Scott Paul Reynolds CV 2017 - Published

7
1 Scott Paul Reynolds Construction Engineer / Project Manager Highly motivated Project and Construction Engineer, with over sixteen (16) years of experience in Greenfields and Brownfields engineering projects within the Oil & Gas Industry across the APAC Region. Comprehensive understanding of design processes, manufacturing, onshore construction/offshore installation methods and the constraints involved in working on a live processing facility, in addition to a tactical background in Brownfields offshore implementation. Strong knowledge of all phases of the project life cycle, with particular experience in floating and fixed offshore platforms, onshore LNG, petrochemical facilities and subsea fabrication and installation. Dedicated to the successful delivery of each project, meeting the required quality, technical specifications, budget and time constraints with strong emphasis on project delivery via safe work practices. Seeking a challenging role with a progressive organisation that will offer potential career development and advancement. Acted as Client Interface Representative on Offshore and Onshore projects; Strong experience in liaising and interfacing between engineering, construction and Client; Developing Project Planning & Construction/Installation Scheduling; in addition to CCLBD/WBS; Generating Construction Execution Plans; Construction/Installation Methodologies; and Construction/Installation Workpacks and Jobcards; Ability to prepare technical documentation, such as Site Quality Manuals; Providing input into the Project Execution Plan for the Construction/Installation Section; Management of third party contractors on site during the execution phase of a brownfield LNG project; including reporting on progress, cost and schedule; Overseeing other disciplines such as Procurement/Materials Control, HSE and arranging all permitting during the Execution phase; Concept development of Greenfields offshore facilities; Preengineering survey and scoping; Development of design deliverables and details for Greenfield and Brownfield projects; Managing third party surveyors for existing facilities; Involved in HAZID, HAZOP, plus design and constructability reviews of construction and resource mobilisation plans; Maintaining compliance of engineering design and installation deliverables to the project schedule; Ensuring timely responses to clarifications on design and specifications; Managing fabrication shop details through to fabrication packs/fabcards; Preparation of installation deliverables and procedures; Conversant with 3D design and modelling packages such as PDMS and PDS; Microsoft Office Suite; and Lotus Notes. Profile Key Skills & Experience Summary 18/1 Wylie Place, LEEDERVILLE Western Australia 6007 M: +(61) 409 055 977 E: [email protected]

Transcript of Scott Paul Reynolds CV 2017 - Published

Page 1: Scott Paul Reynolds CV 2017 - Published

  1  

Scott  Paul  Reynolds  Construction  Engineer  /  Project  Manager      

 

   Highly  motivated  Project  and  Construction  Engineer,  with  over  sixteen  (16)  years  of  experience  in  Greenfields   and  Brownfields   engineering  projects  within   the  Oil  &  Gas   Industry   across   the  APAC  Region.   Comprehensive   understanding   of   design   processes,   manufacturing,   onshore  construction/offshore   installation   methods   and   the   constraints   involved   in   working   on   a   live  processing   facility,   in   addition   to   a   tactical   background   in   Brownfields   offshore   implementation.    Strong  knowledge  of  all  phases  of  the  project  life  cycle,  with  particular  experience  in  floating  and  fixed   offshore   platforms,   onshore   LNG,   petrochemical   facilities   and   subsea   fabrication   and  installation.     Dedicated   to   the   successful   delivery   of   each   project,  meeting   the   required   quality,  technical  specifications,  budget  and  time  constraints  with  strong  emphasis  on  project  delivery  via  safe  work  practices.    Seeking   a   challenging   role   with   a   progressive   organisation   that   will   offer   potential   career  development  and  advancement.          

• Acted  as  Client  Interface  Representative  on  Offshore  and  Onshore  projects;    • Strong  experience  in  liaising  and  interfacing  between  engineering,  construction  and  Client;  • Developing  Project  Planning  &  Construction/Installation  Scheduling;  in  addition  to  CCLBD/WBS;  • Generating  Construction  Execution  Plans;  Construction/Installation  Methodologies;  and  

Construction/Installation  Workpacks  and  Jobcards;  • Ability  to  prepare  technical  documentation,  such  as  Site  Quality  Manuals;  • Providing  input  into  the  Project  Execution  Plan  for  the  Construction/Installation  Section;  • Management  of  third  party  contractors  on  site  during  the  execution  phase  of  a  brownfield  LNG  

project;  including  reporting  on  progress,  cost  and  schedule;  • Overseeing  other  disciplines  such  as  Procurement/Materials  Control,  HSE  and  arranging  all  

permitting  during  the  Execution  phase;  • Concept  development  of  Greenfields  offshore  facilities;  • Pre-­‐engineering  survey  and  scoping;  • Development  of  design  deliverables  and  details  for  Greenfield  and  Brownfield  projects;  • Managing  third  party  surveyors  for  existing  facilities;  • Involved  in  HAZID,  HAZOP,  plus  design  and  constructability  reviews  of  construction  and  

resource  mobilisation  plans;  • Maintaining  compliance  of  engineering  design  and  installation  deliverables  to  the  project  

schedule;  • Ensuring  timely  responses  to  clarifications  on  design  and  specifications;  • Managing  fabrication  shop  details  through  to  fabrication  packs/fabcards;  • Preparation  of  installation  deliverables  and  procedures;  • Conversant  with  3D  design  and  modelling  packages  such  as  PDMS  and  PDS;  Microsoft  Office  

Suite;  and  Lotus  Notes.  

Profile    

Key  Skills  &  Experience  Summary    

18/1  Wylie  Place,  LEEDERVILLE  Western  Australia  6007  M:    +(61)  409  055  977    E:    [email protected]  

 

Page 2: Scott Paul Reynolds CV 2017 - Published

  2  

   RCR  Tomlinson  Pty  Ltd  –  Oil  &  Gas  Division  October  2015  –  December  2016  Pre  Contract  Lead  -­‐  Woodside  Energy  Ltd  (WEL)  Contracts  /  Project  Manager  -­‐  Woodside  Energy  Ltd  (WEL)  Site  Manager  –  Karratha  Gas  Plant  (KGP)  for  Execution  phase  of  VSDS  Project  (WEL)  

Project:  Projects  listed  below  were  in  conjunction  with  the  HVAC  and  Multidiscipline  Services  Agreement  to  service  WEL’s  Onshore  and  Offshore  Facilities:  • VSDS  Building  HVAC  Upgrade  on  KGP  • CCR  Chillers  Upgrade  on  Pluto  LNG.  • GWA  Chiller  Controls  System  Upgrade  • Okha  HVAC  Campaign  Upgrade  

Key  Deliverables:  • Growing  the  scope  of  the  contract  from  Maintenance  to  incorporate  various  projects,  through  

successful  tendering  for  some  of  RCR’s  first  small  HVAC  Upgrade  related  projects  as  an  EPC;    • Evaluating  the  current  business  structure  for  the  Oil  &  Gas  Division  and  developing  a  small  team  

to  run  projects  from  FEED  right  through  to  execution  and  project  handover,  to  meet  WEL’s  extensive  contract  prerequisites;  

• Regularly  providing  feedback  on  all  aspects  of  the  tenders,  including  construction  methodology,  commercial/technical  risks  &  opportunities,  alternative  solutions,  submission  documentation,  material  &  subcontract  enquires  and  any  programming  requirements,  in  addition  to  formatting  of  proposal  documents  and  benchmarking;  

• Development  of  documentation  and  procedures  to  deliver  Projects  in  line  with  WEL  formatting,  particularly  the  KGP/KLE  specific  format  for  execution;  

• Fostering  strong  relationships  and  further  enhancing  these  to  promote  RCR’s  name  as  the  EPC  of  choice,  for  the  completion  of  HVAC  and  mechanical  chiller  upgrades  for  WEL’s  Onshore  and  Offshore  assets;  

• Frequent  site  visits  to  build  client  relationships  and  support  the  onsite  team  through  the  expansion  of  the  contract  scope  to  include  packages  of  work  and  maintenance  on  Pluto  LNG  and  support  WEL  assets  for  the  North-­‐West  Shelf  JV;  

• Mobilisation  to  KGP  to  manage  Client  Representation,  the  execution  of  the  VSDS  project  and  oversee  the  direct-­‐hire  work  crew.  

 Key  Achievements:  • Contributing  extensive  personal  WEL  contacts  (Perth  and  Onsite)  to  the  organisation  to  expand  

the  scope  of  the  contract;  • Engineered  the  scope  and  lead  a  team  to  remove  and  rebuild  the  Pluto  LNG  central  control  

room  chiller’s,  whilst  maintaining  full  functionality  of  the  facility;  • Effectively  engineered  a  solution  to  install  the  HVAC  Units  on  the  LNG  Train  4  VSDS  Building’s  

without  interrupting  production,  by  altering  the  scope  from  Shutdown  Critical  in  April  2016  to  non-­‐shutdown.  

Professional  Experience  

Page 3: Scott Paul Reynolds CV 2017 - Published

  3  

Ausclad  Group  of  Companies  (AGC)  March  2014  –  July  2015  Senior  Project  Engineer  /  Bid  Manager  -­‐  Woodside  Energy  Ltd  (WEL)  

Project:  Karratha  Berth  1  LNG  Jetty  Refurbishment  Phase  1  Project.    AGC  assisted  with  developing  the  TIC  estimate  and  Project  Execution  Schedule  for  the  Develop  FEED  phase  Investment  Decision  for  the  Joint  Venture  Partners.    Key  Deliverables:  • Managing  the  new  EPCM  Matrix  and  the  Implementation  Contractor’s  involvement  under  AGC’s  

Multi  Discipline  Services  Agreement  with  WEL;  • Establishing  the  original  Project  Execution  Team’s  to  manage  the  current  WEL  

Projects/Shutdowns  for  2014,  which  consisted  of  the  DOMGAS  1,  DOMGAS2  and  LNG  Train  1  Shutdown’s  on  the  Karratha  Gas  Plant  (KGP)  for  the  EPCM  Transfield  Worley  Pty  Ltd;  

• Involvement  in  all  facets  of  the  Integrated  Services  Business  Unit  to  deliver  Projects  and  Implementation  support  for  WEL;  

• Maintaining  a  strong  relationship  with  WEL  by  realising  past  experiences  and  lessons  learnt  from  the  Client  and  Assets/Facilities;  

• Creating  and  managing  relationships  with  key  stakeholders  within  the  EPCM’s  that  engaged  AGC  to  deliver  the  engineered  Scopes  of  Work;  

• Managing  the  delivery  of  the  2015  Scope  for  the  Jetty  Class  3  Estimate  and  Level  3  Schedule  to  prepare  AGC  and  assist  Wood  Group  PSN  for  the  FID  to  WEL;  

• Providing  and  managing  the  technical  interphase  with  Wood  Group  PSN  on  the  Constructability’s  of  various  phases  of  the  Develop  FEED  Phase,  HAZID’s,  HAZOP’s,  Risk  Workshops  and  the  management  of  Workpack  and  Jobcard  development;  

• Assuring  the  delivery  of  key  documentation  and  deliverables  to  the  client  was  met,  on  time,  and  within  the  agreed  estimated  tendering  budget.  

 Key  Achievements:  • Delivered  the  Phase  1  Jetty  Bypass  scope  ahead  of  budget,  within  the  tight  schedule  and  

demanding  Production  load-­‐out  windows,  with  Zero  HS&E  recordable  incidents.    

Fluor  Australia  (October  2011  –  December  2013)  August  2012  –  December  2013  Field  Construction  Engineer  /  OMV  Client  Interface  Representative  

Projects:  OMV  Raroa  FPSO  Refurbishment  and  Life  Extension,  which  included  in-­‐situ  change-­‐out  of  the  APL  process  swivel  and  other  refurbishment  activities.  The  main  project  objective  was  to  keep  the  vessel  on  location,  minimise  production  downtime  and  reduce  total  installed  capital  cost.    Key  Deliverables:  • Identification  of  the  proposed  method  for  in-­‐situ  process  swivel  change-­‐out,  given  critical  

constraints  (i.e.  project  timeframe,  weather  window),  whilst  minimising  onshore  construction  hours  and  process  shutdown  period;  

• Conducting  and  managing  the  full  detailed  FPSO  pre-­‐engineering  survey  to  determine  the  construction  methodology  and  handover  of  technical  data  to  engineering;  

• Development  of  detailed  execution  methodology  and  engineered  lifting  plan  for  the  in-­‐situ  swivel  change-­‐out  in  sea  conditions;  

• Development  of  a  unique  and  innovative  offshore  static  lifting  solution  for  the  transfer  of  the  50t  swivel  from  vessel  to  vessel,  without  the  need  to  utilise  an  offshore  heavy  crane;  

Page 4: Scott Paul Reynolds CV 2017 - Published

  4  

• Maintaining  team  focus  on  Risk  Reduction  in  all  aspects  of  implementation  planning;  and  participation  in  project  risk  and  constructability  reviews;  

• Management  of  Local,  Interstate,  and  Overseas  work-­‐share  arrangements  (Melbourne,  Wellington,  Manila,  Perth);  

• Asset  shutdown  planning  and  scheduling;  co-­‐ordination  of  process  swivel  change-­‐out  implementation  activities  with  additional  (online  and  offline)  refurbishment  scope  activities  (i.e.  inert  gas  and  seawater  filtration  re-­‐injection  system  upgrades);  

• Regular  interfacing  with  client  to  ensure  project  requirements  were  met.    

Key  Achievements:  • Lead  the  successful  tender  and  subsequent  award  and  development  of  the  FEED;  • Handover  of  all  engineering  and  Pre-­‐execution  deliverables  prior  to  cancelation  of  the  project.  

 

October  2011  –  July  2012  Construction  Superintendent  /  Woodside  Client  Interface  Representative  Projects:  Woodside  Brownfields  Development  PPG  (Production  Projects  Group)  Works  –  Karratha  Gas  Plant,  which  included  Substation  4  Cutover  and  Refurbishment  (linking  of  the  domestic  gas  trains  to  the  export  product  trains  and  CCR).    Key  Deliverables:  • Engaging  and  managing  a  team  of  35  third  party  contractors  for  site  implementation  and  

installation  activities,  materials  supply,  project  costs,  and  HS&E;  • Development  of  a  robust  system  to  deliver  safe,  and  cost  effective  Workpacks,  Jobcards  and  

installation  deliverable  procedures;  • Participation  in  project  risk  and  constructability  reviews;  • Management  of  technical  changes  and  queries;  • Schedule  and  progress  reporting,  ensuring  project  completion  was  on  time  and  on  schedule,  

and  without  disruption;  • Responsible  for  all  fabrication  and  delivery,  in  accordance  with  a  tight  project  schedule  driven  

by  fixed  shutdown  dates.    

Key  Achievements:  • Delivered  a  major  Electrical  Substation  Cutover  and  Switchboard  Room  replacement  utilising  

Fluor  onsite  engineering,  supervision  and  subcontractors.    

Wood  Group  Australia  December  2010  –  May  2011  Senior  Structural  Engineering  Designer  

Project:  Woodside  North  Rankin  2  (NR2)  Bridge  Landing  Module  Project  (position  was  obtained  after  the  project  was  removed  from  Transfield  Worley  and  awarded  to  Wood  Group  mid-­‐project).    Key  Deliverables:  • Contributing  to  the  development  of  a  robust  system  to  deliver  safe  and  cost  effective  

Workpacks,  Jobcards  and  installation  deliverable  procedures;  • Liaising  with  piping  and  stress  engineers  with  regards  to  management  of  pipe  support  packages;  • Assisting  in  maintaining  cohesion  between  engineering  contracting  companies  (Wood  Group/  

Transfield  Worley)  in  an  integrated  implementation  environment;  

Page 5: Scott Paul Reynolds CV 2017 - Published

  5  

• Structural  involvement  in  the  bridge  landing  module  constructability,  for  the  interface  of  Greenfields  pipe  work  to  existing  platform  Tie-­‐Ins  and  support  structures;  

• Frequent  offshore  site  visits,  liaising  with  the  implementation  team  and  conducting  multi-­‐discipline  survey  work.  

 Transfield  Worley  Pty  Ltd  April  2008  –  December  2010  Senior  Structural  Engineering  Designer  

Project:  Woodside  NRA  Brownfields  to  NRB  Tie-­‐In  FEED      Key  Deliverables:  • FEED  studies  for  the  landing  of  the  Bridge  to  connect  the  existing  NRA  platform  to  the  new  NRB;  

studying  various  options  to  land  the  new  bridge;  • Carrying  out  multiple  site  visits  to  conduct  a  full  pre-­‐engineering  survey,  in  addition  to  scoping  

possible  locations  for  the  bridge  landing;  • Conducting  reviews  of  platform  loads  and  existing  jacket  stiffening  scopes  and  project  estimates  

to  enable  client  FID.  

 Carnegie  Corporation/SeaPower  Pacific  Pty  Ltd  November  2007  –  April  2008  Senior  Structural  Engineering  Designer  /  CAD  Co-­‐ordinator  

Project:  CETO  II  Geared  Wave  Energy  –  Research  and  Development  Project  –  New  Technology - (concept  through  to  fabrication).    Key  Deliverables:  • Setting  up  of  the  3D  CAD  and  design  system,  in  addition  to  the  modelling  and  automated  

drawing  extraction;  • Management  of  the  in-­‐house  fabricator,  sub-­‐contractors  and  the  subsea  (trial)  installation  

team;  • Supervision  at  fabrication,  construction  and  installation  sites.  

 

Exxon  Mobil,  Houston  USA  July  –  October  2007  (12  week  contract)  Senior  Structural  Engineering  Designer  /  Checker  

Project:  Adriatic  Floating  LNG  Terminal.    Key  Deliverables:  • Focal  point  for  the  resolution  of  fabrication  technical  queries;  • Subsequently  required  to  provide  structural  input  to  resolve  solutions  to  de-­‐bottleneck  

fabrication  in  Spain,  between  three  work-­‐sharing  design  offices  and  fabrication  dry  dock  facilities  in  Houston,  Norway  and  Spain.    

   

Page 6: Scott Paul Reynolds CV 2017 - Published

  6  

 Transfield  Worley  Pty  Ltd  (September  2004  –  February  2007)  December  2005  –  February  2007  Senior  Structural  Engineering  Designer  

Project:  Woodside  NRA  Brownfields  to  NRB  Tie-­‐In  FEED.    

Key  Deliverables:  • Conducting  FEED  studies  for  the  landing  of  the  Bridge  to  connect  the  existing  NRA  platform  to  

the  new  NRB  • Studying  various  options  to  land  the  new  bridge  and  add  an  addition  module  to  a  live  process  

platform;    • Review  of  platform  loads  and  existing  jacket  stiffening  scopes;  and  working  closely  with  Jacket  

Assessment  and  Analysis  Team,  on  the  study  of  the  jacket  strengthening;  • Offshore  field  trips  and  surveys  to  determine  the  extent  of  brownfields  strengthening  and  

jacket  modifications  required  to  land  the  new  bridge  and  addition  module;  • Reviewing  project  estimates  to  enable  client  FID.  

 

August  –  December  2005  (Secondment  to  Woodside)  Structural  Engineering  Designer  

Project:  Woodside  NRB  Greenfields  Concept  Select  Phase.  

Key  Deliverables:  • Selected  by  the  Client  from  the  Life  Extension  Team  to  join  the  NRB  Development  Team;  • Offshore  site  visits  to  NRA  for  proposed  planning  and  preliminary  site  surveys;  • Structural  modelling  of  concepts/arrangements  for  the  proposed  new  NRB  platform;  • Production  of  key  milestone  deliverables  to  meet  Joint  Venture  Investment  decisions.  

 September  2004  –  August  2005  Structural  Engineering  Designer  

Project:  Woodside  NRA  Life  Extension  

Key  Deliverables:  • Intensive  six  (6)  month  offshore  position,  operating  on  a  2:2  roster  with  an  equal  back  to  back  

Designer/Field  Engineer;  • Conducted  site  surveying  and  reviewing  of  refurbishment  and  replacement  structural  scopes;  • Delivery  of  all  project  related  offshore  facility  details  and  site  measurements  required  to  

continue  with  engineering  and  design  in  Perth;  • Demobilised  and  returned  to  the  Perth  design  office  to  assist  in  the  fabrication  and  installation  

deliverables;  • Assisted  in  developing  the  installation  and  implementation  Workpacks  and  fabrication  packs;  • Focal  point  for  TQ  management  and  resolution.  

         

Page 7: Scott Paul Reynolds CV 2017 - Published

  7  

Technip  Oceania  March  2002  –  September  2004  Structural  Engineering  Designer  

Projects:  Woodside  Trunkline  System  Expansion  Project  (TSEP)  Project;  Conoco  Phillips  Bayu  Undan  Riser  Supply  Project;  Conoco  Phillips  Belenak  Flexible  Riser  Supply  Project;  Woodside  GWA  Echo  Yodel  Riser  Installation  and  Subsea  Project.  

Key  Deliverables:    • Conducting  offshore  field  surveys,  barge  surveys  and  Layouts,  and  Dive  Support  Vessel  deck  

modifications  required  for  execution;    • Regular  Client  liaison;  • Liaising  with  Workshop  Mangers  and  Installation  Team  Lead  regarding  fabrication  matters;    • Structural  modelling;  development  of  structural  design  drawings;  and  field  layouts  and  

installation  aid  drawings;  • Developing  and  assisting  with  installation  and  hook-­‐up  procedures;  

   Kvaerner  /  Oxair  Australia  Pty  Ltd  February  2000  –  March  2002  Junior  Structural  Designer/Workshop  Detailer  

Projects:  Methanex  New  Zealand  Demonstration  Facility.  

Key  Deliverables:  • Plant  Concept,  Layout  and  Feasibility;  • Liaising  with  Fabrication  Workshop  Manger  regarding  detailed  design  and  shop  drawings;  • Completing  PSA  (Pressure  Swing  Adsorption)  layout  and  shop  detailed  components  required  for  

construction;  including  general  arrangement,  isometrics,  pipe  spools,  manufacturing  drawings,  installation,  and  construction  assistance;  

• Liaising  with  third  party  surveyors  for  equipment  and  plant  positioning;  • Managing  fabrication  and  site  technical  queries,  in  addition  to  solving  fabrication  and  site  

installation  problems.    

 Qualifications  • Diploma  of  Engineering  (Structural)  • Certificate  IV  Civil  &  Structural  Drafting  • Certificate  III  Civil  &  Structural  Drafting  • Plant  Design  Systems  (PDS)  Structural,  Piping,  Mechanical  Equipment  

 Tickets/Licenses  • FOET  (Further  Offshore  Emergency  Training)  • OPITO  -­‐  License  No.  00365858051112159096  • MISC  -­‐  License  No.  VEP0087857  

 References  are  available  upon  request.    

Qualifications  &  Certifications  

References