06/06/22 1 Storage Tanks : Design, Construction, Maintenance, operation & Trouble shooting. A Typical Storage Tanks.

description

Presentation slides for Tank Construction and Maintenance

Transcript of Presentation slides for Tank Construction and Maintenance.ppt

Page 1: Presentation slides for Tank Construction and Maintenance.ppt

04/08/231

Storage Tanks : Design, Construction, Maintenance, operation & Trouble shooting.

A Typical Storage Tanks.

Page 2: Presentation slides for Tank Construction and Maintenance.ppt

04/08/232

Standards & Codes : Design, Construction & Testing

API Standard 650 : Welded Steel tanks for Oil Storage API Standard 620 : Design and Construction of Large, Welded

Low pressure Storage tanks API Standard 653 : Tank Inspection, Repair & Alteration &

Reconstruction Indian Standard, IS 803 : Welded Steel tanks for Oil Storage British Standard Spec. BS 2564 : Vertical Steel Welded Storage

Tanks with Butt Welded shell. DIN 4119 Part 1,2 : Above Ground Cylindrical Flat Bottom tank

installation of metallic materials.

Page 3: Presentation slides for Tank Construction and Maintenance.ppt

04/08/233

Design Criteria of a Code

The Design Code Criteria are the basic rules upon which the design is based. They Cover the design formulas or methods, the design loads and allowable stresses.

Page 4: Presentation slides for Tank Construction and Maintenance.ppt

04/08/234

Design Criteria of API Std 650

API Std 650 is based on maximum Principal stress theory. Thickness of tank shell is calculated by membrane stress due to hydrostatic pressure + internal vapour pressure.

Allowable Stress : Design Condition (Sd) – Min of 2/3 of Yield Stress and 2/5 of UTS

Allowable Stress : Hydrostatic Condition (St) – Min of 3/4 of Yield Stress and 3/7 of UTS

Page 5: Presentation slides for Tank Construction and Maintenance.ppt

04/08/235

API Std 650 : Scope

The standard is meant for design, selection of materials, fabrication, erection & testing

Vertical, cylindrical, above ground, closed and open top, welded steelstorage tanks.

Internal Pressure approximating to atmospheric pressure. However, tanks can be designed for pressure up to 0.175 Kg/cm2. The tanks entire bottom is uniformly supported. The tanks are in non refrigerated service and maximum temp of

200 deg F.

Page 6: Presentation slides for Tank Construction and Maintenance.ppt

04/08/236

API Std 620 : Scope

The standard is meant for design and Construction of large, welded low pressure, CS above ground storage tanks.

Vertical, cylindrical, above ground, closed, welded steel storage tanks.

Pressure in the vapour space not more than 15 lbs/sq inch( 1.055 kg/cm2).

The tanks are for metal temp not greater than 250 deg F.

Page 7: Presentation slides for Tank Construction and Maintenance.ppt

04/08/237

Factors to be specified for design

Metal Temp Specific gravity Corrosion allowance for each component Wind velocity Special consideration to foundation, corrosion allowance,

hardness testing, etc.

Page 8: Presentation slides for Tank Construction and Maintenance.ppt

04/08/238

Design Consideration

Dead Load : Weight of the tank or tank component External Pressure : shall not be less than 1 inch of water

pressure Hydrostatic load: load due to filling the tank with water to the

design liquid level

Page 9: Presentation slides for Tank Construction and Maintenance.ppt

04/08/239

Tank Capacity

Page 10: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2310

Tank Components

• Bottom Plates : (i) All Bottom Plates Min Thkness 6 mm exclusive of any CA.

(ii) Bottom plate shall project outside shell by 25 mm.

Annular Bottom Plate : 6-9 mm. if 1st Shell course is less than 19 mm. 6-11 mm. in case shell course is 19-25 mm 6-14 if 25-32 8-17 if 32-38Variation is due to 1st shell course stress.

Page 11: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2311

Tank Components

•Shell Thickness:

Nominal dia of Tank Nominal Plate thickness

<15 M 5 mm15 M to 36 M 6 mm36 M to 60 M 8 mm>60 M 10 mm

Tank shell to be checked for stability against buckling from the design wind speed. If required for stability, intermediate girders, increased shell plate thickness or both shall be used.

Page 12: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2312

Tank Components

Shell Thickness: •Calculation of thickness by 1-Foot Method- calculates

the thickness required at design points (0.3 m above of the bottom of each shell course)It is used up to tank dia of 60 M.

Page 13: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2313

Tank Components

Page 14: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2314

Tank Components : Shell Openings

A Tank shell opening that is larger than 2’’ to be suitably reinforced. Typical reinforcement details:

Page 15: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2315

Tank Components : Shell Manhole Cover Plate & Bolting Flange

Page 16: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2316

Tank Components : Shell Manhole Neck Thickness

Page 17: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2317

Tank Components: Top & Intermediate Wind Girder

• Open Top Tanks to be provided with stiffening rings to

maintain Roundness at or near the top of the course preferably at outside.• When Wind girders are located more than 0.6M below

the top of the shell, the shell to be provided with a top curb angle : size 64 x 64 x 4.8 mm for shell 5 mm thick and angle size of 76 x 76 x 6.4 mm for shell more than

5 mm thk• Stiffening Ring or wind girder can be used as walkway.

Width of walkway not to be less than 24 inch.

Page 18: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2318

Tank Components: Stiffening Ring Sections

Page 19: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2319

Tank Components: Wind Girder with walkway Separate Top curb angle

Page 20: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2320

Tank Components: Roof

Different types of Roof :A. Fixed Roof : Most widely used and integrated with tank structure.

(a) Cone Roof (used for atmospheric tanks) (b) Dome Roof ( Used for pressurised tanks) Cone Roof : (i) Self Supported – used for small tank dia 4- 6 m.

(ii) Supported by Rafter – used for tank dia 8-12 m (iii) Trussed – used for tank dia up to 60 m (iv) Column Supported – economical for large dia tanks but

not recommended because diff settlement can cause overstress in shell and roof.

Dome Roof : (i) Self Supported – used for tank dia of 4-6 m (ii) Rafter Supported – used for large dia tanks.

Page 21: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2321

Tank Components: Floating Roof Tank

Page 22: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2322

Tank Components: Roof - Cone Roof & Dome Roof

Page 23: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2323

Tank Components: Roof - Cone Roof & Dome Roof

Different types of Roof :Floating Roof : used for storage of volatile products – reduce costly

evaporation loss and increase protection from fire.

(a) Open Top Tank Floating Roof (a) Pan type

(b) Ring Pontoon type© Ring Pontoon with deck pontoon

(d) Double deck type(b) Internal Floating Roof (a) Open pan type

(b) Ring pontoon type© Double deck type

Page 24: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2324

Tank Components: Roof - Cone Roof & Dome Roof

Different types of Roof :

Floating Roof :

Light Weight Internal Floating Roof

(a) Aluminium IFR – most commonly used

(b) Fibre glass roof – used in chemical applications where metal materials not compatible with stored product.

Page 25: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2325

Tank Components: Roof – Floating Roof

Page 26: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2326

Tank Components: Roof – Floating Roof

Page 27: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2327

Tank Components: Roof – Floating Roof

Page 28: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2328

Tank Components: Roof – Floating Roof

Page 29: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2329

Tank Components: Roof – Internal Floating Roof

Page 30: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2330

Tank Components: Roof – Internal Floating Roof

Page 31: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2331

Tank Components: Roof – Internal Floating Roof

Page 32: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2332

Tank Components: Roof Design

• Fixed Roof :

• Dead Load : (a) Self weight of members including the weight of joints & connections.

(b) Weight of covering plates

(C) Weight of bracing members

(d) Weight of nozzles and attachments etc.

• Live Load : Roofs and all supporting members to carry a uniformly distributed live load of 125 kg/m2. This includes wind

load and internal vacuum load also.

• Seismic Load : Basic seismic coefficient are given in IS 1893-1984. These loads are to be considered in conjunction with

the self and live load.

Page 33: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2333

Tank Components: Roof Design

• Fixed Roof

(1) Roof plate shall have a minimum nominal thickness of 5 mm.

(2) Roof plates shall be attached to the top angle of the tank with continuous fillet weld on top side only.

(3) A roof is considered frangible if shell to roof joint fail prior to the shell to bottom joint in the event of excessive internal pressure.

(4) Slope of the roof at the top angle attachment does not exceed 2 in 12.

(5) The roof is attached to the top angle with a single continuous fillet weld that does not exceed 5 mm.

Page 34: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2334

Tank Components: Roof Support

• Supported Fixed Roof

(1) Minimum thickness of any structural member, including any CA on the exposed side or sides shall not be less than 6 mm for columns, knee braces and beams.

(2) It shall be 4 mm minimum for any other members.

(3) For columns the value of L/rc (maximum slenderness ratio) shall not exceed 180.

(4) For all other members except tie rods, the L/rc shall not exceed 300.

where, L = unbraced length, rc = least radius of gyration of column and r = governing radius of gyration.

Page 35: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2335

Tank Components: Roof Support ( typical column base details)

Page 36: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2336

Tank Components: External Floating Roof

• This is covered in Appendix-C of API Std 650.

(1) Deck : Roof in corrosive sour services such as Crude Oil should be contact type designed to eliminate the presence of any air-vapour mixture under the deck.

(2)All deck plates shall have minimum nominal thickness of 5 mm.

(3) Pontton : Pontoon Design shall be based on a liquid with a specific gravity of 0.7 and with primary drain inoperative for the condition as under:

250 mm of rainfall in 24 hours period .

Single deck and any two adjacent pontoon compartments punctured and flooded.

Double deck and any two adjacent compartment punctured and flooded without any water or live load.

Page 37: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2337

Tank Components: External Floating Roof

• Ladders : A ladder to be provided for access to the roof. Ladder shall be

automatic adjusting type. All deck plates shall have minimum nominal thickness of 5 mm.

• Roof Drains : Shall be not less than 3 inch for tank dia up to 36 M and for tank dia more than 32 M, the roof drain shall be 4 inch NB. Drain shall be provided with an NRV.

• Emergency Roof drain : to be provided in double deck design to take care of severe rainfall.

• Vents : To prevent overstressing of the roof deck or seal membrane, automatic bleeder vent is furnished.

• Supporting Legs : Removable or non removable. Size >= 2 inch NPS

Page 38: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2338

Tank Components: External Floating Roof

• Roof Manholes : Minimum diameter of 24 inch. Number of Manholes in the

roof shall be as follows:

Page 39: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2339

Tank Components: External Floating Roof

• Peripheral Seal: Also referred as Rim Seal.

1. Primary Seal : Can be either a mechanical shoe type or a Foam and nitrile rubber casing arrangement. The foam and nitrile rubber casing is protected from weather with a metallic weather protector/ compression plate.

2. Secondary Seal : It shall be wiper type

• Gauging Devices : (1) Manual Gauging Port with cover. – slotted guide pole gauge wells. – it must be provided with a gauging platform.

(2) Automatic Level Gauge : tank need to have ground level reading automatic float level gauge.

Page 40: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2340

Tank Layout

• Tankages installation as per OISD 118.

• Aggregate Cap of tanks in one dyked enclosure shall not exceed

(a) 60000 Cu M for a group of fixed roof tanks

(b) 120000 Cu M for a group of floating roof tanks

• Dyked enclosure shall be able to contain complete contents of the largest dia tank.

Page 41: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2341

Tank Layout

• Dyke volume shall be calculated deducting other tanks

volume and tank pads volume.

• Height of tank enclosure dyke shall be between 1 M & 2 M.

• Process equipments not to be installed inside dyke.

• Separation distance between nearest tanks in separate enclosures shall not be less than dia of the larger of the two tanks or 30 m, whichever is more.

• Dyke volume shall be calculated deducting other tanks volume and tank pads volume.

Page 42: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2342

Tank Layout

• Tanks shall be arranged in maximum of two rows.

• Tanks having 50000 CuM cap & above shall be laid in single row.

• Fire wall of minimum height 600 mm to be provided where more than one tank is located.

• A group of small tanks each not exceeding 9 m dia and in all not exceeding 5000 CuM in capacity to be treated as one tank for fire wall provision.

Page 43: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2343

Tank Components: Tank Fabrication & Erection

Typical Joints :

Page 44: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2344

Tank Construction

Typical Joints :

Page 45: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2345

Tank Construction

Page 46: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2346

Tank Construction : Major Jobs

A. Foundation

• Stone column Foundation – Less Costly. But chances of settlement is there. Settlement occurs during hydrotest.

• Concrete Pile Foundation – Costly. But No settlement.

B. Mechanical Work

• Scaffolding work and round shell work as per height – concern to Safety. More time consuming.

• Jacking Method – Safe, Easy work. – Fast working.

Page 47: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2347

Tank Construction : Concrete Foundation

Page 48: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2348

Tank Construction : Use of Jacking Method

Page 49: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2349

Tank Construction

• Connected piping Work – Nozzle, Manhole, Roof drain, Shell drain and clean out door. • Structural work• GI sprinkler & Foam Pourer system.• Goose Neck, Flame Arrester, Vent, Pressure Vacuum Relief Valve, Jet Mixer, Agitator Assembly.• Instrumentation- Gauging, Manual & Auto• Painting • Insulation – wherever necessary.

Page 50: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2350

Tank Construction : Flame Arrester in Fixed Roof Tank

Page 51: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2351

Tank Construction : Goose Neck in Fixed Roof Tank

Page 52: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2352

Dimensional Tolerances

• Plumpness : Top of shell relative to bottom not to exceed 1/200 of total tank height.

• Roundness : Radii measured at 1 ft above the bottom corner weld shall not exceed the following :

Tank Dia Radius Tolerance

< 40 Ft +/-1/2’’

40 to 150 +/- ¾’’

150 Ft to 250 Ft +/- 1’’

>=250 Ft +/- 1.25’’

Page 53: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2353

Testing

• Bottom Plate welding Testing by Vacuum Box method

• Reinforcement plate welding test by applying 15 PSI gauge pressure.

• Roof plate welding test by vacuum box test method.

• DP test for Shell to bottom/ annular plate joints.

• Radiography at random at Butt Joints of shell.

• Hydrotest by filling water up to maximum liquid level or up to curb angle. Tank shell to inspect frequently during hydrotest.

Page 54: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2354

Check Points During Construction

A) Tank Foundation1. Soil Test Report2. Reference Level3. Pile Details ie Quantity and Size4. Method of Piling being used (Manual or Automatic 5. Type of concrete Mix ( M15, M20 ,M25 or M306. Cube test Result for 7, 14 and 28 days.7.Settlement reading during load test8. Pile cut off level9.Pile cap ( Single or Combined footing)10. Concrete Foundation including ring wall11. Layer wise Compactness checking during Sand

filling.

Page 55: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2355

. Method of Piling being used ( . Method of Piling being used ( 12. Premix Carpeting Ratio ( Sand and Bitumen )13.Strength test report of Premix Carpeting.14. Slope of Tank pad and Level w.r.t Reference Level

B) Bottom Plate Laying 1) Annular plate cutting layout checking w.r.t

Approved Drawing.2) Sketch plate cutting layout checking w.r.t approved

drawing3) Checking of bottom underneath paint thickness.4) Annular plate fitment checking including baking

strip.5) Welding electrode quality and no. of run.6) DP and Radiography as per approved QAP/ITP.7) Bottom sketch plate fitment and lapping dim.

Page 56: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2356

1) ayout checking w.r.t approved8) Vacumn / Pneumatic test

C) Shell Erection 1) Plate Cutting Layout 2) Plate Bending Profile according to Jig. 3) Vertical / Horizontal Joint fit-up 4) Circularity / Verticality 5) Welding Quality 6) “ T” Joint DP / Radiography Test 7) SR Report

D) Roof Erection1)Level of Roof Staging pipe2)Pontoon / Deck Layout 3)Joint fit-ups

Page 57: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2357

4)Welding Quality.5)Vacuum / Pneumatic Test

E) Apparatunces1) Compliance w.r.t Drawing2) Fitment3) Welding quality4) Heat treatment / testing

F)Testing 1) Floatation Test of Deck 2) Puncturing test of Pontoon 3) Roof stability test with 10” Water on roof. 4) Roof Drain Hydraulic Test 5) Swivel Rotation Test

Page 58: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2358

6) Hydraulic Test and Settlement Reading.

G) Other Points 1) Dyke layout 2) Valve Operability 3) Sample point Operability 4) Foam seal fitment 5) Foam Pourer and Sprinkler fitment / operability etc. 6) Earthing Continuity 7) Level Gauge Operability 8) Stair case / rolling ladder /wind girder / structural fitment & welding quality 9) Surface Cleaning and Paint Application

Page 59: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2359

Tank Operational Checks 1) Simultaneous Operation of Valves during change over2)Tank product Level to arrest overflow / maintain SFH.3) Condition of Roof Drain / operability4) Water draining at Regular Interval to Prevent corrosion5) Side mixer operation at regular interval to minimize sludge formation 6) Condition of Spiral Ladder 7) Condition of Roof 8) Condition of Insulation

Page 60: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2360

09) Sampling at regular intervals for testing purpose. 10) Breather valve condition 11) Water seal of Emergency drain 12) Pumping Rate.

Page 61: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2361

Tank Maintenance : Major Jobs Involved

A. Foundation Related:

• Sand Filling

• Morum or PCC (1:2:4)

• Premix Bituminous Carpet –anticorrosive layer.

• RCC of 100 mm thickness outside the tank Annular plate.

B. Mechanical :

• Bottom Plate Replacement.

• Roof Plate Replacement.

Nozzle work – if any.

Page 62: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2362

Tank Maintenance : Pontoon Replacement

Page 63: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2363

Tank Maintenance : Major Jobs Involved

B. Mechanical :

• Floating Roof Tank – Deck, Pontoon repair/ replacement.

• Structural repair/ replacement.

• Swivel joints repair for Roof drain.

• Handrail and Roof walk way.

• Repair/ replacement of Water sprinkler system/ Foam Pourer system.

• Surface cleaning by Grid Blasting.

• Painting and Insulation.

Page 64: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2364

Tank Maintenance : Major Jobs Involved-Swivel Joint

B. Mechanical :

• Floating Roof Tank – Deck, Pontoon repair/ replacement.

• Structural repair/ replacement.

• Swivel joints repair for Roof drain.

• Handrail and Roof walk way.

• Repair/ replacement of Water sprinkler system/ Foam Pourer system.

• Surface cleaning by Grid Blasting.

• Painting and Insulation.

Page 65: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2365

Tank Maintenance : Major Jobs Involved-Pontoon Replacement.

Page 66: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2366

Tank Maintenance : Major Jobs Bottom Plate Replacement

Page 67: Presentation slides for Tank Construction and Maintenance.ppt

04/08/2367

Tank Maintenance : Major Jobs Seal replacement

Page 68: Presentation slides for Tank Construction and Maintenance.ppt

Some Typical Failure of Tanks

During Construction 1) Failure of Pile during Load testing

2) Failure due to material quality.

3) Uneven / excessive settlement of tank pad causing tilting of Tank

during test. 4) Welding failure during Hyd. Test

5) Touching of Roof / deck during initial lifting

6) Collapsing of roof / deck due to excessive water accumulation

and no emergency drain point.

04/08/2368

Page 69: Presentation slides for Tank Construction and Maintenance.ppt

Some Typical Failure of Tanks

7.Improper lifting of Deck / Roof during Hydraulic Test.

During Operation and Maintenance1) Collapsing of roof & shell due to vacuum inside for Breather valve

mal functioning.

2) Connected equipment damage due to mal operation of valves during Tank change over.

3) Roof collapse due to closing of roof drain valve / emergency drain valve.

4) Tank fire due to lightening spark for poor earthing.

04/08/2369

Page 70: Presentation slides for Tank Construction and Maintenance.ppt

Some Typical Failure of Tanks

5) Leakage of bottom plate during running.

6) Tank fire during maintenance due to improper evacuation of hydrocarbon.

7) Roof collapsing due to under insulation corrosion

8) Other failure due to corrosion / aging.

04/08/2370

Page 71: Presentation slides for Tank Construction and Maintenance.ppt

Thank you

04/08/2371