Substructure Technology of Offshore Wind Farm

12
Substructure Technology of Offshore Wind Farm At the center of the energy transformation…

Transcript of Substructure Technology of Offshore Wind Farm

Page 1: Substructure Technology of Offshore Wind Farm

Substructure Technology of Offshore Wind FarmAt the center of the energy transformation…

Page 2: Substructure Technology of Offshore Wind Farm

Ship RepairingConversion

Tubular Special Ship

Business Line

「SAMKANG M&T」

「SAMKANG S&C」

2

On-OffshorePlant

On-OffshorePlant

Page 3: Substructure Technology of Offshore Wind Farm

63

2020.05 First fabricator exporting Jacket type Foundation for OWF in Korea

2017.12 Designated as Defense Industry Company• Contracted 1,500 ton Maritime Police Patrol Ship

2017.11 Acquired STX Goseong Offshore & Shipbuilding (Re-named Samkang S&C)

2016.12 Gold Tower Order of Industrial Service Merit awarded to Chairman Mr. MS Song on Korean 53rd Trade Day

2014.08 Opened Technical Training & Education Center

2008.08 Changed Company Name to Sam Kang M&TAnd Listed on the KOSDAQ

2000.11 Became Korea’s first fabricator successfully producing Heavy Wall Thickness Pipe

1999.08 Established Sam Kang Industries in Miryang

Corporate History

Page 4: Substructure Technology of Offshore Wind Farm

64

Technical Strength Points

1. Advanced workforce with extensive experience in offshore oil & gas field- IWE, QM, HSE, Supervisor, PM, Scheduler, Welder, Painter

3. Large workspace for serial production- Total 1 Million Square Meter

2. Lifting capacity- Various Goliath cranes (900T, 800T, 350T, 300T etc.)

4. Water depth at quayside- Ave. 12m

5. Painting capacity (4 Blasting & 11 Painting Shop)- Blasting shop : 50m x 35m x 18.5m (1)

50m x 50m x 17m (1)30m x 45m x 17m (1)25m x 35m x 18.5m (1)

- Painting shop : 75m x 35m x 18.5m (3)50m x 50m x 17m (5)40m x 35m x 17m (3)

Page 5: Substructure Technology of Offshore Wind Farm

5

Summary of OWF Track RecordsSer.No. Project Name Client Description

(W1 x W2 x H) Weight (MT) Duration Remarks

1 Jeju, Kimnyoung KHNP (Doosan), Korea 4 Leg Jacket: 11m x 11m x 37m3 Leg Jacket: 17m x 17m x 38m 727 May. 2020 – Jun. 2011

2 TPC, Changhua TCP (Jan De Nul), Taiwan 20m x 20m x 58.6m21 Jackets 16,800 Jan. 2019 – Apr. 2020

3 Changfang & Xidao CIP (Bladt), TaiwanUpper Jacket: 25m x 25m x 31mLower Jacket: 31m x 31m x 32m

8 Jackets & 46 Upper Jackets28,764 Aug. 2020 – Oct. 2022

4 Greater Changhua 01/02a Orsted, Taiwan 32.2m x 32.2 x 80.6m62 Jackets 73,259 Jun. 2019 – Dec. 2021

5 Greater Changhua Orsted (KFELS), Taiwan 31m x 31m x 68m2 Jackets 8,440 Jul. 2020 – May. 2021

6 Kunsan, Turbine Demo Penta-pod foundation

Kunsan Industry University Cooperation, Korea

Foundation of Turbine: 33m x 33m x 60m(Suction Bucket: OD9m x L7m – 5ea)

Foundation of Lidar: 21m x 21m x 48m(Suction Bucket: OD6m x L6m – 3ea)

1,300 Nov. 2020 – May. 2021

7Jeju, Development of floating offshore wind power system

(National Assignment)

Ministry of Trade, Industry and Energy

Floating Foundation (Under the Engineering) 3,500 Jan. 2023 – Feb. 2024

Consortium(IAE, KOEN, DOOSAN,

SAMKANG,etc)

Page 6: Substructure Technology of Offshore Wind Farm

6

Project Track RecordsTaiwan, TPC Changhua Offshore Wind Farm Phase-1

Developer Taiwan Power Company(TPC)

Contractor Jan De Nul

Period 2019. 7 ~ 2020. 5

Field West Changhua Country in Taiwan(109.2MW)

Scope of Work 21 Jackets included TP (16,562MT)

Page 7: Substructure Technology of Offshore Wind Farm

7

Project Track RecordsTaiwan, Changfang Xidao Offshore Wind Farm

Developer CIP (Copenhagen Infrastructure Partners)

Contractor BLADT (Denmark)

Period 2020. 06 ~ 2021. 05 (8 Jackets)2021. 04 ~ 2022. 10 (46 Upper Jackets)

Field West Changfang Xidao in Taiwan (650MW)

Scope of Work • 8 Jackets included TP• 46 Upper Jackets

Page 8: Substructure Technology of Offshore Wind Farm

8

Taiwan, Greater Changhua Offshore Wind Farm (Total 900MW)

Project Track Records

Developer Orsted

Period 2019. 12 ~ 2021. 12

Field West Changhua Country in Taiwan (900MW)

Scope of Work 28 Jackets included TP + α (Upscoping)

Page 9: Substructure Technology of Offshore Wind Farm

9

Taiwan, Greater Changhua OSS Jacket and Pile

Project Track Records

Developer Orsted

Contractor Keppel FELS (Singapore)

Period 2020. 1 ~ 2021. 5

Field West Changhua Country in Taiwan(900MW)

Scope of Work OSS Jacket 2 sets (8,440MT) and 16 Skirt Piles (8,235MT) fabrication

Page 10: Substructure Technology of Offshore Wind Farm

10

Taiwan, Greater Changhua OSS Jacket and Pile

Project Track Records

Developer Kunsan Industry University Cooperation, Korea

Contractor Kunsan Industry University Cooperation, Korea

Period 2020. 11 ~ 2021. 5

Field West off the coast of Kunsan, Korea (5.2MW)

Scope of Work

Foundation of Turbine: 33m x 33m x 60m(Suction Bucket: OD9m x L7m – 5ea)

Foundation of Lidar: 21m x 21m x 48m(Suction Bucket: OD6m x L6m – 3ea)

Page 11: Substructure Technology of Offshore Wind Farm

11

Major plan

Key comprehensive Supplier for OWF

Preemptive response to future growth in OWF foundation

demand

Top priority HSE system and sustainable HSE

improvement activities

Responsible supply of OWF foundation in APAC region