Presentation USU TWGII Semarang

21
RENEWABLE ENERGY IN SUMATERA UTARA PROVINCE

description

fsfwrw

Transcript of Presentation USU TWGII Semarang

Page 1: Presentation USU TWGII Semarang

 RENEWABLE  ENERGY  IN  

 SUMATERA  UTARA  PROVINCE  

Page 2: Presentation USU TWGII Semarang

II.  RENEWABLE  ENERGY  POTENTIAL  II.1  WATER  ENERGY  

 II.1    WATER  ENERGY  

 A.  WATER  ENERGY  POTENTIAL  

  Large  Scale  =  3,031.300  MW  (74  LocaDon)    Mini  Scale  =              89.698  MW  (95  LocaDon)    Micro  Scale  =                  3,343  MW  (72  LocaDon)  

   Total        =  3,098.341  MW  

 B.  USE  OF  WATER  ENERGY  :  FOR  GENERATING  ELECTRICITY  

   -­‐    WATER  POWER  PLANT  (PLTA)  IN  SUMATERA  UTARA  

1.   PLTA    Asahan  I    =    180    MW  at  Toba  Samosir  (Tobasa)  Regency  

2.   PLTA    Asahan  II    =    603    MW  at  Toba  Samosir  (Tobasa)  Regency  

3.   PLTA    Renun    =    82    MW  at  Dairi  Regency  

4.   PLTA  Sipansihaporas      =    50    MW  at  Tapanuli  Tengah  Regency  

5.   PLTA  Sigura-­‐gura      =  286  MW  (4  x  71.50  MW)  

Page 3: Presentation USU TWGII Semarang

-­‐  Minihydro  Power  Plant  (PLTM)  in  Sumatera  Utara  

Nol   Name  of  PLTM   LocaDon    Name  

Capacity  (MW)  

1   PLTM  Sibundong     Taput      0,75  

2   PLTM  Raisan     Taput   1,5  

3   PLTM  Kombih     Pakpak  Barat   3,0  

4   PLTM  Silang     Humbahas   0,75  

5   PLTM  Boho     Samosir   0,2  

6   PLTM  B.  Gadis   Madina   0,9  

Page 4: Presentation USU TWGII Semarang

-­‐  Developing  Stage    of  Mini  Hidro  (PLTM)    Power  Plant  in  Sumatera  Utara  

22/07/2010  

No   Name  of  PLTM   Regency    Name  

Capacity  (MW)  

1   PLTM  Parlilitan       Humbahas      7,5    

2   PLTM  Parluasan     Tobasa   4,2  

3   PLTM  Pakkat     Humbahas   10    

4   PLTM  Aek  Hutaraja   Humbahas   5  

5   PLTM  Aek  Silau     Simalungun   10    

6   PLTM  Aek  Sipultak   Tobasa   15  

7   PLTM  Aek  Hasang-­‐1   Tobasa   10  

8   PLTM  Aek  Hasang-­‐2   Tobasa   6  

Total    67,7    

Page 5: Presentation USU TWGII Semarang

-­‐    Microhydro  Power  Plant  in  Sumatera  Utara  :  

NO   Regency   Plant  Scale   Sum  (Unit)  Sum  of  

Power  (KW)  

1   Deli  Serdang     PLTMH   13   303.5  

2   Karo   PLTMH   7   190.5  

3   Simalungun   PLTMH   2   25.5  

4   Tapsel   PLTMH   1   20  

5   Taput   PLTMH   3   75  

6   Humbahas   PLTMH   9   72.5  

7   Langkat   PLTMH   1   50  

8   Asahan   PLTMH   2   48  

9   Dairi   PLTMH   1   10  

10   Lab.  Batu   PLTMH   1   20  

11   Tapteng   PLTMH   1   18  

Total   41   833  

Page 6: Presentation USU TWGII Semarang

No Location Regency Res (MWe) RE (MWe) Ins Sp Hp Ps Pb Pv

1 Berastepu Karo - - - - - - 2 Lau Debuk- Debuk/Sibayak Karo - 71 131 - 39 12 3 Marike Karo 225 - - - - - 4 Dolok Marawa Simalungun 225 - - - - - 5 Pusuk Buhit-Danau Toba Tapanuli Utara 225 - - - - - 6 Simbolon-Samosir Tapanuli Utara 225 - - - - - 7 Pagaran Tapanuli Utara 225 - - - - - 8 Helatoba Tapanuli Utara 225 - - - - - 9 Sipoholon, Ria-ria Tapanuli Utara 225 - - - - - 10 Sarulla Tapanuli Utara - 100 200 - 135 - 11 Sibual-buali Tapanuli Selatan - - 556 - - - 12 Namorailangit Tapanuli Utara - - - - 210 - 13 Sibuhuan Palas 225 - - - - - 14 S. Merapi-Sampuraga Madina - - 420 - - - 15 Sampuraga Madina 225 - - - - - 16 Roburan Madina - - 320 - - -

Total 2025 1701 1627 384 12

II.2  GEOTHERMAL  ENERGY  

             Geothermal  Energy  PotenDal  in  Sumatera  Utara  =  ±  3.680  MW  

Remark  :  SP    :  SpeculaDve  Ps    :  Possible    Pv      :  Proven    Pv      :  Reserve    Hp  :  HipotheDcal  Pb  :  Probable    Res  :  Resources    Ins    :  Installed  

Page 7: Presentation USU TWGII Semarang

II.3 BIOMASS ENERGY

Note :              A    =    Harvested  Area  (Ha)              B    =    ProducDon  (Ton/Year)

Biomass Potential Of Palm

No Regency  

Rice  Husk/Sekam  Padi  Coconut  Shell/Batok  

Kelapa  Shell  of  Palm/Cangkang  Kelapa  

Sawit  Bagasse/Ampas  Tebu  

A  (ha)   B(  Ton)   A  (ha)   B  (Ton)   A  (ha)   B  (Ton)   A  (ha)   B  (Ton)  

1  2  3  4  5  6  7  8  9  10  11  

Deli  Serdang  Karo  Simalungun  Pakpak  Bharat  Asahan  Tj.  Balai  Labuhan  Batu  Tap.  Selatan  Tap.  Utara  Humbahas  Langkat  

153,689  20,966  22,844  5,213  71,099  253  

73,157  103,961  65,649  19,247  58,778  

714,661  13,194  9,989.6  31,755  65,356  1,062  47,693  

89,761.15  74,816.5  87,634  61,717  

4,355  -­‐  -­‐  77  

44,649  3,233  342  5,875  -­‐  

182  6242  

3,695  -­‐  -­‐  

159  5,089.2  2,743  287,418  252.8  -­‐  88  

4,729  

33,856  -­‐  

11,048  1,304  

85,439.96  -­‐  

178,749.94  5,817  -­‐  

376  1,144.8  

486,195  -­‐  

19,312.2  5,216  

70,422.12  -­‐  

69,467.68  2,303.3  

-­‐  1,220  381,6  

848,69  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  

144,409  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  -­‐  

96,000  

Total   594.856   1,135,983.97   64,955   304,174   317,735.7   654,517.9   848,69   240,409  

Fresh Fruit Bunch (Ton)

Waste of Palm Production (Ton) Energy Potential of Palm (Mio K.Cal) Empty Bounch Fiber Shell Empty

Bounch Fiber Cangkang

11,685,317.08 2,570,769.75 1,285,384.88 701,119.03 3,599,077.66 3,599,077.66 2,769,420.15

 Waste  Of  Palm   (fiber  and  shell)  used  as  bahan  bakar   for  boiler   in  more   than  91  POMs   (Palm  Oil  Mills)  which   spreaded   in  several  Regencies.  The  use  of  steam  for  boiler  is  equivalent  to  55  MVA  of  Steam  Power  Plant  (PLTU).  

Page 8: Presentation USU TWGII Semarang

II.4  BIOGAS  ENERGY  

   BIOGAS  ENERGY  POTENTIAL  OF  ANIMALS  

No   Regency/City  Buffalo   Cow   Pig   Goat  

A(Head)   B(Ton)   C(Mio  m3)   A(Head)   B(Ton)  C(Mio  m3)  

A(Head)   B(Ton)   C(jt  m3)   A(Head)   B(Ton)   C(  jt  m3)  

1  

2  

3  

4  

5  

6  

7  

8  

9  

10  

11  

12  

13  

14  

15  

Medan  

Deli  Serdang  

Karo  

Simalungun  

Dairi  

Pakpak  Barat  

Asahan  

Tj.  Balai  

L.  Batu  

Taput  

Humbahas  

Tapteng  

P.Sidempuan  

Tapsel  

Nias  

580  

6.409  

23.140  

78.293  

5.584  

3.079  

7.178  

46  

1.453  

65.134  

10.850  

10.139  

-­‐  

46.692  

763  

4.228  

50.631  

168.690  

570,756  

40,707  

22.445  

53,327  

335  

10,665  

474,826  

85.715  

73,913  

-­‐  

340,384  

5,562  

0,5  

5,67  

18,8  

63,9  

4,5  

2,5  

5,8  

0,04  

1,1  

53,1  

9,6  

8,2  

-­‐  

38,1  

0,6  

3.280  

26.455  

13,990  

6,150  

1,207  

132  

14,952  

28  

6,159  

8,002  

355  

825  

-­‐  

33,014  

913  

21.516  

173.544  

91,773  

40,344  

7,918  

865  

89,085  

183  

40,403  

52,493  

2.328  

5,412  

-­‐  

216,5718  

5,989  

2,4  

19,4  

10,2  

4,5  

0,8  

0,1  

10,9  

0,02  

4,5  

5,8  

0,3  

0,6  

-­‐  

24,2  

0,67  

3.670  

55.984  

40,621  

24,044  

40,137  

3.528  

48,114  

357  

23,215  

507,869  

17.034  

44,173  

-­‐  

-­‐  

268,394  

4.660  

71.999  

51,589  

30,536  

50,974  

4.480  

61,104  

453  

29,528  

644,993  

21.633  

56,099  

-­‐  

-­‐  

240,860  

0,5  

7,9  

5,7  

3,4  

5,7  

0,5  

6,8  

0,05  

3,3  

72,2  

2,4  

6,2  

-­‐  

-­‐  

38,1  

17.714  

46.792  

11,333  

557,954  

2,785  

1.868  

121,810  

2357  

42,171  

18,741  

1.583  

8,330  

-­‐  

53,683  

6,263  

21.256  

56.150  

13,599  

669,545  

3,342  

2.241  

146,172  

2.828  

50,605  

22,489  

1.899  

9,996  

-­‐  

42,819,6  

7,539  

2,4  

6,3  

1,5  

75  

0,3  

0,3  

16,3  

0,3  

5,6  

2,5  

0,2  

1,1  

-­‐  

4,7  

0,8  

TOTAL   262.135   1,933,804   216   122373   933177,8   104   170.026,5   200.473,3   224   910.453   1.092.541,6   122  

Page 9: Presentation USU TWGII Semarang

II.5  SOLAR  ENERGY    Pembangkit  Listrik  Tenaga  Surya  (PLTS)  di  SUMUT  Tahun  2003-­‐2009  :  

•  Melalui  APBD-­‐SU  telah  dibangun  PLTS/SHS  =  1.963  unit.  

•  Melalui  ABBN-­‐ESDM  telah  dibangun  PLTS/SHS  =  5.063  unit.  

Page 10: Presentation USU TWGII Semarang

III.  EXISTING  ELECTRICITY  OF  SUMATERA  UTARA  

III.1    ELECTRICAL  SYSTEM  FACILITY  

  Installed  Power  Capacity  :  1,718  MW    Capability  of  Power  Plant  :  ±  1,410  MW    Peak  Load  :  1,352  MW    Transmission  Line  SUTT  150  kV  :  1,227  KMs    DistribuDon  Line  SUTM  20  kV  :  20,500  KMs    DistribuDon  Line  SKTM  :  500  KMs    SubstaDon  :  30  unit    DistribuDon  Transformer  :  217  unit    Pole  Transformer  :  15,442  unit  

III.2  RURAL  ELECTRIFICATION  

  Total  of  Villages    :  5,856    Total  of  Electrified  Villages  :  4,607    Total  of  Unelectrified  Villages  :  1,249    Ratio  of  Electrified  Villages  :  78.66  %    Ratio  of  ElectrificaDon    :  77.56  %  

Page 11: Presentation USU TWGII Semarang

III.3    DEVELOPMENT  of  ELECTRIC  POWER    PLANT  

1.   On  Going  :    PLTA  Asahan  I  2  x  90  MW    (IPP)  :  180  MW  

  PLTU  Sumut  Unit  1  (PLN)                    :  200  MW  

  PLTU  Sumut  Unit  2  (PLN)                                                    :  200  MW  

  PLTU  Meulaboh  2  x  100  MW  (PLN)      :  200  MW  

                                                                           Jumlah                :  780  MW  

2.  AddiDonal    Prospect  –The  year  of  2014  OperaDon  :  

     PLTU  Kuala  Tanjung,  2  x  125  MW  (IPP)    :  250  MW  

     PLTU  P.  Susu  3  dan  4,  2  x  200  MW  (PLN)  :  400  MW  

     PLTP  Sarulla  Unit  1,  3  x  110  MW  (IPP)    :  330  MW    

     PLTP  Sarulla  Unit  2,  2  x  55  MW  (IPP)    :  110  MW    

     PLTP  Sorik  Merapi,  1  x  55  MW  (IPP)    :  55  MW  

     PLTA  Asahan  III,  2  x  87  MW      :  147  MW  

     PLTU  Nias,  2  x  7  MW      :  14  MW                                                                    Total      :  1,333  MW  

Page 12: Presentation USU TWGII Semarang

3. Development of Minihydro Power Plant Untill The Year of 2010

No     Type  of  Power  Plant   Project  Name   Capacity  (MW)     Status     Regency   Remark    

1     PLTM     Parlilitan     7.5     Commissioning     Humbahas     IPP  

2     PLTM     Parluasan     4.2     Development     Tobasa     IPP    

3     PLTM     Pakkat     10     Development     Humbahas     IPP    

4     PLTM     Aek  Hutaraja     5    Development    

Humbahas     IPP  

5     PLTM     Aek  Silau     10    Development    

Simalungun     IPP  

6     PLTM     Aek  Sipultak     15     Development     Tobasa     IPP  

7     PLTM     Aek  Hasang-­‐1     10     Plan   Tobasa     IPP  

8     PLTM     Aek  Hasang-­‐2     6     Plan   Tobasa     IPP  

Total   67.7    

Page 13: Presentation USU TWGII Semarang

4.  CapDve  Power  

1.    Industrial  Sector    PLTD    =  123  unit,  Installed  Capacity  =  248,785  MW  

 PLTU    =      22  unit,    Installed  Capacity    =      61,652  MW  

 PLTA  =          1  unit,      Installed  Capacity    =  603  MW  

 PLTM  =          6  unit,    Installed  Capacity    =  6,244  MW    

                                                                   Total  of  Installed  Capacity  =  919,681  MW  

2.    Household  Sector  

 PLTMH  =  41    unit,  Installed  Capacity  =    0,833  MW  (833  KW)      

Page 14: Presentation USU TWGII Semarang

5.   List  of  Power  Plant  –  Supplied  To  Sumatera  Utara  Electrical  System    

 (Status  for  January  2010)  

NO   Name  of  Power  Planet   Installed  Capacity  (MW)   LocaDon  

1   PLTG/U  Belawan   1.077                           Medan  

2   PLTG  Paya  Pasir   123   Medan  

3   PLTG  Glugur   100   Medan  

4   PLTD  TiD  Kuning   24,8   Medan  

5   PLTA  Sipansihaporas   50   Tapanuli  Tengah  

6   PLTA  Renun   82   Dairi  

7   PLTU  Labuhan  Angin   230   Tapanuli  Tengah  

8   PLTP  Sibayak   12   Karo  

9   PLTM  Kombih  I,II   3   Pakpak  Barat  

10   PLTM  Boho   0,2   Samosir  

11   PLTM  Silang   0,75   Humbahas  

12   PLTM  Sibundong   0,75   Humbahas  

13   PLTM  Batang  Gadis  I  &  II   0,90   Madina  

14   PLTM  Raisan  I  &  II   1,5   Tapanuli    Utara  

15   PLTD  Gunung  Sitoli   9,89   Nias  

16   PLTD  T.  Dalam   2,81   Nias  selatan  

Total   1.718  

Page 15: Presentation USU TWGII Semarang

IV.  FUEL  AND  GAS  IN  SUMATERA  UTARA  

IV.1  FUEL  RESERVES  

 1.  Langkat  Regency    =  19.466  Mio  barrel  

 2.  Deli  Serdang  Regency    =      7.551  Mio  barrel    3.  Binjai  Regency    =      5.207  Mio  barrel  

 4.  Tapanuli  Selatan  Regency  =      2.000  Mio  barrel  

 5.  Medan  City      =            674    Mio  barrel  

       Total  =  34.898  Mio  barrel  

IV.2  FUEL  AND  GAS  PRODUCTION  

NO   Regency/City   Fuel(Barrel/day)   Gas  (MMSCFD)  

1   Langkat   2.400   20  

2   Deli  Serdang   -­‐   12  

3   Binjai                              200   4  

Total   2.600   36  

Page 16: Presentation USU TWGII Semarang

IV.3  CONTRACTS  OF  FUEL  AND  GAS  IN  SUMATERA  UTARA  

NO   Operator   Name  of  Block  Contract  Type  

Status  

1   Pertamina  EP   NAD-­‐1  Block   KKS   ProducDon  

2   Pertamina  EP   NAD-­‐2  Block   KKS   ProducDon  

3   PT.  Chevron  Pasific  Indonesia   Siak  Block   PSC   ProducDon  

4   PT.  Mosesa  Petroleum   Tonga   PSC   ExploraDon  

5   Serica  East  Seruway   East  Seruway   PSC   ExploraDon  

6   PT.  Sumatera  Persada  Energy   West  Kampar   PSC   ExploraDon  

7   PT.  Real  To  Energy  Nusantara   South  Block  A   PSC   ExploraDon  

8   Pasific  Oil  &  Gas,  Ltd   Kisaran   PSC   ExploraDon  

9   Petronas  Carigali,  Ltd   West  Glagah  Kambuna   PSC   ExploraDon  

Page 17: Presentation USU TWGII Semarang

IV.4    SUPPLY  PROFILE  AND  DISTRIBUTION  OF  BBM  &  LPG  DI  SUMUT  

 -­‐  SPBU      =  258  unit  

 -­‐  Agen  Premium  &  Solar      =  42                unit  

 -­‐  Agen  LPG      =  52                unit  

 -­‐  Pangkalan  Minyak  Tanah    =  2.890    unit  

NO   Depot  Kapasitas  Penyimpanan  

(KL)  Penyaluran  

(KL)  Sumber  

1   Depot  LPG    P.Susu   6.000   600   30  %  K.Dumai,  70  %  Tj.Uban  

2   Instalasi  BBM  Medan  Group   105   6.452   70  %  Impor,  30  %  K.Dumai  3   DPPU  Polonia   2.380   290   IMG  

4   Depot  LPG  Tandem  Binjai   350   108   Depot  P.Susu  

5   Depot  BBM  Kisaran   1.493   272   IMG  

6   Depot  BBM  P.Siantar   2.721   361   IMG  

7   Depot  BBM  Sibolga   21.887   1.068   Tl.  Kabung  

8   Depot  BBM  G.Sitoli   4.699   205   Tl.  Kabung  

Page 18: Presentation USU TWGII Semarang

IV.5  SPPBE  (STASIUN  PENGISIAN  DAN  PENGANGKUTAN  BULK  ELPIJI)    

•  Agen  LPG  -­‐PSO  (3  Kg)  =  168  unit  

•  Agen  LPG-­‐Non  PSO  (12.850  Kg)  =  54      unit  

NO   Pengusaha   Kab/Kota   Kapasitas  Penyimpanan  (MT)  

1   PT.  Trihatras  NS   Medan                                                    40  

2   PT.  Maju  Kita  Bersama   Medan                                                    60  

3   PT.  Petro  Gasindo   Medan                                                100  

4   PT.  Wanantara   Deli  Serdang                                                100  

5   PT.  Dharma  Mitra  1   Deli  Serdang                                                    75  

6   PT.  Citra  Tunas  Sempurna   Deli  Serdang                                                    60  

7   PT.  Gasindo  Alam   Serdang  Bedagai                                                    60  

8   PT.  Sinar  Mulia  MS   Asahan                                                100  

Total                                                595  

Page 19: Presentation USU TWGII Semarang

IV.6  REALISASI  PENYALURAN  BBM  BERSUBSIDI  DI  SUMUT    

                                 Satuan  :  Kilo  Liter  (KL)  

IV.7  REALISASI  PENYALURAN  LPG  NON-­‐PSO  DI  SUMUT  

                                               Satuan  :  Kilogram  (KG)  

NO   Jenis   Tahun  2007   Tahun  2008   Tahun  2009  1   Premium   1.053.943   1.138.925   1.221.641  

   2   Kerosine          653.015          645.075          596.840  

   3   Solar          775.924          817.952          828.642  

Total   2.482.882   2.601.952   2.647.123  

Jenis   Nov  2009   Des  2009   Jan  2010   Feb  2010  

LPG  Non-­‐PSO   3.973.220   4.250.149   5.160.206   5.831.094  

Page 20: Presentation USU TWGII Semarang

V.    UPAYA  MEMACU  PEMBANGUNAN  SEKTOR  ENERGI  DI    SUMATERA  UTARA  

1.   Melakukan  survei  potensi  energi  secara  berkelanjutan.  

2.   Mendorong   pendayagunaan   potensi   energi   alternaDf   alamiah,  seperD  :  air,  panas  bumi,  dan  surya.  

3.   Mendorong  peran  swasta  dalam  pengusahaan  energi.  

4.   Memberikan  kemudahan  bagi  para  investor  yang  ingin  berinvestasi  di  sektor  energi.  

5.   Pembangunan   infrastruktur   untuk   mempermudah   akses   konsumen  terhadap  energi  

Page 21: Presentation USU TWGII Semarang