Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester...

43
Slide 1 ICT 327 Management of IT Projects Semester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004

Transcript of Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester...

Page 1: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 1 ICT 327 Management of IT Projects Semester 2, 2004

ICT 327 Management of IT Projects

Semester 2, 2004

Page 2: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 2 ICT 327 Management of IT Projects Semester 2, 2004

Topic 1

Introduction to Project Management

Page 3: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 3 ICT 327 Management of IT Projects Semester 2, 2004

Topics

• Reading• Learning objectives• What is a project?• Why project management?• Project success• Project Management framework• Project Management software• Project Management skills & jobs

Page 4: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 4 ICT 327 Management of IT Projects Semester 2, 2004

Reading

• Textbook Schwalbe, Chapters 1, 2• PMBOK chapters 1, 2• CHAOS Reports 1994, 1999, 2001

• Course Technologywww.course.com/mis/schwalbe

• Project Management Institutewww.pmi.org

Page 5: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 5 ICT 327 Management of IT Projects Semester 2, 2004

Learning Objectives

• At the end of this topic, you should be able to:• Explain the growing need for better IT project

management.• Explain what a project is and provide examples

of information technology projects• Describe what project management is and

discuss key elements of the project management framework

Page 6: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 6 ICT 327 Management of IT Projects Semester 2, 2004

Learning Objectives (cont.)

• Discuss how project management relates to other disciplines

• Understand the history of project management• Describe the project management profession,

including recent trends in project management research, certification, and software products

Page 7: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 7 ICT 327 Management of IT Projects Semester 2, 2004

Project Management Statistics

• The U.S. spends $2.3 trillion on projects every year, an amount equal to one-quarter of the nation’s gross domestic product.

• The world as a whole spends nearly $10 trillion of its $40.7 trillion gross product on projects of all kinds.

• More than sixteen million people regard project management as their profession; on average, a project manager earns more than $82,000 per year.*

*PMI, The PMI Project Management Fact Book, Second Edition, 2001

Page 8: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 8 ICT 327 Management of IT Projects Semester 2, 2004

More Statistics

• More than half a million new information technology (IT) application development projects were initiated during 2001, up from 300,000 in 2000.*

• Famous business authors and consultants are stressing the importance of project management. As Tom Peters writes in his book, Reinventing Work: the Project 50, “To win today you must master the art of the project!”

*The Standish Group, “CHAOS 2001: A Recipe for Success”

Page 9: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 9 ICT 327 Management of IT Projects Semester 2, 2004

Motivation for Studying Information Technology (IT) Project Management

• IT projects have a terrible track record• A 1995 Standish Group study (CHAOS) found

that only 16.2% of IT projects were successful and over 31% were canceled before completion, costing over $81 B in the U.S. alone

• The need for IT projects keeps increasing• In 2000, there were 300,000 new IT projects• In 2001, over 500,000 new IT projects were

started

Page 10: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 10 ICT 327 Management of IT Projects Semester 2, 2004

Advantages of Using Formal Project Management

• Better control of financial, physical, and human resources

• Improved customer relations• Shorter development times• Lower costs• Higher quality and increased reliability• Higher profit margins• Improved productivity• Better internal coordination• Higher worker morale

Page 11: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 11 ICT 327 Management of IT Projects Semester 2, 2004

What Is a Project?

• A project is “a temporary endeavor undertaken to accomplish a unique product or service” (PMBOK® Guide 2000, p. 4)

• Attributes of projects• unique purpose• temporary• require resources, often from various areas• should have a primary sponsor and/or customer• involve uncertainty

Page 12: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 12 ICT 327 Management of IT Projects Semester 2, 2004

Project vs. Operations

Operations Projects

Page 13: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 13 ICT 327 Management of IT Projects Semester 2, 2004

Questions

• Is doing this unit a project?

• Who is the project manager?

• Is an assignment a project:• Database assignment?• Research paper?

Page 14: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 14 ICT 327 Management of IT Projects Semester 2, 2004

IT Projects Examples

• What is an IT project?• “IT projects” refers to projects involving hardware,

software, and networks

• Northwest Airlines developed a new reservation system called ResNet (see case study: www.course.com/mis/schwalbe)

• Many organizations upgrade hardware, software, and networks via projects

• Organizations develop new software or enhance existing systems to perform many business functions

Page 15: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 15 ICT 327 Management of IT Projects Semester 2, 2004

Goals

• Organisational goals• What is the organisation trying to achieve?• E.g. best customer service or most innovative

projects.• Sony vs. Dell (what are their goals?)

• Project goals• Must meet the organisational goals

Page 16: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.
Page 17: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 17 ICT 327 Management of IT Projects Semester 2, 2004

What is success?

GoalProject

GoalProject

Page 18: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 18 ICT 327 Management of IT Projects Semester 2, 2004

The Triple Constraint

• Every project is constrained in different ways by its

• Scope goals: What is the project trying to accomplish?

• Time goals: How long should it take to complete?

• Cost goals: What should it cost?

• It is the project manager’s duty to balance these three often competing goals

Page 19: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 19 ICT 327 Management of IT Projects Semester 2, 2004

Improvement in Project Success

From 2001 Standish Group Report :• Time overruns decreased from 222% to 163% • Cost overruns decrease from 189% to 145% • Required features and functions were up

from 61%to 67%• Successful US projects up from 28,000 to

78,000• 28% of IT projects succeeded compared to

16%

Page 20: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 20 ICT 327 Management of IT Projects Semester 2, 2004

Why the Improvements?

"The reasons for the increase in successful projects vary. First, the average cost of a project has been more than cut in half. Better tools have been created to monitor and control progress and better skilled project managers with better management processes are being used. The fact that there are processes is significant in itself.“*

*The Standish Group, "CHAOS 2001: A Recipe for Success" (2001)

Page 21: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 21 ICT 327 Management of IT Projects Semester 2, 2004

What is Project Management?

Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements” (PMI*, Project Management Body of Knowledge (PMBOK® Guide), 2000, p. 6)

*The Project Management Institute (PMI) is an international professional society. Their web site is www.pmi.org.

Page 22: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 22 ICT 327 Management of IT Projects Semester 2, 2004

Project Management Framework

Page 23: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 23 ICT 327 Management of IT Projects Semester 2, 2004

Project Stakeholders

• Stakeholders are the people involved in or affected by project activities

• Stakeholders include• the project sponsor and project team• support staff• customers• users• suppliers• opponents to the project

Page 24: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 24 ICT 327 Management of IT Projects Semester 2, 2004

9 Project Management Knowledge Areas

• Knowledge areas describe the key competencies that project managers must develop• 4 core knowledge areas lead to specific project

objectives (scope, time, cost, and quality)• 4 facilitating knowledge areas are the means through

which the project objectives are achieved (human resources, communication, risk, and procurement management)

• 1 knowledge area (project integration management) affects and is affected by all of the other knowledge areas

Page 25: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 25 ICT 327 Management of IT Projects Semester 2, 2004

Question

• Identify examples of each of the nine knowledge areas for the new Perth-Mandurah rail link project

• 4 Core• scope, time, cost, and quality

• 4 Facilitating• human resources, communication, risk, and

procurement management

• 1 Knowledge area• project integration management

Page 26: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 26 ICT 327 Management of IT Projects Semester 2, 2004

How Project Management Relates to Other Disciplines

• Much of the knowledge needed to manage projects is unique to the discipline of project management

• Project mangers must also have knowledge and experience in• general management• the application area of the project

Page 27: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 27 ICT 327 Management of IT Projects Semester 2, 2004

Questions

• Is it enough to be a good project manager or do you need to understand the area you are managing?

• For example, could an experience project manager with no IT background manage an IT project?

• Or, a documentation project (e.g. putting together a tender) with no tendering experience?

Page 28: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 28 ICT 327 Management of IT Projects Semester 2, 2004

History of Project Management

• Some people argue that building the Egyptian pyramids was a project, as was building the Great Wall of China

• Most people consider the Manhattan Project to be the first project to use “modern” project management

• This three-year, $2 billion (in 1946 dollars) project had a separate project manager and a technical manager

Page 29: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 29 ICT 327 Management of IT Projects Semester 2, 2004

Project Management Tools & Techniques

• Project management tools and techniques assist project managers and their teams in various aspects of project management

• Some specific ones include• Project Charter, scope statement, and WBS (scope)• Gantt charts, network diagrams, critical path analysis,

critical chain scheduling (time)• Cost estimates and earned value management (cost)• See Schwalbe Table 1-1 on p. 11 for many more

Page 30: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 30 ICT 327 Management of IT Projects Semester 2, 2004

Software and tools

• Gantt Chart

• Network diagram

• Portfolio management (Enterprise project management)

Page 31: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 31 ICT 327 Management of IT Projects Semester 2, 2004

Project Management Software

• By 2003, there were hundreds of different products to assist in performing project management

• Three main categories of tools exist:• Low-end tools: Handle single or smaller projects, cost

under $200 per user• Midrange tools: Handle multiple projects and users,

cost $200-500 per user, Project 2000 most popular• High-end tools: Also called enterprise project

management software, often licensed on a per-user basis

Project 2002 now includes a separate version for enterprise project management (see Appendix A for details on Project 2002)

Page 32: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 32 ICT 327 Management of IT Projects Semester 2, 2004

Sample Gantt Chart

The WBS is on the left, and each task’s start and finish date are shown on the right using a calendar timescale. Early Gantt Charts, first used in 1917, were drawn by hand.

Page 33: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Sample Network Diagram

Each box is a project task from the WBS. Arrows show dependenciesbetween tasks. The bolded tasks are on the critical path. If any tasks on the critical path take longer than planned, the whole project will slip unless something is done. Network diagrams were first used in 1958 on the Navy Polaris project, before project management software was available.

Page 34: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Enterprise Project Management Tool

In recent years, organizations have been taking advantage of softwareto help manage their projects throughout the enterprise.

Page 35: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 35 ICT 327 Management of IT Projects Semester 2, 2004

The Project Management Profession

• The job of IT Project Manager is in the list of the top ten most in demand IT skills

• Professional societies like the Project Management Institute (PMI) have grown tremendously

• Project management research and certification programs continue to grow

Page 36: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Top Ten Most in Demand IT Skills

Rank IT Skill/Job Average Annual Salary 1 SQL Database Analyst $80,664 2 Oracle Database Analyst $87,144 3 C/C++ Programmer $95,829 4 Visual Basic Programmer $76,903 5 E-commerce/Java Developer $89,163 6 Windows NT/2000 Expert $80,639 7 Windows/Java Developert $93,785 8 Security Architect $86,881 9 Project Manager $95,719

10 Network Engineer $82,906 Paul Ziv, “The Top 10 IT Skills in Demand,” Global Knowledge Webcast (www.globalknowledge.com) (11/20/2002).

Page 37: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 37 ICT 327 Management of IT Projects Semester 2, 2004

Sample PM Job in Perth

6 month contract• This role will manage several of our client’s software development, implementation support

projects (concurrently) on a day-to-day basis with a responsibility to deliver the project commitments with a consistently high-level of customer service. Projects will be a mix of e-commerce and non e-commerce, greenfields and customisation projects.

Skills required:• Manage client relationships• Consulting background helpful• Be comfortable and experienced with using formal methods (RUP is an advantage, but not

essential)• Be technically competent with MS Project or similar. A strong software background and formal

project management skills are essential. OO experience and advantage, as is conceptual knowledge of tools such as Java, Oracle.

Commercial rather than Technical Experience• Effective leadership experience• You will need to be comfortable managing, planning and estimating large software projects.• You will have at least 5 years experience in managing software projects• Insurance experience an advantage• You will need to confident negotiating with business customers, as well as building and

maintaining client relationships. (from www.seek.com January 8, 2004)

Page 38: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 38 ICT 327 Management of IT Projects Semester 2, 2004

Project Management Knowledge Continues to Grow and Mature

• PMI hosted their first research conference in June 2000 in Paris, France, and the second one in Seattle in July 2002

• The PMBOK® Guide 2000 is an ANSI standard

• PMI’s certification department earned ISO 9000 certification

• Hundreds of new books, articles, and presentations related to project management have been written in recent years

Page 39: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 39 ICT 327 Management of IT Projects Semester 2, 2004

Project Management Certification

• PMI provides certification as a Project Management Professional (PMP)

• A PMP has documented sufficient project experience, agreed to follow a code of ethics, and passed the PMP exam

• The number of people earning PMP certification is increasing quickly

• PMI and other organizations are offering new certification programs (see Schwalbe Appendix B)

Page 40: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 40 ICT 327 Management of IT Projects Semester 2, 2004

Growth in PMP Certification, 1993-2002

Page 41: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 41 ICT 327 Management of IT Projects Semester 2, 2004

Ethics in Project Management

• Ethics is an important part of all professions

• Project managers often face ethical dilemmas

• In order to earn PMP certification, applicants must agree to the PMP code of professional conduct

Page 42: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 42 ICT 327 Management of IT Projects Semester 2, 2004

Applying Project Management

• Project Management can apply to all areas

• Project management applies to work as well as personal projects

• Project management applies to many different disciplines (IT, construction, finance, sports, event planning, etc.)

• Project management skills can help in everyday life

Page 43: Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 ICT 327 Management of IT Projects Semester 2, 2004.

Slide 43 ICT 327 Management of IT Projects Semester 2, 2004

Next Week

• Reading• Topics 1 & 2

• Tutorial• Hand in Weekly Report for topic 2

• Template on FTP & WebCT sites.

• Diagnostic writing test• Practical exercises.• Skills