Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing...

16
TMALL 0143 Presentation engelsk v 1.0 Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016

Transcript of Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing...

Page 1: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

TM

ALL 0

143 P

resenta

tio

n e

ngels

k v

1.0

Project ALEX(Automatic LX)

New Level Crossing

Control System

Housing prototype April 2016

Page 2: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

2 2016-04-28

• Training Center personnel are

assembling the prototype

• The prototype is used to

– Optimize space

– Dimension of the batteries

– Find interface requirements

– Receive feedback from maintenance

personnel and suppliers

• During the tender period, a transQ

(category 1.3.5 Level Crossing)

qualified supplier can make an

appointment for a closer look at the

prototype

A housing prototype is built at the

Railway Training CenterALEX is one of several

possible modules

Page 3: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

3 2016-04-28

• Housing prototype

– 8 industrial outdoor cabinets

• standard 19 inch racks

• 1.20 m high incl. socket

• 0.80 m wide

• 0.60 m deep

• All cabinets are equipped with

230 V AC outlet for hand tools and

task lighting

– 3 types of boxes for manual operation

• The prototype is an example of housing

to display the needs and requirements

• Opening and closing of cabinets and

boxes are logged by ALEX and monitored

by the Access Control System (TF+SD).

Switches for access control are visible in

photos of boxes.

Overview

An example of assembly

Page 4: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

4 2016-04-28

• The prototype

– Equipped to handle two tracks

– Some components are missing, see the comments for each cabinet/box

– Only a small number of cables are routed

• The LX control system supplier will be responsible for

– The housing

– Assembly of all components in the housing, unless other component contracts

prevent this

– Delivery to pilot LX sites

– Installation of housing at pilot LX sites

• Trafikverket will be responsible for

– Installation of external objects at pilot LX sites

• All information is subject to change before the RFQ is released

• Trafikverket is still in a silent period regarding ALEX and is unable to

answer any questions

General comments

Page 5: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

5 2016-04-28

• Visible in photo

– Switch for temp. power generator

– Over voltage protection

– Residual Current Device (RCD)

– Power distribution box

• Not visible

– Connector for temporary power

generator

– Zero Voltage Contactor installed

after RCD. Demise of incoming

electrical power must be logged by

ALEX.

• Investigation is ongoing regarding

circuit grounding

Cabinet for

Incoming Power

An example of assembly

Page 6: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

6 2016-04-28

• Visible in photo

– 2 pcs Rectifier 48V

– 2 pcs DC/DC module 48V

– 2 pcs DC/DC module 24V

– 2 pcs SP2 Basic Ind.

– 1 pcs Temperature sensor

– 1 pcs Distribution box

– 1 pcs Fuse 16A

– 1 pcs Fuse 50A

– 1 pcs Fuse 10A

– 1 pcs Fuse 20A

– 4 pcs Battery 12 V

– Terminal blocks

• The batteries will be dimensioned

for 10 hours of operation

Cabinet for

Rectifier and Batteries

An example of assembly

Page 7: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

7 2016-04-28

• Visible in photo

– 6 pcs rectifier 230V AC / 7 V DC

– 6 pcs resistor

– 6 pcs fuse

– 2 pcs Ni Cd battery 6 V

• Not visible

– 4 pcs Ni Cd battery 6 V

– Terminal blocks for track circuits

– Interface terminal block

• Track circuit cabinets need interior

walls to minimize damage when

there is a risk of overvoltage and fire

Cabinet for

Track circuit Feed

An example of assembly

Page 8: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

8 2016-04-28

• Visible in photo

– 2 pcs relay board

– 12 pcs relay socket for JRK

– 1 pcs JRK relay

– 4 pcs inductor, 2 types

• Not visible

– 11 pcs JRK relay

– 2 pcs inductor

– Interface terminal block

• Relay boards can be turned to

facilitate troubleshooting

• Cut & paste has been used in the photo to show the need

Cabinet for

Track circuit Uptake

An example of assembly

Page 9: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

9 2016-04-28

• Left cabinet

– Visible in photo

• 1 pcs relay board cut

• 1 pcs relay board un-cut

– Not visible

• Relay interface to interlocking

– M59 or ESTER

– Design is ongoing

– Drawings in RFQ

– Relay boards can be turned

Cabinets

for

Interfaces

• Right cabinet

– Visible in photo

• Obstacle detector

– Not visible

• Interface to ATC

• Interface to Line Block

• Interface to Adjacent LX

control system

• Line cable #800 and #900

terminal blocks

• Interface terminal block

An example of assembly

Page 10: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

10 2016-04-28

• Available space for the new

LX control system

• Additional cabinets can be

added if not enough space

• Interior wall towards Interface

cabinet can be removed

• The power supply in this

cabinet is +48 V DC

dimensioned for 10 h of

operation

• Not visible:

– Terminal block for ALEX

interface

Cabinet for ALEX

An example of assembly

Page 11: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

11 2016-04-28

• Visible in photo

– Terminal Block with surge

protection

– Optical connection box

– Power unit

– IP/MPLS switch

– Copper line modem (xDSL)

– IP over GSM-R modem (GPRS)

• Not visible

– Access Control interface

– IRIS camera interface

• The power supply in this cabinet is

adapted for telecommunications

equipment, -48 V DC dimensioned

for 10 h of operation

Cabinet for IT

An example of assembly

Page 12: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

12 2016-04-28

• Switch for access control (open hatch)

• Ljudsignaler (Acoustic signals)

– Indicator, yellow

– Maneuver buttons

• Normal

• Blockerade (Blocked)

• Varningssignalering (Warning signaling)

– Indicator, red

– Maneuver buttons

• Normal

• Test

• Cut & paste has been used in the photo to show the need

Box for Manual Control

Normal

Blockerade

Ljudsignaler

Varningssignalering

Test

Normal

An example of assembly

Page 13: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

13 2016-04-28

• Spår 1 (Track 1)

– Switch for access control

– Site-specific sign that clarifies which

adjacent LX control systems who are

affected by the FK function

– Indicator, yellow

– Maneuver buttons

• FK = Frånkoppling

(Disable Warning Signaling)

• IK = Inkoppling

(Enable Warning Signaling)

• Not visible

– Separate box for track 2, however

the FK function is rare on lines with

two tracks

• Cut & paste has been used in the photo to show the need

Box for Disabling Warning Signaling

Spår 1

IK

FK IK

Påverkar även

X-vägen km 123+456

Y-vägen km 124+111

An example of assembly

Page 14: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

14 2016-04-28

• The specification work is not finished

• Switch for access control

• Indicators

– Vit, Medgivande

(White, Permission to open barrier)

– Gul, Varning

(Yellow, Warning)

• Maneuver buttons

– Öppna (Open barriers)

– Stäng (Close barriers)

• Cut & paste has been used in the photo to show the need

Box for Road User Control (only for the solution

User-worked road barrier)

An example of assembly

Page 15: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

15 2016-04-28

• To prevent vandalism, a hatch of an external equipment such as a

barrier machine, should be lockable and be monitored by the access

control system in the same way as the cabinets and boxes

• Any needed climate control will be the responsibility of the ALEX

supplier, it is not visible in the photos

ALEX housing

Page 16: Project ALEX - Trafikverket...Project ALEX (Automatic LX) New Level Crossing Control System Housing prototype April 2016. ... Track circuit Feed An example of assembly. 8 2016-04-28

16 2016-04-28

Thank you for your attention!