Rittal Data Center Solution

75
Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 1 Rittal’ s Data Center Infrastructure Solution Presentation Rimatrix5 Team Rittal Middle East, Dubai

Transcript of Rittal Data Center Solution

Page 1: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 1/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 1 

Rittal’s Data Center Infrastructure Solution

Presentation

Rimatrix5 Team

Rittal Middle East, Dubai

Page 2: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 2/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 2 

Rittal together – A powerful alliance with Friedhelm Loh Group

Page 3: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 3/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 3 

 Enclosure Systems

 Power Distribution

 Electronic PackagingSystems

 System Climate Control

 IT Solutions

 Worldwide Service

IT Solutions

 Data and

Network Technology Modular IT Infrastructures

with RimatriX5

 Data Centre Climate

Control

 Integrated Data Centre

Solutions

 Modular physical

System Security

 IT Infrastructure andintegrated Security

Solutions for

efficient and

secure Data Centres

 Consulting and

planning for

business continuity Risk analyses

 General contractor

for Data Centre

Projects

Rittal together – Complete IT Competence

 Communication Systems 

Rittal in the IT market

Page 4: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 4/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 4 

•Emp loys 8000 peop le world-wide

•Turnover: €  1.4 bil l ion

•Global presence (19 produc t ion sites, 50

subs idiar ies, 70 agenc ies)

•more than 2000 patents

Rit tal Sho rt Pro f i le  

Page 5: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 5/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 5 

Page 6: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 6/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 6 

Rack & Hardware

Power Management

Cooling

Security

Monitoring

RimatriX5 - system & components

Page 7: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 7/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 7 

Rack

comprehensive product range with anunparalleled choice of accessories

greater freedom, greater flexibility and

greater reliability 

PowerConstant and reliable power supplies via

power supplies to racks and datacentres with the Rittal Power System

concept and

back-up solutions of the modular UPS

Power concept.

Cooling

Rittal RimatriX5 climate control concepts,including

Liquid Cooling Package or

direct CPU cooling for temperature-

neutral enhancement of data centres.

SecurityPhysical security of IT racks is essential for

high availability,

temperature, smoke and vibration

sensors, together with signal lamps and

sophisticated access control solutions

and tested enclosure extinguishersystems

provide reliable protection.

Monitoring and Remote

Management  Simple handling and a perfect overview

ofmonitoring, measurement and control

functions

reduce failure risks and enable preventive

intervention.

5 pillars – one system

Page 8: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 8/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 8 

Low End  Middle Range High End

The suitable system platform for any application on the IT market 

RimatriX5 - rack & hardware 

- platform strategy meets all requirements ! 

Page 9: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 9/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 9 

Rittal rack systems

TS 8 – the Top enclosure system

• Rittal TS 8:This all-rounder offers diversity andprotection for your network.

 – Suitable for one or two 482.6 mm (19")mounting levels, and for partial or fullinstallation.

 – The ingenious symmetrical frame designoffers baying on all sides.

 –  A high level of security, thanks to locksystems with a comfort handle and four-point locking

 – Perfect integration of climate controlcomponents

 – Protection category up to IP 55

Page 10: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 10/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 10 

• based on industrial TS8 enclosure

• Equipped with 482.6 mm (19“) mounting

frame at the front and rear, thus load

capacity up to 1500kg 

• Particular suitable for mixed configurationsof server and network technology

TS8 Server rack

Optimised ventilation for all TSserver racks: 

78% free surface 

in the perforated plate section

Significantly higher operational

reliability thanks to optimum discharge

of heat loss

Page 12: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 12/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 13 

Schematic Diagram of Power Distribution in Data Center(UPS, PDR, PDM, PSM concept) 

Power Distribution System in Data Center

Page 13: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 13/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 14 

Single phase for decentralized

operation PMC 12 

• 1 - 12 kVA N+1

 –all as stand alone or 19“

version applicable –1, 2 and 3 kVA : internal

batteries

 –4.5 and 6 kVA : parallel

mode of operation possible;

external batteries –additional battery packs in

same housing dimensions

Rittal UPS range

classification : VFI-SS-111

Page 14: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 14/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 15 

PMC 200 modules

• 12 / 20 kW : 600 mm wide rack

• 32 / 40 kW : 800 mm wide rack

•Racks 600 / 800 mm breit

• increased efficiency [96%] 

• increased power factor [PF=1] 

• increased power/rack with max. 5 modules

• redundant N+1 system architecture for

modules and batteries

Rittal UPS PMC 200

Page 15: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 15/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 16 

Secure return on investment – practically unlimited scalability

 A system can be expanded step by step to incorporate up to 20 parallel PMC modules,e.g. for a UPS capacity of 800 kW without redundancy or 760 kW n+1 (with 40 kW

modules).

Expansion is po ssib le dur ing l ive operat ion witho ut the need to switch to an

unp rotected supp ly.

Page 16: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 16/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 17 

Design features:

• Double conversion UPS systems

up to 800kW or 720kW (n+1)

• UPS protection category: VFI-SS-111

• New module power 80kW

• Safe swap expansion• Modular rack mounting

• Dimensions WxHxD 1200x2000x800

• Two split modules, active & passive

UPS PMC 800 

Page 17: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 17/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 18 

Rittal UPS range

Phase UPS, Rittal Power ModularConcept – PMC 40

• Topology: on-line, dual converters,

VFI-SS-111

• Modular design and switched in

parallel

• Maximum output:

- 40 kW non-redundant

- 20 kW redundant

• Universal applications in each 19”

rack at least 800 mm deep

Page 18: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 18/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 19 

Pay As You Grow……,

your requirement of

with 4 UPS Module

today & 1 Blank

spaces, in future

adding Modu le as per

your Load &

redundancy

requirement  

Hot swappable UPS

Modules ensure no

downtime for

repairing & decrease

(MTTR) 

Picture Illustration of Solution & Benefit

Decentralized Parallel

Architecture (DPA) --

provides highest

Availability 

Page 19: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 19/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 20 

PMC

STATIC BPSWITCH

PMC

POWERUNIT

CENTRAL

PROCESSINGUNIT

PMC

CONTROLPANEL

Critical load 

Supply 1  Supply 2

PMC

STATIC BP

SWITCH

PMC

POWER

UNIT

PMC CENTRAL

PROCESSING

UNIT

PMC

CONTROL

PANEL

PMC

STATIC BP

SWITCH

PMC

POWER

UNIT

PMC CENTRAL

PROCESSING

UNIT

PMC

CONTROL

PANEL

PMC

BATTERY

PACKS

PMC

BATTERY

PACKS

PMC

BATTERY

PACKS

Decentralized Parallel Architecture – DPA™ 

With Decentralised Parallel Architecture (DPA™), the UPS hardware and software components are

distributed as independent modules, thus avoiding a “single point of failure”. 

•  Control panel

•  CPU

•  Power unit

•  Static bypass

• Batteries

(1 string/module)

and

Targeted and sustained avoidance of an SPoF (single point of

failure) and thus increased availability

Page 20: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 20/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 21 

Availability: A = MTBFUPS  / (MTBFUPS + MTTRUPS)

Example

Non-modular (1+1)

redundant configuration

Rack-mounted modular (3+1)

redundant configuration

MTBF 600,000 500,000

MTTR 6 h 0.5h

 Availability 0.999990 (5 nines) 0.999999 (6 nines)

Rack-mounted modular PMC with 4x40 kW

(3+1) redundant configurationTraditional non-modular 2x120 kW

(1+1) redundant configuration

Load

120kWLoad

120kW

120kW 120kW

40kW module

40kW module

40kW module

40kW module

Shortest possible MTTR and previously unattained availability 

That is what counts!(only possible with

a modular technology)

Result

NON-availability:

5 nines = 6 min./year

6 nines = 6 sec./year

DEFINITIONS:MTBF: Mean Time

Between Failures

MTTR: Mean TimeTo Recovery  

Page 21: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 21/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 22 

Design features:

• Energy distribution for additional IT

Racks in the 19“-enclosure

• 19” Power Distribution Module 

mechanically locked in the Rack/19“-

fastening level,incl. main switch,• Connection Plug & Play

• Connected rating max. 40 kW per PDM

• Retrofittable during ongoing operation

• Can be desinged to be with dual

inputs

Power Distribution Module

Page 22: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 22/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 23 

Design features:Input max. 3 x 63 A, 400 V

• 4 Outputs 3 x 16 A, 400 V each

• 2 Outputs 3 x 32 A, 400V each

• Cable-bound to the PSM busbars

Power Distribution Module

Page 23: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 23/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 24 

PDR Flex Modular IT low-voltage distributor

• Application on project basis

• Benefits:

• Simple planning saves time

• Straightforward assembly cuts

costs

• Preconfigured / customer-specific

expansion

• ABB Smissline components can

be integrated

• Can be extended without a large

outlay

• Available as floor-standing and wall-

mounted distributors 

Page 24: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 24/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 25 

Base element of the power

distribution

The PSM consists of two main

components:

• a rail, which meshes into the

horizontal frame profile of the

FR(i) or is installed with a

fastening set in TS 8 panels

•plug-in modules in differentcountry models, which are

integrated directly in the

busbar

Power System Module

Page 25: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 25/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 26 

PSM Plus busbar

• 4 independent circuits infeed• 3-phase / redundant design

• twice the power of actual PSM

possible, max. 192A

 / modules (all with 2x 16A input) 

• 4-socket „Schuko“ module, including

fuses• 4-socket C13 module, including fuses

• 6-socket C13 module

• 4-socket C19 module

• 2-socket C19 module, including fuses

PSM Plus- Rail

Page 26: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 26/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 27 

PSM rail with 3-phase current measurement

• complete rail with measurement

• module for retrofitting in existing

installations

• Blue graphical display

• Modified in-feed X-COM connector

• with display and monitoring of thecomplete three-phase connection

current and the power per phase

• remote monitoring via CMC-TC

• compatible with PSM accessories

Page 27: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 27/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 28 

Operating interface CMC-TC

for active PSM 

PSM Active Monitoring / Management

Page 28: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 28/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 29 

PSM modules active, 2 variants: PSM module / PCU for 19"

• PSM active modules (2 slots)

• Active PCU for 19" assembly

• Switching option per port via CMC-TC

• Stand-alone solution with separate

power pack (without options for

switching or changing the limits)

• Current measurement per module slot

• Current measurement per socket

• Limits can be configured as required

via CMC-TC!

•  2 versions:

• C13 (7859.122 / 7859.125)

• C19 (7859.132 / 7859.135)

Page 29: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 29/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 30 

Power Distribution Unit Compact 32A plug & play power distribution

• Compact all-in-one power distribution

(230V / 400V)• 5 different article versions:

• In general: Measurement per

phase/terminal block

• Some versions: Switching option

per port

• Mounting on TS8 enclosure frames• Installation material supplied

• Version in RAL9005 (black)

• Ready for connection with IEC/EN

60309 plug (32A CEE)

• C13 outputs (additionally C19 in some

cases)• 1 & 3-phase versions available

• Integrated fuses (16A, L+N in each

case)

Page 30: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 30/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 32 

Low Density Mid Density High Density

LCP Plus

LCP Standard/ LCP Modular

LCP Extend

Basic solutions

with cold aisle containment

LCP Inline

Computer room air conditioning system

Heat load on server

enclosure

with cold aisle containment

Rittal Cooling Systems

Page 31: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 31/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 33 

Room climate control

• Air conditioning unit for data centre

cooling using raised floor

• Four power classes - 23-118 kW -

with cold water

• Four power classes - 18-54 kW-

with refrigerant

• Options:

- Humidification

- Heating

- Heating + humidification

Computer room air conditioning (CRAC) system

Page 32: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 32/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 34 

Using New energy efficient CRAC Systems? 

Advantage of new CRAC

No losses due to deflection

No loss of installation height

Larger medium matrixOptimum cold air distribution

Low energy consumption and

space requirements

Can save up to 30% in energy

Page 33: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 33/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 35 

Cold/Hot aisle containment

Advantages of cold aisle containment at a glance: 

No mixing of hot and cold air

• Simple cold air routing direct to servers

• Increased efficiency in conjunction with

conventional air conditioning units

due to higher outlet air temperature.

• Compatible with liquid cooling systems

Increasing efficiency of raised floor climate control

IT C li

Page 34: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 34/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 36 

IT-Cooling

Room-based systems

Increasing efficiency with Aisle Containment

•No mixing of hot and cold air

•Provides planed function

•Controlled cold air supply to the serverswith Cold Aisle Containment

•Increasing efficiency of room climatisation

due to increasing the return air temperature

•No influence of temperature of the warm

areas to the ambient with Hot Aisle

Containment

Page 35: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 35/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 37 

• For mid density applications without raised floors

• Cooling capacity up to 30kW

• Ambient air is extracted from the warm aisle or room through

the perforated rear door, cooled and blown into the cold aisle

• Supports existing room climate control

• In conjunction with cold aisle containment, provides significant

increase in cooling capacity per server rack

LCP Inline

IT-Cooling

Page 36: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 36/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 38 

Cold Aisle Containment with LCP In line 

•In conjunction with Cold Aisle Containment, provides significant increase in cooling

capacity per server rack

Page 37: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 37/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 39 

Cooling Racks By Cold or Hot Aisle Containment

LCP-Inline

Top view- Hot isle Containemt

Hot Isle Containemt

Top view- Cold isle ContainemtsLCP-Inline

Cold Isle Containemt

IT-Cooling

IT Cooling

Page 38: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 38/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 40 

IT-Cooling

Enclosure-based systems

LCP Standard LCP Plus

IT Cooling

Page 39: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 39/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 41 

IT-Cooling

Enclosure-based systems

How does it work?

+ =

Page 40: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 40/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 42 

How does it work?

IT-Cooling

Enclosure-based systems

IT-Cooling

Page 41: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 41/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 43 

IT Cooling

Enclosure-based systems

LCP Standard• Sideways connected

• Equal temperature distribution over the

total height

• Clear accessibility of the 19’’-equipment

• Full 42U of the rack available

• Dimensions:

300 x 2000 x 1000/1200 (W x H x D)

• Integrated condensate management and

leakage protection

IT Cooling

Page 42: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 42/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 44 

LCP Plus

• Sideways connected

• Equal temperature distribution over the

total height

• Clear accessibility of the 19’’-

equipment• Full 42U of the rack available

• Dimensions:

•   300 x 2000 x 1200 (W x H x D)

• Integrated condensate management

and leakage protection• Touch screen for stand-alone use

IT-Cooling

Enclosure-based systems

Page 43: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 43/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 45 

Implementation rack-based systems (n+1 redundancy)

1

2

IT-Cooling

Enclosure-based systems

IT C li

Page 44: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 44/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 46 

IT-Cooling

Enclosure-based systems

Implementation rack-based systems (2n redundancy)

1

2

Server rack

LC

P

LC

P

Server rack

LC

P

LC

P

Server rack

LC

P

LC

P

Page 45: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 45/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 47 

LCP T3+

47 U

IT Cooling

Page 46: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 46/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 48 

IT-Cooling

Enclosure-based systems

LCP T3+

• Cooling capacity to 25 kW

• Redundant power and water feed

• Intelligent software

• Clear accessibility of the 19’’-equipment

• Full 42U or 47U of the rack available

• Dimensions:

300 x 2000 / 2200 x 1200 (W x H x D)

• Leakage protection

• Touch screen for stand-alone use

•Designed for high water in temperatures

IT Cooling

Page 47: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 47/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 49 

IT-Cooling

Enclosure-based systems

Software and remote controlling

• Connection to Network IP•  All measured values on one

view

IT C li

Page 48: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 48/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 50 

Approvals

UL 1995

IT-Cooling

Enclosure-based systems

IT C li

Page 49: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 49/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 51 

IT-Cooling

Enclosure-based systems

OEM Products

HP also trusts on chilled-water cooling of Rittal

Page 50: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 50/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 53 

Processing Unit

Computer Multi Control Top Concept

Acc ess Unit I/O Unit GSM Unit

Security CMC-TC System

Page 51: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 51/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 54 

The Rittal CMC-TC Monitoring System

Page 52: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 52/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 55 

The components

• Processing Unit

 – Basis of the monitoring system

 – Network interface 10BaseT

 – integrated Web server

 – max. 4 sensor units

 – max. cable length to sensor unit: 50m

 – central power supply unit for all sensorsand actuators connected

 – The processing unit may optionally beoperated via the CMC-TC master

Page 53: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 53/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 56 

• Universal I/O Unit

 – automatic sensor /actuator

detection

 – Maximum of 4 sensors / actuators

 – Power supply via the Cat 5 cable

 – max. cable length to sensor: 7m

 –max. cable length to PU 50m

 – is operated by clicking on one

button

The components

Page 54: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 54/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 57 

• Possible sensors for theI/O Unit:

 – Temperature sensor

 – Humidity sensor

 –  Analogue input (4-20 am)

 –  Access sensor (door, side panel,

roof)

 – Vandalism sensor (vibration)

 – Smoke alarm

 – Motion detector

 – Digital input – Digital relay output

 – Voltage monitor

The components

Page 55: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 55/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 58 

•  Access Unit

 – automatic sensor / actuator detection

 – designed for 2 door systems

 – I²C interface for readers

 – Power supply via the Cat 5 cable

 – max cable length to sensor: 7m

 – max. cable length to PU: 50m

The components

Th t

Page 56: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 56/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 59 

• CMC-TC GSM-Unit

• Reports an alarm via the GSM network

• Connection via RJ12 cable to serial interface

•  A separate power pack is not required

• D- or E-network SIM-card is not sufficient

• May be used when a network is not available

• Second (redundant) alarm

The components

A i

Page 57: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 57/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 60 

 Accessories

•Temperature sensor – Temperature application range:

+5 to +45 °C

 – Tolerance +/- 2K

 – NTC, 10kOhm at 25°C

• Humidity sensor

 – Measurement range

10...90% relative humidity

+/- 3% at 20°C

 – Temperature applicationrange +5 to +45 °C

A i

Page 58: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 58/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 61 

Water Leak Sensor :

• Control water ingress

• Length:15 Mtr

• Plug & play connection via RJ12

•  Automatic detection at the CMC-TC

Customer benefits : 

• Water ingress can be reported early

•  Alarm via SNMP, SMS, e-mail or fax

Smoke alarm:

Opto-electronic smoke particle

evaluationMeasurement frequency: one every

10 seconds.

 Accessories

A i

Page 59: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 59/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 62 

 Accessories

Voltage monitor – IEC plug

 – Reports voltage status: voltage

ON/voltage OFF

CMC socket strip

 – 230V AC 50/60Hz / 16A

 – Relay message contact for

Overvoltage protection

Voltage ON/voltage OFF

 – Interference suppressor filter

A i

Page 60: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 60/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 63 

CMC-TC electro- magnetic TS8 handle

with master Key

Comfort handle with electromagnetic locking and additional

master key function

 – Electromagnetic locking for the TS8 enclosure

 – Master key function

 – Monitors the handle position

 – Power supply 24 VDC via the access unit – Note :Locking rods do not have to be changed

 Accessories

CMC-TC reader

The door handle is released to authorize persons who have identified

themselves with a smartcard/magnetic card/combination code.

Card reader is installed above the enclosure handle and can also

function as a central unit for releasing several doors.

Page 61: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 61/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 64 

• Key features: –  automatic rack door opening for

closed rack systems in case of firesor if cooling breaks down

 –  door opening with a magnetic andgas pressure suspension systemthat always releases the door

 – connecting and triggering theautomatic door kit with its control unit –

  the automatic door control unit

 – you can mount it on 1- or 2-pieceglazed or sheet steel door

Automatic Door Opening System

The components

Page 62: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 62/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 65 

The components

Wireless I/O Unit – For up to 16 sensors,

 – Can operate at distances of up to 50 m

indoors

 – 200 m possible outdoors if there is a clear

line of sight

Outdoor aerial

 – For improving the connection

Measurement system

 – For testing the quality of the connectionwhen commencing operation

Th t

Page 63: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 63/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 66 

The components

Wireless temperature sensor

 – 1 measurement value / 30 sec.

 – -25°C to +65°C IP40 / IP54*

Wireless humidity sensor

 – 1 measurement value / 60 sec.

 – -25°C to +65°C IP40 / IP54*

Wireless door sensor

 – -25°C to +65°C, up to IP40 / IP54*

Wireless digital input

 – Polls the status of the floating contacts

 – NO / NC

* With protective coverService life of batteries up to 7 year, batteries can be replaced

(depending on temperature)

Page 64: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 64/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 67 

•  Advantages & benefits:

 – overview of all components

installed into the data centre

 – identifying free capacities

 – you can store the unit ratings

(such as power consumption

and service) on the RFID chip

 – no longer necessary to manually

record

 – extended performance in

connection with RiZone

Rittal Dynamic Rack Control (DRC)

Page 65: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 65/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 68 

• Key features:

 – 1 HE rack extinguishing

system for mounting on the

19” level

 – Early Detection System

 – Protection/rack volume: 3 m3

 – Clean Agent NOVEC 1230

 – 4 hours of emergency power

supply

DET-AC Plus extinguishing system SL

CMC TC MANAGER

Page 66: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 66/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 69 

CMC-TC MANAGER

CMC-TC Manager – SNMP agent based on

Java

 – Used to monitor several

systems CMC-TC and

CMC PCU II

CMC TC MANAGER

Page 67: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 67/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 70 

 –  All error messages from systems on the network appear on a single user

interface.

 – You can control and operate various systems from a single user interface.

 – When errors occur, you can send e-mails or pop-ups to other users.

 –  Analog values are displayed in graphic form.

 – Data is recorded for analysis purposes.

CMC-TC MANAGER

What the CMC-TC Manager Can Do

Monitor/keyboard drawer with SSC

Page 68: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 68/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 72 

Monitor/keyboard drawer with SSC

SSC view8/32 economy:

 – Full administrative facility over up to

8/32 servers accommodated in just 1U in

the server rack

 – SSC view8/32 is mounted behind the

existing monitor unit

 – Operated via OSD menu

 – Power supplied through Rittalmonitor/keyboard unit

Page 69: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 69/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 73 

SSC 8 / 32 ll i f th t

Page 70: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 70/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 74 

SSC 8 / 32 overall view of the system

Rittal International Lampertz physical security

Page 71: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 71/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 75 

Rittal International – Lampertz physical security

Unsere Stärken - Ihr Vorteil ! 

•  Modular IT security rooms to suit all demands

•  Security safes for IT systems

•  Safes for data protection and document storage

•  IT equipment for state-of-the-art workplaces 

Rittal International Lampertz physical security

Page 72: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 72/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 76 

Lampertz Modular Safe LMS 9.3 

The modular Lampertz compact datacenter

• Physical hardware protection on security

level

Fire protection• Fire water tight

• Smoke gas tight

• Flexible cable duct system

• Complete modularity

• Operator door and separate service door

•  And much more...

Rittal International - Lampertz physical security

Rittal International Lampertz physical security

Page 73: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 73/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 77 

Rittal International – Lampertz physical security

References

Page 74: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 74/75

Rittal together to “Complete IT Competence“ for  Data Center Infrastructure Solution 79 

References

Page 75: Rittal Data Center Solution

7/21/2019 Rittal Data Center Solution

http://slidepdf.com/reader/full/rittal-data-center-solution 75/75

80

IT-Cooling

Produktübersicht

Thank you for theAttention!