Self-Generation Incentive Program 1 Generation Interconnection Services.

12
Self-Generation Incentive Program 1 Generation Interconnection Services

Transcript of Self-Generation Incentive Program 1 Generation Interconnection Services.

Page 1: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

1

Generation Interconnection Services

Page 2: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

2

Today’s Topics GIS Role in CSI

Application and Agreement

Project Review

Inspection

Overall Timeline

Resources

1

Page 3: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

3

GIS Role

• One point of contact for customer (or authorized agent) with regard to interconnecting systems

• Coordinate various activities, including engineering, metering, and contract administration

• Responsible to ensure system is installed as design indicates and operating according to Rule 21

• Two types of solar interconnections: NEM and non-NEM options

Page 4: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

4

Interconnection Application and Agreement

• A separate application and process from CSI (recently updated)

• Process runs parallel with CSI/SGIP• Application must be complete and

include required documents for review • Execute Inspection and Interconnection

Agreement before a system is permitted to operate

Page 5: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

5

Project Review NEM Non-NEM Analysis of system Single-line diagram (SLD) SLD, Site Diagram Protection n/a in most cases Larger systems/interconnection at

which level (distribution vs transmission)

Metering (revenue meter)

Bi-directional required No metering change

Net Gen Meter (NGOM)

Dependent upon size and/or selection (EPBB vs PBI); meter must conform to standards

AC Disconnect Self-contained meter – not required; Transformer-rated meter- required (Table 7-3, 2007 PG&E “Green Book”)

Page 6: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

6

Inspection

• Check system to ensure built as designed (matches SLD)

• Install bi-directional meter (NEM)

• Verify installation of AC disconnect and appropriate signage (if required)

• Install Net Gen Output Meter, if needed

Page 7: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

7

Process Improvement

• Change in AC disconnect requirement policy – November 2006

• NEM-MT has been approved to simplify projects with solar combined with other generation technologies

• Underway: simplification of application, to be combined with the Agreement for NEM

Page 8: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

8

Overall Timeline

• NEM projects- generally less than 30 business days

• Non-NEM- within 60 days, if all required docs/signatures and construction is on schedule

Page 9: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

9

Total NEM Applications Received

0

100

200

300

400

500

600

700

800

900

1000

January

February

March April

May

June July

August

September

October

November

December

App

licat

ions

Rec

eive

d

2004 2005 2006 2007

Page 10: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

10

Total NEM Interconnections

0

100

200

300

400

500

600

January

February

March April

May

June July

August

September

October

November

December

Mon

thly

Inte

rcon

nect

ions

2004 2005 2006 2007

Page 11: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

11

May(Standard & Expanded)

438

9 50

100

200

300

400

500

600

Within 12 Over 12 to 30 Over 30

App

licat

ion

Cou

nt

Page 12: Self-Generation Incentive Program 1 Generation Interconnection Services.

Self-Generation Incentive Program

12

Resources

• Standard NEM: http://www.pge.com/suppliers_purchasing/new_generator/solar_wind_generators/standard_e_net/

• Expanded NEM: http://www.pge.com/suppliers_purchasing/new_generator/solar_wind_generators/expanded_e_net/

• Non-NEM projects: http://www.pge.com/suppliers_purchasing/new_generator/retail_generators/

• Contact: [email protected], or 415-972-5676