Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

18
SPE 166581-MS Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs) Pieter van Asten, Lloyd’s Register Energy – Drilling

description

Pieter van Asten presented this at Offshore Europe 2013. Lloyd's Register Energy - Drilling (formerly ModuSpec and WEST Engineering) have, together with Lloyd's Register Consulting (formerly Scandpower and LR ODS) developed a BOP Risk Model based on the popular RiskSpecturm, which is used on 50% of the world's nuclear power stations. In this presentation, Pieter discusses how the BOP Model was developed and how, in the case of a failure, the Model can reduce days of non productive time (NPT) into hours. For more informtation about the BOP RIsk Model, please visit www.lr.org/bopmodel

Transcript of Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

Page 1: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS

Pull or No-pull: Risk-based Decision Support for Subsea

Blowout Preventers (BOPs)

Pieter van Asten, Lloyd’s Register Energy – Drilling

Page 2: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

Innovation comes after denial and before successPieter van Asten 2013

Page 3: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

• The BOP risk model background

• why was it made and for what purpose?

• The project

• how was it done and by whom?

• The solution

• what is the result and how is it used?

• The conclusion

Page 4: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

The tragic Gulf of Mexico accident in April 2010 can be marked as the moment that confirmed the idea for making a subsea BOP (Blow Out Preventer) risk model.

It showed that society, enabled by (social-)media, is our biggest stakeholderwith its own risk acceptance perception.

Page 5: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

What does the majority of society remember about this tragedy?

Societal risk awareness and its (non-) acceptance created the need to manage these risks and became the foundation for the demand for a solution to enable this.

•The industry was faced with a very conservative approach to BOP component failure•This conservatism was fed by the fear that something could go wrong as we all saw happening which was very costly

Page 6: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

A focal point of attention and contribution to what happened in April 2010 became the subsea BOP

With our stakeholder’s biggest concerns in focus, the objective of the requested solution became:

“Enable assistance in decision making if a BOP needs to be pulled or not by means of risk based consistent failure investigation and effect modelling and due communication”

Page 7: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

A subsea BOP is a special system and among few systems combining multiple functions:•Drilling operations control•Risk prevention tool (preventer)•Emergency response tool

It is also •Highly regulated•Not visible when operational

These combinations mean simple component failures can cause

severe risk exposure and non-compliance.

But what to do when a component may have or has failed?

Page 8: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

Delivery of objective assessment and consistent communication about the risk of a BOP component failure leading to a decision to continue or suspend operations has proven to be a challenge.

Some symptoms: •BOP pulling is costly and time consuming: major NPT •BOP pulling is a risk in itself:

Leaving it down with known failure may mean taking safety risks or being out of regulatory compliance

•Non consistent decision-motivation to senior management, regulatory bodies and other stakeholders in the industry•Different solutions for similar problems on different rigs or crews•Lack of risk based information to enable management of compliance aspects against cost of NPT

Page 9: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

Our solution and its approach to this has a true innovative character in every aspect:

•High (society and industry) stakes•A joined effort with five involved parties•No route-map but the main objectives•An industry looking at us

Today, drilling operations are always balancing between conflicting factors:

NPT (Costs) – Risk (Safety) - Compliance

Page 10: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProject

SolutionConclusion

What made it succeed?

I worked with people that were involved in the extreme circumstances after the accident and who lost colleagues.That made me very humble and realized that we just could not fail: there was too much at stake: safety and lives.

I worked with a wonderful team and this team effort, including our client, was one of the most contributing factors for our success.

I am proud of •what we did;•how we did it and•what we achieved.

Page 11: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolution

Conclusion

The total risk model is like a three dimensional cube with six sides that input and affect the outcome and each other.

The cube’s three dimensions represent the complexity and interaction of all aspects of a complete BOP risk model.

How is all this information combined to become a risk model?

Page 12: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolution

Conclusion

Page 13: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolution

Conclusion

The risk model assesses the effect of component failure by calculations and expresses this in a risk level taking regulations, specifications and operational procedures into account.

A color-coding traffic light is used as visual indication to express the risk level of the whole BOP, a subsystem or component.

•Red•Orange•Yellow•Green

Page 14: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolution

Conclusion

Example of the user screen showing the effect of a failure of the 5k to 3k regulator to the blue POD.

Page 15: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolution

Conclusion

BOP risk model solution:

• Risk-based approach in balancing the conflicting factors

• Consistent, transparent pull or no pull decision assistance and motivated decision reporting to all stakeholders

• Better prioritization of maintenance

• Industry credit: done with a major drilling contractor

• Regulator agreement on methodology (BSEE)

Page 16: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolution

Conclusion

• Pre-considered equipment failure: • No need to go through all information and• assessments upon component failure• Reduction of rig downtime: • Faster pull or not-pull decision

• Records history of failed and restored components to assist pull, no-pull decisions

• The model cannot be changed by operating crew.

• Is unique for every BOP and regulatory environment

• Does not take away or replace thinking, competence or responsibility

• Enables training and can create what-ifs: play with different failure scenarios

Page 17: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

SPE 166581-MS • Pull or No-pull: Risk-based Decision Support for Subsea Blowout Preventers (BOPs)• Pieter van Asten

BackgroundProjectSolutionConclusion

Preventing one unnecessary BOP pull proves the value of a BOP risk model. Saving one life with the BOP risk model makes it truly invaluable

This allows for the next steps towards failure prevention:

• BOP reliability and integrity management optimization• Maintenance and spare parts management optimization• Enhanced graphical representation• Web-based application• Other operational or safety critical equipment

Page 18: Pull or no pull: Risk based decision support for subsea blowout preventers (BOP)

For more information, go to:

www.lr.org/BOPmodel

Slide 18