Stm2 tc3 tc4 scope of work part1

20
Siam Toyota Manufacturing Co., Ltd Project STM 2 _ TC 3 & TC 4 PCMC Engineering Co., Ltd

Transcript of Stm2 tc3 tc4 scope of work part1

Page 1: Stm2 tc3 tc4 scope of work part1

Siam  Toyota  Manufacturing  Co.,  Ltd      

Project    

STM  2  _  TC  3  &  TC  4  

PCMC  Engineering  Co.,  Ltd  

Page 2: Stm2 tc3 tc4 scope of work part1

Project  Management    

PCMC  Engineering  Co.,  Ltd  

Work  

Time  

People  

Page 3: Stm2 tc3 tc4 scope of work part1

Project Organization Chart For STM Mechanical : Air Condition and Sanitary Work Revise : 4 ,June, 2013

Document Section! Engineer Section!

Purchase! Site Admin! EE Engineering!ME

Engineering!Auto Cad! Safety Doc.!

Store! House Keeper! ME , EE! Safety Site! Foreman! Foreman!

PCMC Director! Mr. Phichet Wangveera !

Tel : 08-4666-9963!!

QC. !

Project Co.!Document Engineering!

Document Manager! Project Manager!

Site Manager!

Page 4: Stm2 tc3 tc4 scope of work part1

Project  Manager  

•  Name  :  Mr.  Dusitsan  K.  •  Work  Experience  

PCMC  Engineering  Co.,  Ltd  

Page 5: Stm2 tc3 tc4 scope of work part1

Site  Manager  

•  Name  :  Mr.  Tawatchai  S.  •  Work  Experience    – Toshiba  Consumer  Product  (  Thailand  )  Co.,  Ltd  •  ConstrucNon  Manager    

PCMC  Engineering  Co.,  Ltd  

Page 6: Stm2 tc3 tc4 scope of work part1

Current  Project  Show  Case  •  Project  Name  :      FaxLite  Green  Data  Center  •  Owner  :          AIS  •  Main-­‐Contractor  :      Schneider    •  Project  Valve  :      76  Mil  Baht    •  Scope  of  Work  :      Mechanical,  Sanitary,  Fire  ProtecNon    

PCMC  Engineering  Co.,  Ltd  

Page 7: Stm2 tc3 tc4 scope of work part1

FXL  :  Scope  of  Work  

•  Mechanical  Work  – Water  Cooled  Chiller  500  Ton  x  3  Units    – Cooling  Tower  x  3  Units  – Chilled  &  Condenser  Water  Pump    – Piping  ,  InsulaNon  Work  – AHU,  FCU  ,  and  CRAC    – DucNng  and  InsulaNon  Work  – Electrical  Work    – ME  BMS  Control  Work    

PCMC  Engineering  Co.,  Ltd  

Page 8: Stm2 tc3 tc4 scope of work part1

FXL  :  Scope  of  Work  

•  Sanitary  – Cold  Water  Work    – Waste  and  Rain  Water  Work  – Piping  Work    

•  Fire  ProtecNon  Work    – Sprinkler  Work    – Pre-­‐AcNon  Work      

PCMC  Engineering  Co.,  Ltd  

Page 9: Stm2 tc3 tc4 scope of work part1

FXL  :  Single  Line  Diagram  

PCMC  Engineering  Co.,  Ltd  

Page 10: Stm2 tc3 tc4 scope of work part1

 Morning  Talk  /  Safety  Training  

PCMC  Engineering  Co.,  Ltd  

Page 11: Stm2 tc3 tc4 scope of work part1

Safety  Training  

•  อบรมพนักงานใหม่ก่อนเข้าทํางาน •  อบรมพนักงานทุกคน 1  อาทิตย์ต่อครั้ง  

Page 12: Stm2 tc3 tc4 scope of work part1

Rule  and  RegulaNon  

Page 13: Stm2 tc3 tc4 scope of work part1

การแต่งกายช่างที่เข้าทํางานในโครงการ

สวมหมวกนิรภัย

ติดบัตรพนักงาน สวมเสื้อบริษัทฯ

นุ่งกางเกงขายาว

รองเท้าหุ้มส้น

Page 14: Stm2 tc3 tc4 scope of work part1

Safety  Training  

Page 15: Stm2 tc3 tc4 scope of work part1

Safety  Training  

Page 16: Stm2 tc3 tc4 scope of work part1

Safety  Training  :  Worker  ID  

Page 17: Stm2 tc3 tc4 scope of work part1

Safety  Cycle  

Page 18: Stm2 tc3 tc4 scope of work part1

Safety  Patrol  

Page 19: Stm2 tc3 tc4 scope of work part1

Safety  Patrol  

Page 20: Stm2 tc3 tc4 scope of work part1

Safety  Patrol