Scott Paul Reynolds Construction Engineer / Project Manager
Highly motivated Project and Construction Engineer, with over sixteen (16) years of experience in Greenfields and Brownfields engineering projects within the Oil & Gas Industry across the APAC Region. Comprehensive understanding of design processes, manufacturing, onshore construction/offshore installation methods and the constraints involved in working on a live processing facility, in addition to a tactical background in Brownfields offshore implementation. Strong knowledge of all phases of the project life cycle, with particular experience in floating and fixed offshore platforms, onshore LNG, petrochemical facilities and subsea fabrication and installation. Dedicated to the successful delivery of each project, meeting the required quality, technical specifications, budget and time constraints with strong emphasis on project delivery via safe work practices. Seeking a challenging role with a progressive organisation that will offer potential career development and advancement.
• Acted as Client Interface Representative on Offshore and Onshore projects; • Strong experience in liaising and interfacing between engineering, construction and Client; • Developing Project Planning & Construction/Installation Scheduling; in addition to CCLBD/WBS; • Generating Construction Execution Plans; Construction/Installation Methodologies; and
Construction/Installation Workpacks and Jobcards; • Ability to prepare technical documentation, such as Site Quality Manuals; • Providing input into the Project Execution Plan for the Construction/Installation Section; • Management of third party contractors on site during the execution phase of a brownfield LNG
project; including reporting on progress, cost and schedule; • Overseeing other disciplines such as Procurement/Materials Control, HSE and arranging all
permitting during the Execution phase; • Concept development of Greenfields offshore facilities; • Pre-‐engineering survey and scoping; • Development of design deliverables and details for Greenfield and Brownfield projects; • Managing third party surveyors for existing facilities; • Involved in HAZID, HAZOP, plus design and constructability reviews of construction and
resource mobilisation plans; • Maintaining compliance of engineering design and installation deliverables to the project
schedule; • Ensuring timely responses to clarifications on design and specifications; • Managing fabrication shop details through to fabrication packs/fabcards; • Preparation of installation deliverables and procedures; • Conversant with 3D design and modelling packages such as PDMS and PDS; Microsoft Office
Suite; and Lotus Notes.
Profile
Key Skills & Experience Summary
18/1 Wylie Place, LEEDERVILLE Western Australia 6007 M: +(61) 409 055 977 E: [email protected]
![Page 2: Scott Paul Reynolds CV 2017 - Published](https://reader035.fdocuments.in/reader035/viewer/2022081208/589978fa1a28ab49478b87bf/html5/thumbnails/2.jpg)
2
RCR Tomlinson Pty Ltd – Oil & Gas Division October 2015 – December 2016 Pre Contract Lead -‐ Woodside Energy Ltd (WEL) Contracts / Project Manager -‐ Woodside Energy Ltd (WEL) Site Manager – Karratha Gas Plant (KGP) for Execution phase of VSDS Project (WEL)
Project: Projects listed below were in conjunction with the HVAC and Multidiscipline Services Agreement to service WEL’s Onshore and Offshore Facilities: • VSDS Building HVAC Upgrade on KGP • CCR Chillers Upgrade on Pluto LNG. • GWA Chiller Controls System Upgrade • Okha HVAC Campaign Upgrade
Key Deliverables: • Growing the scope of the contract from Maintenance to incorporate various projects, through
successful tendering for some of RCR’s first small HVAC Upgrade related projects as an EPC; • Evaluating the current business structure for the Oil & Gas Division and developing a small team
to run projects from FEED right through to execution and project handover, to meet WEL’s extensive contract prerequisites;
• Regularly providing feedback on all aspects of the tenders, including construction methodology, commercial/technical risks & opportunities, alternative solutions, submission documentation, material & subcontract enquires and any programming requirements, in addition to formatting of proposal documents and benchmarking;
• Development of documentation and procedures to deliver Projects in line with WEL formatting, particularly the KGP/KLE specific format for execution;
• Fostering strong relationships and further enhancing these to promote RCR’s name as the EPC of choice, for the completion of HVAC and mechanical chiller upgrades for WEL’s Onshore and Offshore assets;
• Frequent site visits to build client relationships and support the onsite team through the expansion of the contract scope to include packages of work and maintenance on Pluto LNG and support WEL assets for the North-‐West Shelf JV;
• Mobilisation to KGP to manage Client Representation, the execution of the VSDS project and oversee the direct-‐hire work crew.
Key Achievements: • Contributing extensive personal WEL contacts (Perth and Onsite) to the organisation to expand
the scope of the contract; • Engineered the scope and lead a team to remove and rebuild the Pluto LNG central control
room chiller’s, whilst maintaining full functionality of the facility; • Effectively engineered a solution to install the HVAC Units on the LNG Train 4 VSDS Building’s
without interrupting production, by altering the scope from Shutdown Critical in April 2016 to non-‐shutdown.
Professional Experience
![Page 3: Scott Paul Reynolds CV 2017 - Published](https://reader035.fdocuments.in/reader035/viewer/2022081208/589978fa1a28ab49478b87bf/html5/thumbnails/3.jpg)
3
Ausclad Group of Companies (AGC) March 2014 – July 2015 Senior Project Engineer / Bid Manager -‐ Woodside Energy Ltd (WEL)
Project: Karratha Berth 1 LNG Jetty Refurbishment Phase 1 Project. AGC assisted with developing the TIC estimate and Project Execution Schedule for the Develop FEED phase Investment Decision for the Joint Venture Partners. Key Deliverables: • Managing the new EPCM Matrix and the Implementation Contractor’s involvement under AGC’s
Multi Discipline Services Agreement with WEL; • Establishing the original Project Execution Team’s to manage the current WEL
Projects/Shutdowns for 2014, which consisted of the DOMGAS 1, DOMGAS2 and LNG Train 1 Shutdown’s on the Karratha Gas Plant (KGP) for the EPCM Transfield Worley Pty Ltd;
• Involvement in all facets of the Integrated Services Business Unit to deliver Projects and Implementation support for WEL;
• Maintaining a strong relationship with WEL by realising past experiences and lessons learnt from the Client and Assets/Facilities;
• Creating and managing relationships with key stakeholders within the EPCM’s that engaged AGC to deliver the engineered Scopes of Work;
• Managing the delivery of the 2015 Scope for the Jetty Class 3 Estimate and Level 3 Schedule to prepare AGC and assist Wood Group PSN for the FID to WEL;
• Providing and managing the technical interphase with Wood Group PSN on the Constructability’s of various phases of the Develop FEED Phase, HAZID’s, HAZOP’s, Risk Workshops and the management of Workpack and Jobcard development;
• Assuring the delivery of key documentation and deliverables to the client was met, on time, and within the agreed estimated tendering budget.
Key Achievements: • Delivered the Phase 1 Jetty Bypass scope ahead of budget, within the tight schedule and
demanding Production load-‐out windows, with Zero HS&E recordable incidents.
Fluor Australia (October 2011 – December 2013) August 2012 – December 2013 Field Construction Engineer / OMV Client Interface Representative
Projects: OMV Raroa FPSO Refurbishment and Life Extension, which included in-‐situ change-‐out of the APL process swivel and other refurbishment activities. The main project objective was to keep the vessel on location, minimise production downtime and reduce total installed capital cost. Key Deliverables: • Identification of the proposed method for in-‐situ process swivel change-‐out, given critical
constraints (i.e. project timeframe, weather window), whilst minimising onshore construction hours and process shutdown period;
• Conducting and managing the full detailed FPSO pre-‐engineering survey to determine the construction methodology and handover of technical data to engineering;
• Development of detailed execution methodology and engineered lifting plan for the in-‐situ swivel change-‐out in sea conditions;
• Development of a unique and innovative offshore static lifting solution for the transfer of the 50t swivel from vessel to vessel, without the need to utilise an offshore heavy crane;
![Page 4: Scott Paul Reynolds CV 2017 - Published](https://reader035.fdocuments.in/reader035/viewer/2022081208/589978fa1a28ab49478b87bf/html5/thumbnails/4.jpg)
4
• Maintaining team focus on Risk Reduction in all aspects of implementation planning; and participation in project risk and constructability reviews;
• Management of Local, Interstate, and Overseas work-‐share arrangements (Melbourne, Wellington, Manila, Perth);
• Asset shutdown planning and scheduling; co-‐ordination of process swivel change-‐out implementation activities with additional (online and offline) refurbishment scope activities (i.e. inert gas and seawater filtration re-‐injection system upgrades);
• Regular interfacing with client to ensure project requirements were met.
Key Achievements: • Lead the successful tender and subsequent award and development of the FEED; • Handover of all engineering and Pre-‐execution deliverables prior to cancelation of the project.
October 2011 – July 2012 Construction Superintendent / Woodside Client Interface Representative Projects: Woodside Brownfields Development PPG (Production Projects Group) Works – Karratha Gas Plant, which included Substation 4 Cutover and Refurbishment (linking of the domestic gas trains to the export product trains and CCR). Key Deliverables: • Engaging and managing a team of 35 third party contractors for site implementation and
installation activities, materials supply, project costs, and HS&E; • Development of a robust system to deliver safe, and cost effective Workpacks, Jobcards and
installation deliverable procedures; • Participation in project risk and constructability reviews; • Management of technical changes and queries; • Schedule and progress reporting, ensuring project completion was on time and on schedule,
and without disruption; • Responsible for all fabrication and delivery, in accordance with a tight project schedule driven
by fixed shutdown dates.
Key Achievements: • Delivered a major Electrical Substation Cutover and Switchboard Room replacement utilising
Fluor onsite engineering, supervision and subcontractors.
Wood Group Australia December 2010 – May 2011 Senior Structural Engineering Designer
Project: Woodside North Rankin 2 (NR2) Bridge Landing Module Project (position was obtained after the project was removed from Transfield Worley and awarded to Wood Group mid-‐project). Key Deliverables: • Contributing to the development of a robust system to deliver safe and cost effective
Workpacks, Jobcards and installation deliverable procedures; • Liaising with piping and stress engineers with regards to management of pipe support packages; • Assisting in maintaining cohesion between engineering contracting companies (Wood Group/
Transfield Worley) in an integrated implementation environment;
![Page 5: Scott Paul Reynolds CV 2017 - Published](https://reader035.fdocuments.in/reader035/viewer/2022081208/589978fa1a28ab49478b87bf/html5/thumbnails/5.jpg)
5
• Structural involvement in the bridge landing module constructability, for the interface of Greenfields pipe work to existing platform Tie-‐Ins and support structures;
• Frequent offshore site visits, liaising with the implementation team and conducting multi-‐discipline survey work.
Transfield Worley Pty Ltd April 2008 – December 2010 Senior Structural Engineering Designer
Project: Woodside NRA Brownfields to NRB Tie-‐In FEED Key Deliverables: • FEED studies for the landing of the Bridge to connect the existing NRA platform to the new NRB;
studying various options to land the new bridge; • Carrying out multiple site visits to conduct a full pre-‐engineering survey, in addition to scoping
possible locations for the bridge landing; • Conducting reviews of platform loads and existing jacket stiffening scopes and project estimates
to enable client FID.
Carnegie Corporation/SeaPower Pacific Pty Ltd November 2007 – April 2008 Senior Structural Engineering Designer / CAD Co-‐ordinator
Project: CETO II Geared Wave Energy – Research and Development Project – New Technology - (concept through to fabrication). Key Deliverables: • Setting up of the 3D CAD and design system, in addition to the modelling and automated
drawing extraction; • Management of the in-‐house fabricator, sub-‐contractors and the subsea (trial) installation
team; • Supervision at fabrication, construction and installation sites.
Exxon Mobil, Houston USA July – October 2007 (12 week contract) Senior Structural Engineering Designer / Checker
Project: Adriatic Floating LNG Terminal. Key Deliverables: • Focal point for the resolution of fabrication technical queries; • Subsequently required to provide structural input to resolve solutions to de-‐bottleneck
fabrication in Spain, between three work-‐sharing design offices and fabrication dry dock facilities in Houston, Norway and Spain.
![Page 6: Scott Paul Reynolds CV 2017 - Published](https://reader035.fdocuments.in/reader035/viewer/2022081208/589978fa1a28ab49478b87bf/html5/thumbnails/6.jpg)
6
Transfield Worley Pty Ltd (September 2004 – February 2007) December 2005 – February 2007 Senior Structural Engineering Designer
Project: Woodside NRA Brownfields to NRB Tie-‐In FEED.
Key Deliverables: • Conducting FEED studies for the landing of the Bridge to connect the existing NRA platform to
the new NRB • Studying various options to land the new bridge and add an addition module to a live process
platform; • Review of platform loads and existing jacket stiffening scopes; and working closely with Jacket
Assessment and Analysis Team, on the study of the jacket strengthening; • Offshore field trips and surveys to determine the extent of brownfields strengthening and
jacket modifications required to land the new bridge and addition module; • Reviewing project estimates to enable client FID.
August – December 2005 (Secondment to Woodside) Structural Engineering Designer
Project: Woodside NRB Greenfields Concept Select Phase.
Key Deliverables: • Selected by the Client from the Life Extension Team to join the NRB Development Team; • Offshore site visits to NRA for proposed planning and preliminary site surveys; • Structural modelling of concepts/arrangements for the proposed new NRB platform; • Production of key milestone deliverables to meet Joint Venture Investment decisions.
September 2004 – August 2005 Structural Engineering Designer
Project: Woodside NRA Life Extension
Key Deliverables: • Intensive six (6) month offshore position, operating on a 2:2 roster with an equal back to back
Designer/Field Engineer; • Conducted site surveying and reviewing of refurbishment and replacement structural scopes; • Delivery of all project related offshore facility details and site measurements required to
continue with engineering and design in Perth; • Demobilised and returned to the Perth design office to assist in the fabrication and installation
deliverables; • Assisted in developing the installation and implementation Workpacks and fabrication packs; • Focal point for TQ management and resolution.
![Page 7: Scott Paul Reynolds CV 2017 - Published](https://reader035.fdocuments.in/reader035/viewer/2022081208/589978fa1a28ab49478b87bf/html5/thumbnails/7.jpg)
7
Technip Oceania March 2002 – September 2004 Structural Engineering Designer
Projects: Woodside Trunkline System Expansion Project (TSEP) Project; Conoco Phillips Bayu Undan Riser Supply Project; Conoco Phillips Belenak Flexible Riser Supply Project; Woodside GWA Echo Yodel Riser Installation and Subsea Project.
Key Deliverables: • Conducting offshore field surveys, barge surveys and Layouts, and Dive Support Vessel deck
modifications required for execution; • Regular Client liaison; • Liaising with Workshop Mangers and Installation Team Lead regarding fabrication matters; • Structural modelling; development of structural design drawings; and field layouts and
installation aid drawings; • Developing and assisting with installation and hook-‐up procedures;
Kvaerner / Oxair Australia Pty Ltd February 2000 – March 2002 Junior Structural Designer/Workshop Detailer
Projects: Methanex New Zealand Demonstration Facility.
Key Deliverables: • Plant Concept, Layout and Feasibility; • Liaising with Fabrication Workshop Manger regarding detailed design and shop drawings; • Completing PSA (Pressure Swing Adsorption) layout and shop detailed components required for
construction; including general arrangement, isometrics, pipe spools, manufacturing drawings, installation, and construction assistance;
• Liaising with third party surveyors for equipment and plant positioning; • Managing fabrication and site technical queries, in addition to solving fabrication and site
installation problems.
Qualifications • Diploma of Engineering (Structural) • Certificate IV Civil & Structural Drafting • Certificate III Civil & Structural Drafting • Plant Design Systems (PDS) Structural, Piping, Mechanical Equipment
Tickets/Licenses • FOET (Further Offshore Emergency Training) • OPITO -‐ License No. 00365858051112159096 • MISC -‐ License No. VEP0087857
References are available upon request.