86
Process Operational Readiness and Operational Readiness Follow-On DEVELOPMENT CENTER EG&G Idaho, Inc. PO. Box 1625 ldaho Falls, ldaho 83415 February 1987 UNITED STATES DEPARTMENT OF ENERGY OFFICE OF THE DEPUTY ASSISTANT SECRETARY FOR SAFETY, HEALTH, AND QUALITY ASSURANCE

Transcript of Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process...

Page 1: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Process Operational Readiness and

Operational Readiness Follow-On

DEVELOPMENT CENTER

EG&G Idaho, Inc. PO. Box 1625

ldaho Falls, ldaho 83415

February 1987

UNITED STATES DEPARTMENT OF ENERGY

OFFICE OF THE DEPUTY ASSISTANT SECRETARY FOR SAFETY, HEALTH, AND QUALITY ASSURANCE

Page 2: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

DISCLAIMER

This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product or process disclosed, or represents that its use would not infringe privately owned rights.

Available from:

System Safety Development Center EG&G Idaho, Inc. P.O. Box 1625 ldaho Falls, ldaho 83415

Page 3: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

PROCESS OPERATIONAL READINESS AND OPERATIONAL READINESS FOLLOW-ON

Prepared by R. 3 . Nertney

Pub1 i shed b y

System S a f e t y Development Center EG&G Idaho, I n c .

Idaho F a l l s , Idaho 83415

Prepared f o r t h e U.S. Department o f Energy

Idaho Operat ions O f f i c e

Page 4: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 5: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXECUTIVE SUMMARY

The purpose of this document is to provide additional documentary

material dealing with subjects introduced i n SSDC-1, Occupancy-Use

Readiness Manual, and SSDC-12, Safety Considerations in Evaluation of

Maintenance Programs. In augmenting SSDC-1, Part I of this manual provides additional material related to process safety; i n the case of SSDC-12, the

subject of safety considerations in evaluation of maintenance programs is

broadened in Part I1 to include maintenance of personnel systems and

procedural systems as we1 l as hardware. "Maintenance" is related more

directly to the concept of operational readiness and an alternative

analytical tree is provided for hardware maintenance program evaluation.

i i i

Page 6: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 7: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

CONTENTS

INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

PART 1.. PROCESS SAFETY ................................................ 3

PART II..FOLLO W.ON ACTIVITIES . ........................................ 28

APPENDIX A.. SOME SAMPLE TREES ......................................... 4 1

APPENDIX B.. AN ALTERNATIVE MAINTENANCE TREE ........................... 67

FIGURES

Hardware-People-Procedures R e l a t i o n s h i p s ......................... 5

How do we ach ieve o p e r a t i o n a l read iness? ......................... 7

What i s o u r b a s i c model? ......................................... 9

System ready . .................................................. 10

Development ...................................................... 11

Upstream Processes ............................................... 13

P r e p a r a t i o n o f Procedures ........................................ 15

The Hardware C o n f i g u r a t i o n C o n t r o l Model ......................... 16

Personnel S e l e c t i o n (Example) .................................... 17

O b j e c t i v e ...................................................... 18

The Standard T ree ................................................ 23

How do we use e x i s t i n g i n s p e c t i o n s , rev iews, c h e c k l i s t s , e t c .? ... 26

MORT ........................................................... 29

What i s o p e r a t i o n a l read iness? ................................... 30

How do these Elements F i t Together i n O p e r a t i o n a l Mishaps ........ 32

The Hardware C o n f i g u r a t i o n C o n t r o l Model ......................... 34

............. For Each Bot tom T i e r Hardware I t e m (O.R. Work Sheet) 35

Personnel S e l e c t i o n (Fo l low-on Example) .......................... 36

P r e p a r a t i o n o f Procedures ........................................ 37

Page 8: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

FIGURES (continued)

A1 .

A2 . A3 .

A4 . A5 . A6 . A7 . A8 .

A9 . A10 . All . A12 .

A13 . A14 . A15 . A16 . B1 .

Nuclear Chemical Processing Plant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

. . . . . . . . . . . . . . . . . . . Nuclear Chemical Processing Plant (continued) 46

. . . . . . . . . . . . . . . . . . . Nucl ear Chemical Processing P1 ant (continued) 47

. . . . . . . . . . . . . . . . . . . Nuclear Chemical Processing Plant (continued) 48

Oil Drilling Platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

Oil Drilling Platform (continued) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

Oil Drilling Platform (continued) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52

Nuclear Reactor (N Reactor) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

. . . . . . . . . . . . . . . . . . . . . . . . . . . Nuclear Reactor (N Reactor continued) 55

.................... Princeton Tokamuk Fusion Test Reactor (TFTR) 57

Nuclear Reactor (ATR) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59

Aerial Measurement Operations ................................... 61

Aerial Measurement Operations (continued) ....................... 62

Aerial Measurement Operations (continued) ....................... 63

Radiation Protection Systems .................................... 65

Radiation Protection Systems (continued) ........................ 66

Facility Maintenance ............................................ 76

Page 9: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

PROCESS OPERATIONAL READINESS

AND OPERATIONAL READINESS FOLLOW-ON

INTRODUCTION

The f i r s t document i n t h e SSDC (System S a f e t y Development Center)

s e r i e s d e a l s w i t h t h e s u b j e c t o f Occupancy-Use Readiness (Reference 1).

The m a t e r i a l i n c l u d e d i n t h a t manual p r o v i d e d t h e b a s i s f o r development o f

t h e SSDC workshop i n O p e r a t i o n a l Readiness (Reference 2) . The o r i g i n a l

Occupancy-Use Readiness Manual, however, d e a l s o n l y g e n e r a l l y w i t h t h e

s u b j e c t o f p rocess s a f e t y ; i . e . , t h e s a f e t y o f o v e r a l l "processes" such as

s o l a r c o l l e c t i o n systems, n u c l e a r r e a c t o r s , and c o a l f i r e d e l e c t r i c a l

p l a n t s . The manual a l s o f a i l s t o d e t a i l t h e c o n s i d e r a t i o n s i n v o l v e d i n

m a i n t a i n i n g t h e s t a t e o f r e a d i n e s s on a c o n t i n u i n g b a s i s . B o t h o f t h e

l a t t e r s u b j e c t s a r e d e a l t w i t h i n some d e t a i l i n t h e SSDC1s O p e r a t i o n a l

Readiness Workshop.

The purpose o f t h i s document i s t o p r o v i d e a d d i t i o n a l documentary

m a t e r i a l d e a l i n g w i t h s u b j e c t s i n t r o d u c e d i n SSDC-1, Occupancy-Use

Readiness Manual, and SSDC-12, S a f e t y C o n s i d e r a t i o n s i n E v a l u a t i o n o f

Maintenance Programs. I n augmenting SSDC-1, P a r t I o f t h i s manual p r o v i d e s

a d d i t i o n a l m a t e r i a l r e l a t e d t o process s a f e t y ; i n t h e case o f SSDC-12, t h e

s u b j e c t o f s a f e t y c o n s i d e r a t i o n s i n e v a l u a t i o n o f maintenance programs i s

broadened i n P a r t I1 t o i n c l u d e maintenance o f personne l systems and

p rocedura l systems as we1 l as hardware. "Maintenance" i s r e l a t e d more

d i r e c t l y t o t h e concep t o f o p e r a t i o n a l read iness and an a l t e r n a t i v e

a n a l y t i c a l t r e e i s p r o v i d e d f o r hardware maintenance program e v a l u a t i o n .

Page 10: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 11: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

PART I--PROCESS SAFETY

O ~ e r a t i onal Readiness

We w i l l f i r s t d i s c u s s o p e r a t i o n a l read iness concepts i n t h e c o n t e x t o f

g e t t i n g t h i n g s o f f t o a good s t a r t f o r new o r m o d i f i e d systems. We w i l l

proceed i n P a r t I 1 t o c o n s i d e r a t i o n o f use o f t h e o p e r a t i o n a l read iness

a n a l y t i c a l t o o l s as a b a s i s f o r ongoing e v a l u a t i o n o f system s a f e t y and t h e

e f f e c t i v e n e s s o f t o t a l system maintenance programs.

What Do We Mean by O p e r a t i o n a l Readiness?

I n t h e MORT sense, o p e r a t i o n a l read iness means a c h i e v i n g a

c o n f i g u r a t i o n wh ich p l a c e s t h e r i g h t peop le i n t h e r i g h t p l a c e s a t t h e

r i g h t t i m e s work ing w i t h t h e r i g h t hardware acco rd ing t o t h e r i g h t

p rocedures and management c o n t r o l s . A t a secondary l e v e l , t h i s i m p l i e s

t h a t t h e s e e lements a r e f u n c t i o n i n g i n a p rope r p h y s i c a l and p s y c h o l o g i c a l

e n v i ronment.

What Determines What I s "R igh t " and "Proper?"

"R ightness" i n a c h i e v i n g o p e r a t i o n a l read iness i s based on two k i n d s

o f c r i t e r i a :

1. F u n c t i o n a l C r i t e r i a

a. The system i s accompl ish ing i t s f u n c t i o n s i n an accep tab le

manner.

b. The system i s o p e r a t i n g a t accep tab le r i s k l e v e l i n te rms o f

envi ronment, s a f e t y and h e a l t h r i s k s as w e l l as bus iness

r i s k s .

2. Appl i c a b l e codes/standards and r e g u l a t i o n s e s t a b l i shed a t a1 l

c o n t r o l l e v e l s i n s i d e and o u t s i d e o f t h e o p e r a t i n g o r g a n i z a t i o n .

Page 12: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Whi le t h e i n t e n t o f b o t h o f these t ypes o f c r i t e r i a i s o f t e n t h e

same, a p p l i c a b i l i t y and re levance as r e l a t e d t o s p e c i f i c systems a r e o f t e n

q u i t e d i f f e r e n t i n a p r a c t i c a l sense.

What Are t h e B a s i c Elements o f Any System?

The t h r e e b a s i c system elements a r e :

a People

a Hardware Elements

- Process hardware / too ls , e t c .

- B u i l d i n g s and Grounds

a Procedures and Management C o n t r o l s

As i n d i c a t e d i n F i g u r e 1, these t h r e e e lements p r o v i d e o n l y h a l f o f

t h e a n a l y t i c a l p i c t u r e . We must a l s o c o n s i d e r t h e i n t e r f a c e s among these

elements.

a Do t h e peop le match t h e hardware; e.g., i s t h e hardware

p r o p e r l y ope rab le f o r t h e peop le who have been s e l e c t e d and

t r a i n e d t o ope ra te it; e.g . , have we s e l e c t e d peop le w i t h

p r o p e r c o l o r d i s c r i m i n a t i o n t o d e a l w i t h c o l o r coded

hardware e lements?

a Do t h e procedures match t h e hardware; e.g., have we avo ided

s i t u a t i o n s i n wh ich t h e o p e r a t o r s have been g i v e n Mark I V

p rocedures manuals t o ope ra te Mark V equipment?

a Do t h e procedures match t h e peop le who a r e t o use them;

e.g., do we have s e l e c t i o n procedures wh ich assu re a p rope r

degree o f f u n c t i o n a l l i t e r a c y f o r peop le who must read and

unders tand complex work procedures?

Page 13: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Hardware-People-Procedures Relationships

Figure 1

Page 14: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

How Do We Achieve Operational Readiness?

Operational readiness is accomplished by proceeding along

selection/development lines as indicated in Figure 2. The status of

operational readiness is indicated by the bull's-eye at the center of the

diagram. As may be seen, each of the major elements achieves its state of

readiness by progressing from an establishment of conceptual specifications

and selection criteria to a final state of "here-and-now" readiness labeled

"go" on the diagram.

It should be noted that the interface development cycles must evolve

through the same sort of progression if we are to arrive at a final state

of system reacti ness.

For example, (plant-personnel interface) if we have valves in the

system which require "two strong men and a boy1' to manipulate, we do not

select 90 pound weaklings to operate the system. If components and

displays are color coded, we must establish and maintain proper color

discrimination criteria in personal selection. Similarly,

(personnel-procedural interface) if we select complex written technical

procedures as a control medium, we must maintain functional literacy

requirements in our personnel selection criteria.

Finally, (plant-procedural interface) we must select procedural types

which are appropriate to the hardware systems which our operators are

controlling. The procedures should be sufficient to establish proper

control but should be no more than are necessary in terms of the hardware

design and the characteristics of the personnel themselves.

In short, the personnel, procedures and hardware cannot be taken to a

state of readiness individually. They must be in a collective state of

readiness in accordance with system operational requirements.

Page 15: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

How do we achieve operational readiness?

Procedural syslems

F i q u r e 2

Page 16: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

How Can We Prevent O v e r s i a h t s i n C o m ~ l e x Svstems?

A complex system i n v o l v e s a g r e a t many people, hardware, and

p rocedura l components. T h i s r e s u l t s i n t h e need for a n a l y t i c a l models

wh ich can enab le us t o keep t r a c k o f a l l o f t hese e lements.

The p r i m a r y a n a l y t i c a l model i s t h e read iness t r e e shown i n F i g u r e 3.

T h i s i s t h e same t r e e wh ich was i n t r o d u c e d i n SSDC-1 (Reference 1). Going

beyond t h e d i s c u s s i o n o f Reference 1, however, we may go on t o deve lop t h e

"Bas ic S t r u c t u r e and F a c i l i t y " element d e f i n e d i n Reference 1 t o a complete

hardware /p lan t p rocess d e s c r i p t i o n . T h i s p rocess i s i n d i c a t e d i n

F i g u r e 4. S i m i l a r l y , p l a n t operator/supervisory/management personne l

s t r u c t u r e s may be d e f i n e d and be a s s o c i a t e d w i t h t h e hardware e lements on a

one-to-one b a s i s . F i n a l l y , t h e hardware s t r u c t u r e may be r e l a t e d t o

a p p l i c a b l e o p e r a t i n g procedures and management c o n t r o l s .

T h i s does n o t r e q u i r e s t r u c t u r e o f personne l /p rocedure branches wh ich

d u p l i c a t e t h e hardware c o n f i g u r a t i o n s t r u c t u r e . Rather , i t may be done

t h r o u g h use o f hardware based m a t r i c e s r e l a t e d t o i n d i v i d u a l hardware

i tems. These m a t r i c e s d e f i n e t h e p rocedura l and personne l needs f o r each

hardware e lement. T h i s methodology i s d e s c r i b e d i n d e t a i l i n t h e SSDC

Opera t i ona l Readiness Workshop (Reference 2) . Once t h e a n a l y t i c a l t r e e and

i t s m a t r i c e s a r e completed, i t desc r ibes , i n any d e s i r e d l e v e l o f d e t a i l ,

t h e i n d i v i d u a l t h i n g s wh ich need t o be i n p l a c e i f t h e system i s , indeed,

i n a s t a t e o f read iness .

The T o t a l Development Cyc le

I t migh t appear t h a t t h i s p rocess i s s imp ly a m a t t e r o f t r a c k i n g a

c o n s t r u c t i o n j o b a l o n g w i t h p a r a l l e l personne l s t a f f i n g and s t r u c t u r e o f

p rocedura l systems. Wh i l e we may approach t h i s i d e a l i z e d s i t u a t i o n i n some

cases, t h e more common s i t u a t i o n i n modern h i g h techno logy systems i s t h e

one shown i n F i g u r e 5. In t h i s case, we a r e e v a l u a t i n g o p e r a t i o n a l

Page 17: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 18: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 19: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Development General constraints Baseline configuration I

Current system configuration W

Hardware Personnel procedures & Management controls Safety analysis

I 1 Technical specs I L I I

- *

Operating limits Operational safety Management controls assessment I 4 Operational readiness I

General studies,

General policies, rules, standards, regulations, etc. 2.

development of data, development of method, etc. 1.

QA requirements 10. I

3. reports Preliminary

Methods and Final Information Mission specific 5.

Specific operating protocol

analysis

F igure .5

Page 20: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

read iness based on t h e c u r r e n t system c o n f i g u r a t i o n and a s p e c i f i c

o p e r a t i n g p r o t o c o l i n d i c a t e d i n s i d e t h e d o t t e d r e c t a n g l e . A c c e p t a b i l i t y i s

based on an o p e r a t i o n a l s a f e t y assessment (Box 9) wh ich u t i l i z e s

a p p r o p r i a t e t e c h n i c a l s p e c i f i c a t i o n s , o p e r a t i n g l i m i t s , management c o n t r o l s

and qua l i t y assurance c r i t e r i a / i n f o r m a t i o n (Box 6 ) .

I f we examine t h e s i t u a t i o n c l o s e l y , however, we f i n d t h a t we a r e

dependent on a g r e a t dea l o f upstream developmental work (Boxes 1-5). T h i s

development work has l e d t o t h e system which we a r e d e a l i n g w i t h . We f i n d ,

then, t h a t o u r a b i l i t y t o de termine t h e read iness o f a system i s a lways

dependent t o some degree on t h e q u a l i t y , q u a n t i t y and scope o f t h i s

upstream work. For example, a number o f y e a r s ago, cons ide rab le d i f f i c u l t y

was exper ienced i n e s t a b l i s h i n g o p e r a t i o n a l read iness f o r a n u c l e a r t e s t

r e a c t o r t o ope ra te because o f l i m i t a t i o n s i n p a r a m e t r i c scope o f t h e

l a b o r a t o r y exper iments wh ich had e s t a b l i s h e d t h e e m p i r i c a l equa t i ons

r e l a t i n g t o h e a t t r a n s f e r . These s u p p o r t i n g l a b o r a t o r y exper iments had

a c t u a l l y been per fo rmed many y e a r s e a r l i e r and were n o t r e l a t e d on a

one-to-one b a s i s t o t h e c u r r e n t machine.

G e n e r a l l y speaking, we a r e p r o v i d e d w i t h two cho i ces i n a s i t u a t i o n o f

t h i s k i n d . We may s a c r i f i c e t ime and money t o p e r f o r m a d d i t i o n a l

p r e p a r a t o r y work - o r we may accept t h e u n c e r t a i n t i e s and/or l a c k o f system

c o n t r o l a r i s i n g f rom incomp le te upstream p r e p a r a t i o n .

What I s t h e R e l a t i o n s h i p Between Opera t i ona l Readiness and Mishaps?

The mishap o r a c c i d e n t i s g e n e r a l l y ev idence t h a t a system was no t ,

indeed, o p e r a t i o n a l l y ready. I f we examine F i g u r e 6, we see t h a t t h i s , i n

t u r n , r e p r e s e n t s f a i l u r e i n one o r more o f t h e p r e p a r a t o r y s teps f o r

peop le , hardware, o r procedures/management c o n t r o l s .

Even s i t u a t i o n s i n wh ich c o n d i t i o n s wh ich were n o t under ou r c o n t r o l

were i n v o l v e d as causa l f a c t o r s can s t i l l i n d i c a t e a l a c k o f o p e r a t i o n a l

read iness . For example, w i n d / l i g h t n i n g damage can i n d i c a t e des ign

d e f i c i e n c i e s i n system p r o t e c t i o n f rom these n a t u r a l hazards. O the r

Page 21: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Case study # 1 Upstream Processes The mishap is the result of "upstream processes":

Hardware

People at the

job site

Procedures .

t and

Y

The "upstream Processes"

=I. L - - W

C

controls relating to the mishap

- h L t management

Page 22: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

situations may indicate that we failed to establish meteorological controls

over our operations in an adequate manner.

The nature of the three upstream processes is indicated in Figures 7,

8, and 9. Figures 7 and 8 are self-explanatory; Figure 9 is discussed in

detail in Reference 5. The important points in examining these figures are

three:

1. The processes are complex and involve many people and interfaces.

2. The processes are interrelated.

3 . The need for system follow-on maintenance and ability to deal

with change is evident in the processes, not just hardware

elements.

How Can We Track and Display Progress?

In dealing with complex systems, it is necessary that orderly methods

for tracking and displaying readiness information be established. These

cannot always be based on final product inspection. For example, certain

hardware elements must be inspected prior to the time that they are made

physically inaccessible through construction. Similarly, it is not always

possible to determine whether a procedure was "reviewed" or whether an

operator was "trained" by simple observation after the fact.

Our readiness determination, therefore, must be based to some degree

on records, certification, spot checks and descriptions of processes as

well as on product examination.

The situation is demonstrated in Figure 10. The readiness elements

defined in the analytical trees must be completed by people. These people

perform the tasks defined as "what" in Figure 10. Readiness is achieved

when, and only when, all of the actors ("who") have completed all of their

tasks ("what").

Page 23: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Preparation of Procedures

I Preparedocument 1 revision request I (DRR)

Determine need for and categorize Write or modify

procedure procedure 3.

Obtain field review

W -I

Obtain procedure review board (PRB) Issue procedure

approval for field use 5. 6.

I

Figure 7

Page 24: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 25: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 26: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

I Objective 1

Readiness Working

tree

Work sequence charts

a Known not complete 0 Known complete OStatus unknown

Operational readiness matrix

F igure 10

Page 27: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Very o f t e n t h e manager o r o t h e r r e v i e w e r w i l l n o t be concerned w i t h

"who" b u t o n l y t h a t t h e necessary t a s k s ("what") have been done; t h a t i s ,

t h a t a l l o f t h e e lements i n each v e r t i c a l column o f t h e m a t r i x have been

completed.

I n any case, methods must be e s t a b l i s h e d t o de termine t h a t a l l o f t h e

necessary t a s k s r e q u i r e d t o ach ieve a s t a t e o f read iness have been

accompl ished. D e t a i l e d methods f o r accompl ish ing t h i s a r e d e s c r i b e d and

d i scussed i n t h e Opera t i ona l Readiness Workshop.

Gener ic Readiness vs . Miss ion/Task S p e c i f i c Readiness

O r d i n a r i l y , i n i t i a l o p e r a t i o n a l read iness i s d e f i n e d i n terms o f more

o r l e s s g e n e r a l f u n c t i o n s t o be performed by t h e system. T h i s may o r may

n o t p r o v i d e s u f f i c i e n t assurance t h a t a system i s o p e r a t i o n a l l y ready t o

accompl ish a l l s p e c i f i c m iss ions and tasks . The genera l o p e r a t i o n a l

read iness methodology admi t s t h e p o s s i b i l i t y o f e v a l u a t i n g t h e read iness

process i n t h e c o n t e x t of s p e c i f i c m iss ions o r t a s k s wh ich t h e system m i g h t

be asked t o per fo rm. T h i s i s p a r t i c u l a r l y i m p o r t a n t f o r t asks /m iss ions

wh ich l i e o u t s i d e t h e usua l system f u n c t i o n s . Use o f t h e o p e r a t i o n a l

read iness techn iques i n t h i s way c o n s t i t u t e s a fo rm o f change /d i f f e rence

a n a l y s i S.

C o l l e c t i o n and A n a l y s i s o f Readiness I n f o r m a t i o n

I n o r d e r t o p r o v i d e h i s t o r i c a l r e c o r d s and t o p r o v i d e i n p u t s f o r

o p e r a t i o n a l read iness r e v i e w (as compared w i t h "do") processes, i t i s

necessary t h a t we c o l l e c t and ana lyze o u r o p e r a t i o n a l read iness

i n f o r m a t i o n . F i g u r e 10 i n d i c a t e s t h a t t h e t a s k s d e f i n e d by t h e o p e r a t i o n a l

read iness r e v i e w t r e e a r e per fo rmed b y r e s p o n s i b l e i n d i v i d u a l s and groups

w i t h i n t h e o r g a n i z a t i o n .

I n e a r l i e r d i s c u s s i o n o f F i g u r e 10, we i n d i c a t e d t h a t upper management

i s o f t e n n o t concerned w i t h "who" d i d p a r t i c u l a r t a s k s b u t r a t h e r whether

Page 28: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

t h e complete j o b s have been done o r n o t . T h i s means t h a t c e r t a i n

i n d i v i d u a l s must be r e s p o n s i b l e f o r t r a c k i n g and knowing t h e s t a t u s o f work

comp le t i on .

These a r e n o t n e c e s s a r i l y t h e same i n d i v i d u a l s who - do t h e work . For

example, an i n s t a l l a t i o n o f an i n s t r u m e n t panel may i n v o l v e e l e c t r i c i a n s ,

i n s t r u m e n t personne l , p i p e f i t t e r s , l a b o r e r s , p a i n t e r s , i n s u l a t o r s and o t h e r

c ra f t smen and t h e i r s u p e r v i s o r s . Each o f t hese groups may r e p o r t ,

independent ly , t h a t t h e i r p a r t i c u l a r work o r d e r s a r e complete and " c l e a r " .

The i m p o r t a n t ques t i on , however, i s whether o r n o t t h e c o n t r o l pane l i s

complete and f u n c t i o n a l i n accordance w i t h t h e i n tended des ign and

f u n c t i o n . T h i s may r e q u i r e a d d i t i o n a l i n p u t s f rom t h e q u a l i t y assurance

and o p e r a t i n g groups, as w e l l as " c o l l e c t i v e " ove rv iew r e p o r t s f r o m l i n e

managers and f rom c o o r d i n a t o r s . Exper ience i n d i c a t e s t h a t an i m p o r t a n t

p a r t o f t h e o p e r a t i o n a l read iness process i n v o l v e s i d e n t i f i c a t i o n o f

i n d i v i d u a l s who a r e r e s p o n s i b l e f o r knowing and r e p o r t i n g t h e read iness

s t a t u s o f each component and subsystem o f t h e system.

Readiness Review

The r e v i e w and v a l i d a t i o n o f read iness , as d i s t i n g u i s h e d f rom

a c h i e v i n g an a d v e r t i s e d s t a t e o f read iness , i s an i m p o r t a n t p a r t o f t h e

o p e r a t i o n a l r e a d i n e s s process . Review may be per fo rmed b y s t a f f personne l ,

b y ad hoc committees/boards o r t h i s may be an i m p l i c i t p a r t o f upper

management overv iew.

I n any case, r e v i e w shou ld i n c l u d e s c r u t i n y f rom two p o i n t s o f v iew b y

personne l hav ing d i f f e r e n t s k i l l s and knowledge. Review shou ld i n c l u d e :

m Review by t e c h n i c a l s p e c i a l i s t s t o assure t h a t t h e system i s

adequate f rom t h e p o i n t o f v i ew o f t e c h n i c a l f u n c t i o n o f

i n d i v i d u a l subsystems.

Page 29: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

e Review by higher command level management to assure that the

overall system will do what is needed in the broader sense.

Logical Review vs. a "High Tech Easter Egg Hunt"

While there is much to be said for the benefits of informal technical

review by skilled, experienced individuals, there is a high risk of

oversights (in the "overlooking" sense) and omissions. On the other hand,

rigid checklist type review tends to put blinders on the process. This

indicates that an optimum review process should provide sufficient

structure to reduce oversights/omissions but should provide adequate

unstructured "search-out" latitude to take full advantage of the individual

genius of the reviewers.

We need to base our operational readiness processes on:

r Prevention of oversights in dealing with hazards.

e Establishing the individual criteria which define the state

of readiness and assuring that these criteria are met.

Having the proper specialists participate in each

operational area in:

- Achieving the state of readiness.

- Operational readiness review.

How Do We Set Up the Operational Readiness Trees?

The System Safety Development Center has collected a large number of

sample readiness trees covering a wide variety of applications ranging from

broad generic material to highly specialized applications. Some of these

are shown in SSDC-1 (Reference 1) and in Appendix A of this report.

Generally speaking, three rules apply in design of operational readiness

material :

Page 30: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

1. Use standardized trees and models for straightforward jobs.

2. Develop special trees for unusual and complex systems.

3. Always design operational readiness "do" and "review" analytical

models and methods to the organization's own management, work

control, configuration control and quality assurance systems.

Scaling and Detailing

The analytical trees and matrices shown in Appendix A relate to large

complex systems. The operational readiness technology is scalable to any

type of system. For example, consider application of the standard tree

shown in Figure 11 to the job of a custodian cleaning up a meeting room.

In this case, the model need be developed no further than:

Person

Have custodians been assigned to clean the room?

Hardware

Do the custodians have brooms, dust cloths, furniture polish and

other necessary tool s and equipment?

e Procedures

Do the custodians have adequate instructions relating to when and

how they are to proceed in cleaning the room?

Working to this level will often indicate the need to extend the development further. For example, is the furniture polish referred to

above flammable or toxic? If this is the case, additional training for the

person, special operating procedures and storage cabinets (hardware) may be

necessary.

Page 31: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 32: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

In a l l c a s e s , t h e r u l e i s t o make t h e "punishment f i t t h e crime" in

terms of necessary and s u f f i c i e n t development t o provide adequate hazard

c o n t r o l .

L e t ' s Review How t h e Total Readiness Tree Works

1. Upper echelon personnel s p e c i f y t h e top p o l i c y , g o a l s , o b j e c t i v e s

and c o n s t r a i n t s .

2. Lower echelons and s t a f f provide t h e d e t a i l e d t a s k s t r u c t u r e

necessary t o achieve read iness i n terms of t h e s t a t e d p o l i c y ,

g o a l s , o b j e c t i v e s , and c o n s t r a i n t s .

3 . Lower echelons and s t a f f e v a l u a t e and r e p o r t p rogress i n terms of

completion of t h e d e t a i l e d t a s k s t r u c t u r e (which i s r e l a t e d t o

p o l i c y , goa l s and o b j e c t i v e s through t h e t r e e l o g i c s t r u c t u r e ) .

4. Upper management reviews and/or d i r e c t s s t a f f review of t h e

o v e r a l l p i c t u r e in terms of t h e o r i g i n a l p o l i c y , g o a l s and

o b j e c t i v e s .

5. Upper management t a k e s a p p r o p r i a t e a c t i o n s :

( a ) Accepts t h e s i t u a t i o n a s repor ted .

( b ) D i r e c t s change.

( c ) Requests a d d i t i o n a l informat ion.

What Are t h e Biggest Problems?

a I d e n t i f y i n g a l l of t h e elements of t h e system ( i n proper d e t a i l ) .

a I d e n t i f y i n g d e f i c i e n c i e s , d e v i a t i o n s , unknowns.

Page 33: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

a Reducing d e f i c i e n c i e s , d e v i a t i o n s , and unknowns t o s ta tements o f

o p e r a t i o n a l r i s k .

a Communicating r i s k s t o upper l eve1 command ( d e c i s i o n makers).

How Are E x i s t i n g I n s p e c t i o n s , Reviews, C h e c k l i s t s Used?

As i n d i c a t e d i n F i g u r e 12, e x i s t i n g m a t e r i a l such as c h e c k l i s t s and

r e v i e w and i n s p e c t i o n f i n d i n g s a r e s imp ly used t o p r o v i d e i n f o r m a t i o n

r e q u i r e d t o s a t i s f y t h e a n a l y t i c a l t r e e requ i rements .

An advantage o f s t r u c t u r i n g t h e a n a l y t i c a l t r e e s i n a l o g i c a l manner

i s t h a t two s o r t s o f system d e f e c t s a r e revea led :

1. L o g i c a l d e f i c i e n c i e s i n i n f o r m a t i o n c o l l e c t e d .

2. Redundant and s u p e r f l u o u s i n f o r m a t i o n wh ich i s c o l l e c t e d b u t

serves no u s e f u l purpose i n a l o g i c a l sense.

How Do O p e r a t i o n a l Readiness Trees R e l a t e t o O p e r a t i o n a l R i sk?

Readiness t r e e s shou ld be c o l o r coded i n t h e usua l manner

(References 1 and 3):

Green Code: I t e m known t o be complete as s p e c i f i e d .

Red Code: I t e m known t o be incomple te and/or o u t o f s p e c i f i c a t i o n .

B lue Code: S t a t u s o f i t e m Unknown.

I n t h e case o f "green" i t e m s t h e r i s k ( s a f e t y ) ana l yses wh ich have

been per fo rmed f o r t h e system a r e p r o t e c t e d i n te rms o f system des ign

s p e c i f i c a t i o n s .

Page 34: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 35: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

For "red" i t ems r i s k ( s a f e t y ) analyses must be r e e v a l u a t e d i n t h e

c o n t e x t o f t h e known var iances. A c c e p t a b i l i t y o f t h e system must be

determined i n t h e c o n t e x t o f t h e r e v i s e d r i s k ( s a f e t y ) ana lyses.

"Blue" i t ems a r e most d i f f i c u l t t o dea l w i t h s i n c e t h e na tu re o f

p o t e n t i a l va r iances i s unknown. The " t r u e " b u t "unknown" s t a t u s o f t h e

"b lue" i t e m can l e a d t o a v e r y wide range o f p o t e n t i a l consequences:

1. The i t e m m igh t be complete as s p e c i f i e d .

2. The i t e m m igh t be i n v a r i o u s s t a t e s o f c o m p l e t i o n / v a r i a t i o n f rom

s p e c i f i c a t i o n s . The s t a t e o f c o m p l e t i o n / v a r i a t i o n f rom

s p e c i f i c a t i o n s m igh t :

(a) Have no e f f e c t on o p e r a t i o n a l r i s k s

(b) Have a nega t i ve e f f e c t on o p e r a t i o n a l r i s k s

(c ) A c t u a l l y have a b e n e f i c i a l e f f e c t on o p e r a t i o n a l r i s k s .

I n t h e case o f "red-code" and "blue-code" i tems f a i l u r e mode and

e f f e c t ana lyses must be performed i n o r d e r t o e v a l u a t e a c t u a l / p o t e n t i a l

e f f e c t s on o p e r a t i o n a l r i s k s . Once t h i s i s done t h e a c c e p t a b i l i t y o f t hese

r i s k s ( i n c l u d i n g u n c e r t a i n t i e s and unknowns) may be eva lua ted i n accordance

w i t h t h e management c o n t r o l sequence desc r ibed on page 24.

A s i m i l a r ~ i t u a t i o ~ e x i s t s i n d e a l i n g w i t h t h e ongoing e v a l u a t i o n o f

maintenance and fo l l ow-on a c t i v i t i e s d iscussed i n P a r t I1 o f t h i s r e p o r t .

Page 36: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

PART 11--FOLLOW-ON ACTIVITIES

Keeping t h e System O p e r a t i o n a l l y Ready

Keeping t h e system o p e r a t i o n a l l y ready i s a "maintenance" t a s k and

i n v o l v e s t h e two elements d e f i n e d by MORT (Reference 4).

a Plan

a Execu t i on

As i n d i c a t e d i n F i g u r e 13, t h e des ign and p l a n o f a maintenance

program appears as a p a r t o f p o l i c y imp lementa t ion on t h e r i g h t s i d e o f t h e

MORT diagram. Execu t i on , i n t h e envi ronment, s a f e t y and h e a l t h sense, i s

r e l a t e d t o maintenance o f b a r r i e r s and c o n t r o l s on t h e l e f t s i d e o f t h e

MORT diagram.

I f we r e v i e w o u r d e f i n i t i o n o f o p e r a t i o n a l read iness , we f i n d t h a t

t h e r e a r e t h r e e e lements i n v o l v e d i n a c h i e v i n g an i n i t i a l s t a t e o f

read iness . As i n d i c a t e d i n F i g u r e 14, these i n c l u d e t h e hardware, t h e

personne l , and t h e procedures/management c o n t r o l s .

As i n d i c a t e d e a r l i e r , one must a l s o c o n s i d e r t h e t h r e e i n t e r f a c e s

between these e lements. We, t h e r e f o r e , n o t o n l y have t h e c o n v e n t i o n a l s o r t

o f hardware maintenance t o cons ide r , b u t we must c o n s i d e r b o t h d e s i g d p l a n

and execu t i on i n "maintenance" o f :

Our personne l poo l

Our procedural/management c o n t r o l systems.

L e t ' s l o o k a t t h e s e t h r e e e lements.

Page 37: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

MORT

and Risks losses 1 Specific Management factors factors

I

Hazards Policy

Maintain a state of Design and plan of operational readiness followup program 5 0846

Figure 13

Page 38: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 39: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Maintenance o f Hardware

We have two areas o f i n t e r e s t i n e s t a b l i s h i n g and o p e r a t i n g hardware

maintenance programs:

1. The n a t u r e o f t h e b a s i c program.

2. The way t h a t maintenance e f f o r t s a r e p r i o r i t i z e d i n terms o f

envi ronment, s a f e t y and h e a l t h c o n s i d e r a t i o n s .

The MORT diagram i t s e l f (Reference 3) p r o v i d e s f o r t h e f i r s t

r ud imen ta ry l e v e l o f maintenance program e v a l u a t i o n . T h i s e v a l u a t i o n i s

expended and d e t a i l e d i n SSDC-12 (Reference 4) .

The SSDC-12 e v a l u a t i o n scheme was des igned t o p r o v i d e a one-on-one

correspondence w i t h a contemporary gu ide f o r genera l maintenance program

e v a l u a t i o n i n t h e y e a r 1978. Wh i l e t h i s SSDC-12 a n a l y t i c i s s t i l l v a l i d

and a p p r o p r i a t e , an a1 t e r n a t i v e a n a l y t i c has s i n c e been des igned and

appears as Appendix B o f t h i s r e p o r t . The Appendix B v e r s i o n has b a s i c a l l y

t h e same t e c h n i c a l c o n t e n t as SSDC-12 b u t t h e l o g i c f o rma t has been

markedly changed. For example, t h e number o f f i r s t t i e r i t e m s has been

g r e a t l y reduced f rom those used i n SSDC-12.

P r i o r i t i z i n g o f system components must be done on a custom b a s i s f o r

each system and subsystem. T h i s p r i o r i t i z i n g i s o f t e n taken c a r e o f

a u t o m a t i c a l l y by assignment o f q u a l i t y assurance c r i t e r i a . I f t h i s i s t h e

case, i t must be assured t h a t t h e maintenance program m a i n t a i n s e lements

w i t h t h e same degree o f r i g o r d e f i n e d b y t h e o r i g i n a l q u a l i t y assurance

l e v e l assignments.

How Do The Maintenance Elements F i t Together i n O p e r a t i o n a l Mishaps?

As we i n d i c a t e d e a r l i e r , o p e r a t i o n a l mishaps and a c c i d e n t s g e n e r a l l y

i n d i c a t e a f a i l u r e t o e s t a b l i s h and m a i n t a i n a s t a t e o f o p e r a t i o n a l

read iness . T h i s i s i l l u s t r a t e d i n a g e n e r i c sense i n F i g u r e 15. F i g u r e 15

i s a s i m p l i f i e d even t and causa l f a c t o r c h a r t (Reference 6). Here we

Page 40: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

How do these Elements Fit Together in Operational Mishaps

Program m defect 1

-F--... V

f3il11t-e ( of operational

I"

Event , ). Event

Failure to:

Complete mission Within budget On schedule With acceptable side effects

Figure 15

Page 41: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

have a program d e f e c t l e a d i n g t o a s p e c i f i c program inadequacy wh ich t a k e s

t h e system o u t o f i t s c o n d i t i o n o f o p e r a t i o n a l read iness . A s e r i e s o f

events then c a r r y t h e system th rough t o t h e u l t i m a t e mishap. For example,

t h e s p e c i f i c f a i l u r e c o u l d be f a i l u r e t o l u b r i c a t e a c o o l a n t pump b e a r i n g .

The system i s t hen " o u t o f o p e r a t i o n a l read iness " w i t h a d r y bea r ing . T h i s

l eads t o o v e r h e a t i n g ( t h e second event ) , t o s e i z i n g o f t h e b e a r i n g ( e v e n t

t h ree ) , and f i n a l l y t o l o s s o f c o o l a n t wh ich t h e pump was supposed t o have

prov ided, w i t h severe damage t o components wh ich were t o have been c o o l e d

by t h e pump.

Going back t o t h e program d e f e c t ( o r , more o f t e n , d e f e c t s ) , we f i n d

t h a t "upstream" d e f e c t s l e a d i n g t o f a i l u r e t o l u b r i c a t e t h e pump b e a r i n g

m igh t be o r i g i n a t i n g i n a number o f areas. As i n d i c a t e d i n F i g u r e 16, t h e

f a i l u r e c o u l d be i n v o l v e d i n des ign , f a b r i c a t i o n o r i n s t a l l a t i o n o f t h e

pump i n such a way t h a t m a i n t a i n a b i l i t y was compromised (Reference 7) .

L u b r i c a t i o n o f t h e pump c o u l d i n v o l v e "maintenance" and/or " o p e r a t i o n a l "

a c t i v i t i e s i n a number o f ways.

F i n a l l y , t h e u l t i m a t e d i s a s t e r c o u l d have been a v e r t e d had f a i l u r e t o

l u b r i c a t e been d e t e c t e d and c o r r e c t e d p r i o r t o c a t a s t r o p h i c damage ( t h r o u g h

response t o change). T h i s e n t i r e sequence may be r e l a t e d t o a t y p i c a l

o p e r a t i o n a l read iness work sheet shown i n F i g u r e 17 wh ich i n c l u d e s a number

o f maintenance r e l a t e d i t ems .

It shou ld be no ted t h a t i n i t i a l o p e r a t i o n a l r e a d i n e s s a l s o i n c l u d e d

b o t h "personne l " and "p rocedura l " i terns.

T h i s c l o s e s o u r l o o p back t o F i g u r e s 16, 18 and 19 and i n d i c a t e s t h e

need n o t o n l y t o m a i n t a i n o u r hardware systems b u t t h e need t o m a i n t a i n o u r

personnel poo l w i t h personne l who a r e up- to -date i n t h e i r c a p a b i l i t y t o

ope ra te o u r systems adequate ly as i n d i c a t e d i n Box 1.2 o f F i g u r e 18.

Page 42: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 43: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Number assigned to description box

Brief job description using simplified nomenclature where possible

Numerical coding system for tree orientation

Individual who knows when the job was done, what was done and the final status

V)

a S P p 3

n (D V, 0 C =. 0

5 a

3 c

8 3 ~ ni? 0 m 5 0

P) - 3 (D

U V, ,(D

2 5 g E. CT 5

Status of as-build drawings, analysis and reviews to update systems

Status of and including as-built verification of installation processes

Status of maintenance requirements and calibration processes

Status of required spare parts for equipment and systems as identified in the system design description (SDD)

Status of all drawings designated as specific for a special system or equipment required for a particular job of work

Status of and including resolution of quality assurance discrepancies

Status of procedures, i.e., detailed operating procedures (DOP), maintenance, calibration and requalification procedures

Status of the personnel. Selection, training, qualification, and testing

% Complete with sign off date

2 3 8 % V) a * s q 5 3 2 %

0 7

- a

2 S 2 : % g 9 0

a P.

P)

2 2. 3 g 22 5 5 g. - z.5 0 m a

2 . : V, (D

% P) X a g. U m 0 V,

m

E P S !L 5 (D

U a p 8 , n E C ' 2 8 V,

W

2 V)

o a a !E

5 n !?! 5 g "-

Page 44: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 45: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Preparation of Procedures

Obtain field review

4.

8 Follow-on

I Maintain procedure

history file

m

Figure 19

Obtain procedure review board (PRB)

approval 5.

Issue procedure for field use

6. I

Page 46: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

S i m i l a r l y , Figure 19 i n d i c a t e s , i n Box 1, t h e requirement f o r a cont inuing

funct ion t o e s t a b l i s h t h e need f o r new and rev i sed procedures based on

c u r r e n t opera t iona l requirements .

In s h o r t , we m u s t "maintain" a l l o f t h e opera t iona l r ead iness elements

and t h e i r i n t e r f a c e s , no t j u s t t h e hardware.

Page 47: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

REFERENCES

1. U.S. Department of Energy, Occupancy Use Readiness Manual, SSDC-l, September 1975.

2. O p e r a t i o n a l Readiness Workshop Manual, The System S a f e t y Development Center .

3. U.S. Department o f Energy, MORT Users Manual, SSDC-4, May 1983.

4. U.S. Department o f Energy, S a f e t y C o n s i d e r a t i o n s i n E v a l u a t i o n o f Maintenance Programs, SSDC-12, March 1978.

5. U.S. Department o f Energy, Bas ic Human F a c t o r s Cons ide ra t i ons , SSDC-34, December 1985.

6 . U.S. Department o f Energy, Events and Causal Fac to rs Char t i ng , SSDC-14, August 1978.

7. James P. Bongarra e t a l . , Human F a c t o r s Design G u i d e l i n e s f o r M a i n t a i n a b i l i t y o f Department o f Energy Nuc lear F a c i l i t i e s , Lawrence L ivermore N a t i o n a l Labora tory , June 18, 1985.

Page 48: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 49: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

APPENDIX A

Page 50: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 51: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

APPENDIX A

SOME SAMPLE OPERATIONAL READINESS TREES

T h i s Appendix i n c l u d e s some examples o f o p e r a t i o n a l read iness t r e e s

s e l e c t e d f rom t h e SSDC f i l e s . Due t o space l i m i t a t i o n s , these t r e e s a r e

n o t i n c l u d e d i n t h e i r e n t i r e t y b u t i n c l u d e o n l y enough m a t e r i a l t o d e f i n e

t h e l o g i c and s t r u c t u r e u t i l i z e d by t h e des igne r .

Complete r e p o r t s r e l a t i n g t o each o f t hese t r e e s a r e a v a i l a b l e upon

reques t f rom t h e System S a f e t y Development Center .

Page 52: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 1

This analytical tree was designed to establish operational readiness

for restart of a nuclear chemical processing plant which had been out of

service for a number of years.

Development included the tree itself a1 ong with detailed

"punch l ists."

Page 53: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 54: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

z 5 3 Y

I 0 0 Y '3 'a

'a- 'a-

l 2 0 %

L h

Page 55: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

I 'AW 44

I I I

I IRE PYUICCTIOW L lEANlNf NI0 UIIRK P R l l l t S S WY( I lOHIN6 SYSIIMS OISI'USAI S V S l t N I W S l K E E P l N G conwcc~~n (I.E..

SVSILIIS READV S I S l t W [ ~ I P t M N l RE AflV R t AUV I I I R O W I IWLIHCW- RE AOV l A T l O N OF JSA

CORRECllYI A C I I W

U1 10 P l H U l L l S l CO TO P W C I I L 1 S 1 1 1 . 1 0 11 .12 * *

r

PROILCIIVE C I O I I ~ I H W SAT EPiIAHOS. INlEHNAL SIOKACL. W R K PROCESS BASIC S l R u t l U W t l E q U l P n t N I ( I K f I N L D SECURIIV M O I IYACIUI I L I1 I ES IRANSPORT. E C I P H I I I CWIAI ( INA1 ION

C l 1 1 HCAUl URI L O U \ I I f f l / W E ) f XCLUSION MAOV IIAHOLING SYSIEH RCAOV R1 AOl SVSr fH RCAOV WEAY

W) 10 PWCI I I l S l U I . 1 J

46

NUIE : JSA-JOU SAFEIV N IALVSIS

Figure A3

Page 56: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 57: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 2

T h i s t r e e r e l a t e s t o opera t iona l r ead iness of a l a r g e o i l d r i l l i n g

pla t form on t h e B r i t i s h s e c t o r of t h e North Sea off -shore o i l f i e l d s .

Page 58: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 59: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 60: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

. Figure A7

Cl

H 4'4 ELECTRICAL

in N

S E A POTABLE COMPRESSED WATER WATER A I R

A- h?- C3 I

POWER 3@ 1 M 940" 16 HOV SUPPLY

I

l

NITROGEN G A S

PURGE

Page 61: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 3

This example has t o do with s t a r t u p read iness f o r a nuclear r eac to r .

Page 62: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

unc nucLafiR rnaaJs.rRles

SAFETY INSTRUCTION MANUPL

luetac

REAOINESS REVIElJS - SAFETY Sa fe ty Assessment and

i 4 5 o r - - * = -3s S .z ..-W

-3- g" $ L = S = I

Y Y Z Z ~ S ' Z EZSd =..m2 -- g = n s

Page 63: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 64: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 4

This is the startup readiness tree for the Princeton Tokamak Fusion

Test Reactor (TFTR) .

Page 65: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

l

TFTR READY FOR FIRST PLASMA

PERSONNEL READY SAFETY READY . SERVICES READY PROCEDURES READY

..l.* -<,m .

.,l.* i m,

..L., - "".c ..*.l - ,'* ,911c.1.. . . * . I - Il..I<t tU...Ol *.l.* - l* l l lL " c a l m ..*.l- CY.(1101 .m .,l.. - W I . l l O . ,..,l<.III ..*.~-,1111.. ..#.l L. L1DIII.I ..L.*- O..IUI I II.VIC1l

V) V

*.l., - ,, VC* 1 ~ 1 . 1 - m I C I 1.1.1 -1, IC. 1.1.. -.c I C I *.l., - " v #CB 1.I.L - W . P I W D 1 . 1 1 4 ~ 1 1 #.I.) -#.%AI avtct1c.

a... I -I.* b... l - ,. I.. b... I - C.-

, . l . , -.I1Cmll LO0.l 1.1.1 -*.,CL (011101 It. 1.0.1 -a*/., ,-.l 1.9.6 -""a 11, *.I.* -rO\,.C, L0D.l 1.1.1 -...a. ""111. 1.8.. -I@.", .Wily.( '.!A, l .* .*# - * t I I D U U &.l Ia.a(m '

1.6 li -*L.$.. 1.. ,IUlt.'.l.l.. A- fuu ALL a ~ ~ u a r r 8 * . # . I # i c r e SIIC-W~ c.I..I~ .W,1 .I 6, .

@ i l

Figure A10

Page 66: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 5

This is the hardware branch of a nuclear reactor operational readiness

tree. The operational readiness work sheet discussed in Figure 17 of this

report is completed for each hardware item in this tree. This eliminates

the need for much laborious duplication on the personnel,

procedures/controls branches.

Page 67: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 68: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 6

This is the operational readiness tree for preparation of an RFP

(Request for Proposal) for an AM0 (Aerial Measurement Operations) support

facility.

Page 69: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 70: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Safety considerations

I I I I I I I I Aircraft

Aviation Ionizing ground Pollution Fire Occupational Industrial Traffic Handicapped

protection safety safety control safety health safety safety provisions

Fiaure A13

Page 71: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

1 Hangar I space

m W

runway

I Maneuvering space

Location

shops

Aircraft Ground

Future Personnel needs Fueling access

I Maintenance

adequacy

Tie downs m

Controlled Vulnerability

Parts storage

Maintenance and crew H

Passengers m

Page 72: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

EXAMPLE 7

This i s an opera t iona l r ead iness t r e e prepared t o e v a l u a t e t h e

read iness of r a d i a t i o n p ro tec t ion systems a t nuc lea r power p l a n t s .

Page 73: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

ADEQUATE & EFFECTIVE

RADIATION PROTECTION PROGRAM

I I I I I I

RADIATION PERSONNEL EXPOSURE RADIOACTIVE ALARA PROTECTION SELECTION WASTE FACILITIES &

ORGANIZAION & TRAINING MANAGEMENT "OGRAM EQUIPMENT

I I 1

I

p 111 2 p Ill 3 p 1114 p 111 9 p 111 10 p Ill 11 Figure A15

ROUTINE OPERATIONS

RPCHART NOV 5 1986

EMERGENCY OPERATIONS

Page 74: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

RPCI4ART1 NOV 6. 86

RADl ATlON PROTECTION

ORGANlZATlON

*-l2 A

Site Corporate

L

Cleorl y

Defined Responslbili-

ties Adequate

I r I

Program Management

66

Organization

Chart

L 3

Clear Assign- ment of Duties Authorities k

Responsibilities

-

r

Surveys

Job Coverage

RPM(s)

Technicians

ALARA Review

Respiratory

0) ?- L

m

Personnel Monitoring

Technical Support

m

'

I I

1

W

R W Issuance

Counting Room

lnstrumen

Supervisors

Clerks

Job ~edcrlption Adequate

""

m

Understood

by Individuals

I Maintenance l & Calibration

Protection I

m Chemistry Spacial

Assignments

,-

Training Multi

Discipline

t

Page 75: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

APPENDIX B

Page 76: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 77: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

APPENDIX B

AN ALTERNATIVE HARDWARE MAINTENANCE PROGRAM EVALUATION TREE

M. G. B u l l o c k

1. FACILITY MAINTENANCE

Performance O b j e c t i v e

To p r o v i d e a maintenance o r g a n i z a t i o n t h a t i s adequate ly s t a f f e d ,

t r a i n e d , and has t h e necessary equipment t o m a i n t a i n t h e f a c i l i t y i n a

s t a t e o f read iness t o suppor t t h e program requ i rements . The system o f

a d m i n i s t r a t i o n and c o n t r o l o f t h e maintenance program s h a l l enhance

equipment re1 i a b i l i ty and performance, t o assure p l a n t s a f e t y and

a v a i l a b i l i t y ( F i g u r e B - l ) .

1.1 O r g a n i z a t i o n S t r u c t u r e and A d m i n i s t r a t i o n - - C r i t e r i a

The maintenance o r g a n i z a t i o n s h a l l be o f s u f f i c i e n t s i z e and s t r c c t u r e

t o enable sa fe and e f f i c i e n t performance of d u t i e s . The o r g a n i z a t i o n c h a r t

s h a l l r e f l e c t a c t u a l r e p o r t i n g l i n e s and show t h e r e l a t i o n s h i p t o o t h e r

o r g a n i z a t i o n a l u n i t s .

Comprehensive d e s c r i p t i o n s o f maintenance nonbarga in ing u n i t p o s i t i o n s

s h a l l be f o r m a l l y e s t a b l i s h e d . P o s i t i o n d e s c r i p t i o n s s h a l l d e f i n e j o b

f u n c t i o n s , r e s p o n s i b i l i t i e s , and a u t h o r i t i e s . Copies o f t h e p o s i t i o n

d e s c r i p t i o n s s h a l l be made a v a i l a b l e t o t h e r e s p e c t i v e i n d i v i d u a l s .

Page 78: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

A t r a i n i n g program s h a l l be e s t a b l i s h e d f o r maintenance j o b f u n c t i o n s

t h a t c o u l d a f f e c t t h e q u a l i t y o f s t r u c t u r e s , systems, and components

r e l a t e d t o r e a c t o r s a f e t y . The t r a i n i n g program s h a l l i n c l u d e a p p l i c a b l e

a d m i n i s t r a t i v e c o n t r o l s , s p e c i a l complex system and component i n s t r u c t i o n s ,

and on-the- job demonst ra t ion o f performance c a p a b i l i t y .

Adequate maintenance f a c i l i t i e s and equipment s h a l l be p r o v i d e d t o

suppor t comp le t i on o f a l l necessary work and t o promote s a f e and e f f i c i e n t

work p r a c t i c e s . The v a r i e t y and q u a n t i t y o f spare p a r t s , equipment,

t o o l i n g , and consumable m a t e r i a l s s h a l l be adequate t o p reven t unnecessary

de lays . Methods o f s torage s h a l l be adequate t o p reven t deg rada t ion o f

m a t e r i a l s d u r i n g s torage.

1.2 Work C o n t r o l Sys tem--Cr i te r ia

A work c o n t r o l system s h a l l be e s t a b l i s h e d t h a t p r o v i d e s f o r prompt

i d e n t i f i c a t i o n o f t h e need f o r maintenance a c t i o n and r e s u l t s i n t h e

p r e p a r a t i o n o f a fo rmal work reques t .

A system o f p l a n n i n g and schedu l i ng o f maintenance work t o be

performed d u r i n g o p e r a t i n g and shutdown p e r i o d s s h a l l be e s t a b l i s h e d .

P lann ing and schedu l i ng s h a l l i n c l u d e in te rdepar tmen ta l c o o r d i n a t i o n , work

p r i o r i t y , man-hour es t ima tes and s p e c i a l s k i l l s , procedures, equipment, and

m a t e r i a l r e q u i r e d . P lann ing s h a l l i n c l u d e any a c t i o n needed t o ensure

personnel s a f e t y and t o min imize personne l r a d i a t i o n exposure (ALARA).

Page 79: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

To assure plant operating and design integrity is maintained,

designated maintenance work shall be subjected to quality review. This

review shall address at least the following:

l. Proper identification of safety related components, systems, or

structures.

2. Appropriate acceptance criteria for post-maintenance

verifications and functional test requirements.

3. Nondestructive examination and test requirements.

4. Procedure requirements for the proposed work.

5. Site Work Release (SWR) change controls shall be applied to

maintenance work on any system that may affect plant safety or

re1 iabili ty.

Approval by the operations shift supervisor or other designated

operations personnel shal l be required prior to starting any maintenance

work within the reactor facility. Maintenance supervisory personnel shall

monitor work in progress to assure that the work is completed as described.

Inspection instructions and other specific precautions shall be

integrated into the work control document to assure no undesirable

materials enter the primary system or rotating equipment. Inspection and

operational checkouts shall be performed at the completion of maintenance

work to assure system integrity and operabi l i ty where appl icabl e.

Page 80: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Completed work control documents shall be reviewed for completeness

and verification of the following:

1. Applicable procedures completed.

2. Applicable data sheets filled out properly.

3. All acceptance criteria have been met.

Personnel required to review and verify completion of work control

documents shall be designated formally.

1.3 Maintenance Procedures--Cri teria

For safety-related and other critical equipment, specific procedures

for preventive and corrective maintenance shall be prepared. A system for

timely development and revision of maintenance procedures shall exist.

A clear and consistent format for maintenance procedures shall be

used. Maintenance procedures shall contain adequate instructions to assure

the safe and reliable completion and accurate documentation of the

activities performed.

Maintenance procedure, data sheets, and other work control documents

completed during the performance of maintenance activities shall be

Page 81: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

reviewed periodical ly to identify persistent or recurring problems and

adjustments made to preventive maintenance activities, maintenance

practices, and operating practices to further enhance plant safety and

reliability.

1.4 Preventive Maintenance--Criteria

The preventive maintenance program shall be documented including

specific criteria that defines plant equipment and instrumentation to be

included. The preventive maintenance program shall include at least the

following:

1. Equipment affecting personnel safety.

2. Equipment used to perform or satisfy a Technical Specification

requi rement.

3 . Equipment the operator must rely upon for plant assessment and

control.

4. Equipment affecting plant reliability or availability.

5. Equipment that requires routine lubrication and/or inspection.

Safety-related equipment shall have specific preventive maintenance

procedures available and a hi story fi le of completed procedures establ i shed

and updated routinely as changes to equipment occur.

Preventive maintenance shall be specified and conducted on plant

equipment at realistic frequencies. The preventive maintenance

Page 82: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

requirements shall be based on manufacturer's recommendations, Technical

Specification requirements, past operating experiences, and good

maintenance practices, as applicable.

Preventive maintenance status shall be monitored and controlled to

ensure activities are completed as scheduled. Any preventive maintenance

activities that are deferred shall be reviewed and evaluated by operations

management.

1.5 Control of Portable Measurement and Test Equipment--Criteria

The calibration status of measurement and test equipment shall be

readily apparent and the equipment shall be uniquely and permanently

identified.

Calibration of measurement and test equipment shall be at defined

interval s or prior to use. Certified equipment, traceable to nationally

recognized standards shall be used for calibrating measurement and test

equipment.

Storage and issuance of measurement and test equipment shall be under

a controlled system so as to assure product quality.

Any measurement and test equipment that fails to meet calibration

specifications shall be identified by attaching a reject tag documenting

the rejection and storing rejected equipment in a separate location. Any

Page 83: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

measurements made with that instrument during the interval of the out of

tolerance condition shall be evaluated and remeasurements performed, if

required. The results of the evaluation shall be documented and filed.

1.6 Control of Special Processes--Criteria

A program shall exist for the training, qualification,

requalification, and certification of personnel, procedures, and equipment

needed to perform special processes. This program shall be under

sufficient configuration control to assure consistent product quality.

This program shall include the special processes specified by the EG&G

Idaho Qual i ty Manual , QP-9.

A program shall be established for periodic routine maintenance of

special process equipment

Page 84: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated
Page 85: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

COMPLETED SSDC PUBLICATIONS

Occupancy-Use Readiness Manual Human Factors i n Design A Contractor Guide t o Advance Preparat ion f o r Accident I n v e s t i g a t i o n MORT User 's Manual Reported S i g n i f i c a n t Observation (RSO) Studies T ra in ing as Related t o Behavioral Change DOE Guide t o the C l a s s i f i c a t i o n o f Recordable Accidents Standardizat ion Guide f o r Construct ion and Use of MORT-Type Ana ly t i c Trees Safety In fo rmat ion System Guide Safety In fo rmat ion System Cataloging Risk Management Guide Safety Considerat ions i n Evaluat ion o f Maintenance Programs Management Factors i n Accident / Inc idents ( I n c l u d i n g Management Se l f -Eva lua t ion Checksheets) Events and Causal Factors Chart ing Work Process Contro l Guide SPRO D r i l l i n g and Completion Operations App l i ca t i ons o f MORT t o Review o f Safety Analyses Safety Performance Measurement System Job Safety Analys is Management Evaluat ion and Contro l o f Release of Hazardous Ma te r ia l S

Change Contro l and Analys is R e l i a b i l i t y and F a u l t Tree Analys is Guide Safety Appraisal Guide Safety Assurance System Summary (SASS) Manual f o r Appraisal E f f e c t i v e Safety Review Construct ion Safety Monographs 26.1 Excavation 26.2 Sca f fo ld ing 26.3 Steel Erec t ion 26.4 E l e c t r i c a l 26.5 Housekeeping 26.6 Welding/Cutting 26.7 Confined Spaces 26.8 Heating o f Work Spaces 26.9 Use o f Explosives 26.10 Medical Services 26.11 S a n i t a t i o n 26.12 Ladders 26.13 Paint ing/Specia l Coatings 26.14 F i r e P ro tec t i on 26.15 P r o j e c t Layout 26.16 Emergency Act ion Plans 26.17 Heavy Equipment 26.18 A i r Q u a l i t y

Page 86: Process Operational Readiness and Operational Readiness ... · a Hardware Elements - Process hardware/tools, etc. - Buildings and Grounds a Procedures and Management Controls As indicated

Accident/Incident Investigation Manual (2nd Edition) Glossary of SSDC Terms and Acronyms Barrier Analysis Human Factors Management The Process of Task Analysis The Impact of the Human on System Safety Analysis The MORT Program and the Safety Performance Measurement System Basic Human Factors Considerations A Guide for the Evaluation of Displays MORT-Based Safety Professi onal/Program Development and Improvement Time/Loss Analysis Safety Considerations for Security Programs Process Operational Readiness and Operational Readiness Fol l ow-On The Assessment of Behavioral Climate