Review & Update of the Stormwater C.3 Guidebook

32
Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting

description

Review & Update of the Stormwater C.3 Guidebook. Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting. Topics. Review: What hasn’t changed LID requirements Design procedure Dry wells, flow-through planters, and bioretention facilities Update: What has changed - PowerPoint PPT Presentation

Transcript of Review & Update of the Stormwater C.3 Guidebook

Page 1: Review & Update of the Stormwater C.3 Guidebook

Review & Updateof theStormwater C.3 GuidebookDan Cloak, P.E.PrincipalDan Cloak Environmental Consulting

Page 2: Review & Update of the Stormwater C.3 Guidebook

Topics Review: What hasn’t changed

LID requirementsDesign procedureDry wells, flow-through planters,

and bioretention facilities Update: What has changed

Two new IMP designs IMP Sizing Calculator

Page 3: Review & Update of the Stormwater C.3 Guidebook

Chapters 1, 2, 3 and 5 Stormwater Control Plan required

Consistency and completenessDelineate drainage areas on exhibitsDescribe drainage and facilities

Integrate with site and landscape design submittals

Consider operation & maintenance

Page 4: Review & Update of the Stormwater C.3 Guidebook

Soils, Plantings, and Irrigation Appendix B published January 2009 Soils

Detailed soil specification “Brand name” mixes by local suppliers

Plantings Plant list Fertilization, weed control, pest control

Irrigation Smart irrigation controllers Drip emitters

Page 5: Review & Update of the Stormwater C.3 Guidebook

Chapter 4: LID Design ProcessAnalyze Project for LID

Develop and Document LID

Drainage Design

Specify LID Preliminary

Design Details

Coordinate with Site Design and Landscape Design

Page 6: Review & Update of the Stormwater C.3 Guidebook

Analyze Your Project for LID1. Optimize the site layout2. Use pervious surfaces3. Disperse runoff where possible4. Drain remaining runoff to:

Bioretention Facilities Flow-through Planters Dry Wells Cisterns + Bioretention Bioretention + Vault

Page 7: Review & Update of the Stormwater C.3 Guidebook

1. Optimize the Site Layout Define the

development envelope

Set back from creeks, wetlands, and riparian habitats

Preserve significant trees

Minimize grading

Page 8: Review & Update of the Stormwater C.3 Guidebook

1. Optimize the Site Layout Preserve and use

permeable soils Limit roofs and

paving Detain and retain

runoff throughout the site

Use drainage as a design element

Page 9: Review & Update of the Stormwater C.3 Guidebook

2. Use Pervious Surfaces

Green roofs

Permeable pavements

Page 10: Review & Update of the Stormwater C.3 Guidebook

3. Disperse Runoff

Page 11: Review & Update of the Stormwater C.3 Guidebook

4. Direct Runoff to Facilities Bioretention facilities Flow-through planters Dry wells Cisterns +

Bioretention Bioretention + Vault

Reservoir, 12" min. depth

Reverse bend trap or hooded overflow

18" sandy loam, minimum infiltration rate 5" per hour

12" open-graded gravel, approx. ½" dia.

Perforated pipe

Downspout

Building exterior wall

Cobbles or splash block

Filter fabric

Concrete or other structural planter wall with waterproof membrane

Additional waterproofing on building as needed

Drain to storm drain or discharge; bottom-out or side-out options

Page 12: Review & Update of the Stormwater C.3 Guidebook

LID Design Process

Analyze Project for LID

Develop and Document LID

Drainage Design

Specify LID Preliminary

Design Details

Coordinate with Site Design and Landscape Design

Page 13: Review & Update of the Stormwater C.3 Guidebook

Document Drainage Design1. Delineate drainage

management areas (DMAs)2. Classify DMAs and

determine runoff factors3. Tabulate DMAs4. Lay out facilities

Page 14: Review & Update of the Stormwater C.3 Guidebook

Only one surface type within each area

Many-to-one relationship between drainage areas and facilities

Four Types of Areas1. Self-treating areas2. Self-retaining areas3. Areas draining to a self-retaining

area4. Areas draining to a treatment

facilities

Drainage Management Areas

DMADMA

DMA

Page 15: Review & Update of the Stormwater C.3 Guidebook

Self-treating DMAs Must be 100% pervious Must drain offsite Must not drain on to

impervious areas Must not receive drainage

from impervious areas Must not drain to treatment facilities No treatment or flow control required No further calculations required

Page 16: Review & Update of the Stormwater C.3 Guidebook

Self-retaining DMAs Berm or depress grade to retain 1" rain Set area drain inlets above grade Amend soils Terrace mild slopes Have limited

applicability in Dense

developments Hillsides

Page 17: Review & Update of the Stormwater C.3 Guidebook

Areas draining to self-retaining areas Impervious areas

can drain on to self-retaining areas

Example: Roof leaders directed to lawn or landscape

Maximum ratio is 2:1 for treatment; 1:1 for flow control

No maintenance verification required

Page 18: Review & Update of the Stormwater C.3 Guidebook

1PerviousImpervious

Areas draining to self-retaining DMAs

Page 19: Review & Update of the Stormwater C.3 Guidebook

Tabulating AreasSelf-Treating AreasDMA Name Area (SF)

Self-Retaining AreasDMA Name Area

(SF)

Areas Draining to Self-Retaining AreasDMA Name

Area (SF)

Post-project surface type

Runoff factor

Receiving Self-retaining DMA

Receiving DMA Area (SF)

Ratio

Page 20: Review & Update of the Stormwater C.3 Guidebook

Areas draining to Bioretention Facilities Areas used to calculate the required

size of the bioretention facility Where possible, drain only

impervious roofs and pavement to bioretention facilities

Delineate any pervious areas as separate Drainage Management Areas

Page 21: Review & Update of the Stormwater C.3 Guidebook

DMANam

e

DMASq. Ft

Surface

Type

RunoffFactor

Area x runoff factor

Sizing Factor

Min. Size

SizePlanne

d

Facility A-----

DMAs draining to facilitiesTreatment-only example

Page 22: Review & Update of the Stormwater C.3 Guidebook

Calculating Facility Size

A-2: Paving 10,000 SF

A-3: Turf 20,000 SF

A-1: 5,000 SF

Roof

Bioretention Facility A

Page 23: Review & Update of the Stormwater C.3 Guidebook

DMANam

e

DMASq. Ft

Surface

Type

RunoffFactor

Area x runoff factor

A-1 5000 Roof 1.0 5000

A-2 10000 Paved 1.0 10000

A-3 20000 Grass 0.1 2000 Sizing Factor

Min. Size

SizePlanne

d

Facility A----- 17000 0.04 680 800

DMAs draining to facilities

Runoff Factors

from Table 4-2 onp. 42

Page 24: Review & Update of the Stormwater C.3 Guidebook

Sizing Factors for Flow Control

Surface Storage, V1

Subsurface Storage, V2

Area of soil flooded before overflow, A

Page 25: Review & Update of the Stormwater C.3 Guidebook

Bioretention Design OptionsEdge Treatments

Subsurface Storage Options

Stepped-back side slope

Using Shallow Flooding for Storage

Page 26: Review & Update of the Stormwater C.3 Guidebook

Adjustment for Rainfall

Group A, y = 0.0020x + 0.08Group B, y = -0.0005x + 0.11Group C, y = -0.0022x + 0.06Group D, y = -0.0022x + 0.05

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

-14 -12 -10 -8 -6 -4 -2 0 2 4 6

Mean Annual Rainfall (MAP) Relative to Martinez Gauge (in)

Sizi

ng F

acto

r

Group A soils

Group B soils

Group C soils

Group D soils

Page 27: Review & Update of the Stormwater C.3 Guidebook

Orifice Sizing for Flow Control

Page 28: Review & Update of the Stormwater C.3 Guidebook

Calculation Format with Flow Control

DMA Name

DMAArea (squa

re feet)

Post-proje

ct surfa

ce type

DMARuno

ff factor

DMA

Area

runoff

factor

SoilType: IMP Name

IMPSizingfactor

RainAdjustm

entFactor

Minimum

Area or Volume

Proposed

Area or Volume

Total IMP Area

V or V1V2

Orifice Size:

Page 29: Review & Update of the Stormwater C.3 Guidebook

Update Two new IMPs Sizing Calculator

Page 30: Review & Update of the Stormwater C.3 Guidebook

Cistern + Bioretention

Page 31: Review & Update of the Stormwater C.3 Guidebook

Bioretention + Vault

Page 32: Review & Update of the Stormwater C.3 Guidebook

Sizing Calculator