Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 1
Rittal’s Data Center Infrastructure Solution
Presentation
Rimatrix5 Team
Rittal Middle East, Dubai
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 2/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 2
Rittal together – A powerful alliance with Friedhelm Loh Group
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 3/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 3
Enclosure Systems
Power Distribution
Electronic PackagingSystems
System Climate Control
IT Solutions
Worldwide Service
IT Solutions
Data and
Network Technology Modular IT Infrastructures
with RimatriX5
Data Centre Climate
Control
Integrated Data Centre
Solutions
Modular physical
System Security
IT Infrastructure andintegrated Security
Solutions for
efficient and
secure Data Centres
Consulting and
planning for
business continuity Risk analyses
General contractor
for Data Centre
Projects
Rittal together – Complete IT Competence
Communication Systems
Rittal in the IT market
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 4/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 4
•Emp loys 8000 peop le world-wide
•Turnover: € 1.4 bil l ion
•Global presence (19 produc t ion sites, 50
subs idiar ies, 70 agenc ies)
•more than 2000 patents
Rit tal Sho rt Pro f i le
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 5/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 5
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 6/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 6
Rack & Hardware
Power Management
Cooling
Security
Monitoring
RimatriX5 - system & components
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 7/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 7
Rack
comprehensive product range with anunparalleled choice of accessories
greater freedom, greater flexibility and
greater reliability
PowerConstant and reliable power supplies via
power supplies to racks and datacentres with the Rittal Power System
concept and
back-up solutions of the modular UPS
Power concept.
Cooling
Rittal RimatriX5 climate control concepts,including
Liquid Cooling Package or
direct CPU cooling for temperature-
neutral enhancement of data centres.
SecurityPhysical security of IT racks is essential for
high availability,
temperature, smoke and vibration
sensors, together with signal lamps and
sophisticated access control solutions
and tested enclosure extinguishersystems
provide reliable protection.
Monitoring and Remote
Management Simple handling and a perfect overview
ofmonitoring, measurement and control
functions
reduce failure risks and enable preventive
intervention.
5 pillars – one system
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 8/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 8
Low End Middle Range High End
The suitable system platform for any application on the IT market
RimatriX5 - rack & hardware
- platform strategy meets all requirements !
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 9/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 9
Rittal rack systems
TS 8 – the Top enclosure system
• Rittal TS 8:This all-rounder offers diversity andprotection for your network.
– Suitable for one or two 482.6 mm (19")mounting levels, and for partial or fullinstallation.
– The ingenious symmetrical frame designoffers baying on all sides.
– A high level of security, thanks to locksystems with a comfort handle and four-point locking
– Perfect integration of climate controlcomponents
– Protection category up to IP 55
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 10/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 10
• based on industrial TS8 enclosure
• Equipped with 482.6 mm (19“) mounting
frame at the front and rear, thus load
capacity up to 1500kg
• Particular suitable for mixed configurationsof server and network technology
TS8 Server rack
Optimised ventilation for all TSserver racks:
78% free surface
in the perforated plate section
Significantly higher operational
reliability thanks to optimum discharge
of heat loss
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 11/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 11
Made by Rittal
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 12/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 13
Schematic Diagram of Power Distribution in Data Center(UPS, PDR, PDM, PSM concept)
Power Distribution System in Data Center
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 13/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 14
Single phase for decentralized
operation PMC 12
• 1 - 12 kVA N+1
–all as stand alone or 19“
version applicable –1, 2 and 3 kVA : internal
batteries
–4.5 and 6 kVA : parallel
mode of operation possible;
external batteries –additional battery packs in
same housing dimensions
Rittal UPS range
classification : VFI-SS-111
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 14/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 15
PMC 200 modules
• 12 / 20 kW : 600 mm wide rack
• 32 / 40 kW : 800 mm wide rack
•Racks 600 / 800 mm breit
• increased efficiency [96%]
• increased power factor [PF=1]
• increased power/rack with max. 5 modules
• redundant N+1 system architecture for
modules and batteries
Rittal UPS PMC 200
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 15/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 16
Secure return on investment – practically unlimited scalability
A system can be expanded step by step to incorporate up to 20 parallel PMC modules,e.g. for a UPS capacity of 800 kW without redundancy or 760 kW n+1 (with 40 kW
modules).
Expansion is po ssib le dur ing l ive operat ion witho ut the need to switch to an
unp rotected supp ly.
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 16/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 17
Design features:
• Double conversion UPS systems
up to 800kW or 720kW (n+1)
• UPS protection category: VFI-SS-111
• New module power 80kW
• Safe swap expansion• Modular rack mounting
• Dimensions WxHxD 1200x2000x800
• Two split modules, active & passive
UPS PMC 800
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 17/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 18
Rittal UPS range
Phase UPS, Rittal Power ModularConcept – PMC 40
• Topology: on-line, dual converters,
VFI-SS-111
• Modular design and switched in
parallel
• Maximum output:
- 40 kW non-redundant
- 20 kW redundant
• Universal applications in each 19”
rack at least 800 mm deep
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 18/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 19
Pay As You Grow……,
your requirement of
with 4 UPS Module
today & 1 Blank
spaces, in future
adding Modu le as per
your Load &
redundancy
requirement
Hot swappable UPS
Modules ensure no
downtime for
repairing & decrease
(MTTR)
Picture Illustration of Solution & Benefit
Decentralized Parallel
Architecture (DPA) --
provides highest
Availability
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 19/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 20
PMC
STATIC BPSWITCH
PMC
POWERUNIT
CENTRAL
PROCESSINGUNIT
PMC
CONTROLPANEL
Critical load
Supply 1 Supply 2
PMC
STATIC BP
SWITCH
PMC
POWER
UNIT
PMC CENTRAL
PROCESSING
UNIT
PMC
CONTROL
PANEL
PMC
STATIC BP
SWITCH
PMC
POWER
UNIT
PMC CENTRAL
PROCESSING
UNIT
PMC
CONTROL
PANEL
PMC
BATTERY
PACKS
PMC
BATTERY
PACKS
PMC
BATTERY
PACKS
Decentralized Parallel Architecture – DPA™
With Decentralised Parallel Architecture (DPA™), the UPS hardware and software components are
distributed as independent modules, thus avoiding a “single point of failure”.
• Control panel
• CPU
• Power unit
• Static bypass
• Batteries
(1 string/module)
and
Targeted and sustained avoidance of an SPoF (single point of
failure) and thus increased availability
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 20/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 21
Availability: A = MTBFUPS / (MTBFUPS + MTTRUPS)
Example
Non-modular (1+1)
redundant configuration
Rack-mounted modular (3+1)
redundant configuration
MTBF 600,000 500,000
MTTR 6 h 0.5h
Availability 0.999990 (5 nines) 0.999999 (6 nines)
Rack-mounted modular PMC with 4x40 kW
(3+1) redundant configurationTraditional non-modular 2x120 kW
(1+1) redundant configuration
Load
120kWLoad
120kW
120kW 120kW
40kW module
40kW module
40kW module
40kW module
Shortest possible MTTR and previously unattained availability
That is what counts!(only possible with
a modular technology)
Result
NON-availability:
5 nines = 6 min./year
6 nines = 6 sec./year
DEFINITIONS:MTBF: Mean Time
Between Failures
MTTR: Mean TimeTo Recovery
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 21/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 22
Design features:
• Energy distribution for additional IT
Racks in the 19“-enclosure
• 19” Power Distribution Module
mechanically locked in the Rack/19“-
fastening level,incl. main switch,• Connection Plug & Play
• Connected rating max. 40 kW per PDM
• Retrofittable during ongoing operation
• Can be desinged to be with dual
inputs
Power Distribution Module
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 22/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 23
Design features:Input max. 3 x 63 A, 400 V
• 4 Outputs 3 x 16 A, 400 V each
• 2 Outputs 3 x 32 A, 400V each
• Cable-bound to the PSM busbars
Power Distribution Module
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 23/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 24
PDR Flex Modular IT low-voltage distributor
• Application on project basis
• Benefits:
• Simple planning saves time
• Straightforward assembly cuts
costs
• Preconfigured / customer-specific
expansion
• ABB Smissline components can
be integrated
• Can be extended without a large
outlay
• Available as floor-standing and wall-
mounted distributors
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 24/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 25
Base element of the power
distribution
The PSM consists of two main
components:
• a rail, which meshes into the
horizontal frame profile of the
FR(i) or is installed with a
fastening set in TS 8 panels
•plug-in modules in differentcountry models, which are
integrated directly in the
busbar
Power System Module
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 25/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 26
PSM Plus busbar
• 4 independent circuits infeed• 3-phase / redundant design
• twice the power of actual PSM
possible, max. 192A
/ modules (all with 2x 16A input)
• 4-socket „Schuko“ module, including
fuses• 4-socket C13 module, including fuses
• 6-socket C13 module
• 4-socket C19 module
• 2-socket C19 module, including fuses
PSM Plus- Rail
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 26/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 27
PSM rail with 3-phase current measurement
• complete rail with measurement
• module for retrofitting in existing
installations
• Blue graphical display
• Modified in-feed X-COM connector
• with display and monitoring of thecomplete three-phase connection
current and the power per phase
• remote monitoring via CMC-TC
• compatible with PSM accessories
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 27/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 28
A
A
A
Operating interface CMC-TC
for active PSM
PSM Active Monitoring / Management
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 28/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 29
PSM modules active, 2 variants: PSM module / PCU for 19"
• PSM active modules (2 slots)
• Active PCU for 19" assembly
• Switching option per port via CMC-TC
• Stand-alone solution with separate
power pack (without options for
switching or changing the limits)
• Current measurement per module slot
• Current measurement per socket
• Limits can be configured as required
via CMC-TC!
• 2 versions:
• C13 (7859.122 / 7859.125)
• C19 (7859.132 / 7859.135)
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 29/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 30
Power Distribution Unit Compact 32A plug & play power distribution
• Compact all-in-one power distribution
(230V / 400V)• 5 different article versions:
• In general: Measurement per
phase/terminal block
• Some versions: Switching option
per port
• Mounting on TS8 enclosure frames• Installation material supplied
• Version in RAL9005 (black)
• Ready for connection with IEC/EN
60309 plug (32A CEE)
• C13 outputs (additionally C19 in some
cases)• 1 & 3-phase versions available
• Integrated fuses (16A, L+N in each
case)
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 30/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 32
Low Density Mid Density High Density
LCP Plus
LCP Standard/ LCP Modular
LCP Extend
Basic solutions
with cold aisle containment
LCP Inline
Computer room air conditioning system
Heat load on server
enclosure
with cold aisle containment
Rittal Cooling Systems
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 31/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 33
Room climate control
• Air conditioning unit for data centre
cooling using raised floor
• Four power classes - 23-118 kW -
with cold water
• Four power classes - 18-54 kW-
with refrigerant
• Options:
- Humidification
- Heating
- Heating + humidification
Computer room air conditioning (CRAC) system
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 32/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 34
Using New energy efficient CRAC Systems?
Advantage of new CRAC
No losses due to deflection
No loss of installation height
Larger medium matrixOptimum cold air distribution
Low energy consumption and
space requirements
Can save up to 30% in energy
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 33/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 35
Cold/Hot aisle containment
Advantages of cold aisle containment at a glance:
No mixing of hot and cold air
• Simple cold air routing direct to servers
• Increased efficiency in conjunction with
conventional air conditioning units
due to higher outlet air temperature.
• Compatible with liquid cooling systems
Increasing efficiency of raised floor climate control
IT C li
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 34/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 36
IT-Cooling
Room-based systems
Increasing efficiency with Aisle Containment
•No mixing of hot and cold air
•Provides planed function
•Controlled cold air supply to the serverswith Cold Aisle Containment
•Increasing efficiency of room climatisation
due to increasing the return air temperature
•No influence of temperature of the warm
areas to the ambient with Hot Aisle
Containment
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 35/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 37
• For mid density applications without raised floors
• Cooling capacity up to 30kW
• Ambient air is extracted from the warm aisle or room through
the perforated rear door, cooled and blown into the cold aisle
• Supports existing room climate control
• In conjunction with cold aisle containment, provides significant
increase in cooling capacity per server rack
LCP Inline
IT-Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 36/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 38
Cold Aisle Containment with LCP In line
•In conjunction with Cold Aisle Containment, provides significant increase in cooling
capacity per server rack
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 37/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 39
Cooling Racks By Cold or Hot Aisle Containment
LCP-Inline
Top view- Hot isle Containemt
Hot Isle Containemt
Top view- Cold isle ContainemtsLCP-Inline
Cold Isle Containemt
IT-Cooling
IT Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 38/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 40
IT-Cooling
Enclosure-based systems
LCP Standard LCP Plus
IT Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 39/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 41
IT-Cooling
Enclosure-based systems
How does it work?
+ =
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 40/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 42
How does it work?
IT-Cooling
Enclosure-based systems
IT-Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 41/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 43
IT Cooling
Enclosure-based systems
LCP Standard• Sideways connected
• Equal temperature distribution over the
total height
• Clear accessibility of the 19’’-equipment
• Full 42U of the rack available
• Dimensions:
300 x 2000 x 1000/1200 (W x H x D)
• Integrated condensate management and
leakage protection
IT Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 42/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 44
LCP Plus
• Sideways connected
• Equal temperature distribution over the
total height
• Clear accessibility of the 19’’-
equipment• Full 42U of the rack available
• Dimensions:
• 300 x 2000 x 1200 (W x H x D)
• Integrated condensate management
and leakage protection• Touch screen for stand-alone use
IT-Cooling
Enclosure-based systems
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 43/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 45
Implementation rack-based systems (n+1 redundancy)
1
2
IT-Cooling
Enclosure-based systems
IT C li
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 44/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 46
IT-Cooling
Enclosure-based systems
Implementation rack-based systems (2n redundancy)
1
2
Server rack
LC
P
LC
P
Server rack
LC
P
LC
P
Server rack
LC
P
LC
P
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 45/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 47
LCP T3+
47 U
IT Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 46/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 48
IT-Cooling
Enclosure-based systems
LCP T3+
• Cooling capacity to 25 kW
• Redundant power and water feed
• Intelligent software
• Clear accessibility of the 19’’-equipment
• Full 42U or 47U of the rack available
• Dimensions:
300 x 2000 / 2200 x 1200 (W x H x D)
• Leakage protection
• Touch screen for stand-alone use
•Designed for high water in temperatures
IT Cooling
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 47/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 49
IT-Cooling
Enclosure-based systems
Software and remote controlling
• Connection to Network IP• All measured values on one
view
IT C li
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 48/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 50
Approvals
UL 1995
IT-Cooling
Enclosure-based systems
IT C li
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 49/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 51
IT-Cooling
Enclosure-based systems
OEM Products
HP also trusts on chilled-water cooling of Rittal
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 50/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 53
Processing Unit
Computer Multi Control Top Concept
Acc ess Unit I/O Unit GSM Unit
Security CMC-TC System
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 51/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 54
The Rittal CMC-TC Monitoring System
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 52/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 55
The components
• Processing Unit
– Basis of the monitoring system
– Network interface 10BaseT
– integrated Web server
– max. 4 sensor units
– max. cable length to sensor unit: 50m
– central power supply unit for all sensorsand actuators connected
– The processing unit may optionally beoperated via the CMC-TC master
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 53/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 56
• Universal I/O Unit
– automatic sensor /actuator
detection
– Maximum of 4 sensors / actuators
– Power supply via the Cat 5 cable
– max. cable length to sensor: 7m
–max. cable length to PU 50m
– is operated by clicking on one
button
The components
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 54/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 57
• Possible sensors for theI/O Unit:
– Temperature sensor
– Humidity sensor
– Analogue input (4-20 am)
– Access sensor (door, side panel,
roof)
– Vandalism sensor (vibration)
– Smoke alarm
– Motion detector
– Digital input – Digital relay output
– Voltage monitor
The components
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 55/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 58
• Access Unit
– automatic sensor / actuator detection
– designed for 2 door systems
– I²C interface for readers
– Power supply via the Cat 5 cable
– max cable length to sensor: 7m
– max. cable length to PU: 50m
The components
Th t
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 56/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 59
• CMC-TC GSM-Unit
• Reports an alarm via the GSM network
• Connection via RJ12 cable to serial interface
• A separate power pack is not required
• D- or E-network SIM-card is not sufficient
• May be used when a network is not available
• Second (redundant) alarm
The components
A i
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 57/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 60
Accessories
•Temperature sensor – Temperature application range:
+5 to +45 °C
– Tolerance +/- 2K
– NTC, 10kOhm at 25°C
• Humidity sensor
– Measurement range
10...90% relative humidity
+/- 3% at 20°C
– Temperature applicationrange +5 to +45 °C
A i
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 58/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 61
Water Leak Sensor :
• Control water ingress
• Length:15 Mtr
• Plug & play connection via RJ12
• Automatic detection at the CMC-TC
Customer benefits :
• Water ingress can be reported early
• Alarm via SNMP, SMS, e-mail or fax
Smoke alarm:
Opto-electronic smoke particle
evaluationMeasurement frequency: one every
10 seconds.
Accessories
A i
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 59/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 62
Accessories
Voltage monitor – IEC plug
– Reports voltage status: voltage
ON/voltage OFF
CMC socket strip
– 230V AC 50/60Hz / 16A
– Relay message contact for
Overvoltage protection
Voltage ON/voltage OFF
– Interference suppressor filter
A i
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 60/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 63
CMC-TC electro- magnetic TS8 handle
with master Key
Comfort handle with electromagnetic locking and additional
master key function
– Electromagnetic locking for the TS8 enclosure
– Master key function
– Monitors the handle position
– Power supply 24 VDC via the access unit – Note :Locking rods do not have to be changed
Accessories
CMC-TC reader
The door handle is released to authorize persons who have identified
themselves with a smartcard/magnetic card/combination code.
Card reader is installed above the enclosure handle and can also
function as a central unit for releasing several doors.
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 61/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 64
• Key features: – automatic rack door opening for
closed rack systems in case of firesor if cooling breaks down
– door opening with a magnetic andgas pressure suspension systemthat always releases the door
– connecting and triggering theautomatic door kit with its control unit –
the automatic door control unit
– you can mount it on 1- or 2-pieceglazed or sheet steel door
Automatic Door Opening System
The components
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 62/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 65
The components
Wireless I/O Unit – For up to 16 sensors,
– Can operate at distances of up to 50 m
indoors
– 200 m possible outdoors if there is a clear
line of sight
Outdoor aerial
– For improving the connection
Measurement system
– For testing the quality of the connectionwhen commencing operation
Th t
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 63/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 66
The components
Wireless temperature sensor
– 1 measurement value / 30 sec.
– -25°C to +65°C IP40 / IP54*
Wireless humidity sensor
– 1 measurement value / 60 sec.
– -25°C to +65°C IP40 / IP54*
Wireless door sensor
– -25°C to +65°C, up to IP40 / IP54*
Wireless digital input
– Polls the status of the floating contacts
– NO / NC
* With protective coverService life of batteries up to 7 year, batteries can be replaced
(depending on temperature)
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 64/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 67
• Advantages & benefits:
– overview of all components
installed into the data centre
– identifying free capacities
– you can store the unit ratings
(such as power consumption
and service) on the RFID chip
– no longer necessary to manually
record
– extended performance in
connection with RiZone
Rittal Dynamic Rack Control (DRC)
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 65/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 68
• Key features:
– 1 HE rack extinguishing
system for mounting on the
19” level
– Early Detection System
– Protection/rack volume: 3 m3
– Clean Agent NOVEC 1230
– 4 hours of emergency power
supply
DET-AC Plus extinguishing system SL
CMC TC MANAGER
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 66/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 69
CMC-TC MANAGER
CMC-TC Manager – SNMP agent based on
Java
– Used to monitor several
systems CMC-TC and
CMC PCU II
CMC TC MANAGER
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 67/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 70
– All error messages from systems on the network appear on a single user
interface.
– You can control and operate various systems from a single user interface.
– When errors occur, you can send e-mails or pop-ups to other users.
– Analog values are displayed in graphic form.
– Data is recorded for analysis purposes.
CMC-TC MANAGER
What the CMC-TC Manager Can Do
Monitor/keyboard drawer with SSC
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 68/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 72
Monitor/keyboard drawer with SSC
SSC view8/32 economy:
– Full administrative facility over up to
8/32 servers accommodated in just 1U in
the server rack
– SSC view8/32 is mounted behind the
existing monitor unit
– Operated via OSD menu
– Power supplied through Rittalmonitor/keyboard unit
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 69/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 73
SSC 8 / 32 ll i f th t
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 70/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 74
SSC 8 / 32 overall view of the system
Rittal International Lampertz physical security
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 71/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 75
Rittal International – Lampertz physical security
Unsere Stärken - Ihr Vorteil !
• Modular IT security rooms to suit all demands
• Security safes for IT systems
• Safes for data protection and document storage
• IT equipment for state-of-the-art workplaces
Rittal International Lampertz physical security
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 72/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 76
Lampertz Modular Safe LMS 9.3
The modular Lampertz compact datacenter
• Physical hardware protection on security
level
•
Fire protection• Fire water tight
• Smoke gas tight
• Flexible cable duct system
• Complete modularity
• Operator door and separate service door
• And much more...
Rittal International - Lampertz physical security
Rittal International Lampertz physical security
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 73/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 77
Rittal International – Lampertz physical security
References
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 74/75
Rittal together to “Complete IT Competence“ for Data Center Infrastructure Solution 79
References
7/21/2019 Rittal Data Center Solution
http://slidepdf.com/reader/full/rittal-data-center-solution 75/75
80
IT-Cooling
Produktübersicht
Thank you for theAttention!