Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in...

17
Copyright © 2012 NRX Global Inc. 0 Ensuring EAM Operational Readiness in the World’s Largest Capital Projects April 2012

Transcript of Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in...

Page 1: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

0

Ensuring EAM Operational Readiness in the

World’s Largest Capital Projects

April 2012

Page 2: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

1

AGENDA

An Introduction to NRX

NRX and the NRX – SAP Relationship

NRX Asset Hub and the SAP Technology Stack

The NRX / SAP Initiative at Shell

Shell challenges, NRX solutions, value propositions

Questions

Page 3: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

2

ABOUT NRX

The only commercial solution for building, standardizing, and sustaining the

maintenance master data foundation essential for operations and maintenance

excellence

NEW CAPITAL EXPENDITURE Handover & Maintenance Master Data Readiness to new or

existing CMMS

READINESS

NEW EAM IMPLEMENTATION Maintenance Master Data Remediation and Preparation for New

EAM/CMMS

BROWNFIELD PRODUCTIVITY, SAFETY, OR

COMPLIANCE ISSUE Maintenance Master Data Remediation & Validation for existing

EAM

DATA GOVERNANCE & SUSTAINMENT Sustain the integrity of Maintenance Master Data in new

or existing EAM/CMMS

SUSTAINMENT

ENTERPRISE REFERENCE LIBRARY Central repository of approved maintenance practices and data

for Maintenance Master Data readiness and sustainment

IMPROVE MAINTENANCE PRODUCTIVITY Rich content such as illustrated parts books and documents

accessible from within EAM/CMMS processes

GET THE DATA RIGHT KEEP THE DATA RIGHT

Page 4: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

3

Certified Partner Solutions

Enterprise Services Community

(SDN) SAP Developer‘s Network

Op

en

SAP

Invitatio

n

Industry Value

Network

Business Process Expert Community

ASSET HUB IS AN SAP ENDORSED BUSINESS SOLUTION

Page 5: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

4

© SAP AG 2010. All rights reserved. / Page 3

Application level integration with solution qualification

to ensure end-to-end business process

Maintenance and upgrades through partner

SAP is first point of contact via SAP standard

support processes

Routed to Partner

Product roadmap guided by SAP, based on

cooperative development agreement

Certified partner applications are certified

to run on SAP NetWeaver

Complementary solutions selected by SAP product and industry groups

- endorsed by SAP and sold by partners

Endorsed Business Solutions from SAP

Trusted Industry Solutions

Page 7: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

6

Traditional EIM and MDM

Source: ARC Advisory Group 2011

TRADITIONAL EIM/MDM PLATFORM + ASSET HUB’S DOMAIN

SPECIFIC CAPABILITIES = COMPLETE SOLUTION FOR AIM

Page 8: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

7

HOW IS ASSET MASTER DATA UNIQUE?

CONFIG CHANGE

COMPONENT CHANGE

MOVED LOCATIONS

Harsh Environment

Safety Critical Process

Remote Offshore Location

Country with Unique Regulations

Context Specific

Maintenance

Strategies

Maintenance

Tasks & Plans

Regulations

Spare Parts &

BOM’s

Integrity and

Assurance

Hierarchy

REGULATORY CHANGE

SUPPLIER RECALL

BEST PRACTICE CHANGE

EPC DATA

SUPPLIER DATA

FEED DESIGN & CONSTRUCT

COMMISSION & STARTUP

OPERATIONS & MAINTENANCE RETIRE

ONLY 30% OF DATA READY FOR

MAINTENANCE

70% MUST BE BUILT & VALIDATED BY MAINTENANCE AND ASSET EXPERTS BASED UPON THE MAINTENANCE AND OPERATING

PHILOSOPHY OF THE OPERATING COMPANY

MANAGEMENT OF CHANGE BECOMES ESPECIALLY CHALLENGING

AQUIRE PREPARE | VALIDATE | DEPLOY SUSTAIN

DATA & TEMPLATE CHANGES MUST BE GOVERNED WITH A FULL AND TRANSPARANT AUDIT TRAIL

Page 9: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

8

FEED Detailed Design

Construction

Mechanical Completion

Com- missioning

Fin

al

Inve

stm

ent

Dec

isio

n Han

do

ver

Rel

ease

fo

r S

tart

-up

100%

75%

50%

25%

Operation by Specialists

EAM Build Out Collect, Validate, Enrich, Transform & Load

EAM

Procurement

TRADITIONAL CAPITAL PROJECT LIFECYCLE

In one project Shell incurred an additional

14 man-years and $4M USD in expenses to

collect, create and structure the data needed to

start-up, operate & maintain the new facility

Many analysts suggest

that the average loss

due to poorly managed

information handover equals

over 1% of total CAPEX spend.

Page 10: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

9

FEED Detailed Design

Procurement

Construction

Han

do

ver

Rel

ease

fo

r S

tart

-up

100%

75%

50%

25%

Fin

al

Inve

stm

ent

Dec

isio

n

EAM

EAM Staging Area Sustain

CAPITAL PROJECT ASSET INFORMATION MANAGEMENT

BEST PRACTICE

Com- missioning

Phased, progressive handover of

vendor & design documentation

enables timely EAM Master Data

Build-out and Loading

EAM Staging Area Collect, Validate, Enrich, Transform & Load

% Design Production Capacity

Operation by Specialists

Benefits • Increased production • Reduced EH&S Risks • Reduced extended start-up ops costs • Improved Maintenance productivity • Reduced MRO spares costs

Mechanical Completion

Page 11: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

10

AGENDA

An Introduction to NRX

NRX and the NRX – SAP Relationship

NRX Asset Hub and the SAP Technology Stack

The NRX / SAP Initiative at Shell

Shell challenges, NRX solutions, value propositions

Questions

Page 12: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

11

Asset Hub will be used to manage the handover, readiness, and sustainment

of maintenance master data for new capital projects and the remediation and

sustainment of this data for facilities already in production.

The NRX Asset Hub will provide Shell with a centralized enterprise

Maintenance Reference Library that contains validated maintenance

information and best practices from across the upstream organization.

NRX EXPERIENCE WITH SHELL

Page 13: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

12

NRX EXPERIENCE WITH SHELL

43

Case Study: Shell Canada – Scottford Upgrader

Opportunity

In a multi-billon dollar base plant construction, the information handover was not complete, validated or structured as required by the oil company to perform efficient operations and maintenance as the new facility entered production

An additional 14 person-years and a further investment of over $4 million was necessary to properly collect, create and structure the data and documents needed to startup, operate and maintain the new facility

For the subsequent expansion project, the oil company created the Information Handover Guide and a Downstream Expansion Information Management Plan to specify all aspects of the information handover deliverables

The oil company contractually bound the EPC company to fulfill the IHOG requirements for delivering information for the project

Solutions and Implementations

The oil and EPC companies selected the NRX Asset Center to:

Collect data from source engineering systems and populate a complete and validated asset registry

Collaborate with equipment suppliers to collect equipment details and recommended spare parts

Continuously update and maintain data and information as changes are made during the project

Manage, validate, and report on all data according to Information Handover Guide

Deliver the complete IHOG requirements to the oil company to ensure operational requirements are achieved

Results

Earlier OO-EPC Collaboration and problem identification to reduce risks

Improved quality (completeness, accuracy) of oil sands deliverable to meet the full IHOG specification of the oil company

Consolidated source and access to information requirements

Reduced risk of schedule delays

Reduced information management costs

“The Asset Center provides us with the mission critical functionality we require to

collaborate with our suppliers, integrate with

our internal document management systems, and meet customer specifications

for information migration into their business systems.”

Manager, EPC Systems

Page 14: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

13

Case Study: Shell Gbaran Ubie Project

Handover and Capital Project Readiness with Fluor

Opportunity

For a multi-billon integrated oil and gas project in Nigeria, Shell has contracted Fluor’s

Performance Technology Division to create the maintenance basis for ongoing plant operations

Solutions and Implementations

The EPC company selected the NRX Asset Center to:

Collect data from source engineering systems and populate a complete and validated asset registry

Collaborate with equipment suppliers to collect equipment details and recommended spare parts

Continuously update and maintain data and information as changes are made during the project

Create FLOC hierarchy, asset registry, spare parts, BOM’s, and MJR’s (Maintenance Job Routines) all specific to the Shell specification

E-SPIR Advisor SPIR data is exported from Advisor and imported into the Asset Center for use by

Fluor when building out the Maintenance Job Routines (MJRs).

Manage, validate, and report on all data according to Information handoverspecifications

Deliver the complete information to Shell to ensure operational requirementsare achieved

Results

Improved quality (completeness, accuracy) of oil sands deliverable to meetthe full specification of the project information requirements

Consolidated source and access to information requirements

Reduced risk of schedule delays

Reduced information management costs

NRX EXPERIENCE WITH SHELL

Page 15: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

14

Shell’s Vision

Standardization and Deployment of Maintenance Best Practices across Shell

Enterprise

….. To improve plant mechanical integrity and

reliability

NRX EXPERIENCE WITH SHELL

Page 16: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

15

FEED DESIGN & BUILD

COMMISSION & STARTUP

OPERATIONS & MAINTENANCE RETIRE

SHELL’S EVOLUTION WITH NRX

ASSET HUB is Shell’s Enterprise

Solution for Building,

Standardizing, and Sustaining

Maintenance Master Data in

Upstream

Remediation of Legacy Data/New EAM

SUPPLIER PRODUCT

DATA

SPARE PARTS

MANUALS

AS BUILT

DESIGN DATA

Handover & Preparation for New Capital Projects

SUPERIOR ENTERPRISE APPROACH

Governance

SITE 1

SITE 3

SITE 2 SITE 5

SITE 4

Page 17: Ensuring EAM Operational Readiness in the World’s ... · Ensuring EAM Operational Readiness in the World’s Largest Capital Projects ... Complementary solutions selected by SAP

Copyright © 2012 NRX Global Inc.

16

AGENDA

An Introduction to NRX

NRX and the NRX – SAP Relationship

NRX Asset Hub and the SAP Technology Stack

The NRX / SAP Initiative at Shell

Shell challenges, NRX solutions, value propositions

Questions