Ensuring EAM Operational Readiness in the
World’s Largest Capital Projects
April 2012
Copyright © 2012 NRX Global Inc.
1
AGENDA
An Introduction to NRX
NRX and the NRX – SAP Relationship
NRX Asset Hub and the SAP Technology Stack
The NRX / SAP Initiative at Shell
Shell challenges, NRX solutions, value propositions
Questions
Copyright © 2012 NRX Global Inc.
2
ABOUT NRX
The only commercial solution for building, standardizing, and sustaining the
maintenance master data foundation essential for operations and maintenance
excellence
NEW CAPITAL EXPENDITURE Handover & Maintenance Master Data Readiness to new or
existing CMMS
READINESS
NEW EAM IMPLEMENTATION Maintenance Master Data Remediation and Preparation for New
EAM/CMMS
BROWNFIELD PRODUCTIVITY, SAFETY, OR
COMPLIANCE ISSUE Maintenance Master Data Remediation & Validation for existing
EAM
DATA GOVERNANCE & SUSTAINMENT Sustain the integrity of Maintenance Master Data in new
or existing EAM/CMMS
SUSTAINMENT
ENTERPRISE REFERENCE LIBRARY Central repository of approved maintenance practices and data
for Maintenance Master Data readiness and sustainment
IMPROVE MAINTENANCE PRODUCTIVITY Rich content such as illustrated parts books and documents
accessible from within EAM/CMMS processes
GET THE DATA RIGHT KEEP THE DATA RIGHT
Copyright © 2012 NRX Global Inc.
3
Certified Partner Solutions
Enterprise Services Community
(SDN) SAP Developer‘s Network
Op
en
SAP
Invitatio
n
Industry Value
Network
Business Process Expert Community
ASSET HUB IS AN SAP ENDORSED BUSINESS SOLUTION
Copyright © 2012 NRX Global Inc.
4
© SAP AG 2010. All rights reserved. / Page 3
Application level integration with solution qualification
to ensure end-to-end business process
Maintenance and upgrades through partner
SAP is first point of contact via SAP standard
support processes
Routed to Partner
Product roadmap guided by SAP, based on
cooperative development agreement
Certified partner applications are certified
to run on SAP NetWeaver
Complementary solutions selected by SAP product and industry groups
- endorsed by SAP and sold by partners
Endorsed Business Solutions from SAP
Trusted Industry Solutions
Copyright © 2012 NRX Global Inc.
5
Value-added Service Providers
Complementary Technology
Complementary Solutions
Global Industry Advisory Council
Copyright © 2012 NRX Global Inc.
6
Traditional EIM and MDM
Source: ARC Advisory Group 2011
TRADITIONAL EIM/MDM PLATFORM + ASSET HUB’S DOMAIN
SPECIFIC CAPABILITIES = COMPLETE SOLUTION FOR AIM
Copyright © 2012 NRX Global Inc.
7
HOW IS ASSET MASTER DATA UNIQUE?
CONFIG CHANGE
COMPONENT CHANGE
MOVED LOCATIONS
Harsh Environment
Safety Critical Process
Remote Offshore Location
Country with Unique Regulations
Context Specific
Maintenance
Strategies
Maintenance
Tasks & Plans
Regulations
Spare Parts &
BOM’s
Integrity and
Assurance
Hierarchy
REGULATORY CHANGE
SUPPLIER RECALL
BEST PRACTICE CHANGE
EPC DATA
SUPPLIER DATA
FEED DESIGN & CONSTRUCT
COMMISSION & STARTUP
OPERATIONS & MAINTENANCE RETIRE
ONLY 30% OF DATA READY FOR
MAINTENANCE
70% MUST BE BUILT & VALIDATED BY MAINTENANCE AND ASSET EXPERTS BASED UPON THE MAINTENANCE AND OPERATING
PHILOSOPHY OF THE OPERATING COMPANY
MANAGEMENT OF CHANGE BECOMES ESPECIALLY CHALLENGING
AQUIRE PREPARE | VALIDATE | DEPLOY SUSTAIN
DATA & TEMPLATE CHANGES MUST BE GOVERNED WITH A FULL AND TRANSPARANT AUDIT TRAIL
Copyright © 2012 NRX Global Inc.
8
FEED Detailed Design
Construction
Mechanical Completion
Com- missioning
Fin
al
Inve
stm
ent
Dec
isio
n Han
do
ver
Rel
ease
fo
r S
tart
-up
100%
75%
50%
25%
Operation by Specialists
EAM Build Out Collect, Validate, Enrich, Transform & Load
EAM
Procurement
TRADITIONAL CAPITAL PROJECT LIFECYCLE
In one project Shell incurred an additional
14 man-years and $4M USD in expenses to
collect, create and structure the data needed to
start-up, operate & maintain the new facility
Many analysts suggest
that the average loss
due to poorly managed
information handover equals
over 1% of total CAPEX spend.
Copyright © 2012 NRX Global Inc.
9
FEED Detailed Design
Procurement
Construction
Han
do
ver
Rel
ease
fo
r S
tart
-up
100%
75%
50%
25%
Fin
al
Inve
stm
ent
Dec
isio
n
EAM
EAM Staging Area Sustain
CAPITAL PROJECT ASSET INFORMATION MANAGEMENT
BEST PRACTICE
Com- missioning
Phased, progressive handover of
vendor & design documentation
enables timely EAM Master Data
Build-out and Loading
EAM Staging Area Collect, Validate, Enrich, Transform & Load
% Design Production Capacity
Operation by Specialists
Benefits • Increased production • Reduced EH&S Risks • Reduced extended start-up ops costs • Improved Maintenance productivity • Reduced MRO spares costs
Mechanical Completion
Copyright © 2012 NRX Global Inc.
10
AGENDA
An Introduction to NRX
NRX and the NRX – SAP Relationship
NRX Asset Hub and the SAP Technology Stack
The NRX / SAP Initiative at Shell
Shell challenges, NRX solutions, value propositions
Questions
Copyright © 2012 NRX Global Inc.
11
Asset Hub will be used to manage the handover, readiness, and sustainment
of maintenance master data for new capital projects and the remediation and
sustainment of this data for facilities already in production.
The NRX Asset Hub will provide Shell with a centralized enterprise
Maintenance Reference Library that contains validated maintenance
information and best practices from across the upstream organization.
NRX EXPERIENCE WITH SHELL
Copyright © 2012 NRX Global Inc.
12
NRX EXPERIENCE WITH SHELL
43
Case Study: Shell Canada – Scottford Upgrader
Opportunity
In a multi-billon dollar base plant construction, the information handover was not complete, validated or structured as required by the oil company to perform efficient operations and maintenance as the new facility entered production
An additional 14 person-years and a further investment of over $4 million was necessary to properly collect, create and structure the data and documents needed to startup, operate and maintain the new facility
For the subsequent expansion project, the oil company created the Information Handover Guide and a Downstream Expansion Information Management Plan to specify all aspects of the information handover deliverables
The oil company contractually bound the EPC company to fulfill the IHOG requirements for delivering information for the project
Solutions and Implementations
The oil and EPC companies selected the NRX Asset Center to:
Collect data from source engineering systems and populate a complete and validated asset registry
Collaborate with equipment suppliers to collect equipment details and recommended spare parts
Continuously update and maintain data and information as changes are made during the project
Manage, validate, and report on all data according to Information Handover Guide
Deliver the complete IHOG requirements to the oil company to ensure operational requirements are achieved
Results
Earlier OO-EPC Collaboration and problem identification to reduce risks
Improved quality (completeness, accuracy) of oil sands deliverable to meet the full IHOG specification of the oil company
Consolidated source and access to information requirements
Reduced risk of schedule delays
Reduced information management costs
“The Asset Center provides us with the mission critical functionality we require to
collaborate with our suppliers, integrate with
our internal document management systems, and meet customer specifications
for information migration into their business systems.”
Manager, EPC Systems
Copyright © 2012 NRX Global Inc.
13
Case Study: Shell Gbaran Ubie Project
Handover and Capital Project Readiness with Fluor
Opportunity
For a multi-billon integrated oil and gas project in Nigeria, Shell has contracted Fluor’s
Performance Technology Division to create the maintenance basis for ongoing plant operations
Solutions and Implementations
The EPC company selected the NRX Asset Center to:
Collect data from source engineering systems and populate a complete and validated asset registry
Collaborate with equipment suppliers to collect equipment details and recommended spare parts
Continuously update and maintain data and information as changes are made during the project
Create FLOC hierarchy, asset registry, spare parts, BOM’s, and MJR’s (Maintenance Job Routines) all specific to the Shell specification
E-SPIR Advisor SPIR data is exported from Advisor and imported into the Asset Center for use by
Fluor when building out the Maintenance Job Routines (MJRs).
Manage, validate, and report on all data according to Information handoverspecifications
Deliver the complete information to Shell to ensure operational requirementsare achieved
Results
Improved quality (completeness, accuracy) of oil sands deliverable to meetthe full specification of the project information requirements
Consolidated source and access to information requirements
Reduced risk of schedule delays
Reduced information management costs
NRX EXPERIENCE WITH SHELL
Copyright © 2012 NRX Global Inc.
14
Shell’s Vision
Standardization and Deployment of Maintenance Best Practices across Shell
Enterprise
….. To improve plant mechanical integrity and
reliability
NRX EXPERIENCE WITH SHELL
Copyright © 2012 NRX Global Inc.
15
FEED DESIGN & BUILD
COMMISSION & STARTUP
OPERATIONS & MAINTENANCE RETIRE
SHELL’S EVOLUTION WITH NRX
ASSET HUB is Shell’s Enterprise
Solution for Building,
Standardizing, and Sustaining
Maintenance Master Data in
Upstream
Remediation of Legacy Data/New EAM
SUPPLIER PRODUCT
DATA
SPARE PARTS
MANUALS
AS BUILT
DESIGN DATA
Handover & Preparation for New Capital Projects
SUPERIOR ENTERPRISE APPROACH
Governance
SITE 1
SITE 3
SITE 2 SITE 5
SITE 4
Copyright © 2012 NRX Global Inc.
16
AGENDA
An Introduction to NRX
NRX and the NRX – SAP Relationship
NRX Asset Hub and the SAP Technology Stack
The NRX / SAP Initiative at Shell
Shell challenges, NRX solutions, value propositions
Questions