial Institutions
Walk score Walk score for this location is 73 (Very Walkable) Most errands can be accomplished by foot
P 1300 66 45 32 [email protected] 23 | S M P
Commuter statistics to Melbourne CBD
By car: 25.5 km, 30 minutes (25 minutes during rush) By bicycle: 27.5 km, 54 minutes By bus: 4 minute walk (250m) to Ajax Road/Jells Road Stop 754 to Flinders Street Station (See Route information below)
(Source Public Transport Vic)
Providing Convenient & Secure Bike Storage
The development will be providing 130 bike spaces located on the basement level 2of the development These spaces are aimed at encouraging the use of alternative transport, thus reducing traffic congestion and pollution
Shown on plans
P 1300 66 45 32 [email protected] 24 | S M P
7. Waste Management
Clause 22.13-2 Objectives:
To promote waste avoidance, reuse and recycling during the design, construction and operation stages of development.
To ensure durability and long-term reusability of building materials.
To ensure sufficient space is allocated for future change in waste management needs, including (where possible) composting and green waste facilities
Issues Design Response Drawing reference
Storage Spaces for Recycling and Green Waste
Refer to Waste Management Plan prepared by others
Construction Waste Management
To help minimise waste generated during the construction phase, standard size materials and pre-fabricated materials will be used where possible. This will reduce the amount of off-cuts and on-site waste production During the construction of the proposed development, skips containing construction waste will be sorted into recyclable categories – plastics and cardboard packaging, metal offcuts and cable, concrete and rubble. Only non-recyclable products are be sent to landfill A commitment has been made to recycle or reuse at least 80% of the existing building through the demolition phase. In general, most demolition companies recycle as much material as possible as the most economic option
For example:
Steel and metal items including roof sheet, window frames and other steel framing materials are completely recycled
Brickwork, concrete slabs and asphalt are crushed and used as materials for road works
Any bricks in good enough condition to be reused may be cleaned and re-sold as garden/paving supplies
Minor components of the buildings that are unable to be recycled (such as fixtures and fittings) are sent to landfill as a last resort
Operation Waste Management Plan
Refer to Waste Management Plan prepared by others
P 1300 66 45 32 [email protected] 25 | S M P
8. Urban Ecology
Clause 22.13-2 Objectives:
to protect and enhance biodiversity within the municipality to encourage the planting of indigenous vegetation
To provide environmentally sustainable landscapes and natural habitats, and minimise the urban heat island effect
To encourage the retention of significant trees
To encourage the provision of space for productive gardens, particularly in larger
residential developments
Issues Design Response Drawing reference
Reuse of Already Developed Land
A car park and multi storey building currently occupies the site and is to be demolished
Source: www.realestate.com.au
Maintaining & Enhancing Ecological Value
The existing site has some ecological value in its current state. The site has the potential to greatly enhance the urban ecology with planting opportunities on the ground level in the courtyards and on the balconies and roof terraces
Show on landscaping plan, if applicable
Creating Resident Amenity and Biodiversity
It is envisaged that with landscaping this will improve the overall ecological and aesthetic value of the development These shrubs and trees can be of various sizes and heights providing visual interest as well as “softening” the lines of the building
Show on landscaping plan, if applicable
P 1300 66 45 32 [email protected] 26 | S M P
The balconies and roof terrace of the dwellings provide a space for potted vegetation, thus increasing biodiversity by providing a green environment and a pleasant open space for the residents and visitors to enjoy In addition, with the increased vegetation, less CO2 is released into the atmosphere
Outdoor Communal Facilities
Not proposed for this development
P 1300 66 45 32 [email protected] 27 | S M P
9. Innovation (not in Clause 22.13)
Objectives:
to encourage innovative technology, design and processes in all development, which positively influence the sustainability of buildings
Issues Design Response Drawing reference
Significant Enhancements to Environmental Performance
Rainwater tanks will store all roof runoff for recycling in toilet flushing
80% of demolition will be recycled or reused
5 star rated WELLS efficient fixtures
Good Passive Design Approach
All habitable rooms feature openable windows/doors to enable passive ventilation and cooling
New technology Low VOC paints have been specified
Alternative transport use encouraged
Location is close to public amenities and public transport options to discourage use of conventional vehicles
P 1300 66 45 32 [email protected] 28 | S M P
10. Ongoing Building & Site Management (not in Clause 22.05)
Objectives:
to encourage a holistic and integrated design and construction process and ongoing high performance
Issues Design Response Drawing reference
Building User’s Guide that Explains ESD Principles
N/A – Not generally required for townhouse developments, however we would recommend it as a value add to assist occupants of the home manage and maximise the energy and water efficiency of their home. A BUG can enable them to minimise their environmental impact including energy and water usage Please consult EcoResults for assistance with the production of a plain English Building Users’ Guide
Operation Waste Management Plan
Please refer to Waste Management Plan prepared by others
P 1300 66 45 32 [email protected] 29 | S M P
Conclusion Our sustainable building consultants have found the proposal to meet, and in most areas exceed by a
considerable margin, the benchmarks set out by the STORM assessment tool (see appendix for
breakdown).
The project has included a range of other ESD features over and above those measured by the STORM benchmarks, as discussed with reference to the objectives of the 10 key building sustainability principles above. These features combine significantly to further enhance the energy efficiency of the development, lessen its environmental impact and to encourage sustainable lifestyle choices by the occupants of the building during its life-cycle. The development will meet the objectives and application requirements of the City of Monash objectives if it is constructed in accordance with the application drawings and the measures detailed in this SMP. The development is likely to meet the current benchmarks set out by SDAPP. We are not able to verify this
completely due to the unavailability of the BESS tool to assess projects within the City of Monash (see
comments in introduction). This will be enabled by the careful selection of water efficient taps and fittings,
energy efficient heating and cooling appliances, building materials with low embodied energy and other
sustainability features as outlined under the 10 sustainability categories.
Legal statement This Sustainable Management Plan (SMP) has been prepared in conjunction with FirstRate5, which have
been used as Sustainable Design Assessment in the Planning Process (SDAPP) assessment tools.
The development is assessed to achieve the stated ratings only if it is built in accordance with the
specifications listed in the attached assessment tool printouts, and according to the plans provided by the
designer to EcoResults. This report must be read in conjunction with all assessment tool printouts.
Any variation to the design or construction of the development will deem this SMP void unless the
variations are assessed by EcoResults. Please contact EcoResults if there are any questions or variations
that are required.
EcoResults is not responsible for any loss or damage arising directly or indirectly from the use of this SMP
in circumstances where there has been a variation to the design or construction of the development, which
has not been assessed by EcoResults. To the extent permitted by law, EcoResults excludes all liability,
including any liability for negligence or for any loss including indirect or consequential damages, arising
directly or indirectly from the use of this SMP in circumstances where there has been a variation to the
design or construction of the development, which has not been assessed by EcoResults.
P 1300 66 45 32 [email protected] 30 | S M P
Appendix
Why is sustainable development needed? Buildings have the potential to greatly affect the environment of their immediate surroundings, as well as
the atmosphere globally. According to recent studies (COAG, 2009), buildings account for approximately
20% of Australia’s greenhouse gas emissions, and there is overwhelming evidence that global warming
contributed to by such emissions will increasingly affect the earth’s environment, climate and the quality
of life of those living on it.
The design of any new development has the potential to either exacerbate or lessen the impact on the
environment, for better or for worse. There are many design features that may be included (many with
little or no additional monetary cost) to reduce the environmental impact of the end product, thus creating
a more sustainable outcome for the life-cycle solution of the development.
In addition, using energy unnecessarily creates added cost in both the construction and occupancy of the
building, as energy prices rise, and in view of the tax on carbon emissions, and the future emissions trading
scheme. By saving energy, costs for the developer and building occupant can be reduced.
STORM assessment tool The Council Alliance for a Sustainable Built Environment (CASBE) within the MAV (Municipal Association of
Victoria) has developed a broad program called 'Sustainable Design Assessment in the Planning Process'
(SDAPP). The SDAPP Program refers to the consistent inclusion of key environmental performance
considerations into the planning permit approvals process in order to achieve more sustainable outcomes
for the long-term benefit of the wider community.
P 1300 66 45 32 [email protected] 31 | S M P
Stormwater quality (STORM Assessment)
STORM rating required: 100%
STORM rating for project: 100%
Stormwater quality for this project is 100%, meeting the current best practice design for urban pollutants
Please note that the proposed stormwater treatment and Water Sensitive Urban Design (WSUD) measures
as outlined below shows a series of measures that could be used to achieve compliance. However this may
change once a detailed Civil design has been done later in the project. Best practice for Stormwater Quality
will be achieved and verified by STORM or MUSIC. This may be done in part, by payment of a contribution
or levy for WSUD treatment to the relevant Water Authority
The following are detailed requirements to the current method used to achieve the STORM score:
Runoff from the roofs of all apartment buildings (610m2) is to be drained into rainwater tank(s) with
180,000L dedicated to reuse
o Tanks must be connected so that they operate in series as if they were one tank
o All toilets in the apartments to be supplied with water from the rainwater tank(s)
o It is recommended (but not required to achieve the STORM rating) to connect external
irrigation tap(s) to the rainwater tank(s)
Runoff from the roofs of each townhouse (125m2 per dwelling) is to be drained into a 3,500L
rainwater tank connected to all toilets within the townhouse
o Tanks must be connected so that they operate in series as if they were one tank
o All toilets in the apartments to be supplied with water from the rainwater tank(s)
o It is recommended (but not required to achieve the STORM rating) to connect external
irrigation tap(s) to the rainwater tank(s)
Refer to Melbourne Water Rainwater Tank Fact Sheet for additional information
The rainwater from a portion of driveway paving with a minimum area of 300m2 is to be collected
and discharged via a gravity fed system into a minimum of 4 Enviss Sentinel pits (shown as 4.4m2 of
100mm raingardens on STORM printout)
o A maximum of 75m2 is to be drained into each pit as per manufacturer’s specifications
o Refer to the Enviss Sentinel technical and product information below (including raingarden
equivalency table) for additional information on how to install and maintain the pits
Please note that the detailed, site specific design of WSUD measures should be undertaken by a
suitably qualified person
Refer to Maintenance Program for WSUD measures below
Please note that the proposed stormwater treatment and Water Sensitive Urban Design (WSUD)
measures may change once a detailed Civil design has been done later in the project. However best
practice for Stormwater Quality will be achieved and verified by STORM or MUSIC
P 1300 66 45 32 [email protected] 32 | S M P
Maintenance program for WSUD measures rainwater tanks The project’s hydraulic/services engineers will be responsible for the design of the tanks and
rainwater reticulation, shall inform the building facility manager and/or owners corporation in
writing, of the required maintenance tasks to keep the system operational including:
o Regular inspections of the tank(s), pump(s), reticulation system and toilets to ensure that
the system is operating for toilet flushing as designed
o Periodic cleaning and major maintenance of the tank(s), pump(s) and reticulation system to
ensure the long term viability of the system
The building facility manager and/or owners corporation shall include on their building
maintenance schedule the required maintenance tasks specified by the hydraulic/services
engineers at the required intervals
Maintenance program for WSUD measures for Enviss Sentinel pits The project’s hydraulic/services engineers will be responsible for the design of the Enviss Sentinel pits
and stormwater reticulation, shall inform the building facility manager and/or owners corporation in
writing, of the required maintenance tasks to keep the system operational including:
o Clean grate and sediment trap annually
o Replace filtration cartridge every 4 years
The building facility manager and/or owners corporation shall include on their building
maintenance schedule the required maintenance tasks specified by the hydraulic/services
engineers at the required intervals
For further information refer to and Enviss Sentinel fact sheets attached
P 1300 66 45 32 [email protected] 33 | S M P
Preliminary NatHERS Thermal Performance Assessment Sample energy ratings for a variety of dwellings:
Dwelling Types Net conditioned floor area
Heating MJ/m2
Cooling MJ/m2
Total MJ/m2 Star Rating
Town House A 144.4 111.0 12.3 123.2 6.1 Upper Module B3 Facing East 114.6 90.4 17.7 108.2 6.4 Lower Module B3 Facing East 107.1 101.0 22.6 123.6 6.0
Apartment A 108.0 123.5 21.6 145.1 5.4 Upper Module B3 Facing West 116.8 95.5 21.4 114.5 6.2 Lower Module B3 Facing West 110.7 137.6 10.1 147.7 5.4 Apartment D 91.6 81.9 14.4 96.2 6.8
Apartment C 87.7 92.3 37.9 130.2 5.9
Loft C 58.8 86.3 52.8 139.2 5.6
Average 104.8 102.2 23.4 125.3 6.0
To achieve the ratings above, construction was based on the following:
NatHERS Energy Rating Specifications for dwellings
Ave Heating Loads: 102.2 MJ/m² | Ave Cooling Loads: 23.4 MJ/m² | Ave Combined Loads: 125.3 MJ/m²
Average Star Rating: 6.0 Stars
6 Star Benchmark for this climate zone (Moorabbin): 125 MJ per m² annually
Element Specifications to achieve the required NatHERS rating
Roofs & Ceilings
Metal Roofs 6.0 Bulk Insulation
Ceiling Connected To Dwelling Above
R3.0 Bulk Insulation
Recessed downlights Downlights have been modelled according to the default values under
NatHERS protocol - sealed and non-ventilated type has been assumed
Walls
Lightweight Walls R2.5 Bulk Insulation
Internal Walls connected To Garage
R2.0 Bulk Insulation
Party Walls R2.0 Bulk Insulation on both sides of party wall
P 1300 66 45 32 [email protected] 34 | S M P
Floors
Concrete Slab on Ground No added insulation
Floors Directly Above A Car Parking Area
R2.0 Bulk Insulation for type 9 dwellings
No add insulation for other dwellings types
Floors Directly Above An External space
R3.0 Bulk Insulation
Other Suspended Floor Areas
No added insulation
External Glazing
All Glazing
All sliding and fixed glazing to have combined (frame and glass) values of
U=4.3 and SHGC=0.53
All other glazing to have combined (frame and glass) values of U=4.3 and
SHGC=0.47
These values were achieved in FirstRate5 using Aluminium frame, double
glazing, air filled, clear glass, high solar gain low-e windows
FR5 Glass Codes ALM-004-03 & ALM-003-03
Glazing Notes
The above U and SHGC values were achieved in FirstRate5 using the FR5
“default” glazing type listed, however they may be able to be achieved
with lower spec windows
Any windows may be used as long as the U-value does not exceed the
values listed and the SHGC is within a 5% tolerance above or below the
values listed
Refer to FirstRate5 Thermal Performance Assessment energy rating screenshots for additional information
Please note that the sample ratings included are from dwellings with an earlier internal design layout. The Masterplan is largely unchanged. EcoResults is confident that the design as shown on the current drawings
for submission are thermally similar to the design at the time that the sample ratings were conducted
P 1300 66 45 32 [email protected] 35 | S M P
Wind Frequency Analysis
P 1300 66 45 32 [email protected] 37 | S M P
Travel Time Maps These maps show how far you can travel by car, bike and foot from 855-869 Ferntree Gully Road, Wheelers
Hill
Walk Score Information | 30 minutes by car travel time map
Walk Score Information | 10 minutes by bike travel time map
P 1300 66 45 32 [email protected] 38 | S M P
Walk Score Information | 10 minutes by foot travel time map
P 1300 66 45 32 [email protected] 39 | S M P
Energy Ratings | Preliminary Thermal Performance Assessments
FirstRate5 | 1 Townhouse A
P 1300 66 45 32 [email protected] 40 | S M P
FirstRate5 | 3 Upper Module B3 Facing East
P 1300 66 45 32 [email protected] 41 | S M P
FirstRate5 | 4 Lower Module B3 Facing East
P 1300 66 45 32 [email protected] 42 | S M P
FirstRate5 | 6 Apartment A
P 1300 66 45 32 [email protected] 43 | S M P
FirstRate5 | 7 Upper Module B3 Facing West
P 1300 66 45 32 [email protected] 44 | S M P
FirstRate5 | 8 Upper Module B3 Facing West
P 1300 66 45 32 [email protected] 45 | S M P
FirstRate5 | 9 Apartment D
P 1300 66 45 32 [email protected] 46 | S M P
FirstRate5 | Apartment C
P 1300 66 45 32 [email protected] 47 | S M P
FirstRate5 | 12 Loft C
See below for assessment tool printouts (9 pages): STORM printout (1 page) Melbourne Water Rainwater Tank Fact Sheet (2 pages) Enviss Sentinel Brochure (4 pages) Enviss Sentinel Raingarden Equivalency Table (2 pages)
Apartment building roofs B
1,090.00 Rainwater Tank 45,000.00 80 164.00 82.00
Apartment building roofs D
1,090.00 Rainwater Tank 45,000.00 80 164.00 82.00
Driveways (open to sky) 2,150.00 None 0.00 0 0.00 0.00
Landscaped areas over basement (open to sky)
600.00 Buffer Strip 400.00 0 66.00 0.00
Treated driveways (open to sky)
300.00 Raingarden 100mm 4.40 0 121.95 0.00
Apartment building roofs A
1,090.00 Rainwater Tank 45,000.00 80 164.00 82.00
Apartment building roofs C
1,090.00 Rainwater Tank 45,000.00 80 164.00 82.00
Townhouse Roofs 2,760.00 Rainwater Tank 77,000.00 70 113.40 94.20
Pathways inbetween apartments (open to sky)
300.00 None 0.00 0 0.00 0.00
Remaining impermeable areas over basement (open to sky)
550.00 None 0.00 0 0.00 0.00
Treatment %Occupants /Number OfBedrooms
TreatmentArea/Volume
(m2 or L)
Treatment TypeImpervious Area(m2)
Description
STORM Rating Report
Municipality:
Address:
Assessor:
Development Type:
Allotment Site (m2):
MONASH
855-869 Ferntree Gully Rd
Wheelers Hill
VIC 3150
Marius Andrasciuc
Residential - Multiunit
15,866.00
Tank WaterSupply
Reliability (%)
Rainfall Station: MONASH
STORM Rating %: 100
TransactionID: 461062
Program Version: 1.0.0Date Generated: 02-May-2017
Most people install a rainwater tank primarily to harveststormwater from their roof and conserve their mains wateruse. In addition to conserving water, a rainwater tank alsohelps treat stormwater and protect local streams from highstorm flows by reducing the volume of stormwater andquantity of pollutants coming from a house block that wouldotherwise be delivered to the local stream.
What do I use my tank water for?
Garden irrigation, laundry and toilet flushing consume much ofour home water use. In most cases these uses do notrequire the water to be of drinking quality standard that isprovided by mains water. By plumbing your rainwater tank toyour toilet or laundry and substituting these mains waterneeds with the rainwater harvested from your roof, you canconserve mains water whilst reducing the amount ofstormwater that enters our streams.
Melbourne Water 131772Melbourne Water Corporation, PO Box 4342, Melbourne Victoria 3001
Rainwater TanksStormwaterSensitiveHomes
How does a rainwater tank help protect our local streams?
10%kitchen
15%laundry 20%
toilet
20%bathroom35%
gardens& lawns
A typical home usesapproximately 250,000 litres ofwater each year.
Rainwater Tanks Stormwater Sensitive Homes
Why can’t I use my rainwater tank for my gardenalone?So that your tank is not too full to collect rainwater when it rains,you need to be consistently using your tank water all year round.
If tank water is used for your garden alone, your tank will remainfull and unused during the winter months when your garden doesnot require watering. With a full tank, your capacity to captureand store the regular winter rainfall and thus benefit the localwaterway is significantly reduced.
By plumbing your rainwater tank to your toilet or laundry, yourtank water is used consistently all year round allowing rainfall torefill the tank more often especially in winter. This ultimatelyreduces the volume of stormwater that is delivered to the streamand the quantity of pollutants that are washed with it.
The Victorian Government has recognised the importance ofplumbing your tank to your toilet and offers a cash rebate for theinstallation of connected rainwater tanks (www.dse.vic.gov.au). Inaddition, a 5 star energy standard has been introduced thatrequires a connected 2000Lt rainwater tank or solar hot waterservice to be installed in all new houses and apartments (class 1and 2 buildings). (www.buildingcommission.com.au).
How do I choose a rainwater tank?The most important thing to consider when choosing a rainwatertank is to first identify what you want from your rainwater tank.The size and type of rainwater tank you choose will varydepending on your homes water needs and the reliability you seekfrom your rainwater tank supply. There are a number of factorsthat may influence this and the following questions should beconsidered when planning your tank installation:
• what is the water demand of your home?• how many people are living in your home?• what is your intended use of rainwater?• what reliability do you want from your tank?• what is the total area of roof draining into your tank?• what is average rainfall of your area?• do you need extras like a pressure pump, the ability to top up
your tank with drinking water, a backflow prevention device ora first flush device?
• are the materials used on your roof suitable to collectrainwater?
• are there physical constraints of your property that mayinfluence the type of rainwater tank you need?
Once you know how much water you can collect and how muchwater you are going to use then a tank size can be selected toprovide the reliability of water supply that you need.
Types of rainwater tanksRainwater tanks come in a variety of materials, shapes and sizesand can be incorporated into building design so they don’t impacton the aesthetics of the development. They can be located aboveground, underground, under the house or can even beincorporated into fences or walls.
There are three main tank systems to consider and a variety ofmaterials to choose from. Features of these are outlined belowand in the pictures above:
Tank systems:
Gravity Systems - rely on gravity to supply rainwater to thehousehold and the garden by placing the tank on a stand at height.
Dual Supply Systems - top your rainwater tank with mains waterwhen tank level is low ensuring reliable water supply.
Pressure Systems - use a pump to deliver rainwater to householdand garden fixtures.
To reduce the amount of sediment and debris entering a tank, meshscreens and ‘first flush diverters’ can be fitted. A screen will filterlarge debris such as leaves and sticks while ‘first flush diverters’store the ‘first flush’ of the rainfall that carries the sediment andother pollutants initially washed from your roof (see figure below).
Costs & rebatesCosts of installing a tank vary however a standard 2000Lt tank orbladder will cost around $1000.
Additional plumbing and/ or.....
• Above ground tanks cost approximately $250 for a 500 litre tank.• Below ground tanks cost between $300-$600 per 1000 litres of
storage• The costs of pumps start from $200.Additional plumbing and/or excavation costs vary on intendeduse, pipe layout, materials and site accessibility.
The Victorian Government offers a total rebate of $300 for theinstallation of a rainwater tank that is plumbed to toilet andconnected by a licensed plumber. For further details refer to theDepartment of Sustainability and Environment websitewww.dse.vic.gov.au.
For more information:Melbourne Water’s Water Sensitive Urban Design Website:www.wsud.melbournewater.com.au
Municipal Association of Victoria Clearwater Program:www.clearwater.asn.au
Water Sensitive Urban Design in the Sydney Region: www.wsud.org
Urban Stormwater Best Practice Environmental Management Guidelines,Victorian Stormwater Committee, CSIRO publishing, 1999.
WSUD Engineering Procedures: Stormwater, Melbourne Water, 2005.
Delivering Water Sensitive Urban Design: Final Report of Clean Stormwater– a planning framework, ABM, 2004.
tank
from roof to tank
First flush diverter added to a tank
Page 1 of 2
Technical Bulletin
envissSentinelTM
Assumptions: • Hydraulic conductivity is 2000mm/hr • Ponding depth 50mm
(flush with surface)
April 2015
envissSentinelTM Equivalency for STORM Calculator Raingardens Melbourne Water has an on-line design tool - known as STORM Calculator - to assist in assessing the stormwater treatment requirements for small-scale developments within Melbourne. The calculator uses basic input information about the subject catchment and assesses the relative compliance of the proposed solution in meeting the Melbourne Water ‘Best Practice Environmental Management (BPEM) Guidelines – TSS – 80%, TP – 45%, TN – 45%. The output is presented as a rating (%) relative to these standard target figures. Treatment measures available for selection include rainwater tanks, ponds, wetlands, infiltration, raingardens & buffer strips. Rocla has undertaken a comparative assessment of its envissSentinel
TM Media Filter (using MUSIC V6.1) so as to provide a further option for
design consultants to achieve desired treatment outcomes. The following figures show relative equivalencies of the envissSentinel
TM Media Filter to the
Storm Calculator’s raingarden estimate.
Raingarden Assumptions: • Filter surface area is equal to
ponding area • Filter depth is 0.5m • No soil exfiltration • Hydraulic conductivity is 200mm/hr
Storm Calculator Assumptions: 100% rating = BPEM Guidelines
• 80% TSS • 45% TP • 45%TN
General MUSIC V6.1 Assumptions: MUSIC defaults are used except where replaced by Storm Calculator inputs.
Page 2 of 2
Technical Bulletin
Typical Surface Inlet Arrangement
The comparison makes various assumptions about the options modelled (stated above), but key to the comparison is that the envissSentinal
TM requires no pre-
designated area be set aside for ponding and functional planting with pits placed directly within paved areas, flush with the surface.
envissSentinalTM
requires only 50mm ponding, which is provided between the permeable paver and the top of the sediment trap
100mm Raingarden* 300mm Raingarden#* EnvissSentinelTM Area (m 2) Area (m 2) (no. of Pits)
0.70 0.57 1
1.05 0.85 1
1.40 1.13 2
2.10 1.70 2
3.15 2.55 3
4.20 3.40 4
5.25 4.25 4
6.30 5.10 5
7.00 5.67 6
* Ponding depth above media surface with a projected area equal to the raingarden area. #* Needs to be positioned where extra ponding depth does not cause loss of serviceability or safety hazard
envissSentinelTM Media Filter Pit