Copyright of Royal Dutch Shell plc., 2015 Please contact Ronald Gatbonton for more information for underlying data.
A
B
E
F H
D
PROJECTS OPERATED PTP/O Highlights July 2015A – NorwayNyhamna Expansion: Turnaround successfully completed in July, and milestone for pull-in of the Polarled pipeline achieved
F - NigeriaGU Ph2A: Execution ongoing. Compressors have arrived at site and pipelay (pictured left), is in progress
Bacton
Norg UGS Expansion
Laila Development
F14: Achieved first gas ahead of GIP and below budget.
I - MalaysiaLaila: First Oil Delivery achieved, completed Final Acceptance and handed over to Asset.
C - OnegasBacton: First systems (instrument air and first reboiler) have been handed over. 450 days TRCF free achieved.
F14 Development
PTP/O HSSE Performance YTD 1st July 2015
Operated Non- Operated
Gamba Export Sealine
Nyhamna Expansion
Majnoon FCP Sweet Gas
G - Iraq Majnoon FCP Sweet Gas: Progress on Trains 1 & 2, including glycol regeneration unit installation.
J
J – PhilippinesMalampaya MP3: Turnaround completed after installation of new depletion compression platform.
Malampaya Depletion Compression
G
H – Brunei (NOV)CWF B23: Topside, bridges and helideck sailed away to Champion field for installation.
Champion Waterflood B2 B3
HSSE performance similar to 2014 (not improved)
D - NetherlandsNorg: Expansion projects successfully started up and in operation.
E - GabonGamba Export Sealine: Offshore pipelaycomplete – now installing onshore facilities
C
B – United KingdomClair Ph2 (NOV): The three modules have been installed on the LQ jacket and hook-up has started
Clair Ph2
Brent Decommissioning
Brent Decom: The Brent Delta topsides removal programme has received Government approval. Under-deck lift points for the single lift are being installed
Malikai: Topsides superlift successfully completed; this is an industry first for lift and skid at height. Offshore pipelay is in progress
I
Gumusut: Annual oil production ahead of target. First water injection achieved on 9th June, and turn-around completed on 27th July ahead of operating plan
Gumusut-Kakap
Gbaran Ubie infill
G - Iraq (NOV)Basra Gas – Khor al-Zubair(KAZ): Power plant started up at the gas plant to supply site power and free grid power for local use.
Basra Gas – KAZ Power
Malikai