PAUL OBERLE PAUL OBERLE Professional Experience

Transcript of Project Experience Presentation 3a

PAUL OBERLEPAUL OBERLEProfessional Experience

PROJECT EXPERIENCE HIGHLIGHTS

(The following Projects are not all inclusive but rather a partial listing of experience )

Jersey City,

NJ

Kansas

City

East

Windsor

NJ

Data Center

Projects in Central

and Eastern U.S.

� Locations where

projects constructed

� Multiple data center

Miami

FLDallas

Richmond

VA

Atlanta

GA

Bentonville

AR

� Multiple data center

projects in:

� Kansas City

� Atlanta

� Jersey City/New

York

Sacramento

CA

Data Center Projects in Western

U.S.

� Locations where projects constructed

� Multiple data center projects in:

� Santa Clara

Santa Clara

CA

Phoenix

AZ

� Santa Clara

PROJECT EXPERIENCE

QTS Metro Data Center-

Atlanta, GA� Former Sears & Roebuck Dist. Center

� Former site for Sprint e-Solutions � Former site for Sprint e-Solutions

Data Center

� 1 MM sf facility

� Currently 120 MW of substation

capacity

� Designed full capacity of 80 MW of

UPS

� 2nd largest data center in the US

� Scaled Expansions in Phases

PROJECT EXPERIENCE

QTS Data Center-Richmond, VA� Former chip wafer manufacturing facility

being re-purposed to Data Center

� 1.3 MM sf facility� 1.3 MM sf facility

� Currently 110 MW of substation capacity

� Designed full capacity of 75 MW of UPS

� Scaled Expansions in Phases

PROJECT EXPERIENCE

Manhattan

QTS Data Center-Jersey City, NJ� Across the Hudson River from lower

Manhattan, NY

QTS Data

Center

PROJECT EXPERIENCE

QTS Data Center-Jersey

City, NJ� DC in the top four (4) floors

of 20 story Class “A” Office QTS Data

Centerof 20 story Class “A” Office

building

� Master Planning

� Multiple improvement

projects

� New central vault upgrade to

provide an additional 12 MW

of power from PSE&G

Center

PROJECT EXPERIENCE

Wal-Mart Data Center,

(Confidential Location)� New ground up 120,000 sf Data Center

facilityData

Center

Office

Building

facility

� Hardened facility to withstand F4 tornado

� Work also included construction of new

180,000 sf 2 story Office Building

� Both Office and Data Center built on

opposite ends of existing office facility

Center

PROJECT EXPERIENCE

Sprint Data Center, Lee’s Summit,

MO� Expansion of CR #5 for Sprint billing data

centercenter

� New MEP equipment in compact MEP room

area

� Required uptime of facility to be

maintained during construction inside of

live operating data center

PROJECT EXPERIENCE

Cerner Data Center-North Kansas

City, Missouri � Preconstruction activities for new ground

up facilityup facility

� 110,000 sf

� Bunkered to protect against storms

� Initial white space build out of 20,000 sf

PROJECT EXPERIENCE

QTS Data Center-Santa Clara,

CA� Former Office R&D facility

� 55,000 sf- each building� 55,000 sf- each building

� Two building campus owned by QTS

on ground leased from Mission

College

� Currently 10 MW of substation

capacity

� Designed full capacity of 15 MW of

UPS

� Expansions in Phases

PROJECT EXPERIENCE

QTS Data Center-Sacramento,

CA� Formerly Herakles data center

� 92,000 sf� 92,000 sf

� Currently 10 MW of utility substation

capacity

� Designed full capacity of 6 MW of

UPS

� Full build out expandable in Phases

PROJECT EXPERIENCE

Sprint e-Solutions Data Center,

San Jose, CA� Existing 2 story Warehouse facility

converted to 40,000 Data Centerconverted to 40,000 Data Center

� Designed full capacity of 4 MW of UPS

� Expansions in Phases

PROJECT EXPERIENCE

West Edge (former name) on

the Plaza, Kansas City, MO� Ground up new site development on

West side of the Plaza Outdoor Shopping Hotel

Office

BuildingWest side of the Plaza Outdoor Shopping

Mall

� 10 story 220,000 sf office building

� 7 Story, 130 room boutique Hotel

� 6 story below grade CIP Parking Garage

Hotel Building

PROJECT EXPERIENCE

Plaza Colonnade, Kansas City,

MO� New 400,000 sf 10 story office facility

� New 1,280 car parking garage Park Garage

Office

� New 1,280 car parking garage

� Included 42,000 sf of space for KC Public

Library

� New Retail Building Space

New KCMO

Library

Retail

Park Garage

PROJECT EXPERIENCE

American Royal Arena

Facility - Kansas City, MO� 360,000 sf of Arena and Exhibition Hall

� 120,000 sf of existing Exhibit Hall

Existing

Exhibit

Arena

� 120,000 sf of existing Exhibit Hall

� Renovation of existing Exhibit Hall

New

ArenaNew

Exhibit Hall

Terminal A

KCI Control

Tower

KCI International Airport

Parking Garage & Control

Tower, Kansas City, MO� Two separate projects completed 10 Terminal A

Parking Garage

� Two separate projects completed 10

years apart

PROJECT EXPERIENCEKCI Parking Garage & Control

Tower, Kansas City, MO� 2,000 Car CIP Parking Garage

� One of the first Silica Fume Concrete

Structures in the U.S.

� 250 ft. tall Control Tower and TRACON

BuildingBuilding

PROJECT EXPERIENCE

Western Missouri Correctional

Center, Cameron, MO� Medium Security facility

� 500,000 sf of facilities� 500,000 sf of facilities

� 1,000 cells in Housing Units

� Administration facility

� Central Services Building

PROJECT EXPERIENCE

Colgate Palmolive Building ‘K’,

Kansas City, KS� New ground up bar soap manufacturing

plant for Colgate

Building ‘K’

plant for Colgate

� 100,000 sf, 3 story production plant

� Production Line for Irish Spring Soap

� Facility built between existing facility

buildings

PROJECT EXPERIENCE

The Link @ Union Station,

Kansas City, MO� 900 foot long Pedestrian Bridge &

WalkwayWalkway

� Ornamental Steel

� Curtainwall & Architectural Sheet Metal

PROJECT EXPERIENCE

Rosana Square Shopping Center,

Overland Park, KS� Multiple projects over a 3 year period at

site for Kansas City based Priviteriasite for Kansas City based Priviteria

family

� Strip center conversion to office space

for the IRS

� Existing Theatre building converted to

Office

PROJECT SITE SELECTION DUE DILIGENCE PROCESS

(The following slides are a sampling of work product and tools used for Site

Selection & Due Diligence efforts)

Site selection information matrix used to gather site assessment information & data

Project Site selection Due

Diligence Process

Site Capacity Analysis Sheet used to quickly determine site capacity needs for :

Project Site selection Due

Diligence Process

site capacity needs for :

Total Utility PowerGenerationUPSCooling

Site Budgeting Analysis to establish initial project budgets & ROI modeling

Project Site selection Due

Diligence Process

ROI modeling

Site Due Diligence Report for site due diligence findings

Project Site selection Due

Diligence Process

Project Closeout & Lessons Learned

Project Site selection Due

Diligence Process