SECTION 1: PROPOSED CONCRETE TOE SECTION 3: PROPOSED …
Transcript of SECTION 1: PROPOSED CONCRETE TOE SECTION 3: PROPOSED …
5.0
5.0
5.0
5.0
5.0
5
.0
5
.0
5
.0
5
.0
5.0
5
.0
5.0
5.0
5.0
5.0
5.0
5.0
1
0
.0
10.0
5.0
5
.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
10.0
5.0
5.0
10.0
10.0
1
0
.0
5
.0
5
.0
5.0
5
.0
5.0
5.0
5.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
5.0
0.0
0.0
RS
RS
RS
TP
TP
P
P
P
CULV IL
CULV IL
CULV IL
CULV IL
CULV IL
Bin
SoffitSoffit
7.97
7.97
7.97
7.91
5.52
3.463.51
3.39
3.48
3.53
3.42
3.40
3.03
2.36
5.0
5.0
5.0
5.0
5.0
5
.0
5
.0
5
.0
5
.0
5.0
5
.0
5.0
5.0
5.0
5.0
5.0
5.0
1
0
.0
10.0
5.0
5
.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
10.0
5.0
5.0
10.0
10.0
1
0
.0
5
.0
5
.0
5.0
5
.0
5.0
5.0
5.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
5.0
0.0
0.0
S
E
C
TIO
N
1
S
E
C
T
IO
N
3
S
E
C
T
IO
N
5
S
E
C
TIO
N
8
S
E
C
TIO
N
10
E
C
N
2 18m
0020yds
PROPOSED SLOPE
PROTECTION
PROPOSED
RETAINING
WALL
PROPOSED
CONCRETE
TOE
PCT01
PCT02
PCT03
PCT04
PCT05
PSP01
PSP02
PSP03
PSP04
PSP05
PSP06
PSP07
PSP08
PRW01
PRW02
PRW03PRW04
PRW05
E
C
N
2 18m
0235yds
E
C
N
2 18m
0450yds
E
C
N
2 18m
0830yds
E
C
N
2 18m
0870yds
E
C
N
2 18m
1030yds
E
C
N
2 18m
1145yds
EC
N2 18m
1645yds
EC
N2 18m
1745yds
EC
N2 18m
1680yds
SILVERSANDS BAY
CULV IL
PCT01
PCT02
PCT03
PCT04
PCT05
5
.0
5
.0
PSP01
PSP02
PSP03
PSP04
PSP05
PSP06
PSP07
PSP08
SoffitSoffit
3.463.51
PRW01
PRW02
PRW03PRW04
PRW05
DateDate
DateDateDrawn Designed
Checked Approved
Revision
Scale Fairhurst Ref
Drawing Number
Drawing Title
Project Title
Drawing Status
DescriptionDateRev AppdChkdDrawn
A1
225 Bath Street
GLASGOW G2 4GZ
Tel: 0141 204 8800 Fax: 0141 204 8801
BURNTISLAND COASTAL DEFENCE
CD 200/564
LOCATION PLAN
AC CG
HW JC
15/02/21 15/02/21
15/02/21 15/02/21
AS SHOWN
138173
DRAFT
-138173/6000
DO NOT SCALE FROM DRAWING
SAFETY HEALTH AND ENVIRONMENTAL INFORMATION
IN ADDITION TO THE HAZARD/RISKS NORMALLY
ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS
DRAWING, NOTE THE FOLLOWING RISKS AND INFORMATION.
CONSTRUCTION:
FOR INFORMATION RELATING TO USE, CLEANING AND
MAINTENANCE SEE THE HEALTH AND SAFETY FILE
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY
A COMPETENT CONTRACTOR WORKING, WHERE
APPROPRIATE, TO AN APPROVED METHOD STATEMENT.
RISKS LISTED HERE ARE NOT EXHAUSTIVE. REFER TO
DESIGN ASSESSMENT FORM PROVIDED IN APPENDIX C OF
THE FORM 001.
MAINTENANCE:
NOTES:
THIS PLAN IS BASED ON THE ORDNANCE SURVEY MAP
WITH THE PERMISSION OF THE CONTROLLER OF HER
MAJESTY'S STATIONARY OFFICE. CROWN COPYRIGHT.
UNAUTHORISED REPRODUCTION INFRINGES CROWN
COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL
PROCEEDINGS.
LEGEND:
- OUTLINE OF EXISTING WORKS
- OUTLINE OF PROPOSED WORKS
- MHWS 2.8m A.O.D
SECTION 1: PROPOSED CONCRETE TOE
POINTS EASTING NORTHING
PCT01 320129.873 685561.494
PCT02 320135.080 685561.831
PCT03 320135.882 685561.709
PCT04 320136.525 685560.806
PCT05 320129.909 685560.497
SECTION 3: PROPOSED SLOPE PROTECTION
POINTS EASTING NORTHING
PSP01 320603.456 685681.399
PSP02 320606.281 685682.479
PSP03 320607.399 685683.295
PSP04 320611.657 685683.976
PSP05 320611.464 685685.827
PSP06 320631.156 685692.330
PSP07 320632.006 685688.537
PSP08 320616.272 685683.831
SECTION 8: PROPOSED RETAINING WALL
POINTS EASTING NORTHING
PRW01 321515.205 685937.107
PRW02 321519.251 685937.023
PRW03 321519.110 685936.059
PRW04 321515.195 685936.148
PRW05 321515.194 685936.598