Reconstruction funicular bridge in Petr
CrMoha
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
2/17
The information panel of the reconstru
Design by PONTEX Ltd.
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
3/17
Acces to the construction site
The path was created for the drilling machine and also as an access to the cons
Due to the rough area, levelling is needed
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
4/17
The path is also used for the transport omaterial towards the site and the waste ou
site
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
5/17
The material used in the field:
- Cement- Bentonite- Driller
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
6/17
The material used in the field:
- Steel tube- Containers (storage)
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
7/17
The waste
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
8/17
Arrangement of the platform for the drillin
The pla- Soi- Wa
brid
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
9/17
Main machines used on the site
- Drilling machine with high pressure air- Crane
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
10/17
Machines used on the site
- Crane: used for the carrying
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
11/17
Machines used on the site
- Backhoe- Generator- Cement grout mixer- Pump
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
12/17
Micropiles construction
- Putting the temporary casing- Boring
o Drilling machineo High pressure air
- Placement of the steel tube (and electric welding)
36 micropiles of 15m long
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
13/17
- Grouting- Pulling out the casing- Grouting refill- High pressure cement grout (after grout
hardening)
Grouting and casing removing
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
14/17
Temporary pedestrian by-pass along the cons
- Pedrestrian path is createdby the use of gravel
- Temporary timber bridge
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
15/17
Site protection
- Temporary fences- Caution lines- Blue envelope
Function:- Avoid entry of non-emp- Keep people in safe dist
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
16/17
Safety factors
- Helmets- Boots- Reflectant jacket- Gloves
(Safety reasons!)
-
8/18/2019 Reconstruction of the Funicular Bridge in Petrin Hill
17/17
Thank you for your attent