Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000...

29
Speciality, Experience and Quality Under our Commitment...

Transcript of Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000...

Page 1: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

Speciality, Experience and Quality

Under our Commitment...

Page 2: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

AYKEN ELECTRIC ENERGY ENGINEERING CONSTRUCTION CO.

COMPANY PROFILE

The Construction and Energy Industries are locomotive industries wh i ch leads

many sub-industries alongside their own progresses. These progressing industries

are requir ing both highest technological advanced installations and also high

quality hardware to be applied with an increasing demand.

Since its foundation in 1998, AYKEN Co. Ltd. has been focused on electrical and

mechanical installations as the main aspect of installation works, coupled with

technological hardware as primary area of activity, working by turn-key electrical,

mechanical and automation EPC contracts.

AYKEN Co. Ltd. have completed many National and International contracts, with a

principle of providing reliable engineering and contracting services with high quality

and well disciplined business principles governed by the ISO 9001-2000 Quality

Management System, ISO 14001:2004 Environmental Management System and TS-

18001 Occupational Health and Safety Management Systems. The basic principle

constituting the quality policy of AYKEN is to complete and commission all the

contracted works and productions within the specified budget and time schedule

assigned by the contract, in compliance with the determined technical standards and

norms.

AYKEN Co. Ltd. has already completed many engineering and contracting services

for electrical – electronic installations in many projects successfully and currently is

working and proceeding with ongoing contracts at many locations in Turkey and in

other countries.

Page 3: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

OUR QUALITY POLICY

Our quality policy is to be able to meet the demands and expectations of our

customers completely through our integrated engineering concept that can settle

with the advancing technology and adopting customer satisfaction principle; to

bring our firm among the level of industry leaders by adopting all changing

conditions in accordance with the business code of conduct without compromising

our quality management system and technical necessities and to develop our

system continuously by complying with the terms of our quality management

system.

OUR VISION

To become a company that could meet the powerful customer demands completely

in any scale with a regular growth target both in Turkey and International markets

in the next years utilizing customer oriented integrated service understanding.

OUR MISSION

To create permanent satisfaction meeting the expectations of our customers by

completing the services we have committed under the contracts concluded with

our customers in accordance with demanded standards within the scope of the

stipulated budget and time through integrated engineering concept.

OUR GOALS

1. To adopt the competitive conditions within the market

2. To rank among industry leaders

3. To perform also in international markets

4. To achieve a sound and planned real growth rate

5. To adopt total quality management application within the company

6. To carry out our commitment within the frame of our contracts

Page 4: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

ENGINEERING & CONTRACTING SERVICES

Electrical & Mechanical engineering and contracting services of the Ayken

Company can be described as the Electrical&Mechanical and I&C Systems design

and erection for all kind of Buildings including all utility type buildings, Industrial

Plants, Thermal Power Plants, Small Hydro Power Plants and all utility type

buildings like hotels, hospitals, malls, residential complexes.

Ayken Ltd. Co.’s engineering and contracting services always a im to achieve the

latest technology as all the Power Plants, Industrial Complexes and all Intelligent

Buildings shall be constructed with the latest technological systems and

applications. All the latest norms and standards shall be taken into consideration

during the design and the erection of all these type of building constructions.

M.K oray ERYILMAZ is the company manager of Ayken Co Ltd., also coordinates

the contracting services. As a 1993 graduate of Middle East Technology

University Electrical-Electronics Engineering Dept., M.Koray ERYILMAZ, worked

in General Electric Medical Systems and Enersis Co.Ltd. after his graduation.

Since 1998, M. Koray ERYILMAZ has been managed Ayken Co. Ltd. as the

Company Manager and Chief Engineer.

Electrical Systems for the engineering and contracting services and solutions

are listed below that are provided by Ayken Co. Ltd. for both design and erection

solutions.

Page 5: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

FINANCIAL INCOME STATEMENT FOR LAST FIVE YEARS

2013: 36.500.000 TL

2014: 39.000.000 TL

2015: 38.500.000 TL

2016: 40.000.000 TL

2017: 42.500.000 TL

2018: 39.500.000 TL

2019: 28.000.000 TL

-

5.000.000,00

10.000.000,00

15.000.000,00

20.000.000,00

25.000.000,00

30.000.000,00

35.000.000,00

40.000.000,00

45.000.000,00

2013 2014 2015 2016 2017 2018 2019

TL

Page 6: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

REFERENCES

M.Koray ERYILMAZ is the company owner and company manager, coordinates

the contracting services in Ayken Co. Ltd.. M.Koray ERYILMAZ graduated from

T.E.D Ankara College in 1989 and Middle East Technical University Electrical

Electronics Engineering Department in 1993. He got the post graduate M.Sc.

degree from Middle East Technical University in 1996. M.Koray ERYILMAZ worked

in General Electric Medical Systems Co. and Enersis Co. Ltd. after the graduation

in the field engineer, site chief, project manager and group manager positions for

many contracts before the establishment of Ayken Ltd Co. Ayken Ltd Co. has been

established in 1998 and managed by M. Koray ERYILMAZ as the owner and

Company Manager since 1998.

The references ongoing and completed projects by Ayken Ltd Co. are listed below.

Page 7: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

ONGOING CONTRACTS

NATIONAL DEFENSE UNIVERSITY DEAN’S BUILDING -

(TURKISH MILITARY ACADEMY ) TOTAL PROJECT TIME: 18 MONTHS

PROJECT BUDGET: 1.610.000 USD

MAIN CONTRACTOR: YP INSAAT

PROJECT COORDINATOR: CEYHUN PEKER

Supply, erection, tests, start up, commissioning of all Electrical Systems are under contract

of Ayken Electric Energy& Eng. Company

ANKARA MUNICIPALITY SİNCAN WASTE BURNING PLANT

TOTAL PROJECT TIME: 3 MONTHS

PROJECT BUDGET: 500.000 USD

MAIN CONTRACTOR: ITC LTD.Co.

PROJECT COORDINATOR: Erol Çetinkaya

Maintenance and repair, erection tests, start up, commissioning of Electrical Systems ,

Instrumentation, Pressured Air System, Wet Scrapper System are under contract of Ayken

Electric Energy& Eng. Company

YP İNŞAAT KOORDINAT RESIDENCES PROJECT

TOTAL PROJECT TIME: 3 YEARS

PROJECT BUDGET: 5.000.000 USD

MAIN CONTRACTOR: YP İNSAAT

PROJECT COORDINATOR: Nevzat Kayabaşı Supply, erection, tests, start up, commissioning of all Electrical Systems are under contract

of Ayken Electric Energy& Eng. Company

ZAMBIA LUSAKA US EMBASSY DCC BUILDING

TOTAL PROJECT TIME: 10 MONTHS

PROJECT BUDGET: 1.000.000 USD

MAIN CONTRACTOR: 740 Construction

COORDINATOR: Berkay ŞEŞEN

Maintenance and repair, erection tests, start up, commissioning of Electrical Systems ,

Instrumentation, Pressured Air System, Wet Scrapper System are under contract of Ayken

Electric Energy& Eng. Company

Page 8: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

COMPLETED CONTRACTS

No Project Name Project Amount Contractor Completion Date

1 HANONU COPPER MINE 6.200.000 USD ACACIA MINIG CO. 10/09/2019

2 NIZIP P2 WATER PUMP STATION 1.395.000 USD MEHMET GUNES CO. 10/07/2019

3 SELKUR LTD. MİGROS GÖLBAŞI WAREHOUSES 1.800.000 TL SELKUR 10/10/2018

4 3M FACTORY – DAMMAM 12.100.000 SAR 3M 14/04/2018

5 TANAP (Trans Anatolian Natural Gas Pipeline) ,MCC Building

900.000 USD YP İNŞAAT 28/04/2018

6 NEFİS ÇANKAYA RESIDENCES 5.550.000 TL YP İNŞAAT 15/09/2017

7 MERSIN SODA A.S 320t CF Boiler FACILITY 2.250.000 EURO EFOR-RAFAKO 15.02.2017

8 ROKETSAN MAAT Factory

1.070.000 USD

YP CO.

30.01.2017

9 KARABUK-ZONGULDAK RAILWAY MAINTENANCE

1.635.000 USD YAPI MERKEZI - MON

20.12.2016

10

P502 CALA CAMP LEMONNIER

5.600.000 USD

METAG INSAAT

10/10/2016

11 P217 APRON CAMP LEMONNIER 1.050.000 USD METAG INSAAT 31/06/2015

12 AVRUPA MAH. PROJECT 3. ETAP 625.000 USD ANKARA İNŞ. TİC. AŞ. 31/12/2015

13 DUNLOP TIRE FACTORY 1.765.000 USD ÖZCAN MÜH. MİM. İNŞ. SAN. A.Ş

31/12/2015

14 ÇANKAYA ÜNV. DORMITORY 295.000 USD SÜRÜCÜLER İNŞ. 31/12/2015

15 KASIMLAR HEPP 780.000 EURO TAÇYILDIZ ENERJİ 31/12/2015

16

SELKUR SALT REFINERY

902.000 USD

SELKUR MADEN

29/12/2015

17

KURİŞ PLAZA

2.000.000 USD

KILIÇOĞLU İNŞ.

31/10/2015

18

MERMERLER PLAZA

1.379.000 USD

KILIÇOĞLU İNŞ.

31/10/2015

19

AKDAŞ CASTING FACTORY

6.500.000 EURO

AKDAŞ DÖKÜM

31/08/2015

20 HENKEL SULFINATION PLANT 80.000 EURO PROKON 30/07/2015

21

ANAGOLD-CLAY PLANT

300.000 USD

ATİLLA MAKİNA

31/12/2014

22

AFGHAN NATIONAL ARMY - FORWARD AREA ARMİNG AND REFUEL POİNT (FAARP)

5.600.000 USD

METAG

24/12/2014

23 ANAGOLD-SART PLANT 500.000 USD ATİLLA MAKİNA 31/09/2014

24

ANAGOLD-CIC PROJECT

150.000 USD

ATİLLA MAKİNA

31/08/2014

25 ÇATALDERE 1-2-3 HEPP 1.000.000 EURO KOÇOĞLU ENERJİ 01/06/2014

Page 9: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

26

YANIKKÖPRÜ HEPP

732.000 USD

TÜRKER GRUP

20/05/2014

27

ANAGOLD-AGLERAMATOR

200.000 USD

ATİLLA MAKİNA

31/04/2014

28 ÇAKMAK 1-2 SÖGÜTLÜ HEPP 1.800.000 USD EGE HİDRO- RAİNPOWER

30/03/2014

29 KÖPRÜBAŞI HEPP 600.000 EURO ARSAN ENERJİ 31/01/2014

30

KAYA KÖPRÜ -1 HEPP

800.000 EURO

ARSAN ENERJİ

31/01/2014

31 SOĞUK PINAR HEPP 700.000 EURO ARSAN ENERJİ 31/01/2014

32 AFGHAN NATİONAL ARMY - COMBAT LOGISTICS BATTALION (CLB)

4.500.000 USD

METAG

25/01/2014

33 AFGHAN NATİONAL ARMY - TRANSIENT KANDAKS

1.150.000 USD METAG 25/01/2014

34 AFGHAN NATİONAL ARMY - 7CDO 790.000 USD METAG 25/01/2014

35 KIY HEPP 1.157.000 EURO KIY ENERJİ 10/01/2014

36

AYDIN 400 BED STATE HOSPITAL

3.450.000 USD

ENDER İNŞAAT

31/12/2013

37 DOĞUŞ AUTOMOTİVE LOGISTICS CENTER A BLOCK

510.000 USD

TEKYAPI İNŞAAT

30/12/2013

38

KARDEMIR THERMAL POWER PLANT(TPP- 50MW)

579.000 USD

KARDEMİR A.Ş.

30/07/2013

39 DOĞUŞ OTOMOTİV AUTOMOTİVE LOGISTICS CENTER

2.100.000 USD TEKYAPI İNŞAAT 10/11/2012

40 UTILITY INFRASTRUCTURE &COMMAND AND CONTROL FACILITY BASTION /AFGANISTAN

3.756.430 USD YENİGÜN İNŞ. A.Ş. 15/07/2012

41 THEATRE VEHICLE MAINTENANCE BUILDINGS KHANDAHAR /AFGANISTAN

3.326.430 USD YENİGÜN İNŞ. A.Ş. 25/07/2012

42

MURAT I-II HEPP

1.316.000 EURO

MURAT ENERJİ A.Ş.

30/05/2012

43

ÇAĞLAYAN HEPP

620.000 EURO

LALE TEKSTİL

30/05/2012

44 DOĞANKAYA HEPP 812.500 EURO MAR-EN ENERJİ 15/03/2012

45 ROKETSAN ROCKET INDUSTRIAL AREA CONSTRUCTIONS

230,000 USD YP İNŞAAT 01/09/2012

46

ARPA HEPP

1.600.000 EURO

BM İNŞAAT.

20/12/2011

47 KIRAN HEPP 604.000 EURO ARSAN A.Ş. 01/10/2011

48 KAYAKÖPRÜ_2 HEPP 647.000 EURO ARSAN A.Ş. 30/09/2011

49

HORYAN HEPP

647.000 EURO

ARSAN A.Ş.

30/09/2011

50 YÜKSEL PROJECT ADDITIONAL BUILDING 317.000 USD YP İNŞAAT 01/06/2011

Page 10: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

51

TAEK PROTON ACCELERATION CENTER

1,030,000 USD

YDA İNŞAAT

01/02/2011

52 ÇANKAYA UNIVERSITY NEW CAMPUS CONSTRUCTION

5.350.000 USD

SÜRÜCÜ İNŞAAT

15/12/2010

53

KANDAHAR KAF PERİMETER FENCE

1.500.000 USD

YENİGÜN İNŞ. A.Ş.

24/07/2010

54 DOUBLE TREE HILTON HOTEL ELECTRICAL WORKS

750.000 USD

PETA HOLDİNG

01/06/2010

55 GÜVEN HASTANESİ ADDITIONAL BUILDING ELECTRICAL WORKS

989.000 USD

AHMET KÜÇÜKEL

01/05/2010

56

SGK GENERAL DIRECTORATE BUILDING B-C-D RENOVATION OF THE BLOCK ELEKTRICAL WORKS

715.000 USD

DELTA İNŞ. A.Ş.

15/04/2010

57

TRİPOLİ BEACHPARK RESTAURANT

920.000 EURO

ARTES İNŞAAT

20/02/2010

58

KANDAHAR KAF (NAMSA) ATCT

580,000 USD

YENİGÜN İNŞ. A.Ş.

01/11/2009

59

TOKİ HALKALI 1860 HOUSING

3.850.000 USD

KOÇOĞLU İNŞ. A.Ş.

20/10/2008

60

ASO SERVICE BUILDING

1.400.000 USD

ENDER İNŞ. A.Ş.

01/06/2008

61

AB CFCU DİYARBAKIR COURT-HOUSE

430.000 EURO

AKSA İNŞ. A.Ş.

20/06/2008

62

HACETTEPE ÜNV. FACULTY OF MEDICINE ONKOLOJİ HOSPITAL

2.220.000 USD

METEKSAN A.Ş.

30/05/2008

63 VADİ PANORAMA HOUSES 300,000 USD TUZCUOĞLU İNŞ. LTD. ŞTİ.

01/05/2008

64 KARDELEN PARK HOUSES 387.000 USD EGE İNŞ.YAPI END. A.Ş.

31/03/2008

65 UNOPS KABİL CUSTOMS BUILDING 1.410.000 USD YP İNŞAAT A.Ş. 01/01/2008

66 SU ŞEHRİ HEPP 950.000 EURO SCHNEIDER ELEKTRİK A.Ş.

01/10/2007

67 ŞEKERBANK INFORMATION PROCESSING CENTER

702.000 USD YP İNŞAAT A.Ş. 01/05/2007

68

SAMSUN TOKİ 684 HOUSING

1.100.000 USD

KOÇOĞLU A.Ş.

01/05/2007

69 EGE HOUSES 530.000 USD EGE İNŞ. ADİ ORTAKLIĞI

31/12/2006

70 T.C. KABİL EMBASSY BUILDING 1.000.000 USD YP İNŞAAT A.Ş. 10/11/2006

71

IRAK 60 BED HOSPITAL

200.000 USD

ÖZALP İNŞ.

01/08/2006

72

IRAK/ERBİL MEDICAL LABORATORY

1.000.000 USD

İÇTAŞ HOLDİNG

31/12/2005

73

KOÇOĞLU ULUDAĞ KARİNNA HOTEL

815.000 USD

KOÇOĞLU İNŞ. A.Ş.

28/12/2005

74

ABI BOTTLING PLANT

500.000 USD

YP İNŞAAT A.Ş.

10/10/2005

75 EFİKAP4 KAPSAMINDA ANKARA (ÇANKAYA, ELVANKENT), ADANA (MERKEZ, SEYHAN), TARSUS MERKEZ İLKÖĞRETİM OKULLARI

1.120.000 USD ILGINLAR İNŞ. A.Ş. 30/09/2005

Page 11: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

76 HACETTEPE UNIVERSITY GREAT REPAIR 296.000 USD METEKSAN A.Ş. 30/04/2005

77 ANTALYA AIRPORT 2. EXTERNAL LINES TERMINAL ADDITIONAL ELECTRICAL WORKS

120.000 USD

İÇTAŞ HOLDİNG

15/04/2005

78

EREĞLİ IRON-STEEL FACTORY CONVEYOR

120.000 USD

PASİNER İNŞ. A.Ş.

01/03/2005

79 SWITZERLAND EMBASSY HOUSE RENOVATION PROJECT

100.000 USD KUR TEKNOLOJİ LTD. ŞTİ.

28/02/2005

80

BTC PETROLEUM PIPE LINE ERZURUM PT2 PUMP STATION

382.000 USD

TEPE ALTYAPI YENİGÜN A.Ş.

01/03/2004

81

TOBB EKONOMİ ve TEKNOLOJİ UNIVERSITY

2.060.000 USD

KOÇOĞLU İNŞ. A.Ş.

01/10/2004

82 BİLKENT ÜNV. FİZİK BÖL. NANOLAB BUILDING 75.000 USD METEKSAN A.Ş. 30/05/2004

83

ADANA 300 BED STATE HOSPITAL

1.550.000 USD

KOÇOĞLU İNŞ. A.Ş.

01/05/2004

84

WORLD BANK ANKARA OFFICE

75.000 USD

ZAFER İNŞ. A.Ş.

01/02/2004

85 MSB KULELİ ASKERİ LİSESİ 1500 PERSON CONFERENCE HALL

350.000 USD KFS İNŞAAT A.Ş. 01/02/2004

86

DÜZCE/YALOVA PRIMARY SCHOOLS

250.000 USD

YDA İNŞAAT A.Ş.

20/02/2003

87 ANADOLU TURİZM ve OTELCİLİK VOCATIONAL HIGH SCHOOL

200.000 USD

ALVER İNŞ. A.Ş.

20/02/2003

88

MKE ELROKSAN A.Ş. ROCKET FACTORY ANKARA

94.000 USD

ARZU İNŞ. A.Ş.

30/01/2003

89 ERZURUM ATATÜRK ÜNV. SÜLEYMAN DEMİREL TIP MERKEZİ YAKUTİYE HOSPITAL

910.000 USD TAVŞANOĞLU ŞİRKETLER TOPLULUĞU

31/12/2002

90

UNITED NATIONS NEW SERVICE BANIAS

100.000 USD UTM ULUSLARARASI TİC.ve MÜH. LTD.

15/06/2002

91 MEB P14-P30 PRIMARY SCHOOLS 150.000 USD TAVŞANOĞLU İNŞAAT A.Ş.

30/12/2001

92

MARMARA DEPREMİ MEER PROJECT KOCAELİ HWIZ1 PERMANENT EARTHQUAKE HOUSING 420 HOUSING

390.000 USD

KOÇOĞLU İNŞ. A.Ş.

30/09/2001

93

ADANA MAVİ (KÜÇÜK) SÜRMELİ HOTEL

395.000 USD

ABERK TURİZM A.Ş.

01/12/2000

94

MKNZ.PYD.TÜM.KMT.LIĞI BİR.F/0 KABLO ve UTP KABLO DAĞ.SİS.

100.000 USD

VIS A.Ş.

01/12/2000

95 T.C. BAKU EMBASSY, AZERBAIJAN HARP SCHOOL SPORTS SALOON

225.000 USD UTM ULUSLARARASI TİC. ve MÜH. LTD.

30/09/2000

96 AZERBAIJAN HARP SCHOOL SWIMMING POOL 205.000 USD UTM ULUSLARARASI TİC. MÜH. LTD.

30/09/2000

97 THE MINISTRY OF FINANCE MARMARİS/FETHİYE TAX ADMINISTRATION

375.000 USD TEPE YAPI A.Ş. 01/04/2000

98 KARA KUVVVETLERİ EDOK CLASSROOM BUILDING

50.000 USD TEPE YAPI A.Ş. 15/03/2000

Page 12: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

99 AZERBAIJAN HARP SCHOOL EDUCATION CENTER 245.000 USD UTM ULUSLARARASI TİC. MÜH. LTD.

15/02/2000

100 KOCAELİ UNV.124 BED HOSPİTAL 150.000 USD TEPE YAPI A.Ş. 01/02/2000

101 JAND. GN. KOMUTANLIĞI SPORTS FACILITIES POOL AND BUILDING

150.000 USD

ERVA İNŞ. LTD. ŞTİ.

31/12/1999

102

MSB BİNASI UPS DISTRIBUTION AND 800 DATA DISTRIBUTION SYSTEM

110.000 USD

VIS A.Ş.

20/12/1999

103 JAND. GN. KMTN.LIĞI EĞT. SPORTS FACILITIES MAIN BUILDING

120.000 USD TEPE YAPI A.Ş. 30/08/1999

Page 13: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan

ACTIVE STAFF

ENGINEER: 12

TECHNICIAN: 4

DRAFTSMAN: 2

FORMEN: 6

ELECTRICAL MOUNTER: 60

LOGISTICS 3

FINANCE 5

TOTAL: 92

Page 14: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 15: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 16: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 17: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 18: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 19: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 20: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 21: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 22: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 23: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 24: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 25: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 26: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 27: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 28: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan
Page 29: Speciality, Experience and Quality Under our Commitment · 12 avrupa mah. project 3. etap 625.000 usd ankara İnŞ. tİc. aŞ. 31/12/2015 13 dunlop tire factory 1.765.000 usd Özcan