Project Management of Project Management of Water Supply ProjectWater Supply ProjectCapacity: 93 MLD Cost: USD 80 MillionCapacity: 93 MLD Cost: USD 80 Million
Chandra DissanayakeChandra DissanayakeSenior Resident EngineerSenior Resident Engineer
Tokyo Engineering Consultants Co Ltd
Pattuvam Scheme, Kerala, IndiaPattuvam Scheme, Kerala, India
February 2010February 2010
The state has been able to provide water to 79% of the urban and 59% of the rural population and efforts are being made to cover the rest of the population.
Accordingly a very ambitious project known as Kerala Water Supply Project (KWSP) was derived with support of International Corporation - Japan International Corporation Agency (JICA). Five Schemes under KWSP:
•Trivandrum
•Meenard
•Cherthala (Kollam)
•Kozhikode (Calicut)
•Pattuvam (in Kannur District)
KERALA WATER SUPPLY PROJECT (KWSP) & PATTUVAM SCHEME
KERALA WATER SUPPLY PROJECT (KWSP)
• The Government of India is the borrower and the Kerala Water Authority is the executing Agency. This Project aims at rehabilitating and augmenting the water supply systems of two urban regions namely Kozhikode and Thiruvananthapuram and to construct new water supply systems for three rural regions namely, Pattuvam of Kannur district, Cherthala of Alappuzha district and Meenad of Kollam district. Pattuvam Scheme is the north most beneficial area from this massive project.
• The international consultants M/s TEC consortium (with Black & Veatch, GKW, STC, CED) led by M/s Tokyo Engineering Consultants Company Ltd (TEC). Japan has been selected by the KWA to manage the implementation of the project.
Pattuvam Scheme
KERALA WATER SUPPLY PROJECT (KWSP) & PATTUVAM SCHEME
Kerala is a state located in southwestern India. Neighboring states include Karnataka to the north and Tamil Nadu to the south and east, and the Arabian Sea is to the west. Major cities include the state capital of Trivandrum (Thiruvanaputhram), Kollam, Cochin, Calicut (Kozhikode) and Kannur (Cannore).
Kozhikode Scheme
Cherthala Scheme
Meenard Scheme
Trivandrum Scheme
The Pattuvam Scheme is in Kannur District is the northern most area benefits with the KWSP. The objective of the scheme is to supply safe and potable water to 530,000 consumers in 10 villages, 7 semi-urban areas and 1 municipality in the Kannur District by constructing new facilities. Facilities include technical components for water abstraction, raw water transmission, water treatment, treated water transmission, storage reservoirs and distribution networks.
The project area covers 350 km2 and the water demand of the area is estimated as 93 MLD. The source is at Pazhassi Barrage at Valapattanam River at Kuiloor and the method of extraction is by intake well. The raw water is boosted through steel pipe of 1100 mm diameter for a length of 11 km, to the Treatment Plant. The capacity of the Treatment Plant located at Peruvalathuparamba is 93 millions liters per day.
PATTUVAM SCHEME
Pattuvam Scheme PackagesPackage Description Contractor Cost
Ind Rs Million
Cost USD
Million
1 Intake, Raw Water Main, WTP
Kiriloskar Brothers, Pune
1,109 28
2 Transmission Main & Associated Work
SPML, Bangalore 1,219 27
3 Distribution Systems KRKCPL, Hydarbard
650 17
4 Service Reservoirs IVRCL, Hydrabard 395 8
Overall 3,349 80
PROJECT MANAGEMENT
The Client, Kerala Water Authority has appointed Tokyo Engineering Consultants Co Ltd (TEC) as the leading consultant – The Engineer – to implement the project. The Pattuvam Scheme is led by highly experienced Senior Resident Engineer (SRE), Chandra Dissanayake who acts as Engineer’s Representative. He is supported by a project team of 36 personnel including four experienced Site Engineers. The SRE is responsible for managing the day-to-day work of the project: Construction supervision, project management, progress
monitoring and reporting, quality control, verification of contractor’s invoices etc.
Lead the construction supervision team set for the package. Liaison with the Consultant’s main office (Project Manager),
Contractors and Client for the performance of the assigned contract package.
Site EngineerPackage 1
Site EngineerPackage 2
Site EngineerPackage 3
Site EngineerPackage 4
Junior Inspectors
4
Senior Inspector
Junior Inspectors
4
Senior Inspector
Junior Inspectors
4
Senior Inspector
Junior Inspectors
4
Senior Inspector
Admin & Support StaffOffice ManagerComputer Assistant – 2 NosOffice Assistant – 2 NosOffice Attendant– 2 NosDrivers – 5 Nos
Senior Resident EngineerChandra Dissanayake
Project Management Structure
Tokyo Engineering Consultants Co., Ltd. Japan
Project Highlights• About 1,000,000 cubic meters of earthwork; 720 kilometres of
pipelines; 25,000 cubic meters of concrete and 2000 tonnes of steel. Total project value is USD80 Million.
• The project is unique in its nature and complexities, characterised by its spread across a large area. In view of the massiveness of the project and the complexities in the nature of the work components, it is a challenge and however essential and important for the Senior Resident Engineer to put in place a comprehensive project management, supervision, quality assurance and control during the implementation.
• The Project is being executed following a fast track approach.
Pattuvam SchemeST1 ST2 SHT
FILTER
FHWW H
OHT
CB
KoonamTank I
KoonamTank II
CWT
CCT
P3
P2
P1
P4
CF
1200 dia MS pipe 22km
INTAKE
TRANSMISSION MAIN 80 km
DISTRIBUTION SYSTEM
SERVICE RESERVOIRS
SL
PB 1PB 2
1100 dia MS pipe 22km
630 Km pipelines
WTP 93 MLD
Pazhassi Dam
A
Serve for population of 530,000
Reservoir Capacity - 27 ML
Package 1
Component Details
Intake Pump-well, Intake-well, Connecting pipeline & Buildings
Raw Water Main (supply & laying)
11 km 1118 mm dia MS Pipeline
WTP Various treatment structures & staff buildings
Intake
Intake well & intake houseFoot bridgePump well & pump houseConduits for intakeRaw water pumps, surge vessel & pipingStaff housingSub station for intake
Intake Model
SRE’s Instruction on building coffer dam around Intake in late 2007
Senior Resident Engineer discusses with Hon Minister for Water Resources on Construction Program of Intake in early 2008
Intake site February 2008
Intake site on January 2010
Raw Water Pumping Main
11 km long mild steel pipeline from Intake to Water Treatment Plant
Pipe-bridge on raw water pipeline
Water Treatment Plant
Water treatment Plant StructuresStructure NameRaw water Inlet/Cascade Aerator & Magnetic flow meter chamber
Lamella Clarifiers& Flocculators
Rapid Gravity Sand Filters
Filter control building
Used wash water holding tank
Chlorine contact tank & Treated Water Reservoir
Treated water pumping station
Balancing reservoir
Chemical Building
Chlorine building
Sludge balancing tank & pump house
MCC
Sludge Thickener
Sludge Lagoons
Roads, Compound, Landscaping
Staff housing
Water treatment plant site on January 2007
Water treatment plant on February 2010
SRE with Team Leader, Site Engineer and Construction Manager
Tiling on Aerator
SRE with Senior Inspector on Balancing Reservoir
Flocculaters, Clarifiers, Wash-water holding tank
Clear water reservoir
EOT Crane at pump-station
Electrical panels in pump-station
Balancing reservoir
Vintage point – From the roof top of the balancing reservoir
Access road to WTP
Package 2
Transmission Main & Associated Work
From the Clear Water Reservoir at the WTP the water flows by gravity to the Master Balancing Reservoir at Koonam from where it flows to 7 zonal reservoirs and through 2 booster pumping stations to 5 zonal reservoirs. The total length of transmission main is 82 km.
Package 2
Description Quantity
MS pipeline 25km
DI pipeline 50km
uPVC & PE pipeline 6km
Pipe bridges 4nos
Buildings & Associated Works
KOONAM MBR
W.T.P. + BPT
Paddy field-below ground pipes
VALAKAI RIVER
POOMANGALAMRIVER
MS PIPESTWTM-
TALIPARAMBA-IRIKKURKSTP ROAD
MS 1219mm OD
MS 1118mm&1067mm OD
MALPPATTAMSREEKANDAPURAM
IRIKKUR
MALAPPATTAM ROAD
POKKUNDU
CHENGALAI RIVER
CHENGALAI BRIDGE
VALAKAI BRIDGE
10
2
7
54
3
9
8
6
10
1112
13141516
17
18
19
20
21
POOMANGALAM BRIDGE
MSPIPE LAID
FSL-158.80
MWL-138.90
LWL-150.90
LWL-135.00
PACKAGE II-
25.1
Length(KM) Laid(KM)
24.07
KANJIRANGADU JN. .
13m13m
18.20m 19.30m
24.00m24.00m24.00m
Gap 1WTP- KSTP Road
Gap 2Test gap
Gap 3KSTP-Kaniyar vayalroad crossing
Test gap Gap 4
Gap 5PKM CollegeRoad crossing +above ground
Gap 6Chengalai bridge
Gap 7Cherankunnu-Narikkalbreaking
Gap 8KSTP Road+ Valakkairoad crossing
Gap 9Above Ground + Belowground Valakkai
Gap 1074.4m on hold due to thedispute at Pokkundu
Gap 11Koonam MBR Inlet
Gap 12Above grounfd- Below groundPoomangalam Bridge
StreamOn pedestals
Below ground
119m
486m
Gap 9
Gap 5
96m
22m 21m
WTP to Koonam MBR
Koonam to Kanjirangad
Total
Balance(KM)
4.4
20.7
4.33
19.74 0.96
0.1
1.03
KALLIASSERIMBR + OHSR
KARAKUNNU OHSR
KANNOM OHSR
KUZHICHAL OHSR
KARAKKUNDU OHSR
FROM KOONAM MBR
NADUKANIBPT + OHSR
MADAKKADU GLSR
ODUVALLITHATTU OHSR
MADAMTHATTU OHSR
ADIIKKAMPARA OHSR
KANJIRANGADOHSR
s
KARIKKAPPARA OHSR
KANJIRANGAD BPS
s
DI,uPVC &PE PIPESTWTM-PACKAGE II-
CHAPPARAPPADAV BRIDGE
DHARMASALA
MANNA JN.
INDEX
PIPE LAID
TALIPARAMBA-IRIKKURKSTP ROAD
TALIPARAMBA-COORGEROAD
KUPPAM RIVER UNDERWATER CROSSING
12
DI
uPVC
50.34
PE3
Sl No. Pipe Length (Km)
3.942.91
Laid (Km)
44.38
2.34
2.53
13m 21.433m 21.433m 21.433m
KUPPAM JN.
Balance (Km)
5.96
1.60
0.38
1 2
34
5
6
7
8
9
10
11
1213
14
15
16
17
18 19
20
21
22
23
24
2526
2728
29
Valakkai Pipe Bridge
MS Pipeline Laying along Highway
Chengali pipe-bridge steel trusses
Pipeline on pedestal at Valakkai
Chapparapadawu pipe-bridge
Package 3
Distribution System
Package 3The project area has been divided in to 21 major distribution zones to be served by 1 Master Balancing Reservoir (MBR) and 12 zonal reservoirs. The total length of distribution network is 625 km.
– DI pipeline of 150-500mm dia 56 km– uPVC pipes of 75-280mm dia 428 km.– PE pipes 90 &110mm dia 139km
Laying distribution pipeline (PE) on countryside
Special Machinery for hard latraite excavation in trenches
Special Machinery – smaller versions for narrow rural roads
Package 4
Service Reservoirs
Package 4
From Master Balancing Reservoir at Koonam water flows to 7 zonal reservoirs and through 2 booster pumping stations to 5 zonal reservoirs.
– Over Head Service Reservoirs 12 – Ground Level Service Reservoirs 1
Package 4 ReservoirsKoonam (Tank I) – 3.18MLKoonam (Tank II) – 2.62MLKanjirangadu – 0.59MLKarikkapara – 0.92MLKalliasseri – 3.78MLKuzhichal – 2.75MLAdikampara – 4.18MLOduvallithattu – 0.26MLNadukani – 1.17MLMadamthatta – 1.18MLKarakundu – 1.95MLKarakunnu – 3.33MLKannom – 0.91MLMadakkadu – 0.26MLAdministrative BuildingsStaff Quarters
Koonam Twin Reservoirs Capacity: 6 ML Height from the ground: More than 20m
Karikapara Reservoir
Adikampara Reservoir
Oduwalaththatta Reservoir
END