San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

34
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge San Francisco-Oakland Bay Bridge East Span Seismic Safety Project East Span Seismic Safety Project March 12, 2002 March 12, 2002 Contractor Outreach

description

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project. Contractor Outreach. March 12, 2002. Project Introduction. Project Limits. Contract Limits. OAKLAND APPROACH. YBI TRANSITION. SUSPENSION. SKYWAY. OAKLAND GEOFILL. SKYWAY. SUSPENSION. OAKLAND APPROACH. YBI - PowerPoint PPT Presentation

Transcript of San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

San Francisco-Oakland Bay BridgeSan Francisco-Oakland Bay BridgeEast Span Seismic Safety ProjectEast Span Seismic Safety Project

March 12, 2002March 12, 2002

Contractor Outreach

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Project LimitsProject Limits

Project IntroductionProject Introduction

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBITRANSITION

SUSPENSION SKYWAY

OAKLANDAPPROACH

SKYWAYSUSPENSION

YBI

TRANSITION

OAKLANDAPPROACH

OAKLANDGEOFILL

Existing Bridge

Contract Limits

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Project IntroductionProject Introduction

Bridge Cross SectionBridge Cross Section

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Replacement - Computer simulationReplacement - Computer simulation

AlternativesAlternatives

Photo simulation of the Replacement Alternative N-6 as viewed from Yerba Buena Island

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI Eastbound On-RampYBI Eastbound On-Ramp

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena IslandYerba Buena Island

Heavy topography -- 60 meter elevation change

Steep slopes

Narrow winding roads

USCG base for 24 hour Search and Rescue unit

Lots of underground utilities

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Contractor Access on YBIContractor Access on YBI

Potential Barge Mooring Areas

USCG Search and Rescue Base

Vehicular Access

USCGAccess

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Environmental Constraints on YBIEnvironmental Constraints on YBI

USCG Facilities

Historic Structures

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI Special Aquatic SitesYBI Special Aquatic Sites

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

EELGRASS

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Construction IssuesConstruction Issues

STAGE 1 Construct new

Bridge Construct

eastbound (EB) and westbound (WB) detours

Construction StagingConstruction StagingReplacement AlternativeReplacement Alternative

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Construction IssuesConstruction Issues

STAGE 2 Shift traffic on to

detours at Oakland TD

Construct new WB approach at Oakland TD

Complete construction of detours at YBI

Construction StagingConstruction StagingReplacement AlternativeReplacement Alternative

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Viaduct Modifications:• Retrofit existing YBI viaduct• Widen existing viaduct for westbound detour• Construct temporary portal frame• Remove columns

YBI Viaduct Modifications

To Oak

land

To

San

Fra

ncis

co

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Remove existing Caltrans electrical substation and garage

Electrical Substation

WB On-rampto SF

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Reroute WB Traffic

Plan

WB detour

Typical Section

Route WB traffic to WB detour

Existing Bridge

EB Detour

WB EB (lower deck)

Plan

WB detour

Existing Bridge

EB Detour

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

EB

WB

WB Traffic is on new Skyway, new SAS, and WB detour.

EB Traffic is still on existing bridge (lower deck).

Traffic

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Portal Frame and Seat Extension

Plan

WB detour

EB Detour

Construct seat extension at south side

… and construct portal frameExisting Bridge

Typical Section

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Load Transferred to Portal Frame

Plan

WB detour

EB Detour

Typical Section

Portal frame:• Supports upper deck• Creates opening for EB detour operation

Existing Bridge

WB

EB

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Eastbound Detour

(7) Route EB Traffic to EB Detour

Existing Bridge

To San Francisco

To Oakland

Eastbound Detour

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Construction IssuesConstruction Issues

STAGE 3 Shift traffic to new

WB bridge and detours at YBI

Construct EB landing at Oakland TD

Remove existing bridge from Bent 48 to YB1

Construction StagingConstruction StagingReplacement AlternativeReplacement Alternative

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Construction IssuesConstruction IssuesConstruction StagingConstruction Staging

Replacement AlternativeReplacement Alternative

STAGE 4 Construct remaining

section of the new bridge at YBI

Shift all traffic to new bridge

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Construction IssuesConstruction IssuesConstruction StagingConstruction Staging

Replacement AlternativeReplacement Alternative

STAGE 5 Dismantle existing

bridge

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena Island Traffic Yerba Buena Island Traffic ImpactsImpacts

Westbound on-ramp (east side of island)Westbound on-ramp (east side of island)

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena Island Traffic Yerba Buena Island Traffic ImpactsImpacts

Eastbound off-ramp (east side of island)Eastbound off-ramp (east side of island)

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Yerba Buena Island Traffic Yerba Buena Island Traffic ImpactsImpacts

Southgate RoadSouthgate Road

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Cut columns to transfer load to portal frame

Number ofClosures

Activity Requiring EB and WB Full Bridge Closures

4

Hours per Closure

6

Closure Alternatives

28

Simultaneous Eastbound and Westbound Full Bridge Closures

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

Activity Requiring EB Only Full Bridge Closures

6 23Remove 96 upper deck concrete panels

8 13Remove 48 stringers and 9 floor beams

Remove side trusses and replace steel curbs with temporary “K” rails

12 11

Closure Alternatives

Number ofClosures

Hours per Closure

Eastbound Only Full Bridge Closures

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

UtilitiesUtilities

Westbound Eastbound

6 NPS ReclaimedWater

10 NPS Sanitary Sewer with

18 NPS Casing

12 NPS Water

NOT TO SCALE

CT Airand Water

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

FLOOR BEAM SECTION

INSTALLATION OF UTILITIES INSIDE MAIN SPANINSTALLATION OF UTILITIES INSIDE MAIN SPAN

E LINE

UTILITY TRAYS

TRAVELER

BIKE PATH

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

YBI SUBSTATION

MACALLA ROAD

USCG ROAD

W LINE

E LINE

UTILITY TRENCH PIER W2

PROPOSED UTILITY RELOCATIONS ON YBIPROPOSED UTILITY RELOCATIONS ON YBI

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

ELEVATION

CONCRETE DUCT BANK ANCHORS

SECTION A-A

SECTION B-B

SECTION C-C

ELEVATION

SLOPE STABILIZATION

UTILITY DUCT INSTALLATION DETAILSUTILITY DUCT INSTALLATION DETAILS

1.500

0.300

0.800

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

PLAN AT GRADE

PLAN AT BOTTOM DECK

SECTION A-AMAIN SPAN DETAILS OF CONDUIT

RISER UP TO W2 WB

TRAYS

CONDUITS

ROUTING OF UTILITY DETAILS AT PIER W2ROUTING OF UTILITY DETAILS AT PIER W2

W2

C.L. PIER W2

UTILITY TRAYS

TRAVELER

RETAINING WALL

SFOBB East Span Seismic Safety ProjectSFOBB East Span Seismic Safety Project

• Covers domestic transportation of merchandise

• Requires floating cranes to be domestically built, owned, and operated

• Foreign floating cranes can be used as long as they do not “transport” merchandise

JONES ACT INFORMATION