    Talisman Malaysia LimitedHS&E Section

    Job Safety Analysis

    Doc. No: PM3-HSE-GEN-PR-F-0 0!Re"ision: 0Date: J#ne $00%Pa e: A''en(i) 3

    JOB SAFETY ANALYSIS WORKSHEETS

    JOB SAFETY ANALYSIS DATE PERMIT NO:

    JOB Running air compressor machineWORK TEAM Pipe Fitter SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES

    1. Check diesel and M-oil Diesel fumes. Scalding / burns. l!a"s check from up!ind. Make sure engine hascooled off. #se hand glo$es.

    %. &urn on ignition ke". '(plosion. )igh noise from running machine. Standb" fire e(tinguisher at the $icinit" of themachine. *ear ear protector.

    +. Put machine into the desired load. Mo$ing parts. 'nsure all mo$ing parts are fitted !ith guards.

    ,. pen compressor air $al$e. ir leakage. )ose connection dislodges. 'nsure there is a complete rubber seal atconnections and secured b" !ire pins. Do notstand directl" in front of hose connections gauges.

    WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUALEXPERIENCE YES NO YES NO

    )a$e "ou done this ob before0 / re "ou kno!ledgeable !ith the ob to beperformed0 /

    )a$e "ou referred to technical dra!ing/$endorprocedure/SSP0 / s super$ision/e(perienced assistance re2uired0 /

    PPE YES NO YES NO

    )ard hat0 / *ork $est0 /Safet" 3lasses0 / pron0 /Safet" shoes0 / 3oggle0 /'ar plugs0 / Face shield0 /Right t"pe of glo$es0 / Respirator" protection0 /Safet" harness0 /POTENTIAL HAZARDS YES NO YES NO

    Slipper" floor0 / &rapped pressure0 /Congested area0 / Pressuri4ed e2uipment/$essel ha4ard0 /&ripping0 / Fire/e(plosion ha4ards0 /

    TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0

  • 8/12/2019 Running Air Compressor Machine

    2/2

    Talisman Malaysia LimitedHS&E Section

    Job Safety Analysis

    Doc. No: PM3-HSE-GEN-PR-F-0 0!Re"ision: 0Date: J#ne $00%Pa e: A''en(i) 3

    $erhead !ork0 / 'scape route0 /*orking at height0 / Shock/electricit"/static0 /Scaffolding0 / 5reaker rack out0 /

    Secure ladder0 / 6al$e isolation0 /)ea$" load0 / 3uard rotating e2uipment0 /)ammer strikes0 / Po!er tools ha4ards0 /Pinch/trap finger7 hand0 / )igh noise area7 double ear protection0 /5ack in ur" ha4ard0 / Spark/hot slag0 /S!inging ob ect0 / 5urn 8heat/chemical90 /Falling ob ect0 / :ear radioacti$e materials/sources0 /

    thers closeb"0 / 'n$ironmental spill0 /Sharp ob ect0 / )ose connection0 /'"e in ur"0 / *ind"0 /3rating/deck opening0 / Dust"0 /5locked drains0 /

    Prepared b";