November 30. 2017 Repurposing the Colstrip Transmission System A white paper explaining the transmission questions that arise when considering the retirement of coal fired generation facilities and the addition of new renewable resources on the Colstrip Transmission System. By Charles A. Stigers – Principal Power Systems Engineer – USE Consulting Commissioned by

Transcript of Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission...

Page 1: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

November30.2017

RepurposingtheColstripTransmissionSystemAwhitepaperexplainingthetransmissionquestionsthatarisewhenconsidering

theretirementofcoalfiredgenerationfacilitiesandtheadditionofnewrenewableresourcesontheColstripTransmissionSystem.

ByCharlesA.Stigers–PrincipalPowerSystemsEngineer–USEConsulting

Commissionedby

Page 2: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

Forward

ThiswhitepaperexplainsthetransmissionquestionsthatarisewhenconsideringtheretirementofcoalfiredgenerationfacilitiesandtheadditionofnewrenewableresourcesontheColstripTransmissionSystem(CTS).Thewhitepaperalsocontainsadiscussionofseveralpotentialmitigationstoaddressthesequestionsandtherangeofcostsassociatedwithmakingthistransition.Fourscenariosareexamined,eachwithadifferentamountofColstripGeneration(Units1through4)retiringandasimilaramountofwindenergyaddedtothesystem.

Nonewengineeringanalysiswasdonespecificallyforthepreparationofthiswhitepaper.Rather,thepaperisbasedprimarilyonmyknowledgeofhigh-voltagetransmissionsystemsandmyextensiveexperiencewiththeColstripTransmissionSystem(CTS),includingparticipationinnumerousothertransmissionstudiesofthatsystemoverthepast44years.IalsorelyonmydeepinvolvementinthedesignandimplementationoftheexistingRemedialActionScheme(RAS)atColstrip,whichisanimportantcomponentsurroundingmuchofthisdiscussion(seeAccelerationTrendRelay(ATR)innote3attheendofthispaper).

Severalengineeringstudiesthattouchonthistopichavebeencompletedbyvariousgroupsrecently.Whileeachofthesestudies(listedbelowinthispaper)endeavoredtoanswersomebasicquestionsaboutthefeasibilityofretiringthecoal-firedgenerationatColstripandaddingwindgeneration,noneofthemhaveansweredthebasicquestionoftheadequacyorfeasibilityofanyproposedRAS(seenote3)intendedtoproperlyreplacetheATR.ThepurposeoftheATRistoprotecttheMontanatransmissionfromcriticalcontingenciesontheCTS(seenote2).

Mostofthesequestionswillultimatelyhavetobeansweredthroughadditionaltransmissionstudiesandengineeringeffortswellbeyondthosethathavebeendonesofar.Thiswhitepaperidentifiesthisfuturestudyworkandalsosomeoftheotherfinancialandpolicyquestionsthatwillultimatelyhavetobedecidedbythevariouscommercialentitiesinvolved.

CharlesA.StigersPrincipalPowerSystemsEngineerUSEConsulting

Page 3: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

NoteAbouttheAuthor:AsanemployeeofMontanaPowerCompany(MPC)andNorthwesternEnergyCorporation(NWE),forover38yearsChuckStigerswasdirectlyinvolvedintheengineeringdesignstudiesandtheplanningandoperationalstudiesoftheColstripTransmissionSystem(CTS).DuringthattimeDr.Stigersperformedavarietyofstudies1ontheCTSandwastaskedwithleadingtheteamthatdesignedtheRemedialActionSchemecurrentlyfunctioningatColstrip.Dr.StigersearnedhisMSandPhDdegreesinphysicsfromTheUniversityofArkansasin1968and1970.HeiscurrentlyemployedbyUtilitySystemEfficiencies,Inc.asaPrincipalPowerSystemsEngineer.Since2011hehascontinuedtoperformtransmissionstudywork.MuchofthisstudyworkinvolvedapplyinghisknowledgeoftheCTS,andworkingwithamodeloftheATRtoproperlyrepresentthatdeviceindynamicsimulations.

ThispaperwascommissionedbyRenewableNorthwest,anon-profitrenewableenergyadvocacyorganizationbasedinPortland,Oregon.

1Powerflowanalysis(steadystatenetworkperformance),Faultdutyanalysis,Dynamicstabilityanalysis(transientstabilityperformance),Sub-synchronousResonanceanalysis,TransientSwitchingAnalysis.,RASdesignanalysisandengineeringdesign.

Page 4: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current
Page 5: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

ExecutiveSummary:RepurposingtheColstripTransmissionSystem

i

ExecutiveSummary

ThispaperexplainsthetransmissionquestionsthatarisewhenconsideringtheretirementofcoalfiredgenerationfacilitiesatColstripandtheadditionofnewrenewableresourcesontheColstripTransmissionSystem(CTS).Severalpotentialmitigationstoaddressthesequestions,andtherangeofcostsassociatedwithmakingthistransition,arediscussed.Fourscenariosareexamined,eachwithadifferentamountofColstripGeneration(Units1through4)retiringandasimilaramountofwindenergyaddedtothesystem.

Scenario1:Colstrip1and2retire;610MWofwindenergyisaddedtotheCTS.

Underthisscenariothereshouldbenoimportantpowerflowissues(seeNote1)associatedwiththisfairlymodestchangeintheresourcesatColstrip.However,therewouldbeaneedtodesignaRemedialActionScheme(RAS)2capableofprovidingwindgeneratortrippingforcertaincriticaltransmissionoutagesontheCTStoassuretransientstabilityismaintained(seeNote2).Thedesignstudyforthis“WindRAS”shouldtakeabout3-6months.ItwouldbeessentialforthisRAStocoordinatewellwiththeAccelerationTrendRelay(ATR)—thecurrentRASfortheColstripUnits—andtheotherexistingRASprotectionschemesontheCTS.Toachievethiscoordinationbetweenthe“WindRAS”andtheATR,timingiscritical.The“WindRAS”wouldberequiredtotriptheappropriateamountofwindgenerationaftertheATRhasreacheditstripdecision,butbeforeitistoolatetoproperlyprotectthesystem.

The“WindRAS”wouldbesubjecttoreviewbythevariousWECCreliabilitycommittees(particularlytheRemedialActionSchemeReliabilitySubcommittee,orRASRS)thataretaskedwiththeprotectionofthereliabilityoftheWesternInterconnection.WhiletherearenosignificanttechnicalbarrierstodesigningsuchaRAS,oneshouldanticipatealengthyreviewprocess.ThisshouldbeexpectedtobeaverythoroughanddetailedreviewofthephysicaldesignoftheRAS,andcouldrequire1-2yearsafterthedesignstudyeffortiscomplete.

2RemedialActionScheme(RAS–alsosometimescalledanSpecialProtectionScheme(SPS)isaprotectionschemethatperformsoperationsonasysteminresponsetocertaineventsthatgobeyondtheactionsofsimplefaultprotectionthatisprovidedforeverytransmissionline.Simplefaultprotectiondetectsafaultanywhereonthelineandopensbreakersateitherendofthefaultedlineto“clear”thefault.ARASmaybedesignedtoinitiateactionssuchasgenerationtrippingorotherswitchingactionstopreventasystemfromcollapsingduetoaswitchingevent.EveryRAShasitsownuniquefeatures.

Page 6: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

ExecutiveSummary:RepurposingtheColstripTransmissionSystem

ii

Scenario2:Colstrip1,2and3retire;1,355MWofwindenergyisaddedtotheCTS.

BecausethisscenariorepresentstheretirementofamuchgreaterfractionofthetotalcapacityoftheColstripgeneration,oneshouldexpecttheneedformoreengineeringanalysisanddesign.TherangeofvariationoftheflowoverPath8(Montana-to-Northwest)wouldbemuchgreaterunderthisscenario.ThisincreasesthedemandforshuntVArresources(seenote1)tokeepthevoltagewellregulatedastheflowvaries.Thisvariancewillsomewhatdependonwhetheranyoftheregulatinggeneration(usedtocompensateforthevariablenatureofthewind)islocalorremote(westoftheCTS).3

AssumingthatthereisnolocalregulatinggenerationtherangeofvariationinflowontheCTSduesimplytothevariabilityofthewindpowerinMontanawouldbegreaterthan1,500MW(partofthiswouldbeduetovariationofotherwindprojectsthatarealreadyinplaceinMontanathatcanbeexpectedtobepartiallycorrelatedwiththe“new”1,355MWofwind.Besidesthisvariation,theloadineasternMontanacanbeexpectedtovaryoverarangeofabout300MW.ThishastheeffectofrequiringalargernumberofvariableVArresourcesthatareflexible(seenote1)tomaintainthevoltagesinMontanawithinanacceptablerange.UnderthisscenarioitisnecessarytostudytheMontanatransmissionsystemunderawiderrangeofoperation,withtheexpectationthatanylevelofwindgenerationcouldlastforasignificantperiodoftime,andmustthereforebetreatedasanormalsystemcondition.

Therequired“WindRAS”forthisscenariowouldtakeonacompletelydifferentcharacterfromthatforScenario1.ItwouldberequiredtooperateindependentoftheATRwhenColstripunit4isoff-lineformaintenance,sincetheATRcanonlyoperatewhenatleastoneoftheColstripunitsispresent.TherearetwooptionsfordesigningaRASforthisscenario:1)ContinuetooperatetheATRforthepurposeofmakingthetrippingdecisionoftheremainingColstripunit(number4);2)RetiretheATRanduseasingleRASdevicetoprovidetrippingbothforColstrip4andforthenewwindgenerators.

Scenario3:AllColstripunitsareretired;2,100MWofwindenergyisaddedtotheCTS.

ThisscenariowouldresultinthemaximumpossiblevariationoftheflowontheCTS.Forthisreasontherecouldbesomesteady-statesystemoperationaldifficulties.WiththeverylimitedamountofconventionalgenerationineasternMontanatherewilllikelybe

3Thispaperwillassumethattheregulatinggenerationisremote(worstcasechoice).AnenergystorageplantsuchasthatproposedfortheHarlowtonareawouldbeapossiblewaytobuildlocalregulatinggeneration.Also,agas-firedcombustionturbine(aero-derivative,notcombinedcycle)locatedintheBillingsareacouldalsobeusedforlocalregulatinggeneration.

Page 7: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

ExecutiveSummary:RepurposingtheColstripTransmissionSystem

iii

significantvoltageconcernsthatwillhavetobemitigatedwithresourcessuchasVoltageSourceConverters(VSCs,STATCOMS),StaticVArCompensators(SVCs),switchedshuntdevices,orothersuchVARsources.ThenecessaryRASunderthisscenariomaybesimplifiedinsomewaysbecauseitwon’tberequiredtocoordinatewiththeATR.ThisRAScouldbesimplifiedfurtherbyusingacontinuousactingVARsourcesuchasaVSCoranSVCtominimizetransientvoltagedeviationscausedbysomecontingencies.Providingreliableloadserviceunderextremecalmwindconditionswillalsobeaconcern,thoughtheCTScancertainlycarryinenoughpowerfromWestCoastmarkets,assumingthatpowerisavailable.Systemrestorationafteramajoroutagecouldalsobeproblematic.RestartingalargeACpowernetworkwhenmostoftheresourcesarewindpoweredmachineswithinvertersthatrelyonastablesystemwithawell-regulatedfrequencywillrequireastablevoltagesource.ConventionalgeneratorsineasternMontanacanprovidesomestart-up.NorthWesternEnergywillneedtoconducta“blackstartstudy”toconfirmthisisenough.

Scenario4:ThisscenarioconsidersanysystembenefitsfromdifferentlocationsofwindgeneratorswhenallColstripunitsareretiredand2,100MWofwindenergyisaddedtotheCTS.

WiththecontemplationofsuchalargeconcentrationofwindgenerationineasternMontana,utilizingthestrongtransmissionconnectionthattheCTScanprovidewouldbeverybeneficialformovingpoweracrossthearea,supportingtheloadwhenthewindisdown,andexportingthesurpluswhenthewindoutputisatmaximum.Fromatransmissionengineeringperspective,thereisnoobviousadvantagetomovingthewindmachinesortheirpointsofinterconnectionfartherawayfromtheCTS.AtfullcapacityeachoftheabovescenariosrequiresasignificantamountofpowertobeexportedfromtheMontanaareasinceitfarexceedstheindigenousload.TheCTSprovidesthebestcurrentlyavailablemeanstoexportthesurpluspowerfromeasternMontanaintothewesterninterconnection.

TherearelineoutageconditionsalongtheCTSthatcancausethermaloverloadingoncertainelementsoftheCTS(atmaximumflowconditions).ThemostimportantexampleofthisistheoutageofoneColstrip—Broadview500kVline.Undermaximumflowconditions(withtheexistingcoal-firedgenerators)theoutageofoneoftheselinescancausetheflowintheadjacentlinetoexceedthecurrentratingofitsseriescapacitorbank.Aseriescapacitortypicallyhasanemergencyrating,butflowmustbecurtailedbeforeacertaintimehaspassed.Theprotectiverelayingwillautomaticallybypassthecapacitoratthistimelimit.However,bypassingaseriescapacitormaynotbeadesirableoutcome,fromasystemsperspective,sincevoltageswoulddrop.Also,duringsuchanoutage,generationthatisconnectedatColstripisatsomeriskofbeingtripped.IngeneraltheCTSiscapableof

Page 8: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

ExecutiveSummary:RepurposingtheColstripTransmissionSystem

iv

operatingatornearitsmaximumcapacitywithanysinglelineoutofserviceonatemporarybasis(insteadystateoperation).Placingsomeofthewind-poweredgeneratorssothattheyareconnectedatBroadviewinsteadofColstripshouldmitigatetheissueofasingleColstrip—Broadview500kVlineoutageasdescribedabove.

Ingeneral,noneoftheabovescenariosposeaproblemthatisknowntobeinsurmountable,butallofthemrequiresomeamountofadditionalstudyworkandengineeringtodesignthenecessarysystemreinforcementstoachievecompletelyreliableoperations.Theadditionalstudiesthatneedtobecompletedinclude:1)examiningallsingleanddoublecontingenciesontheCTSwithpowerflow,post-transientpowerflowanddynamicstudies;2)RASdesignandapproval(1-3years)3)PathRatingapprovalthroughthestandardWECCprocess(1-2years).Areasonableexpectationfortheamountoftimeitwilltaketoconductthesestudiesandreceivethenecessaryregulatoryapprovalsis1-3yearsdependingupontheavailablemanpowertocompletethework.

Page 9: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

1

Introduction

Thiswhitepaperisanefforttodelineateinbroadtermsthetransmissionissuesthatareinvolvedinretiringexistingcoal-firedgenerationatColstripandaddingnewrenewableresourcessuchaswindandsolartotheColstripTransmissionSystem(CTS).ThespecificquestionofretiringvaryingamountsofgenerationattheColstrippowerplantsineasternMontanaandaddingasimilaramountofwind-poweredgenerationconnectedtotheColstrip500kVsystematColstripandBroadviewisexaminedindetail.AcasualobservermaybetemptedtosuggestthatifsimilargenerationcapacityisconnectedtotheColstripswitchingstation,thetransmissioncapacityshouldsimplyremainthesame.However,thisideaignoresnumeroustransmissionissuesthatarenotapparentifoneisnotfamiliarwiththeelectrictransmissiondesignissuesoftheColstripproject.TheuniquefeaturesoftheCTSpresentcomplicatingfactorsthatmustbeaddressed.

Thispaperdoesnotattempttospecifythedesignofanynecessarysystemchangestoachieveamegawatt-for-megawattreplacementofcoal-firedgeneratorswithwind-poweredgeneration.Thatworkwillneedtobecompletedaspartoftherequiredgeneratorinterconnectionstudiesforspecificwindprojects.InsteaditisageneraldiscussionoftheengineeringissuesthatwouldariseduetotheuniquefeaturesoftheCTSandprovidescontextforthesolutionsandassociatedcosts.Thefocuswillbeonhowthechangefromcoal-firedgenerationtowind-poweredgenerationwouldleadtoadifferentsetofoperatingconcernsfortheColstripTransmissionSystem(CTS)andwhatthesolutionsandrangeofcostsassociatedwiththosesolutionsmaybe.

InthispaperthedesignissuesoftheCTSarediscussedwithoutengaginginalotoftechnicallanguageormathematicalexpressionsthatmightrequirethereadertobeversedinengineeringsubjects.Thegoalisnottocompletelyavoidtechnicalsubjects,butratherpresentthesesubjectsonaverybasicleveltogivetheaveragereaderabetterunderstandingoftheissuesandsolutionsthatexist.TheCTSpresentlyreliesonasophisticatedcombinationoftechnicalfeaturesthathavegreatlyenhancedbothitsreliability,anditscapacity.

Toreplacethecoal-firedgeneratorswithwind-poweredgeneratorsandretainasimilarcapacitywithsimilarreliabilitywillrequirespecificandtargetedengineeringsolutionstomakesurethatthesystemcanmeetperformancerequirements.

Page 10: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

2

TheColstripTransmissionSystem(CTS)

TheCTSstretchesforroughly500milesacrosstheStateofMontanaandnorthernIdahofromColstripinthesoutheasternquadrantofthestatetointerconnectionpointsintheeasternpartofWashingtonState.TheportionoftheCTSownedbytheColstripConsortium(CPM)extendsapproximately240milesfromColstriptotheownershipchangelocationnearTownsend,Montana.TheBPA-ownedportionofCTSextendsfromTownsendtoaswitchingstationcalled“Taft”whichisapproximately215mileswestneartheMontana–IdahostatelinenorthofI-90.TherearetwoBPAlinesthatinterconnectCTStopointswestofTaft.OneconnectsTafttoaswitchingstationcalled“Bell”nearSpokane,WA(about85mileswest);theotherconnectsTafttoaswitchingstationcalled“Dworshak”(nearthedamwiththesamenameabout75milessouthwestofTaft).

Page 11: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

3

Thereareeightimportant500kV(EHV)linesegmentsthatrepresentmajorelementsoftheCTSsystem.4EverylinesectionintheCTSisandmustbeseriescompensatedtoachievethepresentratingoftheCTSthroughoutthelengthoftheCTS.(Seriescapacitorbanksaremulti-milliondollarinvestmentswithuniqueinsulationandprotectionissuesthatrepresentsignificantengineeringconsiderationsintheirownright.)

Besidestheseeightlinesthateachrepresentamajorcontingency,thereisanother500kVlineconnectingtheTaftswitchingstationtoastationcalledHotSpringsinNorthwestMontana.ThisconnectsfourNorthwestMontanaHydro(NWMH)largehydro-electricplants(HungryHorse,Libby,CabinetGorgeandNoxon)intoBPA’s500kVsystematTaft.Therearealsoseveral230kVlinesthatknitthesefourplantstogether,andsomethatconnectthemintothegreaterSpokanearea.AthightransferlevelsonthetransmissionpathbetweentheMontanaArea,andtheNorthwestArea(Path8),thereissomeinteractionbetweenthelevelofthetotalgenerationproducedbytheNWMHplantsandtheflowonPath8thatisallowed.Generally,thesefourhydroplantsonlyoperateatpeakoutputduringpeakloadhoursinthespringmonths.Path8usuallyoperatesatmaximum

4Colstrip–Broadview500kVlineA(Broadviewisabout110mileswestofColstrip);Colstrip–Broadview500kVlineB;Broadview–Townsend–Garrison500kVline1(GarrisonisinwesternMontana);Broadview–Townsend–Garrison500kVline2;Garrison–Taft500kVline1(TaftisneartheboundarybetweenMontanaandIdaho);Garrison–Taft500kVline2;Taft–Bell500kVline(BellisnearSpokane,WA);Taft–Dworshak500kVline

Page 12: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

4

flowduringoff-peakhours.ThethermalplantsatColstripareoftenscheduledformaintenanceduringthespringtoavoidasituationwherethedemandsarehighonPath8duringthisseason.Duringthespringrunoffseason,curtailmentoftheflowovertheCTSmayberequiredoccasionally.Thechangefromcoal-firedgeneration,whichrequiresscheduledmaintenanceoutagesthatcanconvenientlybeusedtoavoidcongestiononPath8,towindpowerthathasnosuchmaintenanceschedulingcharacteristic,maycausetheneedtoworkoutsomeotherarrangementtoavoidtheconflictbetweenthesetwodemandsfortheuseofPath8capacityandtheWestofHatwaipathcapacity.

Page 13: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

5

ConsiderationsforAddingLargeAmountsofWindGenerationtotheColstripTransmissionSystem

Thenormalconcernsforatransmissionstudytoaccountforwhenexamininganypowersystemarethermaloverloads,voltagecontrolissues,andtransientstability.FortheCTSoneshouldalsoconsiderRASprotectionsimplybecauseofthelongradialcharacterofthesystemwithtwoparallellines.Also,becausetheCTSisseriescompensatedonemuststudySubSynchronousResonation(SSR);however,thespecificchangefromsynchronousmachines(coalfiredgenerators)tonon-synchronousmachines(windgenerators)makesthisissuechangeincharacter.ByfarthebiggestissuetoaddressistheRASprotectionone.IfoneassumesthattheRASprotectionisfunctioningcorrectly,thethermaloverloadissueisrathertrivial,andtheRASaddressesalltransientstabilityissuesautomatically.Voltagecontrolissuesmustbeaddressedinanycase.

Thermaloverloadingoccurswhenthereistoomuchpowerflowingoveraspecifictransmissionlineorsetoflines.Thetransmissionsystemisdesignedtoavoidthermaloverloads,butwhenaportionofthesystemfailsforwhateverreason,thermaloverloadsbecomeapossibilityandmustbemitigated.

TherearelineoutageconditionsalongtheCTSthatcancausethermaloverloadingoncertainelementsoftheCTS(atmaximumflowconditions).ThemostimportantsuchoutageistheoutageofasingleColstrip–Broadviewline(discussedintheexecutivesummaryabove).TherearealsooutageconditionsthatcouldresultinoverloadingoflinesthatoperateinparallelwiththeCTS.

Page 14: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

6

VoltageControlIssues

WhentheCTSisoperatedatitsmaximumtransfercapabilityitisloadedsomewhatabovetheSurgeImpedanceLoading(seenote1eonquadraturepowerfordetailonthissubject).Atthatflowlevel,voltagesonkeybuseswillbegintodecreasebelowacceptablelevelsunlessadequatereservesofVArsareavailable.ThegeneratorsmustproducemoreVArstocompensateforthetendencyofthevoltagetosag.IfthegeneratorsarenotcapableofproducingtheseVArs(asthecoal-firedgeneratorsnormallyare)thenotherdevicesmaybeneededtoproducetheseVArs.ContinuousVArcontrolisdesirableforqualityperformance.Thistopicisdiscussedfurtherbelow.

Colstripunits1and2areeachcapableofapproximately115MVArofreactivepoweroutputatfulloutput(continuouslyforlongperiodsoftime).Colstripunits3and4areeachcapableofapproximately270MVArofcontinuousreactivepoweroutput(thesemachineshavearatedpowerfactorcapabilityof95percent).Togetherthefourunitscanproduceanapproximatetotalof770MVAr.ThisVArcapacityisusedtotightlycontrolthevoltageontheColstrip500kVbus.TheycontinuouslysupplyVArsasnecessarytomaintainaconstantvoltageonthatbusoverawiderangeofflowconditions.ThisistheprincipalvoltagecontrolontheCTS.

Ifthe2,100MWofcapacityofthecoal-firedunitsisreplacedwithwind-poweredgeneration,itwouldrequireapproximately1,400largewind-turbinegenerators(thesefiguresarebasedona1.5MWwindunitsize).Thetotalreactivepowercapacityofthe1,400wind-poweredgeneratorswouldbeabout480MVAr(basedonanassumedpowerfactorcapabilityof97.5percent).UnderpartiallycalmedconditionstheVArcapacityofthewindfleetwouldbediminishedduetothegeneratorsthatarestopped(oroff-line).Thismeansthatthewindvariation(atlowspeeds)maycontributetovariabilityofsystemvoltageaswindmachinesdropoutatthecriticallowwindspeed.ItwillbemorechallengingtomaintainaconstantvoltageontheCTSusingafleetofwindgeneratorsthatisconstantlyinastateofflux.ItmaybewisetoinstallsomeVArgeneratingdevices(e.g.synchronouscondensers,VSCs,orSVCs)toassureacceptablevoltagelevelsaremaintainedsmoothlywithsomereserveVArsavailable.

Apowerflowstudyshouldbedonetoevaluatetheminimum(andmaximum)VArcapacityrequiredofthewindfleetunderpartially(andtotally)calmedconditionswheresomeunitsarenotavailableduetocalmconditions.UsingwindmachinesthatarecapableofproducingsomeVAroutputevenwhentheyarestoppedwouldhelptomitigatethisissue.Thesestudiesshouldbedoneduringheavyloadconditions,andalsoduringlightloadconditions(calmwindsmayoccurduringeithercondition).Voltagecontrolissuesmaydiffersignificantlyforthesetwoconditions.

Page 15: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

7

TheauthorhasproducedasinglepowerflowcasewithnoColstripgeneration,noauxiliaryloadsatColstrip,andnowindgenerationineasternMontana.Thepurposeofthiscasewasonlyto“calibrate”theremarksinthiswhitepaper.Thecasesolved,andvoltageswereinacceptableranges(somebuseswereafewpercentbelowthevoltagetheyareoperatedattoday).ThiscasesuggeststhattheexistingswitchedshuntdevicesontheCTSbusesarecapableofachievingacceptablevoltagesontheCTSforheavyloadconditionsandnocontinuousVArsupplyfromeitherColstripgeneratorsorthewindgeneratorsineasternMontanatoday.Thiswasonlyacursorylook,loadswerenotvaried(heavysummerloads2025wereused),andnodynamicstudieswereperformed.Underlightloadconditions,thevoltagemightbetoohigh.Thissinglecasedoesnotchangetheneedforacomprehensivestudy.

Also,atmaximumwindconditionsastudywouldbeneededtoverifythatsufficientVArsareavailabletomaintainadequatevoltageontheCTSusingarealisticfeedersystemtoconnectthewindmachinestotheCTS(completewithtransformersandintermediatetransmissionthatisreasonablyrepresentativeofactualgeneratorinterconnections).Thisshouldbeperformedatbothheavyloadandlightloadconditionsbecausemaximumwindconditionsmayoccurduringeitherloadingcondition.OneshouldexpectthemaximumflowontheCTStooccurwhenwindgenerationisatamaximumandtheloadinMontanaisataminimum.

Reactivepower(VArs)providedbyancillarydevices(capacitors,reactors,“synchronouscondensers”andstaticVArdevices,SVCsandVSCs)canbeusedtoprovidevoltageregulationonanACsystem.Thesebecomemorenecessaryifthe(real)powerflowlevelonthesystemvariesoverawiderange,andiftheflowlevelcyclesmoreoften.Problemscausedbyhighflowlevels(lowvoltage)cangenerallybemitigatedbyreducinggenerationtoreduceflow,butproblemscausedbylowflowlevels(highvoltage)wouldhavetobemitigatedbytheuseofshuntreactors(orcomparabledevices)thatabsorbtheexcessVArsthatthelinesaregenerating.

TheCTSpresentlyhasanassortmentofswitchableshuntreactorsthatareusedtoabsorbVArsunderlightpowerflowconditions(duringgeneratoroutagesprimarily).WhentherealpowerflowontheCTSislow,thevoltagetendstogohighduetotheVArsthatareproducedbythecapacitiveshuntreactanceofthe500kVlines.Asthewindspeed(averagedoverthewholecollectionofwindturbinesinMontana)decreases,therealpowerflowontheCTSwoulddecrease.Ifcalmconditionsprevailgenerally,therewouldbeaneedtotakemeasurestocontrolhighvoltageasthe500kVlinesincreasetheirVArproduction.Theseswitcheddevicesallowstep-wisecontrolofthesystemvoltage,butdonotprovidecontinuouscontrol.TheprimarysourceofcontinuouslyvariableVArsupplytodayistheset

Page 16: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

8

ofcoal-firedgeneratorsatColstrip.ItmaybenecessarytosupplementthecontinuousVArsupplyofmodernwindmachineswithaSVCorVSC,especiallyundercalmwindconditions.Thecostofsuchdevicesdoesnotrepresentasignificantportionoftheprojectcosts.

Therewouldbeaneedforpowerflowstudiesthatspecificallyaddresshowtomitigatethisoveravarietyofpossibleconditions.Includinglightandheavyloadconditionsforbothhighwind(fullgeneration)andcalmwind(windgeneratorsoffduetoverylightwinds).TheCTShasmanyfeaturesthatifappropriatelyusedwouldlikelybehelpfulformanagingtheCTSsystemvoltages.Someoftheseoptionsshouldonlybeusedwhenallothermethodshaveproventobeinadequate.Thesefeaturesinclude:

1. SwitchedshuntreactorsthatarealreadyinplaceatColstrip,Broadview,Garrison,andTaft.

2. SeriescapacitorsthatcanbeswitchedouttoincreaseVArlossesinthelineswhenthepowerflowinginalineislow.Unfortunatelythesehavelittleeffectwhentheseriespowerflowingislow.

3. OpeningonesegmentofalinetodeliberatelyincreaseVArlossesintheadjacentsegmentcanhelpcontrolhighvoltage.(Thisshouldnotbecommonpractice.)

Itmaybenecessarytoaugmentthevoltagecontrolfeaturesinthelistabovetoprovidemorevoltagecontrolatverylowflowconditions(partiallycalmed).Thiscanonlybeassessedbyperformingtherangeofstudiesdescribedabove.Totalsystemloadcyclesdailyandbothhighandlowwindconditionsmayoccuratanytimeofday.Thepossibilitythatitmaybenecessarytoaugmentthevoltagecontrolfeaturesaboveisgreatestwhenallofthecoal-firedgenerationisoff-line.Thenumberofdutycyclesofthethreetypesofdeviceslistedabove(peryear)maywellincreaseduetothevariabilityofthewindresource(totaloutput).Thismaycausetheneedtoreplaceswitchesthatareusedforvoltagecorrectionmoreoftenthanitisrequiredforthesystemwithcoal-firedgeneration.OnewaytomitigatethiswouldbetoaddsomecontinuouslyactingVArdevicessuchassynchronouscondensers,staticVArcompensators(SVCs),VoltageSourceConvertersetc.tothesystem.

Page 17: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

9

DynamicStudyIssues(“TransientStability”)

Transientstabilityreferstoatransmissionsystem’sabilitytowithstandamajorfaultandquicklyreturntoastableconditionbeforeadditionalproblemsoccurorspreadtootherpartsofthesystem.TheCTSiscurrentlyconfiguredwithaRAS(theATR)thatisdesignedtotripgenerationatColstripintheeventofthelossofatransmissionline.ThistrippingmechanismprotectsthetransmissionsystemandallowsforanincreasedtransfercapabilityonPath8.ThereisalsoaRASownedbyBPAthatswitchesreactorsoffatGarrisonforcertaincontingencies.

EarlyinthedesignphaseoftheColstripproject(inthe‘70s)itwasestablishedthatroughly2,200MWofgenerationwouldbeconstructed,andthatthiswouldrequiretwo500kVtransmissionlinesoperatinginparallel.IntermediatestationsattwolocationsbetweenColstripandthewesternterminusweredesignedtoallowforinterconnectionwiththeMontanasystem,andtoimprovetransientstabilitybyinsuringfaulteventsonlyresultedinapartiallossofeitherline.Theideawastosectionalizethesystemintothreeroughlyequalsegments.Historicaleventsforcedachangethatmadethecentralsectionmuchlongerthantheothertwosegments.ThisactuallyreducedthenativecapacityoftheCTS.ThishadtobecompensatedforbysupplyingamoreeffectiveRAS.

IntheearlystagesofplanningfortheCTSitwasdecidedthatthistransmissionsystemwouldbe“justenough”toservetheseplants.Itwaswellunderstoodthatmaintainingtransientstabilitywouldbeachallenge.Everyknowndeviceforenhancingtransientstabilitywasatleastconsidered.Muchwasdoneintheearlystudyphasetoreviewalloptionsforwaystoimprovestabilityandkeeptheoverallcostdown.Thisidealeddirectlytotheunderstandingthatgeneratortrippingwouldbeneededforcertaincontingencies(especiallythe“side-by-side”lineoutages).

Thus,theCTSreliedimplicitlyuponaRemedialActionScheme(RAS)fromitsinception.TheoriginalpresumptionwasthatthisRASwouldbea“DirectTransferTrip”(DTT)scheme.TherearenumeroussuchRASschemesinthewesterninterconnection.ThebasicideaofsuchaRASisthateachsystemoutage(lineortransformer)thatwouldrequiregeneratortrippingwouldbeidentifiedthroughourstudyeffort.Thisisnottoodifficultifthereareveryfewcriticalcontingenciesforwhichtrippingisneeded.Thencommunicationsline(s)betweentheswitchingstation(s)wherethelineterminalsforanyoutageoccurswoulddeliveratrippingsignaltotheappropriategenerator(s)tocausethemtobetrippedfortheoutage.Thisseemssimpleenough,butonemustrecognizethatthereareliterallydozensofoutagestostudyontheCTStobesurethattheRASwillcoverallnecessarycontingencies.SystemperformancewithoutaRASvariesgreatlywiththetotalflowontheCTS.Somelineterminalsarehundredsofmilesfromthegenerators.Communication

Page 18: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

10

circuitsthatarehighlyreliablearesometimeshardtofind(ortoputitanotherway,veryexpensive)inMontana.Thesecommunicationlineswouldneedtoberedundant(includingrouteredundancy)andalsosecuretopreventexcessivefalsetripping.ForeachoutagetheRASmustpromptlyinitiateanacceptableamountofgeneratortripping,enoughtoassuresystemstabilityispreservedoverarangeofflowlevels.Also,thepreciseamountofrequiredgeneratortrippinggenerallydependsontheflowlevelsonthecriticalelementsoftheCTS.Trippinglargecoal-firedgeneratorsisquiteexpensive.Itrequiressubstantialquantitiesofauxiliaryfueltorestartaplant,andthereisacertainriskofdamagetocriticalequipmenteverytimeaunitistripped.Forthisreasonitwasalwaysconsideredveryimportanttominimizefalsetripping.SavingonthecostofcommunicationsisoneofthegreatadvantagesoftheATR.

TheexistinggeneratorsatColstriparelargesteamturbine-generators.Thereareonlyfourlargesteamturbine-generatorsintheColstripproject.TheRASforthesemachinesonlyneedstomakefourtrip/notripdecisions,oneforeachofthefourunits.Thetotalgenerationoneachunitistrackedinreal-time,andeachofthe15possiblecombinationsofgeneratorsistotaledandsortedsothatwhentheATRproducesatrippingdecision,itcanquicklyselecttheappropriatecombinationofgeneratorstotriptogetjusttherightamountofgenerationtripping(withina“step-size”thatisaboutthesizeofonesmallunit).

Page 19: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

11

Designinga“WindRAS”fortheCTS

ToretiretheexistinggeneratorsatColstripandaddacomparableamountofwindgeneration,a“WindRAS”willhavetobedevelopedfortheCTSinordertomaintainacomparabletransfercapability.AlloftherecentCTSstudiesdiscussedinthispaperassumed(withoutproof)thatasufficientRASwasindeedinplaceandsomeassumedthatitwasaseffectiveastheexistingATRRASatColstripandcompatiblewithit(underallscenarioswhereanyofthefourColstripunitsarestilloperating).No“WindRAS”designhasactuallybeenproposedorchosen.Obviously,whena“WindRAS”designisactuallyproposed,itwillhavetodemonstrateitseffectivenessthroughtesting.Thiscanbeaccomplishedthroughadditionalstudies.TheinterconnectionstudiesforlargewindplantsconnectingtotheCTSconductedbyNorthwesternEnergysofarsuggestthatthecostofsuchaRASwouldbe$1millionto$4million.AlargepartofthecostofaRASisintheengineeringeffort.Thecostofthemajorequipmentwoulddependverymuchonthechosendesign.Longcommunicationpathsthatinvolvestringingfiberopticsovergreatdistancescouldgreatlyincreasethecost.Thelogicdevicesthataretypicallyusedareeitherlargeprogrammablelogiccontrollersorhardenedcomputers(rackmountedwithspecialfeaturesforhandlingmanydigitalinputs/outputs).Cleverengineeringmightsavesomemoney,butitisnotwiseto“gocheap”onthistypeofequipment.

Totriptheequivalentofonesmallunitofcoal-firedgenerationwouldrequireapproximately200wind-turbinestobetripped.Theequivalentofonelargeunitwouldbeabout500wind-turbines.Trippingsuchmassivenumbersofwindgeneratorsmightinvolvesubstantialamountsofswitchingequipment,dependinguponhowthewindgeneratorsareorganizedandconnectedtotheCTS.ItisnotdesirabletoseparatethewindgeneratorsintoverymanysmallparcelsbecausethecostofaRASwouldbehigherifitwererequiredtooperatemoreswitches.ThebestplanforsuchaRASwouldbetobringallsignalsfromremotelinesintoasinglelocationwherethe“brains”oftheRASislocated(redundantofcourse).Inorderto“manage”theamountofgenerationtotrip,thereshouldsomesimplewaytototalizethepowerfromeachgroup(thathasindividualtrippingavailable)ofwindmachinessothatonecantripthedesiredamountofwindpowerquickly,andavoidtrippingallofitforeverycontingency.GivingtheRASthecapabilitytotrippartialsetswouldbehighlydesirableinordertomaximizethecollective“plantfactor”forthefullsetofwindplantsbyavoidingexcessivetripping.Sinceeverygroupwouldhavevariableoutput,thiscouldrequireacarefullyengineeredRASdesign.

Ifoneiscontemplatingreplacementofthecoal-firedgeneratorswithwind-poweredmachinesontheCTS,thereislittlechoicebuttodevelopaDTTRAS.Thebestwaytocontrolthecostsistotakethemaximumadvantageofcommunicationpathsthatarealreadyin

Page 20: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

12

placeforthecurrentrelayingschemesthatprovideprotectionfortheCTS(faultdetectionandbreakeroperations).AdditionalcommunicationlinesmaystillberequiredtoprovidetheredundancyneededtomeetpresentdayRASdesignrequirements.ThiswillrequiresomeresearchtodeterminehowmanyoftheneededcommunicationlinesforanyproposeddesignareavailableintheexistingCTScommunicationslines.

ThemostimportantdesignfeaturenecessarytominimizetheadditionalrequirementsfortrippingthewindmachinesinvolvesthetopologyoftheconnectinglinesthatfeedpowerfromthewindplantstotheCTSsystem.Thepowerfromsizablegroups(200–500MW)ofwindcapacityeachshouldbefedthroughintermediatevoltage“trunk”linestotheBroadviewandColstripswitchingstations.Trippingshouldbeaccomplishedbyopeningthese“trunk”lines(mostly230kV).Eachtrippingactionwouldthustripasizeableamountofgeneration.Thecostofthehigh-reliabilityredundantcommunicationsrequiredtogetsignalstothese“trunk”linescouldthusbeminimized.Allofthese“trunk”linesshouldterminateclosebytheexistingCTSswitchingstations.

Thecontrollerforthe“WindRAS”probablyshouldbeatBroadview(itshouldberedundanttoo).TheotherchoiceisColstrip.AnothersetofredundantcommunicationslinesfromthesetwocontrollersshouldbesetupbetweenBroadviewandColstrip.ThisshouldcarrytrippingsignalstoColstrip(orBroadview)fromthecontrollerforeach“group”ofgeneratorsconnectedthere(all“feeders”shouldconvergeonthesetwostations).Costscouldbekeptdownbyminimizingthenumberof“groups”ofgeneratorsconnectedatColstrip.Also,trippinginformation(formatteddata)shouldbetransmittedtotheATRforthosescenariosthatthe“WindRAS”needstocoordinate.

Onepossible“simpleidea”forscenario1(whereColstripUnits3and4arestilloperating)wouldbetohavetheATRprovideacommunicationssignaltothe“WindRAS”controllerthatwouldtripthewind-poweredgeneratorsthataredesignatedtobe“replacements”forColstripunits1and2wheneveritwouldbecallingfortheirtrippingatpresent.Therewouldlikelybeaneedto“recalibrate”theATRtomakesuretrippingisreasonablyaccurate.

Thereareotherwaysthatmayworkjustaswell.ThemainrequirementforanyproposedRASdesignwouldbethatathoroughstudyhasbeendoneinadvanceoftheinstallationtoverifythesystemperformanceisassured.Thestudywouldbefairlyeasytoperform,butifthefirstideadidnotwork,onewouldneedtobepreparedwithotherideas.

Strongevidenceneedstobeprovidedtoshowthatanysuch“WindRAS”isreliabletothestandardsoftheregulatorsthatmustapproveanysuchschemeintheWECC.

Page 21: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

13

TheRoleofInertiainDynamicEvents

TheeffectofhavingalargeamountofwindgenerationconcentratedineasternMontanaduringaserioustransmissionoutageisanareathatrequiresfocusedstudy.Aseriousefforttomodelthedynamicsofthesystemwouldberequiredtoanswercriticalquestionsabouthowsuchachangewouldaffectperformance(long-termdynamicsstudiescouldbeusedtogainmoreunderstandingofthisissue).Theratioofthetotalwind-generationtothetotalgenerationprovidedbyrotatingsynchronousmachines(includinghydro-electric)isanimportantparameterinevaluatingthisconcern.MostoftherotatinginertiaineasternMontana(roughly90percentofit)isinthecoal-firedmachinesatColstrip.Therearejustafewsmallcoal-firedgeneratorsintheareabesidestheColstripunits.Therearegas-firedcombustionturbinegeneratorsinAnaconda,andnumeroussmallhydro-electricplantsinGreatFallsandpointsfurtherwest.So,forscenario2,3and4discussedinthispaper,therearesituationswherethetotalrotatinginertiaineasternMontanawouldbereducedbyafactoroften.Ifthispartofthetransmissionnetworkwereislandedforanyreason,thefrequencywouldbetentimesmoresensitivetoloadandgenerationchanges.Whilethissuggestsaninvestigationisinorder,thereisnotproofthatthiswouldleadtounacceptableoperationoftheremainingsystemaslongasitisconnectedtotheWECCthroughtielines.

Windgeneratorswouldactuallyeliminatesomeofthedynamicissuesdiscussedabove.Sincethewindgeneratorshavenoeffectiveinertia,ittakeslesstransmissionstrengthtostoptheover-speedeventthatcanoccurwhenthereisatransienteventcausedbyalinefault.However,steadystatevoltageperformancewouldneedtobemaintainedintheaftermathofacontingencythatrequirestrippingofwindgeneratorsasnecessary.AwelldonestudycoulddetermineifaproperlysizedstaticVArdeviceorvoltagesourceconverter(orseveralthatarestrategicallyplaced)couldmitigatethelowvoltagedipthatoccursduringadynamiceventprecipitatedbyafaultedlineandtheaftermath.Suchadevicemightallowtheamountofgeneratortrippingtobereduced(comparedtotheATRtrippingamount)forsomeofthelesscriticalcontingencyevents.

Page 22: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

14

OtherDynamicsIssues

Aproperdynamicstudymustmodeleachswitchingsequenceingreatdetailusingpreciseknowledgeaboutthespeedofthecircuitbreakers,protectionrelays,andanyautomaticswitchingthatmayexist(suchasaRAS).Theremaybeaneedforatrippingsignaltotravelovergreatdistancesandrelaysmust“pick-up”uponthearrivalofthissignalsothereareadditionaltimerequirementsherethatmustbeproperlymodeled.Itisveryimportantthatany“WindRAS”thatneedsto“coordinate”withtheATR(tobecompatible)mustactaftertheATRtrippingalgorithmshavehadtimetoact.Ifthisisnotdone,theveryactionoftrippingthewindgenerationearlywilltendtohavetheeffectof“blinding”theATRtotheevent.ThismayresultinthefailureoftheATRtoactforacriticaloutage.

Theexistingcoal-firedgeneratorsrequireauxiliaryfueltorestartthem.Thismakesthecostoftrippingthemsignificantevenwithoutregardtothecostofreplacementenergy.Thereisnosuchrequirementforfuelforawindmachine.Therealsoisnoneedforalengthydelaybeforeawindmachinecanberestarted(assumingishasnotbeendamagedbytheshutdown).Theauthorisnotawareofaseriousriskofdamagethatwouldresultfromfrequenttrippingofa“type-4”windmachine;however,thisisnotatrivialmatter,sincemanyunitscouldbeexposedtotrippingeachtimetheRASmustact.Forthispaperitisassumedthisisnotaproblem.Thus,forthisconcernitwouldappearthatwindgeneratorshaveacertainadvantageovercoal-firedgenerators.

Ontheotherhand,wind-poweredgeneratorshavesomefeaturesthatmayleadtodifficultiesnotfoundwithlargecoal-firedmachines:

1. Windturbinegenerators(including“type-4”machinesdonothavealargeshorttermemergencycapability(abovetheirnameplatecapacity)togenerateVArsthatimprovesystemperformanceduringemergencyconditionssuchasafaultedline.ThegeneratorsatColstripareequippedwithhighspeedexcitationsystems.TheserespondtoafaultbyquicklycausingthemachinestogenerateVArsatveryhighlevels(wellabovetheirsteady-staterating)forashortperiodoftime.WithlargeamountsofnewwindgenerationaddedtotheCTS,VoltageSourceConvertersstrategicallyplacednearloadcenterscouldhelpwiththisconcern,especiallyatBillings.

2. Windturbinegeneratorscannotbecountedontobeavailabletoservelocalloadduringoutages.Dispatchablereservegenerationwillbeneededtoservelocalloadduringsuchevents.InthesediscussionsthisisassumedtoexistwestoftheCTS.

3. Windturbinegeneratorsdonotgenerallyhavethecapabilitytoprovidefrequencyregulationinawaythatadvantagesthereliabilityofthepowersystemduringlargegenerationoutages.

Page 23: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

15

4. Whenadynamiceventoccursthewindmachinesdonotrespondtothefrequencyincreasebyameasurableincreaseinitsrotorspeedinthewaythatasynchronousmachinedoes.ThisimpliesthatadeviceliketheATRcannotworkonawindmachine(becauseitsprinciplesofoperationarenotcompatible).

Page 24: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

16

Sub-SynchronousResonance(SSR)Concerns

TheCTStransmissionlinesareseriescompensated(seriescapacitorsareconnectedtooneendofeachlinesection).Thisimprovespowerflowandstabilityperformance.Italsoreduceslossesinthelines,andhasotherbenefits(withoutseriescompensationonecouldarguethatathirdlinewouldhavebeenneeded,oratleastsomeotherremedywouldhavebeenneeded).However,seriescompensationalsocomplicatestheoperationandprotectionoftheCTS.Aseriescompensatedlinehasanaturalresonantfrequency.Typically,thecapacitiveimpedanceissmallerinmagnitudethanthereactiveimpedanceoftheline.Thisassuresthattheresonantfrequencyislessthanthesystemoperatingfrequency(hence“sub-synchronous”).Networksofsuchlinesnormallyhavemultipleresonantfrequenciesdependingonthenetworktopology.Ifavoltageisappliedat(ornear)aresonantfrequencyofthenetworkextremelyhighvoltagesmayoccur.Thismustbeavoidedtopreventapossiblecatastrophicfailureorseveredamagetotheline.Lineequipment(especiallyseriescapacitors)couldbedestroyed.Also,generatorsfeedingpowerintothesystemcouldbeseverelydamaged.Themostseriousnegativeeffectsofthisphenomenonarecollectivelyreferredtoas“Sub-SynchronousResonance”(SSR).

TherearethreetypesofSSR,5allofwhichhavesevereeffectsthatmustbeevaluatedforaseriescompensatedtransmissionsystemthatiswellconnectedtolargesteamturbinegenerators.AllwerestudiedfortheCTSduringthedesigneffort.

WhenweperformedtheoriginalSSRstudyworkforColstrip,wehadtostudyeachofthepossiblecombinationsofgeneratorsonlinebecausethesystemresonantfrequencieschangeforeachconfiguration.OfthefourColstripunits,theSSRriskisgreatestforColstrip

5ThethreetypesofSSRare:

1. Inductiongeneratoreffect:Becauseofthenaturalresonance,ageneratormayspontaneously“feed”thesystemresonancegeneratingcurrentatthatfrequency).Thiscanseverelydamagethewindingsinthegenerator.

2. TorsionalResonance:Whenasystemresonanceoccursasub-synchronoustorqueisdevelopedontherotorofeachconnectedgeneratorduetothecurrentflowinginthemachinewindings.Thistorquecanstimulatearesonanceintheturbine-generatormechanicalsystemthatcancauseseriousdamagetotheshaftofthemachine.

3. TransientTorqueAmplification:Whenswitchingoccursonthetransmissionsystemeachswitchoperationcausesatransienttorqueoneachconnectedgeneratorshaft.Thefirstswitchingeventstimulatesatorsionalvibrationthatmaythenbeenhancedbythenextswitchingevent(timingiscritical).Thiscanleadtoexcessivestressonthegeneratorshaftasitrings.Shaftfailureispossible.

Page 25: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

17

1and2.ThustheSSRrisktotheColstripunitswouldbegreatlyreducedforallofthescenariostreatedinthispapersincetheyarepresumedtoberetiredforallscenarios.

The“InductionGeneratorEffect”istheonlyoneofthethreetypesofSSRdescribedabovethatcouldbeconsideredanissueforwindgeneratorsingeneral.Type4windgeneratorsshouldnothavethisproblematallsincetheirinductiongeneratorisisolatedfromthegridbytherectifierinverterinterface.However,therehavebeencaseswherewindturbinegeneratorshadinteractionswithseriescompensatedlinesincloseproximitytotheirterminals.

Ibelievethepotentialissueformodernwindmachinesisthatthevoltageregulatorsintheseunitshavecontrollersthatarecapableofrespondingtovoltagechangesatfrequenciesthatarehighenoughtostimulatethesub-synchronousresonancesoftheseriescompensatedsystem.Insomecasesthetimedelayinthecontrolloopbetweenthevoltagesensorandtheamplifiercontrollingthevoltageregulatormayleadtoapositivefeedbackloopwhichcouldbedangeroustothegenerator.

Thelengthofthewindfeederlines,andthelocationofthePOI,wouldchangetheresonantfrequencyofthesystemforeachinstallation.Thisissueshouldbeexaminedthroughafrequency-domainstudyforeachgeneratorlocation,andifthereareissuesidentifiedforaparticularlocationthenthevoltageregulatorsonthewindmachinesatthatlocationshouldbemodifiedwithafilter(notchorlowpass)thatisdesignedtoavoidthisproblem.

Special“frequencyscan”programsarewidelyavailablethatcanbeusedtocalculatethefrequencyresponseofthepowersystematanybusinthesystemtodeterminethesystemresonantfrequenciesatspecificbuses.Thistypeofprogramshouldbeappliedbeforethegeneratorsareconnected.

Afterthefrequencyscanstudyforeachsiteiscompleted,afrequencyresponsetestmustbeappliedtotheinvertersofthespecificwindmachineschosenforthatsitetodetermineiftheyarecapableofexcitingthesystemresonance(s).Filtersshouldbeappliedtoeachmachineatthesitetoblockthegeneratorfromproducingpowerattheundesirablefrequencies.

Page 26: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

18

ExistingStudiesReview

a. 2014NorthernTierTransmissionGroup(“NTTG”)PublicPolicyStudy:6ThisstudybyNTTGexaminedtheretirementofColstripUnits1and2andtheadditionof610MWofnewwindinthearea.Thiswasonlyapowerflowstudyandalthoughitnaturallydidnotfindanymajorissues,itisoflimitedusebecauseitdidnotlookatthemoreimportanttransientstabilityquestions.ThepowerflowcaseswerecreatedundertheassumptionthataRASwasinplacetotriptheappropriateamountofgeneration(withoutproofoftheefficacyofanyspecificRASdesign).

b. NorthWesternEnergyStudies:7

NorthWesternhaspubliclyreleasedatleasttwostudiesexaminingcomponentsofscenarioswherealloforsomenumberoftheColstripUnitsareretiredandwindisaddedtotheCTS.OneofthestudieslooksatascenariowhereColstripUnits1and2areretiredandreplacedwithamixofdifferentresources,buttheremainingtwoColstripunitscontinuetorun.Thisstudyconductedadynamicstabilityanalysisandfoundnomajorissues,butitdoesidentifytheneedforadditionalstudyworkrelatedtotheRAS,frequency,voltagesupport,andpathrating.TheotherNorthWesternEnergyStudylookedatdifferentscenarioswhereallfourunitsatColstripareretiredandasmuchas2,520MWofnewwindisaddedtothesystem.Thisstudydidnotexaminethetransientstabilityquestions.

c. WesternWindandSolarIntegrationStudy,Phase3,Section4.2.1:8ThisstudyconductedbyNRELlookedatvariousscenariosofhighlevelsofnewrenewablesacrosstheWestandalsoconductedsomefocusedanalysisontheColstripareabecauseofthehistoryofstabilityissuesthere.ItexaminedlargeadditionsofwindandsolarinMontanawhileeitherallorthreeofthefourColstripUnitswerestilloperating.OnlyoneswitchingeventinMontanawasstudiedfordynamicperformance.ThiseventrepresentsthemostcriticalsinglecontingencyeventfortheCTS.Forthiseventthesystem(today)wouldgenerallybestablewithnoRASaction,butmaynotmeetvoltageperformancerequirements.ThecasewasrunfortheBaseCaseandforthe“Hi-mix”case.ThegreaterstartingangleindicatesthatMontanawasexporting

6http://nttg.biz/site/index.php?option=com_docman&view=download&alias=2405-nttg-report-for-the-2014-2015-public-policy-consideration-scenario-final-05-13-2015&category_slug=ppc-draft-report&Itemid=317http://www.mtaffordableelectricity.org/wp-content/uploads/2015/11/Attach-B-4-15-NWE-Study-Colstrip-111d-Shutdown-Impact-on-Transmission-5-8-15-Final.pdfhttp://www.northwesternenergy.com/docs/default-source/cpp/epa-cpp-transmission-impact-11-17-15-final-pdf8http://www.nrel.gov/docs/fy15osti/62906.pdf

Page 27: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

19

morepowerforthe“Hi-mix”case.ThefactthatthechangeinangleatthemaximumpointintheswingwasgreaterfortheBaseisademonstrationofthefactthatwindmachinescanbeexpectednottoaccelerateasmuchassynchronousmachineswouldduringswingevents.Interestingly,thisstudyfoundthatthestabilityofthesystemactuallyslightly“improved”withtheadditionsofnewrenewablestothesystem(becausetheswinganglewasreduced).Thisfacthaslittlebearingontheover-allperformanceofthesystemwithahighpenetrationofwindgenerationasareplacementforthecoal-firedplants.Thecaseisnotacriticalcase.Theover-allperformancewillneedtobeevaluatedforallcriticalcases.Itisquitelikely,thatthemostcriticalcasewill“setthelimit”fortransfercapability.NoRAS(noteventheexistingone)wasappliedforthisstudy.IftheATRhadbeenapplied,theremighthavebeengeneratortrippingforeitheroneorbothofthesecases.

d. NorthWesternEnergyGenerationInterconnectionSystemImpactStudies,ProjectNumbers:31,99,101,and115.9Theseinterconnectionstudiesexaminethelocalsystemrequirementsfornewgenerationinterconnectionsforvariouswindprojects.Thesestudiesdonottypicallyexaminethetransmissionquestionsweareconsideringhere,butareusefulinthattheyidentifytheneedforthesegeneratorstohaveanewRASandestimatethecosttobeintherangeof$1-$4million.

e. 2016NTTGPublicPolicyStudy(draft):10

ThisstudylooksatretiringColstripUnits1,2,and3andadding1,494MWofnewwindtotheCTS.ThestudysuggeststhatreplacingcoalwithwindmaybefeasibleontheCTS.Thisstudydidconductatransientstabilityanalysisandfoundnoviolationsundertheirscenariosandassumptions.However,theassumptionsforthisstudyweresimplytoooptimistic.ThisstudyalsoassumedthataneffectiveRASwouldbeinplacebutdidnotspecifythedesignofsuchaRAS.Instead,allwindgenerationwastrippedinstantly(toofasttoberealistic)foreverycriticaloutage.ThisisnotevenpossibleforarealisticRASdesign.Thismayhaveeffectively‘blinded’theATRoratleastdelayeditsresponse(seediscussionabove).Thisstudydidnotconsidersub-synchronousresonanceissuesnordoesitconstituteapathstudy.

Insummary,noneofthesestudiesidentifiedanyfatalflawsforconvertingtheCTStotransportwindenergy,atleastnotforthescenariosandassumptionsthatweremadefor

9Availableat:http://www.oatioasis.com/NWMT/NWMTdocs/GenConnect7.html10http://www.mtaffordableelectricity.org/wp-content/uploads/2015/11/Attach-B-4-15-NWE-Study-Colstrip-111d-Shutdown-Impact-on-Transmission-5-8-15-Final.pdf

Page 28: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

20

eachstudy.Thisismostlybecauseallthesestudieswerelimitedinsomefashionandthusnotcapableofrevealingsuchflaws.Allofthestudiesrecognizedtheneedformorecomprehensivestudyworkand,ultimately,thedesignandengineeringofspecificmitigations.Thetoolsexisttomakethesescenariosrunreliably,butthetimeitwilltaketodothestudyworkanddesignthechangestothesystemissignificant.Thispaperdescribestheadditionalstudyandengineeringworkthatneedstobeaccomplishedandtimingconsiderationsforcompletingthiswork.

Page 29: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

21

ExaminationofFourColstripRetirementandNewWindScenarios

Scenario1:

ThisscenariopostulatesthatColstrip1and2havebeenretiredand610MWofwind-poweredgenerationisaddedtotheColstripswitchingstation(thetotalnetgenerationfromunitsoneandtwoisapproximately610MWmaximum).

Forthisscenariopowerflowissueswouldbeminimalandthisispartiallysupportedbythepreviousstudyworkdiscussedabove.(Although,therewasnodemonstrationoftheeffectivenessofanyparticularRASdesign.)

Underthisscenario,thevariationofthewindpowerfromzerotomaximumdoesnotrepresentaseriouschallengetotheabilityoftheexistingCTSequipmenttomaintainvoltageswellwithinacceptablelimits.ThisisbecauseColstrip1and2together,amounttoonlyapproximately29percentofthetotalColstripnetcapacityandthepercentageoftheavailableVArcapacityforthesetwounitsislessthan29percentofthepresenttotal.TheCTStotalgenerationvariesbythisamount(610MW)fairlyoftenforvariousgeneratoroutages,ordispatchingchoices.TheCTSworksverywelloverthisrangeonasteady-statepowerflowbasis.Colstrip3and4haveplentyofreserveVArcapacityformaintainingvoltagesineasternMontanaatfullloadwhentheyareon-line.

Ifonlyoneofthelargeunitswereinserviceforthisscenario,VArsupplyshouldstillbeadequate;however,toproperlyevaluatethisscenario,oneshouldstudythesystemwitheitherColstripunit3orunit4off-line(andunavailable).Thisisnecessarybecauseallcoal-firedgenerationplantsrequireannual(ornearlyannual)maintenanceoutagesthatlastforweeks.Duringthemaintenanceoutagetheplantwouldnotbeavailableatall.

Ifthewindpowerisoff(orverylow)underthisscenariothereareshuntreactorsavailableatBroadviewandColstrip.Thesewouldhelpkeepvoltagesundercontrol.Plannedgeneratoroutagesforthecoal-firedunits(3and4)couldbemanagedtoavoidsimultaneousoutages(aforcedoutageofthelastColstripunitshouldbemanageable,butrare).

Forthisscenarioa“WindRAS”isneededtotakesomeorallofthewind-poweredgenerationoutofservicerapidlyforcertaincontingenciesatmaximumflow.ThisRASwouldhavetocoordinatewellwiththeATRwhichprovidesforthetrippingoftheColstripcoal-firedgenerators.ThismeansitwouldhavetotripinatimeframethatisafterthedecisiontimeoftheATR,butfastenoughtobeeffective.Iwouldnotexpectthistobeaprohibitivelydifficultthingtodo,buttherewouldbeaseriousneedtoadequatelystudythis,andprovethatonehasaschemethatismutuallyacceptabletothewind-power

Page 30: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

22

ownersandtheColstripowners.QualifyingaRASinthepresentdayregulatoryenvironmenttakessignificanttime.ThesoonerthisworkcanbeginthelessdelaywilloccurbetweenthetimethatColstripUnits1and2retireandthetimethatnewgenerationcantakeservice.TheWECCRASRS(RemedialActionSchemeReliabilitySubcommittee)conductsthetechnicalreviewoftheproposedRASdesign.

Withawell-designed“Wind-RAS”thereislittlereasonforconcernaboutasignificantreductioninthepathratingofPath8.Anyincrease(ordecrease)intheratingwouldhavetobedemonstratedthroughtheresultsofthestudyeffortneededtoqualifytheRAS.Thisstudywouldalsobethedefinitivetestofthesignificanceofconcernsaboutinertia.AproperRASdesignneedstomakesurethattrippingofthewind-poweredmachinesdoesnotgetinitiatedbeforetheATRhasmadeitstrippingdecision,butbeforethereisasignificantdeteriorationofthepowersystemconditions(droppingbusvoltages)hasoccurredinanysimulatedevent.Theauthorhasbeeninvolvedinotherstudiesthatshowthisisinfactfeasible,howeverthesestudieswerenotspecificallyfocusedonsubstitutingwindforcoal.

Scenario2:

ThisscenariopostulatesthatColstrip3hasbeenretired(inadditiontounits1and2)andthat1,355MW(thisisthetotalnetcapacityofthethreeunits)ofwind-poweredgenerationisaddedtotheCTS.Thisrepresentsapproximately64.5percentofthetotalcoal-firedgenerationcapacityatColstrip.

Thisscenariowouldleadtoamuchgreatervariability(morethandoublethatofScenario1above)ofthegeneration(bothrealpowersupplyandVArsupply)availableatthesourceendoftheCTS.MeaningfulstudiesshouldincludeexaminingthissystemwithColstrip4out-of-service(asaplanned,long-termoutage).Thisisneededbecausecoal-firedgeneratorsgenerallyrequireannualmaintenanceoutages.Theseoutagesoftenlastforweeks.Forsuchanextendedperiodoftimeitisreasonabletoexpectthewindtobecalmedforapartofthattime.ThismeanstherewouldbeverylittlegenerationavailableineasternMontana.TheflowontheCTSwouldbereversed.WithnoVArresourcesexceptforswitchedshuntdevicesandthreemuchsmallercoal-firedmachines(onenearColstrip,oneinHardenandtheotherinBillings)voltagecontrolwouldbesomewhatdifficult.Itmayrequireextra-ordinarymeasurestooperatetheCTSundertheseconditions.Somewind-poweredgeneratorsarecapableofsupplyingVArswithnowindavailable—thiscouldbehelpfulforprovidingsmoothervoltageregulationundercalmconditions.

Page 31: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

23

Forthisscenarioa“WindRAS”isneededtotakesomeorallofthewind-poweredgenerationoutofservicerapidlyforcertaincontingencies.ItwouldhavetoeithercoordinatewellwiththeATRwhichprovidesforthetrippingoftheoneremainingColstripcoal-firedgenerator(unit4),orsimplyreplaceit.Inanycasethis“WindRAS”wouldhavetobeabletofunctionwhenunit4isoutofservice(thisoutageimpliesthatnoATRisavailable).TherearetwobasicoptionsforsuchaRASdesign:

Option1:

WhenColstripunit4ison-line,the“WindRAS”wouldhavetocoordinatewiththeATR.Thismeansthatthe“WindRAS”wouldhavetoexecuteitstrippingactionaftertheATRhashadenoughtimetoevaluatetheeventforthetrip/notripdecisionforColstripunit4.And,whenColstripunit4isoff-line,the“WindRAS”wouldhavetobeabletoapplyanynecessarytrippingforthewindgenerationthatisonlinewhenacriticaleventoccurs.

Option2:

WhenColstripunit4ison-linethe“WindRAS”wouldneedtoincludethatunitinitstrippinglogic.WhenColstripunit4isoff-line,the“WindRAS”wouldhavethesamefunctionasforoption1above.

Thestudyefforttodesigna“WindRAS”forthisscenariowouldthushavetobeflexibleenoughtocopewithtwoquitedifferentsituations.Effectively,the“Wind-RAS”mustfunctionfortwoquitedifferentversionsofthepowersystem(withColstrip4on,andwithitoff)andwouldlikelyrequiremoretimetoproduce(roughly6-12months).

Oneshouldexpectthereviewprocesstobelongertoo(possiblyupto3years).TheWECCRASRS(RemedialActionSchemeReliabilitySubcommittee)conductsthetechnicalreviewoftheproposedRASdesign.

Themainrequirementfordevelopingthe“WindRAS”wouldbetotestthedesignadequatelyinadvanceofitsinstallationthroughanextensivestudyeffort.Thiswouldrequireexaminationofeverysingleandeverydoublecontingency.Becausethisscenarioinvolvesamuchlargerfraction(butnotall)oftheexistingColstripcapacity,thisstudyworkwouldneedtobemorecomprehensiveandwouldtakemoretimethantheonerequiredforscenario1above.AllcaseswouldhavetobeperformedwithandwithoutColstrip4on-line.

Withawell-designed“WindRAS”thereislittlereasonforconcernthattherewouldbeasignificantreductionintheratingofPath8.Anyincrease(ordecrease)instabilityconcernswouldhavetobeansweredthroughthestudyefforttoqualifythe“WindRAS”.Thiswould

Page 32: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

24

alsobethedefinitivetestofwhethersignificanceofconcernsaboutinertia(atleastfortransientswitchingeventsontheCTS)isjustified.Aproper“WindRAS”designneedstomakesurethattrippingofthewind-poweredmachinesdoesnotactuallyoccurbeforetheATRhasmadeitstrippingdecision,butdoesactintimetoassuretheproperrecoveryofthepowersystemaftertheswitchingevent.Therehavebeenstudiesthatshowthisisinfactfeasible.

Scenario3:

Thisscenariopostulatesthatallfourofthecoal-firedgeneratorsatColstriphavebeenretiredandthat2,100MWofwind-poweredgeneratorsareaddedtotheCTS.

ThisscenariowouldimplythatnoVArresourcesareavailablefromthecoal-firedgeneratorsregardlessoftheamountofwind-poweredgenerationavailable.Somewind-poweredgeneratorsarecapableofsupplyingVArswithnowindavailable—thiswouldbehelpfulforprovidingbettervoltageregulationundercalmconditionsthoughitmaynotbenecessarygiventheexistinggenerationandswitchableshuntdevicesthatareavailableineasternMontana.

ThetotalcustomerloadineasternMontana(connectedthroughtheBroadviewandColstripswitchingstations)variesfromabout300MWto600MW.Underextremelycalmconditions(lowavailabilityofwindgeneration)theflowwouldbewesttoeastontheCTS.ThepowerflowneededtosupplyloadsinMontanawouldcomemostlyfromthewestandenterthroughtheGarrisonandBroadviewswitchingstations.Astheloadvaries,switchedshuntreactorsatGarrisonandBroadviewwouldneedtobeswitchedon(oroff)inordertokeepthevoltagesonthe500kVbuses(andtheunderlyingMontanasystem)withintheirdesiredlimits.ThevoltagechangeasdevicesareswitchedwouldbemorenoticeablesincetherewouldnotbecontinuouscontroloftheCTSvoltagebytheColstripgenerators.ContinuouscontrollerVArresourcescanbeappliedinordertoevenoutthevoltageundertheseconditions.Devicesthatcanprovidethiscapabilityare:1)Synchronouscondensers,2)VoltageSourceConverters(VSCs),3)STATCOMsand4)StaticVArCompensators.

Forthisscenarioa“WindRAS”isneededtotakesomeorallofthewind-poweredgenerationoutofservicerapidlyforcertaincontingencies.This“windRAS”wouldhavetobeabletofunctionadequatelyforeverycritical500kVcontingencyontheCTS.Ideally,itwouldissuemeasuredamountsoftripping,insteadofsimplytrippingallofthewind-poweredgeneratorsforeverycontingencyknowntobeanissue.Atreducedamountsofwindgeneration,itmaynotneedtotripatall.

Page 33: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

25

Themainrequirementfordevelopingthe“WindRAS”wouldbetotestthedesignadequatelyinadvanceoftheinstallationthroughanextensivestudyeffort.Thiswouldrequireathoroughstudyeffortexaminingeveryplausiblecontingency.

Withawell-designed“Wind-RAS”itshouldbepossibletoavoidasignificantreductionintheratingofPath8.Becauseoftheintermittentnatureofthewindpowertheamountoftimethatthesystemwouldbeloadedhighenoughtorequirethemaximumamountsofgeneratordroppingshouldbelower.Anyincrease(ordecrease)instabilityconcernswouldhavetobeansweredthroughthestudyefforttoqualifythe“WindRAS”.Thiswouldalsobethedefinitivetestforconcernsabouttransientstabilityperformance.Aproper“WindRAS”designneedstomakesurethattrippingasufficientfractionofthewind-poweredmachinestakesplaceintimetoassurethatthetransientstabilityperformancestandardsoftheWECCaremet.TheRASRS(RemedialActionSchemeReliabilitySubcommittee)conductsthetechnicalreviewoftheproposedRASdesign.

Scenario4:

Thisscenariopostulatesthatallfourofthecoal-firedgeneratorsatColstriphavebeenretiredandaskstheopenquestionwhethertheremightbe“systembenefitsassociatedwithmovingsomeofthewindtoothersubstationsinMontana,”ascomparedtosimplyconnectingthemtotheColstripandBroadviewswitchingstationsasproposed.

Inshort,therearenoobviouselectricalbenefitstobegainedbyconnectingthewindtootherstations.TheremaybesomesmallbenefittoconnectingmoretoBroadview,andlesstoColstrip,butthisisnotcritical.(ItwouldreducetheprobabilitythataColstrip–Broadview500kVoutagewouldcauseanoverload.)TheCTSiscertainlythemostsubstantialtransmissiontoconnectsuchalargeamountofgenerationtotheMontanatransmissionsystem.

Itwouldbeawisechoicetodividethewind-poweredgeneratorsintosubstantiallyequalsizedgroups.Eachgroupshouldbeaboutthesamesize(say300–500MW).Forexamplefourequalgroupswitheachgrouphavingapproximately525MW.Thiswouldsimplifytheefforttoproperlystudyanddesignthe“Wind-RAS”.TheRASRS(RemedialActionSchemeReliabilitySubcommittee)conductsthetechnicalreviewoftheproposedRASdesign.

Page 34: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

26

NOTES:

1. Powerflowstudies(steady-state):Issuesthatmustbeaddressedinpowerflowstudiesare:

a. Voltageregulationastheflowlevelvariesfromminimumflowconditionstomaximumflowconditionsbothforthefullsystem,andforoutagesituations.(Voltageatintermediatestationsthatarenotregulatedbygeneratorsmaysagduringheavyflowconditionsonthelines,andfloattoohighwhenthelinesarelightlyloaded.)Voltageregulationisgenerallyachievedbyusingdevicesthatproducequadraturepowertomanagethevoltagewhenthesystemisunderstress.Voltageregulationisthemostimportantsteady-stateissueforthescenariosdiscussedinthispaper.

b. Thermaloverloading(flowmayexceedratingofaline,orseriesconnectedlineequipmentsuchasseriescapacitors,switchesetc.).Thermaloverloadingisgenerallycausedwhenexcessrealpowerisflowingthroughcriticalelementsinthenetwork.

c. RealPowerIssues:ThefirstthingIshouldsayaboutrealpowerissuesisthatthereshouldbeminimalproblemsprovidedtheamountofwind-poweredgenerationisnogreaterthanthatproducedbythecoal-firedgeneratorsinplacetoday.Realpowerisrealpowerwhetheritisproducedbywindturbinegeneratorsorsteamturbinegenerators.Thisistheunderlyingfactthatpromotestheideathatthecoal-firedgeneratorscansimplybereplacedwithwindgenerators.Thisiswhyoneshouldnotexpectnewrealpowerflowproblemstocomeupbecauseofthesubstitutionofwind-powerforcoal-firedpower.Thisimplies,however,thatstudiesthatonlyexaminesteady-staterealpowerflowissueswillnotrevealanyproblemsandreallydoesnotaddresstheprimaryconcernsinvolvedwiththescenariosexaminedinthispaper.

Page 35: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

27

d. ReactivePowerIssues:11Inthepowertransmissionstudybusinesswegenerallyonlyuse“reactive”unitstoavoidconfusionasmuchaspossibleandsimplytreattheVArsasasignedquantity.Inthisterminology,ashuntcapacitorinjects“reactive”VArsintothepowersystem,andashuntreactorabsorbs“reactive”VArsfromthesystem.Generatorscan(anddo)producequadraturepowerofeithersign.Theydothiswhiletheysimultaneouslyproducerealpower.Typically,coal-firedgeneratorshavelargercapacitytoproduceVArs(ofeithersign)thandowindmachines.ShuntcapacitorscanbeusedtogeneratesupplementaryVArsasneeded,butthesetypicallyswitchinlargesteps.Large“synchronouscondensers”canproduceVArswithcontinuouscontrolsimilartoacoal-firedgenerator.Youcanthinkofa“synchronouscondenser”asageneratorthathasnoprimemover.Becausethereisnoprimemoveritcannotproducerealpower,butithasanexcitationsystemjustlikeageneratordoes,andcanproducereactivepowerofeithersign.Thesecanbeusedtoregulatethevoltageonabussmoothly.

e. Reactivepowerissuesintransmissionlines:Atransmissionlineproduces(orconsumes)VArs.Infact,alinecannotbestoppedfromdoingthis.ThenetVAroutputofatransmissionlinedependsuponhowmuchrealpowerisflowingthroughit.Whenatransmissionlineisidle(connectedbutwithzerorealpowerflowing),itgeneratesthemaximumamountofVArspossible.Itdoesthisasanaturaloutcomeofthephysicalcharacteristicsoftheline(largeparallelconductorsstretchingformilesoverthesurfaceoftheearthwhichisconductive).Atransmissionlineactslikeaverylongcapacitor.

Thelongertheline,themorecapacitanceithas.(Whenphasewiresare“bundled”thisaddscapacitivereactancebecausetherearemorewires.)AllofthelinesintheCTSare“bundled”.Thisisnecessarytomitigatecoronalossesandtoreducetheelectricfieldsthatthelinesproduceatgroundlevel.

11Definitionsoftwocomponentsofpower:WhenACcurrentflowsinanydevice(e.g.powerline);theappliedvoltageisnotnecessarilyinphasewiththecurrent.Foranyphaserelationship,onemaythinkofthecurrentashavingtwocomponents:1)Thecomponentthatisexactlyinphasewiththevoltage:Thiscomponentiscalled“Realpower”(measuredinWatts,Kilowatts(kW)andMegawatts(MW).Realpoweractuallyiscarryingenergythroughthedevicethatiscapableofdoingworkovertime.Normally,wejustshortenthenameto“power”,sinceitisthepartoftheACcurrentthatcarriesenergyfromthesourcetotheload.2)Thecomponentthatisexactly90degreesoutofphasewiththevoltage.Thiscomponentiscalled“Quadraturepower”(or“VArs”).Quadraturepowerdoesnotcarryenergythroughadevicethatiscapableofdoingwork.Itcanhowever,haveaveryimportanteffectontheperformanceofatransmissionsystem.

Page 36: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

28

Astherealpowerflowonatransmissionlineincreases,thereareVArlossesinthelineduetoitsseriesinductance.Atacertainpredictablerealpowerflowlevel,theVArlossesinthelinebecomelargeenoughtomatchtheVArsbeingproducedbytheshuntcapacitanceoftheline.Thisflowlevelisreferredtoas“surge-impedanceloading”(SIL).(SeriescapacitorshavetheeffectofincreasingtheeffectiveSILofatransmissionline.)WhentheflowisaboutequaltotheSILthelineneitherconsumesnorgeneratedVArs(VArlossesmatchtheVArsthatarebeinggenerated).AtflowsgreaterthantheSIL,theVArlossesgrowlarger,andthereisnetlossofVArsintheline.AtflowshigherthantheSILasystemwillbegintohavelowvoltageproblemsastheVArlossesinthelinecontinuetoclimb.

IfnothingisdonetocounterbalancetheeffectoftheVArlossesthataregeneratedinthelinesasdescribedabove,thevoltageatthebusesalongthelinemaybetoohighatlowflowlevels,andtoolowathighflowlevels.Neitherconditionisacceptable.

AtlowflowlevelsvoltagesonkeybusescouldgotoohighunlesstherearedevicesavailabletoabsorbtheexcessVArsbeinggeneratedbythetransmissionlines.Again,ifthegeneratorsarenotcapableofabsorbingthesurplusVArs,otherdeviceswillhavetobeputintothesystemtodothis.Suchdevicesincludesynchronouscondensers,largestaticVArcompensators,switchedcapacitorbanks,andswitchedshuntreactors.

2. Transientstabilitystudies:Transientstabilityissuesareaboutthedynamicperformanceofthetransmissionsystemduringthefirstfewsecondsafterafaulthasoccurred.ForanyACpowersystemtheremaybecertaincriticalcontingencieswherethesystemmaybedynamicallyunstablebecauseacriticalline(orsetoflines)mustbeopenedtoclearthefault.Suchaneventmayleadtoa“blackout”ofasignificantpartofthetransmissionsystem.Ataminimum,aproperevaluationofaproposalsuchasthereplacementofthecoal-firedplantsatColstripwithwindgeneratorsofequalnetcapacityrequiresathoroughstabilitystudy.ThisisbecausetheCTSalreadyreliesuponaRASfortransientstabilityperformancefornumerouscontingencies.

3. RASissues:ThepurposeofaRASistoprotectthereliabilityofapowersystemforeventsthatcannotbeallowedtoproceedwithoutinterventionbeyondthatprovidedby“simpleprotection”.RASissuesareaboututilizingspecialrelayprotectionschemestoperformnon-traditionalswitching(suchasgeneratordropping,orswitchingofother

Page 37: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

29

systemcomponents)topromotetheabilityofthesystemtorecoverfromacriticalcontingency.ARAScanexpandtheoperatingrangeofaspecifictransmissionsystemtransferpath(perhapsonethatisotherwise“weak”)beyondwhatcanbeachievedthrough“simple”protectionschemes.(Simpleprotectionschemescanbeconsideredtobethosethatareaccomplishedbyusingtraditionalline-relayprotectiontoopenafaultedlineatbothendsinordertoremoveitfromserviceand“clear”thefault.)ARAScanbeusedtoremedya“powerflow”problemsuchasanoverloadorlowvoltagecondition,oratransientstabilityproblem.TherearenumerouscriticalcontingenciesintheCTSforwhichoperationatfullcapacitywithnoRASwouldresultinunacceptableperformance.Insomecasesthesystemwouldbecompletelyunstable.ForthisreasonitismandatorythattheCTSbeequippedwithafunctioningRASthatiscapableofprotectingagainstthelossofsystemstabilityorinsomecasesunacceptablevoltageperformance(regardlessofthetypeofgeneratorsusedtosupplythepower).Withtheexistingsystem,theRASthathandlesthebulkoftheseissuesistheATR.Thisdeviceemploysanunusualtechnology.ItmonitorstherotorspeedofthesynchronousmachinesatColstrip,andmakesalltrippingdecisionsbasedontherelativespeed,acceleration,andangleoftherotorsduringapotentiallyunstableevent.WiththereplacementoftheColstripsynchronousmachineswithwindgenerators,theATRcouldnotfunctionbecauseoftheprinciplesofoperationofthedevice.Instead,itwillbenecessarytobuildanewRASschemebasedonsomeothertechnology.ThemostobviouschoiceisaconventionalDirectTransferTrippingscheme(DTT).Inthispapertheterm“WindRAS”hasbeenusedconsistentlytorefertothisscheme.Regardlessofthescenario,someformof“WindRAS”willbenecessarytoprovidefortrippingthewindgenerators.ThisrepresentsthesinglemostcriticalengineeringdesignissuethatmustbemetinordertoprovidecomparablereliabilityandcapacityfortheCTSunderthescenariosconsideredinthispaper.

4. SeriesCompensation:Sometimes,“seriescompensation”isusedtoeffectivelyreducetheseriesimpedanceofaline(capacitorsareplacedinserieswithsometransmissionlines).Thishasthebeneficialeffectofimprovingpowerflowcapacityontheline,andvoltageperformance.Itcanbeasolutiontoproblemsdescribedin(Note1)aboveanditcanalsohelpwithtransientstabilityissues,(Note2)above.Youcanthinkof

Page 38: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

30

seriescompensationasawaytomakeaweaklinestronger.Whenpoweristransferredoververylongdistances(hundredsofmiles)itrequiresacarefuldesigntoachievehighpowertransfers.Ingeneralthelongerthedistance,themoreimportantitistousehighertransmissionvoltages(toreducetherequiredamountofcurrent),themoreimportantitbecomestouseseriescompensation(toeffectivelyreducetheimpedance),andthemorelikelyitbecomesthattransientstabilitywillalsobeaproblem.AlloftheseissueswereimportanttothedesignoftheCTS.

5. Inertiaissues:

a. Inaswitchingeventcausedbyafault,higherinertiainthesourcecan“buytime”fortheresponseoftheprotectionsystemallowingforalongerfaultclearingtime.

b. Thedownsideofhighinertiaisthatifahighinertiageneratorgainsenoughspeedduringafault,itwillbehardertoslowitdownwithouthavingitlosesynchronism.(Thereisnoperfectvalueforinertiafromatransientstabilityperspective.)Duringaswitchingevent(causedbyafault)theaccelerationoftheunitsnearthefaultedlinecontinuesatleastuntilthefaultiscleared(normallythisis3-4electricalcyclesorabout0.050-0.067seconds).Asthecircuitbreakersopenforthefaultedline(removingitfromthesystem)theremainder(weakened)systemmustbecapableofslowingthemachinesthatwereacceleratedbythefaultandrestoringequilibrium.Allofthekineticenergythathasbuiltupintherotorsofthegeneratorsmustbeabsorbedandtheymustberestoredtosynchronousspeed.

c. Forlongtermfrequencyperformanceofacompletepowersystemthemoretotalconnectedinertiathebetter.Thehighinertiamakesiteasiertokeepthesystemfrequencyconstant.Highinertiasmoothstheresponseofthesystemtochangingloadsandchangingtotalgeneration.Reducingtheinertiainalargesystemwouldeventuallyresultindifficultiesmaintainingaconstantfrequency.EasternMontanaiswellconnected(throughtheCTSandotherweakerties)totherestofthewesterninterconnection.ReducingthetotalinertiaineasternMontana,asexaminedthroughthescenariosinthepaper,willmakeeasternMontanamoredependentupontherestofthewesterninterconnectiontomaintainaconstantfrequency.Iftheentirewesterninterconnectionissimilarlyreducinginertia,eventuallythewholesystemwillhavedifficultiesmaintainingaconstantfrequency.

d. Foraswitchingeventsuchastheonedescribedin(b)above,windturbines(type4)wouldnotaccelerateasmuch(theinverteronlytrackssystemfrequency—theprimemovermaybegintodumpwindtoavoidover-speedingtheturbine)duringthefault,

Page 39: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

31

buttheywouldgoonsupplyingconstantelectricpowertoatransmissionsystemaslongastheirlocalvoltagepermitsthat.Theinvertercontrollerstrivesforconstantpower.Duringanoutage,thesystemmightneedrelieffromthisflow(dependinguponwhichlinemustbeopened).Anysynchronousmachinethatmightbeoccupyingthesamesystemwouldbeacceleratingfromitsownprime-mover—andfromthepresenceofthewindmachinestoo.So,itwouldaccelerateevenfaster.Asthesynchronousmachinesnearbyaccelerate,thewindmachineswillmatchfrequencywiththem.Wind-poweredgeneratorsactuallydohavearotatinginertia(onthewindturbinesideoftherectifier),butthisinertiaiscompletelyde-coupledfromthesynchronouspowersystem.The“type-4”wind-poweredgenerator(thetypeproposed)actuallyproducesACpowerwithinductiongenerators(onthewindturbinesideoftherectifier,thispoweristhenrectifiedtoproduceDCpower,andfinally,theDCpowerisagainconvertedtoACpower(onthesystemsideoftheinverter)atthesystemlocalfrequency(regardlessofthesystemconditions).Withthisdesign,thewind-poweredmachinesshouldbeconsideredtohavenoeffectiveinertia(onthesystemsideoftheinverter).

6. EnergyManagementissues:Powerflowproblemsshouldnotbeconfusedwithenergymanagementproblems.Ofcoursethepowergeneratedbycoal-firedgeneratorsiscapableofremainingconstantforverylongperiodsoftime(days).Thepowerproducedbywind-poweredgeneratorsmaystayfairlyconstantduringwindyperiodsbutthendropsoffinasomewhatunpredictablewayasthewindspeeddrops.Thisvariabilityraisesuniqueconcernsthatmustbeexamined.Fromatransmissionowner’sperspectivethismerelymeansthatthetransmissionwillbeidlemuchofthetimeiftheregulatinggeneration(generationthatistherespecificallytomakeupfortheabsenceofthewindpowerduringcalmedperiods)isnotlocatednearthelocationofthewindgeneration.Whentheiroutputdropsregulatinggenerationisneededtomeetload.Thetreatmentofenergymanagementissueswillultimatelydependonthebusinessstructuresunderlyingthebuildoutofthescenariosdescribedinthispaper.Althoughtheseissuesareimportant,theyarenotthesubjectofthispaper.

7. Sub-SynchronousResonance:Aseriescompensatedlinehasanaturalresonantfrequencythatislowerthanthesystempowerfrequency(hencethetermsub-synchronousresonance).Networksofsuchlineshavemultipleresonantfrequencies.Everytransmissionoutagechanges

Page 40: Repurposing the Colstrip Transmission System - bpa.gov · Repurposing the Colstrip Transmission System ... my deep involvement in the design and implementation of ... the current

RepurposingtheColstripTransmissionSystem

32

theoverallsetofresonantfrequenciesofthesystem.Ifavoltageisappliedat(ornear)aresonantfrequencyofthenetworkextremelyhighvoltagesmayoccuracrossacapacitorbankoronanybusasverylargesub-synchronousfrequencyvoltagesoccuracrosssystemelements.Thismustbeavoidedtopreventapossiblecatastrophicfailure.Lineequipment(especiallyseriescapacitors)couldbedamaged,andalsogeneratorsfeedingpowerintothesystemcouldbedamaged.ThemostseriousnegativeeffectsphenomenonofthisarecollectivelyreferredtoasSub-SynchronousResonance(SSR).12

8. PathRatingProcess:TheWECChasapathratingprocessthatisdesignedtoassurethatwhenanewpathisproposedormodified(newtransmissiontielineoroldpathimprovement)thestudyworkneededtojustifytheproposedratingisproperlyperformedwithfullattentionpaidtothepotentialforconflictswithexistingpaths.Thisprocessisapartofthenormaltransmissionplanningprocess.Peerreviewisthekeystoneofthisprocess.ThepathownermustannouncetheirplantobuildthenewpathormodifyanexistingoneandinviteinterestedWECCmemberstoattendaseriesofmeetingswherethepathownerpresentstherequiredinformationconcerningtheplanofservice,expectedratingandotherbasicinformationincludingthetargetdateforcompletionoftheproject.SincePath8isanexistingpath,thisprocesscouldbeabbreviated.Thedocumentcontainingtherulesforthisprocessis:“Project_Coordination_Path_Rating_and_Progress_Report_Processes_proposed_changes_2015-09-11.pdf”(orasuccessordocumentavailablethroughWECC).

AsPathoperator,NWEwouldhavetotaketheleadinconductingthisseriesofmeetings.

12TherearethreetypesofSSR:1)Inductiongeneratoreffect(Becauseofthenaturalresonance,ageneratormayspontaneously“feed”thesystemresonancegeneratingcurrentatthatfrequency).2)TorsionalResonance(Whenasystemresonanceoccursasub-synchronoustorqueisdevelopedontherotorofeachconnectedgeneratorduetothecurrentflowinginthemachinewindings.Thistorquecanstimulatearesonanceintheturbine-generatormechanicalsystemthatcancauseseriousdamagetotheshaftofthemachine.)3)TransientTorqueAmplification.(Whenswitchingoccursonthetransmissionsystemeachswitchoperationcausesatransienttorqueoneachconnectedgeneratorshaft.Thefirstswitchingeventstimulatesatorsionalvibrationthatisthenenhancedbythenextswitchingevent(timingiscritical).Thiscanleadtoexcessivestressonthegeneratorshaftasitrings.Shaftfailureispossible.