INTRODUCTION TO CONSTRUCTION MANAGEMENT PREPARED BY: AILEEN REYES NATALIO BS ARCHITECTURE 5-1 SPECIALIZATION II

description

specialization

Transcript of Report Spec II

Page 1: Report Spec II

INTRODUCTION TO

CONSTRUCTION MANAGEMENT

PREPARED BY:AILEEN REYES NATALIOBS ARCHITECTURE 5-1

SPECIALIZATION II

Page 2: Report Spec II

IS THERE A NEED FOR CONSTRUCTION MANAGEMENT?

Page 3: Report Spec II

CONSTRUCTION INDUSTRY

• IT IS THE LARGEST INDUSTRY IN THE WORLD• IT IS MORE CHALLENGING DUE TO

ITS:• UNIQUE NATURE• EVERY PROJECT IS ONE OF A KIND• MANY CONFLICTING PARTIES ARE INVOLVED• TIME PRESSURED• MONEY AND QUALITY• HIGH RISK

Page 4: Report Spec II

CONSTRUCTION PROJECT

A Project is defined whether it is in construction or not by the following characteristics:

• A Defined goal and objectives•Specific task to be performed•A Defined Beginning and End•Resources are being Consumed

Page 5: Report Spec II

WHAT IS THE SUMMARY OF PROJECT PHRASES ?

Page 6: Report Spec II

PRECONSTRUCTION PHASE•CONCEPTUAL DESIGN•SCHEMATIC DESIGN

•DESIGN DEVELOPMENT•CONTRACT DOCUMENTS

PROCUREMENT PHASE• BIDDING

CONSTRUCTION PHASE

CLOSE-OUT PHASE

Page 7: Report Spec II

MAJOR TYPE OF CONSTRUCTION PROJECT

•RESIDENTIAL HOUSING CONSTRUCTION•INSTITUTIONAL AND COMMERCIAL BUILDING CONSTRUCTION

•SPECIALIZED INDUSTRIAL CONSTRUCTION•INFRASTRACTURE AND HEAVY CONSTRUCTION

Page 8: Report Spec II

PROJECT PARTICIPANTS

• OWNER THE INDIVIDUAL OR ORGANIZATION FOR WHOM

THE PROJECT IS TO BE BUILT UNDER A CONTRACT.

• THE DESIGNER THE INDIVIDUAL OR ORGANIZATION THAT

INTERPRET AND GUIDE THE OWNER IN DESIGN,CONSTRUCTION COST, SCHEDULE AND DOCUMENTS. EXAMPLES ARE ARCHITECTS AND ENGINEERS.

• THE CONSTRUCTION PROFESSIONALSTHE PARTIES THAT RESPONSIBLE FOR

CONSTRUCTING THE PROJECT

Page 9: Report Spec II

• PROJECT MANAGER THE INDIVIDUAL CHARGED WITH THE OVER ALL COORDINATION OF THE ENTIRE CONSTRUCTION PROGRAM FOR THE OWNER. THESE INCLUDE PLANNING, DESIGN,PROCUREMENT AND CONSTRUCTION

• CONSTRUCTION MANAGER THE SPECIALIZED FIRM OR ORGANIZATION WHICH ADMINISTRATES THE ON-SITE ERECTION ACTIVITIES AND THE CONSULTING SERVICES REQUIRED BY THE OWNERS FROM PLANNING THROUGH DESIGN AND CONSTRUCTION THROUGH COMMISSIONING.

Page 10: Report Spec II

THANK YOU FOR LISTENING