Public Hearing
December 10, 2019https://www.hflcsd.org/district/capital_project_information
1
Timeline
• July 9 Concept of New Capital Committee
• Sept 10 Board of Education Creates Committee
• Sept 17 Develop/Prioritize Scope of Work and Budget
• Oct 1 Committee Reviewed Middle/Auditorium
• Oct 8 Committee Reviewed High School/Turf
• Oct 15 Draft Recommendations presented to Board of Ed.
• Oct 29 Board Approves Scope and Legal Resolutions
• Nov 25 Project Newsletter mailed to all residents
• Dec 10 Public Hearing
• Dec 17 Voter Referendum
HFL CSD PHASE II.V
PROJECT FINANCING
State Building Aid
71%
Capital
Reserve
29%
Funding Sources Amount
Total Project Cost $9,786,661
Capital Reserves $2,855,000
State Building Aid $6,931,661
Total Project Funds $9,786,661
LOCAL TAX IMPACT $0
The primary areas of focus in this investment include:
• Replace High School boiler and chiller facilities
• Modernize Middle School science classrooms to meet instructional needs
• Continue modernization and safety enhancements of classrooms at Lima Primary
• Construct sports lighting for new turf fields with LED fixtures
• Paint the District Auditorium, replace stage flooring, and curtains.
12/5/2019
High School
• Replace existing boiler and chiller
• Light the new turf field
• HVAC improvements/repairs
• Selective door replacements both interior and exterior
• Selective electronic access locks
• Replace pool sump pumps
5
High School $ 4,222,264
REPLACE TUBE STYLE BOILER (SIM TO EXISTING)
PROPOSED NEW BOILERS (QUANTITY THREE)
ICE STORAGE TANKS
1998
COOLING TOWER
1998
PROPOSED NEW CHILLERS (QUANTITY TWO)
designg roup
E N G A G E • I M A G I N E • I N S P I R E
"Education is the
Foundationfo r Success"
PROPOSED NEW
POOL HEATER
PROPOSED NEW
HOT WATER PUMPS
POOL DEHUMIDIFICATION
UNITHEATING PUMPS 1998
SUMP PUMP
•••
ACID NEUTRALIZATION
TANK
HEAT EXCHANGER - - .
1998
••••••••• BOILERS 1998
DOMESTIC HOT WATER
STORAGE TANKS -
,,,,.
""""' EQUIP.
l166B IELEC.
l 102A I
CHILLED WATER PUMPS
2019 · CONTROLS COMPRESSOR
L ---1ir CHli.--1-1 - - - - - - - - -199 '
••
BOILER
I 102 I
POOL
1166 1EXCHANGER
ABORPTI ON CHILLER
II ID
CO ENERATION UNITS199l1 -- - - - - - - - - -
J
EXISTING COOLING TOWER AND ICE STORAGE TANKS
PHAS E 2.5 H GH SCHOOLHONEOYE FALLS-LIMA CSD83 EASTSTREET
HONEOYE FALLS, NY 14472
DATE: 10/15/2019Phase II.V High School
BIOLOGY
106
EARTH
SCIENCE
107
SUPERINTENDENT
114A
FAC. LOUNGE
115F
BOILER
139A
OFFICE
117B
FITNESS
99
CORR
97
VEST.
098
EQUIPMENT
STORAGE
167B
BOYS LOCKER
168
OFFICE
169
GYMNASIUM
167
TEAM LOCKER
168D
BOYS LOCKER
164
POOL
166
BOILER
102
EARTH
SCIENCE
103
BOCES
104
CHORAL
112
MUSIC THEORY
CLASSROOM
112A
FACULTY
TOILET
111A
INSTRUMENTAL
MUSIC
113
CONF
116
SERVER
118
SP. ED. 12:1+1
119B
BOCES 8:1+1
119A
SPECIAL ED.
12:1+1
121
SPECIAL ED.
12:1+1
124
I.T.
123
HEALTH
CLASSROOM
126
SP. ED. REL.
SVCS. (A.I.S.)
128
SP. ED. REL.
SVC. (A.I.S.)
127
B.O.E. MEETING
ROOM
129
BOCES 8:1+1
130
SP. ED. 12:1+1
131
SP. ED. RES.
ROOM (I.S.S.)
132
PHYSICS
133
CHEMISTRY
137
CHEMISTRY
139
GYM
142
LOBBY
003
SP. ED. RES.
ROOM
(SENSORY)
131A
LOBBY
007
CENTRAL
KITCHEN
141
TECHNOLOGY
144
STORAGE
147
CAD LAB
148
COMPUTER
ROOM
149 MATH
CLASSROOM
152
MATH
CLASSROOM
153
MATH
CLASSROOM
154
MATH
CLASSROOM
155
TRAINER
176B
MEN'S TOILET LOCKER RM.
173 177
W OMEN'S
TOILET
175
LOCKER RM.
177A
MEDIA /
CLASSROOM
176C
LOCKER RM
177B
LOCKER RM
177C
VEST.
171
BIOLOGY
105
JANITOR
CLOSET
178
CORR.
167C
MAIN OFFICE
181
BIOLOGY
LECTURE
109
AUDITORIUM
140
STAGE
140A
RECEPTION
115
CAFETERIA
158
GUIDANCE
163
NURSE
161
FLEXIBLE
LEARNING LAB
157
ART
120A
ART
120
CLASSROOM
122
ROBOTICS LAB
150
LOBBY
001
OFFICE
180B
EQUIP.
166B
DISTRICT OFFICE
NEW AHU, CEILING
LIGHTS, DIFFUSERS
BOILER ROOM
SELECT EQUIPMENT
REPLACEMENT5 10 15 30 60
DATE: 10/15/2019
PHASE 2.5 HIGH SCHOOLHONEOYE FALLS-LIMA CSD83 EAST STREET
HONEOYE FALLS, NY 14472
1" = 30'-0"1OVERALL 1ST FLOOR PLAN
CHEMISTRY
136
SCOPE OF W ORK:
DISTRICT OFFICE HVAC IMPROVEMENTS
FIELD LIGHTING AT NEW MULTIPURPOSE TURF FIELD
SUMP PUMP REPLACEMENT IN POOL EQUIPMENT ROOM
B-W ING GYM IMPROVEMENTS - BACKSTOP MOTORS & CORRIDOR DOOR REPLACEMENT
•
•
•
•
•
•
•
HEATING & COOLING PLANT REPLACEMENT
SELECT EXTERIOR DOOR REPLACEMENT
ADDITIONAL ACCESS CONTROL LOCKS AT COMMON AREAS
Major renovation anticipated in boiler room and central office.
Phase II.V High School
SEIgroupdesign
.,
,..·:«:::.-....-....'.. :::.·:.:......::·: -.··:··-.,:. .<..":....::·>.:...·;..·-:·· '·., ... ·:........·o···
0
"Education is theFoundation for Success"
..u
PHASE 2B M DDLE SGHOOLHONEOYE FALLS - LIMACSD619 QUAKERMEETING HOUSEROAD
HONEOYE FALLS, NY 14472
DATE 10/ 15/2019
EN GAGE • IMAGIN E • IN S P IR E
Install
• LED Field LightingEstimate 10 PolesElectronic Controls
• Exterior Bathroom Access into Middle School
Phase II.V Lights
Middle School
• Create MS Discovery Lab
• Renovate Science classrooms and labs
• Replace mechanical unions
• Pain auditorium and replace curtains, and stage flooring
• Convert select controls to electronic
• Cool 4-6 additional instructional spaces
• Add electronic access controls
• Replace original main electrical panel 9
Middle School $ 3,497,607
s
104770 SF
SP. ED. 6TH GR.
RESOURCE RM. CLASSROOM
106770 SF
6TH GR.
CLASSROOM
108
770 SF
SP. ED. 6TH GR.
RESOURCE
110770 SF
6TH GR.
CLASSROOM
112
771 SF
ELECTRIC
ROOM
420A
STOCK ROOM
419
OFFICE
420
BOILER ROOM
418
BOILER ROOM
418A
STORAGE
412
842 SFAUDITORUM
524
6628 SF
STOR.
415
218 SF
6/7TH GR. ART
416973 SF
CONF. ROOM
404
214 SF
LOBBY
C101
SP. ED. 12:1:4
1141195 SF
6/7TH GR. ART
8TH GR. STUDIO
ART
4141074 SF
VEST
V100
MAIN OFFICE
402
6TH GR.
CLASSROOM
102
770 SF
6TH GR.
CLASSROOM
100
770 SF
AUDITORIUM
RENOVATIONS
(PAINTING, STAGE
FLOORING / CURTAINS
6TH GR.
CLASSROOM
200
770 SF
6TH GR.
CLASSROOM
202
770 SF
PREP
203A
114 SF
6TH GR.
CLASSROOM
HEALTH & AIS
204770 SF
SP. ED. 12:1:4
206770 SF
PREP
205A
114 SF
PREP
207A
115 SF
7TH GR.
CLASSROOM
208
770 SF
RESOURCE, AIS
& READING LAB
109469 SF
7TH GR.
GENERAL
SCIENCE &
BIOLOGY
203997 SF
8TH GR.
GENERAL &
EARTH
SCIENCE
2051000 SF
8TH GR.
GENERAL
SCIENCE
207998 SF
LAB
209
1478 SF
DISCOVERY
7/8TH GR.
CLASSROOM
210
770 SF
7TH GR.SP. ED.
RES. ROOM
212770 SF
6/7TH GR.
CLASSROOM
LOTE
304770 SF
6/7TH GR.
CLASSROOM
LOTE
306770 SF
7/8TH GR.
CLASSROOM
LOTE
308770 SF
SP. ED. 8TH
GRADE
RESOURCE
310770 SF
8TH GR. ELA
CLASSROOM
312
770 SF
8TH GR. ELA
CLASSROOM
314
770 SFAIS SUPPORT
316
770 SF
318506 SF
MATH LAB
8TH GR. S.S.
CLASSROOM
320
770 SF
322770 SF
7/8TH GR.
CLASSROOMCAD LAB
324
762 SF
TECHNOLOGY
326
1807 SF
GYMNASIUM
400
6221 SF
STOCK
400A
405 SF
OFFICE
424A
137 SF
TLT
424B
48 SF
FACULTY
406
486 SF
JAN.
C105A CAFETERIA
410
3210 SF
W .I.C.
408A
CUST.
422
ICE
423OFFICE
417
98 SF
OFF.
305
153 SF
OFF.
303
257 SFAIS LAB
315
406 SF
8TH GR. MATH
CLASSROOM
401
776 SF
8TH GR. MATH
CLASSROOM
403
770 SF
CONFERENCE
405
GUIDANCE
407
SERVER
409C
RECEIVING
421
LIBRARY
307
21599 SF
CORR.
C102
BOYS LOCKER
ROOM
424504 SF
CORR
C104VEST
C105
KITCHEN
408
1460 SF
7TH GR. GEN.
SCIENCE
511900 SF
MAIN LOBBY
506
SPEC. ED.
RESOURCE
512
792 SF
7TH GR. MATH
CLASSROOM
513
792 SF
7TH GR. SS
CLASSROOM
514
792 SF
7TH GR. ELA
CLASSROOM
515
792 SF
MUSIC
CLASSROOM
518
884 SF
STAGING
527
1015 SF
STAGE
525
2297 SF
STORAGE
526
1023 SF
SPECIAL ED.
12:1:4
521775 SF
VOCAL MUSIC
520
1048 SF
INSTRUMENTAL
MUSIC
5191924 SF
PRACTICE
ROOM
520A
222 SF
VEST
522
80 SF
OFFICE
519D
110 SF
PRAC.
519C
93 SF
PRAC.
519B85 SF
OFFICE
519A
109 SF
EXAM
411B
139 SF
NURSE
411
481 SF
TLT
411A
OT / PT
409
586 SF
HOME &
CAREERS
PROJECT R00M
300B457 SF
PRINCIPAL
158A
VICE PRINCIPAL
158B
KITCH.
158C
KILN
162A
STOR.
413
MAIL / COPY
ROOM
158D
GIRLS TLT
161
CORR
C100VEST
507
VEST
506A
VEST.
SERVER 509
507A
VEST
521
VESTIBULE
523
993 SF
W ASHER/
DRYER
HOME AND
CAREERS
300
SPEECH
409A
152 SF
TLT ROOM
521A
48 SF
TLT
516
TLT
517
DISCOVERY LAB/
FLEXIBLE
LEARNING SPACE
SCIENCE &
COMPUTER LAB
RENOVATIONS
JAN
309
FAC. TLT.
GIRLS LOCKER
ROOM
426
FAC. TLT.
165
BOYS TLT
160
FAC. TLT.
164SIDE LOBBY
505
VEST
503
CORR
501
CORR.
502
PREP
510
114 SF
JANITOR
504
LINK
501A
STOR. VEST.
501B
BOYS TLT
113
GIRL'S TLT.
111
FAC. TLT.
107
JAN.
105
JAN.
141B
FAC. TLT.
141AGIRLS TLT.
151
BOYS TLT.
152
STOCK OFFICE
CORR
C303
CORR.
C103
CORR.
C103
5 10 15 30 60
NEW TOILET ROOMS
(EXTERIOR - ONLY ACCESS)
GREENHOUSE
DEMO
RELOCATED
TOILET ROOMS
DATE: 10/15/19
PHASE 2.5 MIDDLE SCHOOLHONEOYE FALLS - LIMA CSD619 QUAKER MEETING HOUSE ROAD
HONEOYE FALLS, NY 14472
3/64" = 1'-0"1MS - OVERALLFLOOR PLAN
SCOPE OF W ORK:
• DISCOVERY LAB RENOVATIONS
• SCIENCE LAB RECONSTRUCTION
• TOILET ROOM RENOVATIONS
• EXTERIOR-ONLY ACCESS TOILET ROOMS FOR ATHLETIC FIELD USE
• AUDITORIUM RENOVATIONS - HOUSE PAINTING, STAGE FLOORING & CURTAIN REPLACEMENT
• ADDITIONAL ACCESS CONTROL LOCKS AT COMMON AREAS
• DDC TEMPERATURE CONTROL UPGRADES
• MISC MECHANICAL / ELECTRICAL UPGRADES
• PHASED IMPLEMENTATION OF CLASSROOM COOLING (4-6 ROOMS)
1
3
1A
S
501C
3
0
0A3
2
6B 3
2
6A
Major Renovations
Phase II.V Middle School
7TH GRADE GENERALSCIENCE / BIOLOGY 203
8TH GRADE GENERALSCIENCE / EARTH SCIENCE205
8TH GRADE
GENERAL SCIENCE 207
DATE 10/15/2019
PHASE 2.5 MIDDLE SCHOOLHONEOYE FALLS - LIMA CSD619 QUAKER MEETING HOUSE ROAD HONEOYE
FALLS, NY 14472
1SCIENCE ROOMS
Phase II.V Middle
Middle School Science Room Renovations
DATE: 10/15/2019
PHASE 2.5 MIDDLE SCHOOLHONEOYE FALLS - LIMA CSD619 QUAKER MEETING HOUSE ROAD
HONEOYE FALLS, NY 14472
1COMPTUER LAB
2COMPUTER LAB
1/4" = 1'-0"3COMPUTER LAB
Phase II.V Middle School
Renderings of proposed Discovery Lab space at the Middle School
Manor Elementary School
$ 383,325 .
• Replace library carpet
• Replace band room carpet
• Cool 4-6 additional instructional spaces
13
ENTRY
100LOBBY
101
FACULTY
110
BOILER ROOM
205
ART
208
CUST.
221
A.V. ROOM
228
OFFICE
230
TEACHER
RESOURCES /
STAFF
DEVELOPMENT
226
LIBRARY
229
SP. ED.
RESOURCE
302
INSTRUMENTAL
MUSIC
401
141
STORAGE
139
SUPPLIES
GYM STATION
135BPRACTICE
401B
GYM STATION EQUIPMENT
412B
PROJECT
ROOM
411
GYM STATION
135
135A
GENERAL
MUSIC
304
12:1:1 SPECIAL
EDUCATION
306
SP. ED. 12:1:1
308
CORRIDOR
300
SENSORY
108
SERVING/
KITCHEN
111
CAFETERIA
109
SPEECH
CLASSROOM
SP. ED.
RESOURCE
GRADE 3
CLASSROOM
GRADE 3
CLASSROOM
GRADE 3
CLASSROOM
311
GRADE 3
CLASSROOM
GRADE 3
CLASSROOM
315
GRADE 3
CLASSROOM
322
GRADE 3 GRADE 3
CLASSROOM CLASSROOM
320 318
GRADE 3
CLASSROOM
316
GRADE 4
CLASSROOM
314
GRADE 4
CLASSROOM
312
MATH
CLASSROOM
310
GRADE 2
CLASSROOM
404
GRADE 2
CLASSROOM
406
GRADE 2
CLASSROOM
408
GRADE 2
CLASSROOM
410
SP. ED.
RESOURCE
421
GRADE 2
CLASSROOM
419
GRADE 2
CLASSROOM
417
GRADE 2
CLASSROOM
415
GRADE 5
CLASSROOM
224
GRADE 5
CLASSROOM
222
SP. ED.
RESOURCE
220
GRADE 5
CLASSROOM
218
GRADE 5
CLASSROOM
216
GRADE 4
CLASSROOM
214
SP. ED.
RESOURCE
212
GRADE 4
CLASSROOM
209
GRADE 4
CLASSROOM
211
GRADE 5
CLASSROOM
213
GRADE 5
CLASSROOM
215
GRADE 5
CLASSROOM
217
AIS REMEDIAL
READING
210
GRADE 4
CLASSROOM
207
CARPET
REPLACEMENT
5 10 15 30 60
DISCOVERY
LAB
219
GENERAL
MUSIC
402
CARPET
REPLACEMENT
1" = 30'-0"1FIRST FLOOR PLAN
DATE: 10/15/19
PHASE 2.5 MANORHONEOYE FALLS - LIMA CSD147 EAST STREET
HONEOYE FALLS, NY 14472
SCOPE OF W ORK:
• CARPET REPLACEMENT IN LIBRARY AND BAND ROOM
• ADDITIONAL ACCESS CONTROL LOCKS AT COMMON AREAS
• MISC MECHANICAL UPGRADES
• PHASED IMPLEMENTATION OF CLASSROOM COOLING (4-6 ROOMS)
3
0
1
3
0
33
0
5
3
0
73
1
3
Phase II.V Manor
Proposed carpet replacement
Lima Primary
15
$ 1,634,736
Lima Primary School K-1
• Replace cafeteria roof
• Renovate four classrooms
• Replace and update corridor wall tile
16
• Replace classroom door hardware with intruder-type function
• Additional electronic fob access for common spaces
• Classroom flooring replacement in select rooms
.
ELEC.
127
LIBRARY
135
1315 SF
BOOK ROOM 137
190 SF
VEST.
117B
CORRIDOR 122
CORRIDOR 147
GYM
117
3914 SF
OFFICE
119
106 SF
120186 SF
STOR.
STOR.
121
184 SF
SERVER
134
RESOURCE
ROOM 132
OT/PT ROOM 118
CUSTODIAL 115
STORAGE 114
DISCOVERY LAB
104STEAM
107
GRADE 1
CLASSROOM 108 KINDERGARTEN 109
GRADE 1
CLASSROOM 110
ART
111
SERVING FACULTY 113A
112
CAFETERIA
113
SP. ED.
RESOURCE
(SENSORY) 116
READING 1125CONF.
126
SPEECH COUNSEL PSYCH.
128 129 130
GRADE 1
CLASSROOM 138
GRADE 1
CLASSROOM 139
KINDERGARTEN 140
KINDERGARTEN 141
CORRIDOR
122A
RESOURCE
106A
CUSTODIAL
ROOM
113B
CORRIDOR 123LOBBY
V101
NURSE'S
OFFICE 103
PRINCIPAL'S
OFFICE
101
MAIN OFFICE 102
CLASSROOM 105
5 10 15 30 60
CORRIDOR WALL TILE
REPLACEMENT
SP. ED.
RESOURCE 200
KINDERGARTEN 201 KINDERGARTEN 202
OFF.
203
KINDERGARTEN 204
GRADE 1
CLASSROOM 206
GRADE 1
CLASSROOM 210
CORRIDOR 211
UPPER GYM
CORRIDOR WALL TILE
REPLACEMENT
DATE 10/15/2019
PHASE 2.5 LIMA ELEMENTARYHONEOYE FALLS - LIMA CSD7342 COLLEGE STREET
LIMA, NY 14485
SCOPE OF WORK:
•
•
•
•
•
•
CAFETERIA ROOF REPLACEMENT CORRIDOR WALL TILE
UPGRADESPHASED IMPLEMENTATION OF CLASSROOM RENOVATIONS (4 ROOMS)SELECT CLASSROOM FLOORING REPLACEMENT CLASSROOM CORRIDOR DOOR LOCKSET UPGRADES ADDITIONAL ACCESS CONTROL LOCKS AT COMMON AREAS
1" = 30'-0"1
OVERALL 1ST FLOOR PLAN
1" = 30'-0"2
OVERALL 2ND FLOOR PLAN
Phase II.V Lima Primary
838 SF
GRADE 1
CLASSROOM
206
32 SF
TOILET
206A999 SF
CORRIDOR
211
RE
CO
RD
EX
MAGNETIC WHT. BD.
3 WARDROBE w/ MAGNETIC SURFACE (ON DOORS)
LOW COUNTER w/ STOOLS
MAGNETIC WHT. BD.
MECH. CHASE
5 10
TYPICAL CLASSROOM15
DATE 10/15/2019
PHASE 2.5 LIMA ELEMENTARYHONEOYE FALLS - LIMA CSD7342 COLLEGE STREET
LIMA, NY 14485
1/8" = 1'-0"1
Phase II.V Lima Primary
Operations CenterTransportation/Facilities
• Provide additional cameras for bus lot
• Replace gate in fence adjacent to fuel island
Operations Building $ 48,729
Overall BudgetPhase II.V
Total Project Conceptual Budget $ 9,786,661
• High School $ 4,222,264
• Middle School $ 3,497,607
• Manor Elementary School $ 383,325
• Lima Primary School $ 1,634,736
• Transportation Building $ 48,729
Total $ 9,786,661
20
43%
36%
4%
17%0%
Cost
High School
Middle
Manor
Lima
Operations
HFL CSD PHASE II.V
PROJECT FINANCING
State Building Aid
71%
Capital
Reserve
29%
Funding Sources Amount
Total Project Cost $9,786,661
Capital Reserves $2,855,000
State Building Aid $6,931,661
Total Project Funds $9,786,661
LOCAL TAX IMPACT $0
HFL CSD PHASE II.V
PROJECT SCHEDULE
• 10/29/2019 Board of Education Resolution
• 12/10/2019 Public Hearing
• 12/17/2019 Voter Referendum
• 6/2020 SED Submission of Documents (except Lima Primary)
• 1/2021 SED Submission of Documents – Lima Primary School
• 2/2021 Anticipated SED Approval of Project Documents
• 3/2021 Bid Period for Prime Contracts
• 4/2021 BOE Prime Contract Award Meeting
• 6/2021 Start Construction
• 9/2022 Substantial Completion of Construction
• 12/2022 Final Cost Report Submission
Frequently Asked QuestionWhat has the District done to make sure the budget is enough to cover costs?
a. The District worked to increase our yearly escalation from 2.65% to 5% since our original Phase II conceptual budget.
b. The District also worked with both SEI and Campus as in the original Phase II conceptual budget we carried 7% escalation for 3 years in comparison to our current Phase II.V conceptual estimate that is carrying 10% for 2 years of escalation.
c. The District will be strategizing throughout the design period to identify areas in design where we can provide value engineering, scheduling of construction to maximize the district's funds and create project alternates to protect the budget. 23
Frequently Asked QuestionHow can there be no additional taxes?
a. HF-L created a capital reserve account to save funds to pay the local share of capital projects
b. Funding the local share means remaining project costs are paid with state aid – no material tax increases from project
24
Frequently Asked QuestionThere are so many other things to do, how did you choose these items?
a. The Board charged a Capital Project Committee to make a recommendation.
b. Through collaboration with our capital project committee, principals and staff reviewed items reduced or eliminated due to cost escalation from the current Phase II Capital Project and identified the highest priority of needs from the district’s most recent Building Conditions Survey.
c. In addition to reviewing our Building Condition Survey, the District worked carefully with our financial advisors and through detailed cost analysis for maximizing state support and limiting local tax liability. We remain committed to minimizing the impact of this project on local taxpayers.
d. Capital Project funds cannot be used to pay staff 25
26
27
Proposed Vote Date
Capital Project Community Vote
December 17, 20199AM-9PM
High School: Board Room
If schools are closed due to weather, the vote would occur December 19th.
Open for Public Comment
28