RUN COORDINATOR’S REPORT 13-20 March 2006

19
RUN COORDINATOR’S REPORT 13-20 March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 20. März 2006

description

RUN COORDINATOR’S REPORT 13-20 March 2006. Thomas Sch örner-Sadenius Universit ä t Hamburg ZEUS Monday Meeting DESY, 20. M ärz 2006. SUMMARY. ¶ Probably my first run coordinator week without major (or only minor) desasters. – access, cooling, evacuation, fire … - PowerPoint PPT Presentation

Transcript of RUN COORDINATOR’S REPORT 13-20 March 2006

Page 1: RUN COORDINATOR’S REPORT  13-20 March 2006

RUN COORDINATOR’SREPORT 13-20 March 2006

Thomas Schörner-SadeniusUniversität Hamburg

ZEUS Monday MeetingDESY, 20. März 2006

Page 2: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 2

SUMMARY

¶ Probably my first run coordinator week without major (or only minor) desasters. – access, cooling, evacuation, fire …

¶ Lumi this week: – HERA delivered: 4.88 pb-1 – ZEUS gated: 3.26 pb-1 – Largest fill: 1.02 pb-1 delivered – best fill: 91% efficiency

¶ Two very nice fills, else suffering from backgrounds or ZEUS problems; – sometimes efficiency below 50% – average efficiency 66%

Page 3: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 3

HERA PERFORMANCE

¶ Instantaneous (specific) lumi up to 4*1031 (2*1030)

¶ Currents up to 87 and 37 mA, respectively.

¶ Polarization going up to almost 40%.

Page 4: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 4

HERA PROBLEMS

Tuesday:- proton injection problems- e- transmitter problems- Temperature alarms north- bad e- injection efficiency- feedback system …- rather bad backgrounds

Wednesday:- proton magnet PS+cooling 2 short breaks- then p lost during ramping.- H1 e- dump

thursday:- bad backgrounds- “conflict” between H1 VFPS and ZEUS conditions (orbit).

saturday:- temperature alarm WR e- dump after lumi declaration- lifetime problems.

sunday:- computer problems no electrons.

today:- beam loss because of sender east-right.

Page 5: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 5

ZEUS PROBLEMS¶ VETO wall excluded because of problem with GSLT interface card.

¶ FMUON: – some readout problems excluded for large parts. – water leak on Sunday excluded.

¶ FTD/STT: few times in error after activate, stuck in trans

¶ CAL: – stuck in trans, a few times “no busy response from CAL” – once RCAL transputer not reachable, BCAL digital crate off.

¶ HES: hc3 PS trip module R17 silent needs access.

¶ CDAQ: two times Ulf had to restart processes (FLINK, run number server)

¶ MVD: “SC_ALIGN_INSERT” process needed to be restarted.

¶ CTD HV program crashes (2)

¶ one noisy CFLT channel causing slightly high deadtime.

¶ BAC causing high deadtime new calibration needed.

Page 6: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 6

ZEUS PERFORMANCE

¶ … and on top of that bad backgrounds from time to time … – proton-induced – synchroton radiation

Page 7: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 7

ZEUS PERFORMANCEMonday, tuesday

Page 8: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 8

ZEUS PERFORMANCEWednesday, thursday

Page 9: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 9

ZEUS PERFORMANCEThursday, friday

Page 10: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 10

ZEUS PERFORMANCESaturday, Sunday …

Page 11: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 11

ZEUS LUMINOSITY

Page 12: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 12

LUMI/EFFICIENCY PER DAY

Page 13: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 13

LUMI/EFFICIENCY PER FILL

Page 14: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 14

LUMI LOST BECAUSE …

Page 15: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 15

EVENTS OF THE WEEKNC at Q2 = 6704 GeV2

Page 16: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 16

EVENTS OF THE WEEKCC at Q2 = 17000 GeV2

Page 17: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 17

EVENTS OF THE WEEKCC at Q2 = 5235 GeV2

Page 18: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 18

EVENTS OF THE WEEKNC at Q2 = 13140 GeV2

Page 19: RUN COORDINATOR’S REPORT  13-20 March 2006

DESY, 20.3.2006 TSS: Run Coordinator Report 19

NEXT WEEK …… your friendly run coordinator on duty is …

Me again …