PROJECT EXPERIENCE HIGHLIGHTS
(The following Projects are not all inclusive but rather a partial listing of experience )
Jersey City,
NJ
Kansas
City
East
Windsor
NJ
Data Center
Projects in Central
and Eastern U.S.
� Locations where
projects constructed
� Multiple data center
Miami
FLDallas
Richmond
VA
Atlanta
GA
Bentonville
AR
� Multiple data center
projects in:
� Kansas City
� Atlanta
� Jersey City/New
York
Sacramento
CA
Data Center Projects in Western
U.S.
� Locations where projects constructed
� Multiple data center projects in:
� Santa Clara
Santa Clara
CA
Phoenix
AZ
� Santa Clara
PROJECT EXPERIENCE
QTS Metro Data Center-
Atlanta, GA� Former Sears & Roebuck Dist. Center
� Former site for Sprint e-Solutions � Former site for Sprint e-Solutions
Data Center
� 1 MM sf facility
� Currently 120 MW of substation
capacity
� Designed full capacity of 80 MW of
UPS
� 2nd largest data center in the US
� Scaled Expansions in Phases
PROJECT EXPERIENCE
QTS Data Center-Richmond, VA� Former chip wafer manufacturing facility
being re-purposed to Data Center
� 1.3 MM sf facility� 1.3 MM sf facility
� Currently 110 MW of substation capacity
� Designed full capacity of 75 MW of UPS
� Scaled Expansions in Phases
PROJECT EXPERIENCE
Manhattan
QTS Data Center-Jersey City, NJ� Across the Hudson River from lower
Manhattan, NY
QTS Data
Center
PROJECT EXPERIENCE
QTS Data Center-Jersey
City, NJ� DC in the top four (4) floors
of 20 story Class “A” Office QTS Data
Centerof 20 story Class “A” Office
building
� Master Planning
� Multiple improvement
projects
� New central vault upgrade to
provide an additional 12 MW
of power from PSE&G
Center
PROJECT EXPERIENCE
Wal-Mart Data Center,
(Confidential Location)� New ground up 120,000 sf Data Center
facilityData
Center
Office
Building
facility
� Hardened facility to withstand F4 tornado
� Work also included construction of new
180,000 sf 2 story Office Building
� Both Office and Data Center built on
opposite ends of existing office facility
Center
PROJECT EXPERIENCE
Sprint Data Center, Lee’s Summit,
MO� Expansion of CR #5 for Sprint billing data
centercenter
� New MEP equipment in compact MEP room
area
� Required uptime of facility to be
maintained during construction inside of
live operating data center
PROJECT EXPERIENCE
Cerner Data Center-North Kansas
City, Missouri � Preconstruction activities for new ground
up facilityup facility
� 110,000 sf
� Bunkered to protect against storms
� Initial white space build out of 20,000 sf
PROJECT EXPERIENCE
QTS Data Center-Santa Clara,
CA� Former Office R&D facility
� 55,000 sf- each building� 55,000 sf- each building
� Two building campus owned by QTS
on ground leased from Mission
College
� Currently 10 MW of substation
capacity
� Designed full capacity of 15 MW of
UPS
� Expansions in Phases
PROJECT EXPERIENCE
QTS Data Center-Sacramento,
CA� Formerly Herakles data center
� 92,000 sf� 92,000 sf
� Currently 10 MW of utility substation
capacity
� Designed full capacity of 6 MW of
UPS
� Full build out expandable in Phases
PROJECT EXPERIENCE
Sprint e-Solutions Data Center,
San Jose, CA� Existing 2 story Warehouse facility
converted to 40,000 Data Centerconverted to 40,000 Data Center
� Designed full capacity of 4 MW of UPS
� Expansions in Phases
PROJECT EXPERIENCE
West Edge (former name) on
the Plaza, Kansas City, MO� Ground up new site development on
West side of the Plaza Outdoor Shopping Hotel
Office
BuildingWest side of the Plaza Outdoor Shopping
Mall
� 10 story 220,000 sf office building
� 7 Story, 130 room boutique Hotel
� 6 story below grade CIP Parking Garage
Hotel Building
PROJECT EXPERIENCE
Plaza Colonnade, Kansas City,
MO� New 400,000 sf 10 story office facility
� New 1,280 car parking garage Park Garage
Office
� New 1,280 car parking garage
� Included 42,000 sf of space for KC Public
Library
� New Retail Building Space
New KCMO
Library
Retail
Park Garage
PROJECT EXPERIENCE
American Royal Arena
Facility - Kansas City, MO� 360,000 sf of Arena and Exhibition Hall
� 120,000 sf of existing Exhibit Hall
Existing
Exhibit
Arena
� 120,000 sf of existing Exhibit Hall
� Renovation of existing Exhibit Hall
New
ArenaNew
Exhibit Hall
Terminal A
KCI Control
Tower
KCI International Airport
Parking Garage & Control
Tower, Kansas City, MO� Two separate projects completed 10 Terminal A
Parking Garage
� Two separate projects completed 10
years apart
PROJECT EXPERIENCEKCI Parking Garage & Control
Tower, Kansas City, MO� 2,000 Car CIP Parking Garage
� One of the first Silica Fume Concrete
Structures in the U.S.
� 250 ft. tall Control Tower and TRACON
BuildingBuilding
PROJECT EXPERIENCE
Western Missouri Correctional
Center, Cameron, MO� Medium Security facility
� 500,000 sf of facilities� 500,000 sf of facilities
� 1,000 cells in Housing Units
� Administration facility
� Central Services Building
PROJECT EXPERIENCE
Colgate Palmolive Building ‘K’,
Kansas City, KS� New ground up bar soap manufacturing
plant for Colgate
Building ‘K’
plant for Colgate
� 100,000 sf, 3 story production plant
� Production Line for Irish Spring Soap
� Facility built between existing facility
buildings
PROJECT EXPERIENCE
The Link @ Union Station,
Kansas City, MO� 900 foot long Pedestrian Bridge &
WalkwayWalkway
� Ornamental Steel
� Curtainwall & Architectural Sheet Metal
PROJECT EXPERIENCE
Rosana Square Shopping Center,
Overland Park, KS� Multiple projects over a 3 year period at
site for Kansas City based Priviteriasite for Kansas City based Priviteria
family
� Strip center conversion to office space
for the IRS
� Existing Theatre building converted to
Office
PROJECT SITE SELECTION DUE DILIGENCE PROCESS
(The following slides are a sampling of work product and tools used for Site
Selection & Due Diligence efforts)
Site selection information matrix used to gather site assessment information & data
Project Site selection Due
Diligence Process
Site Capacity Analysis Sheet used to quickly determine site capacity needs for :
Project Site selection Due
Diligence Process
site capacity needs for :
Total Utility PowerGenerationUPSCooling
Site Budgeting Analysis to establish initial project budgets & ROI modeling
Project Site selection Due
Diligence Process
ROI modeling
Site Due Diligence Report for site due diligence findings
Project Site selection Due
Diligence Process