Slide 1
MIPA Progress PresentationFor SERENA Progress meeting, Santa Fee, May 2008
Prepared by Johan Svensson and Stas Barabash
Slide 2
Outline
• Status in Chandrayaan-1 configuration
• MIPA Status
• Budgets (Mass, Power).
• Action item addressed during progress meeting 2008-02-13
Slide 3
MIPA status (Ch1 configuration)
SARA FM (including SWIM - MIPA in Chandrayaan-1 configuration) completed, calibrated and delivered to ISRO (Indian Space Research Organization) Bangalore, India.
SWIM, CENA and DPU successfully integrated and tested on Chandrayaan-1 S/C.
Slide 4
MIPA status (Ch1 configuration)SARA package integration on Chandrayaan 1
SWIM
CENA
DPU
SWIM on C1
Slide 5
MIPA status (1/2)
• DDM model delivered to IFSI (Feb. 2007)
• Finalization of the mechanical interfaces with ELENA is on-going
• Sensor mechanical design completed.
• Latest data package delivered 2007-09-24 during D-ISRR-2. • Last EID-B update delivered 2007-12-20.
• Funding confirmed
Slide 6
MIPA status (2/2)
Since February 13 2008 progress meeting, most MIPA efforts regard the thermal design.
• Decision to go for hot design was taken. Ti, macor and high temperature coating.
• Thermal tests of the coatings are planned in Mercury solar simulation chamber in Bern mid June, and at ESTEC.
• Manufacturing of STM starts mid May.