RETAINING WALL
Code Descriptions Unit
be read in conjunction with
preambles and specifications
Retaining wall
Excavation works
A F131 Excavation; cut and dispose; earth
m3
B F121 Excavation; cut to fill ; earthm3
C F141 Excavation; foundation; earth m3
D P111.1
m
E F311 Filling; general; excavated materialm2
F F410.1m3
Concrete works
G I111.1m2
H I142m3
J I145m3
K I411.1 Formwork; sides; bases; rough finishm2
Item Ref
The bills of quantities shall
Drain excavation; in earth; depth not exceedng 1.5m; commencing from finished level; 300mm thick V-shape concrete drain
Filling ancillaries; geotextiles; 19-40mm imported granite
Insitu concrete designed mix; grade C15; blinding; 50mm thick
Insitu concrete designed mix; grade C30; bases; 50mm thick
Insitu concrete designed mix; grade C30; walls
![Page 2: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/2.jpg)
L I414.1 Formwork; sides; walls; fair finishm2
RETAINING WALL
BQ/1
![Page 3: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/3.jpg)
RETAINING WALL
Code Descriptions Unit
be read in conjunction with
preambles and specifications
Concrete works (cont'd)
A I652.1
nr
B P250.1
m
C I523t
D 1525
t
Item Ref
The bills of quantities shall
Concrete ancillaries; inserts; other inserts; 200mm dameter; cast iron pipe; grouted into wall at 2.00 metres centre to centre
Surface drain; toe drain; concrete V-shape drain; 300mm x 300mm nominal size; 25mm thick lining
Reinforcement; high tensile bars; nominal diameter; 12mm
Reinforcement; high tensile bars; nominal diameter; 20mm
BQ/1
![Page 4: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/4.jpg)
RETAINING WALL
BQ/2
![Page 5: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/5.jpg)
RETAINING WALL
Code Descriptions Unit
Retaining wall
COLLECTION
Page No:BQ/1Page No:BQ/2
Item Ref
BQ/2
![Page 6: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/6.jpg)
RETAINING WALLBQ/3
![Page 7: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/7.jpg)
RETAINING WALL
Qty Rate (RM) Amount (RM)
2045
651
159
85
651
192
289
145
153
89
![Page 8: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/8.jpg)
765
To Collection RM
![Page 9: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/9.jpg)
RETAINING WALL
Qty Rate (RM) Amount (RM)
44
85
7
18
![Page 10: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/10.jpg)
To Collection RM
![Page 11: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/11.jpg)
RETAINING WALL
Qty Rate (RM) Amount (RM)
![Page 12: Retaining Wall Buildsoft](https://reader035.fdocuments.in/reader035/viewer/2022080100/5695d3f61a28ab9b029fc73e/html5/thumbnails/12.jpg)
To Summary RM