  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    1/17

    Reconstruction funicular bridge in Petr

    CrMoha

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    2/17

    The information panel of the reconstru

    Design by PONTEX Ltd.

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    3/17

    Acces to the construction site

    The path was created for the drilling machine and also as an access to the cons

    Due to the rough area, levelling is needed

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    4/17

    The path is also used for the transport omaterial towards the site and the waste ou

    site

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    5/17

    The material used in the field:

    - Cement- Bentonite- Driller

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    6/17

    The material used in the field:

    - Steel tube- Containers (storage)

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    7/17

    The waste

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    8/17

    Arrangement of the platform for the drillin

    The pla- Soi- Wa

    brid

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    9/17

    Main machines used on the site

    - Drilling machine with high pressure air- Crane

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    10/17

    Machines used on the site

    - Crane: used for the carrying

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    11/17

    Machines used on the site

    - Backhoe- Generator- Cement grout mixer- Pump

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    12/17

    Micropiles construction

    - Putting the temporary casing- Boring

    o Drilling machineo High pressure air

    - Placement of the steel tube (and electric welding)

     36 micropiles of 15m long

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    13/17

    - Grouting- Pulling out the casing- Grouting refill- High pressure cement grout (after grout

    hardening)

    Grouting and casing removing

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    14/17

    Temporary pedestrian by-pass along the cons

    - Pedrestrian path is createdby the use of gravel

    - Temporary timber bridge

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    15/17

    Site protection

    - Temporary fences- Caution lines- Blue envelope

    Function:- Avoid entry of non-emp- Keep people in safe dist

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    16/17

    Safety factors

    - Helmets- Boots- Reflectant jacket- Gloves

    (Safety reasons!)

  • 8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill

    17/17

    Thank you for your attent