[XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary...

91
Tank Spreadsheet 3/23/2010 Instructions to Users >Enter information into the Summary worksheet about the storage tanks. Guidelines >The tank turnover time and mixing calculations are not applicable for every tank. The following are guidelines for these calculations Tank Mixing Assessment CAN Be Done On: Turnover Time Calculation CAN Be Used On: -- Tanks that operate in a fill/ draw mode -- Tanks that operate in a fill/ draw mode -- Tanks with a submerged inlet. Tank Mixing Assessment CANNOT Be Done On: Turnover Time Calculation CANNOT Be Used On: -- Irregular-shaped tanks. -- If the tank is baffled or has pillars. >Care should be taken to apply these calculations in the following cases: -- If you do not know the configuration of the tank inlet or if you do not know if there are any baffles inside the tank. -- If the inlet is located near the tank wall, mixing will be reduced. -- If the age of the water entering the tank is significantly old, the turnover time will not approximate the total water age in the Date Modified: Modifications & By Whom: 10/24/2003 LDD modified tank worksheets to simplify data entry requirements. Provided space for up to 15 tank fill periods. 9/13/2004 MWS added guidelines 10/6/2004 MWS added Data Summary worksheet 12/13/2004 MWS added Summary, Prioritization, and Analysis worksheets. Also revised Data Input worksheet's error in turnover time 1/27/2005 MWS added calculations for rectangular tanks. Made minor modifications to all sheets for increased functionality. >The purpose of this spreadsheet is to summarize tank characteristics, assess water storage tank turnover time and mixing, and determine operational strategies to improve turnover time and mixing. level changes over a period of time are required inputs. Water system SCADA data is typically used to determine the changes in tank water levels. >If the tank turnover time calculations (in the Tank worksheet) determine that turnover time is high, the Turnover Time Analysis should be used to determine operational changes to improve turnover time. >If the tank mixing calculations (in the Tank worksheet) determine that mixing is poor, the Mixing Analysis should be used to determine solutions to improve mixing. vertically. baffling tanks or certain tanks having SCADA that report changes in volume (i.e., elliptical or spherical) -- Cylindrical, rectangular, or hydropillar tanks or tanks having SCADA that report changes in volume configuration temperature difference between the inlet water and tank water) -- Under any buoyancy conditions (temperature differences between the inlet -- Flow-through tanks (tanks operating with simultaneous inflow and outflow) -- Flow-through tanks (tanks operating with simultaneous inflow and outflow) -- If the temperature difference between the water coming into the tank and the water in the tank is significantly different. This may decrease tank mixing due to buoyancy. >In situations where the tank is not well mixed or when the mixing calculations cannot be used, the tank turnover time calculations only show the average turnover time of the tank. There may be much older "dead-zones" of water in the tank.

Transcript of [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary...

Page 1: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank Spreadsheet 3/23/2010Instructions to Users

>Enter information into the Summary worksheet about the storage tanks.

>If the tank mixing calculations (in the Tank worksheet) determine that mixing is poor, the Mixing Analysis should be used to determine solutions to improve mixing.

Guidelines

>The tank turnover time and mixing calculations are not applicable for every tank. The following are guidelines for these calculations:

Tank Mixing Assessment CAN Be Done On: Turnover Time Calculation CAN Be Used On:-- Tanks that operate in a fill/ draw mode -- Tanks that operate in a fill/ draw mode-- Tank inlets oriented horizontally or vertically. -- Tanks with any inlet orientation and baffling

-- Tanks with a submerged inlet. -- Tanks with any inlet/outlet configuration

Tank Mixing Assessment CANNOT Be Done On: Turnover Time Calculation CANNOT Be Used On:

-- Irregular-shaped tanks.-- If the tank is baffled or has pillars.

>Care should be taken to apply these calculations in the following cases:-- If you do not know the configuration of the tank inlet or if you do not know if there are any baffles inside the tank.-- If the inlet is located near the tank wall, mixing will be reduced. -- If the age of the water entering the tank is significantly old, the turnover time will not approximate the total water age in the tank.

Date Modified: Modifications & By Whom:

10/24/2003 LDD modified tank worksheets to simplify data entry requirements. Provided space for up to 15 tank fill periods.9/13/2004 MWS added guidelines10/6/2004 MWS added Data Summary worksheet12/13/2004 MWS added Summary, Prioritization, and Analysis worksheets. Also revised Data Input worksheet's error in turnover time calculations.1/27/2005 MWS added calculations for rectangular tanks. Made minor modifications to all sheets for increased functionality.

>The purpose of this spreadsheet is to summarize tank characteristics, assess water storage tank turnover time and mixing, and determine operational strategies to improve turnover time and mixing.

>Enter data into the Tank worksheets for the storage tanks in the distribution system. Tank diameter, inlet diameter, and water level changes over a period of time are required inputs. Water system SCADA data is typically used to determine the changes in tank water levels.>If the tank turnover time calculations (in the Tank worksheet) determine that turnover time is high, the Turnover Time Analysis should be used to determine operational changes to improve turnover time.

-- Cylindrical, rectangular, or hydropillar tanks or certain tanks having SCADA that report changes in volume (i.e., elliptical or spherical)

-- Cylindrical, rectangular, or hydropillar tanks or tanks having SCADA that report changes in volume

-- Under neutrally buoyant conditions (no temperature difference between the inlet water and tank water)

-- Under any buoyancy conditions (temperature differences between the inlet water and tank water)

-- Flow-through tanks (tanks operating with simultaneous inflow and outflow)

-- Flow-through tanks (tanks operating with simultaneous inflow and outflow)

-- If the temperature difference between the water coming into the tank and the water in the tank is significantly different. This may decrease tank mixing due to buoyancy.

>In situations where the tank is not well mixed or when the mixing calculations cannot be used, the tank turnover time calculations only show the average turnover time of the tank. There may be much older "dead-zones" of water in the tank.

Page 2: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank Summary

Instructions:

I. Tank Characteristics (See Glossary worksheet for illustrations of Tank Characteristics)**Data must be entered into this section for the spreadsheet to function.**Do not enter tank dimensions if the tank is NOT cylindrical, rectangular, or hydropillar.**Hydropillar tanks can be approximated as cylindrical tanks depending on their operating range. See glossary for illustration.

Tank #1 Tank #2 Tank #3 Tank #4 Tank #5 Tank #6 Tank #7 Tank #8 Tank #9 Tank #10

A. Name of TankB. Volume (MG)

C.

D1.

D2.

E1.

E2. (If rectangular) Shortest Sidewall length, L (ft)E3. (all tanks) Inlet Diameter, d (ft)

F. (all tanks) Maximum Operating Water Depth, H (ft)G.

H/D ratio #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

The remaining data is automatically calculated based on the data entered above:no no no no no no no no no nono no no no no no no no no no

II. Tank Calculations (from Tank Data Input worksheets)

Turnover Time (days)Mixing Performance Ratio (Measured/ Desired)

Notes:1. Hydropillar tanks can be approximated as cylindrical tanks depending on their operating range. See glossary for illustration.

3. If the tank operates flow-through the turnover time calculations are not applicable.

1. Enter tank characteristics into section I below. Section II and III will be populated automatically when data is entered into the tank worksheets. NOTE: Data inputted by the user are shown in red. Data must be entered into section I for the spreadsheet to function.2. After completing section I, go to the tank worksheets entitled "Tank #1", "Tank #2", etc. Enter the operational data in Step 1 of the worksheet. Once the data is entered in Step 1, proceed to Step 2 and 3, if appropriate.3. If the tank calculations in Step 1 determine that turnover time and/or mixing is poor, Step 2 and 3 of the tank worksheet will determine possible ways to improve tank operations. The calculations analyze current operations and develop operational solutions to decrease water age and increase mixing in the tank.

If the SCADA/ telemetery reports tank level in feet answer question C, then answer questions E, F, and G. If the SCADA/ telemetry does not report the tank level in feet, answer "n" in question C and then answer questions D1, D2, E3, F, and G.

Is the tank Cylindrical (C), Rectangular (R), Hydropillar1 (H), or None of these (n)?

Does the SCADA/ telemetry report tank level in volume (y/n)?

If SCADA/ telemetry is reported in volume, are the tank mixing equations applicable - see note 4 (y/n)?

(if cylindrical/hydropillar/) Tank diameter or (if rectangular) Longest Sidewall length, D (ft)

(all tanks) Is the tank operated fill-draw (fd) or flow-through2 (ft)?

Are the turnover time calculations applicable?3

Are the mixing equations applicable?4

**If data is missing the reason could be that the tank mixing equations may not be applicable or the tank may not be cylindrical, hydropillar, rectangular, or have SCADA that reports volume rather than level.

2. In flow-through operation water is simultaneously coming into the tank and leaving the tank. In fill-draw operation water is can either be filling the tank or drawing from the tank at any one time (this is typical of most tanks).

4. The mixing calculations are applicable if the tank shape is cylindrical, rectangular, elliptical, or a hydropillar AND the tank operates fill-draw. The mixing calculations are not applicable if the tank operates flow-through OR the tank is irregularly shaped.

Page 3: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #1 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #1 Graph

Time (days)

Leve

l (ft

/gal

)

Page 4: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 5: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 6: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 7: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #1 Worksheet

Page 8: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 9: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 10: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 11: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #2 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #2 Graph

Time (days)

Leve

l (ft

/gal

)

Page 12: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 13: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 14: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 15: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #2 Worksheet

Page 16: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 17: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 18: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 19: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #3 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #3 Graph

Time (days)

Leve

l (ft

/gal

)

Page 20: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 21: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 22: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 23: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #3 Worksheet

Page 24: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 25: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 26: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 27: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #4 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #4 Graph

Time (days)

Leve

l (ft

/gal

)

Page 28: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 29: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 30: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 31: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #4 Worksheet

Page 32: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 33: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 34: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 35: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #5 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #5 Graph

Time (days)

Leve

l (ft

/gal

)

Page 36: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 37: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 38: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 39: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #5 Worksheet

Page 40: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 41: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 42: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 43: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #6 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #6 Graph

Time (days)

Leve

l (ft

/gal

)

Page 44: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 45: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 46: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 47: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #6 Worksheet

Page 48: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 49: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 50: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 51: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #7 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #7 Graph

Time (days)

Leve

l (ft

/gal

)

Page 52: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 53: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 54: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 55: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #7 Worksheet

Page 56: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 57: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 58: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 59: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #8 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #8 Graph

Time (days)

Leve

l (ft

/gal

)

Page 60: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 61: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 62: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 63: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #8 Worksheet

Page 64: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 65: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 66: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 67: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #9 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #9 Graph

Time (days)

Leve

l (ft

/gal

)

Page 68: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 69: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 70: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 71: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #9 Worksheet

Page 72: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 73: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 74: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 75: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #10 WorksheetStep 1: Data Input- Tank Turnover and Mixing Calculations

Tank Name: 0Volume, MG: 0

0.00

0.00

0

0

0

#DIV/0!

Inlet diameter, d: 0.00 ft

Date Time Min Level Max Level Date + Time Delta Time Level ChangeFt Ft Days Ft

12/30/99 0:00 0.0 112/30/99 0:0012/30/99 0:00 212/30/99 0:0012/30/99 0:00 312/30/99 0:0012/30/99 0:00 412/30/99 0:0012/30/99 0:00 512/30/99 0:0012/30/99 0:00 612/30/99 0:0012/30/99 0:00 712/30/99 0:0012/30/99 0:00 812/30/99 0:0012/30/99 0:00 912/30/99 0:0012/30/99 0:00 1012/30/99 0:0012/30/99 0:00 1112/30/99 0:0012/30/99 0:00 1212/30/99 0:0012/30/99 0:00 1312/30/99 0:0012/30/99 0:00 1412/30/99 0:0012/30/99 0:00 1512/30/99 0:00

Cylindrical (C), Rectangular (R), Hydropillar (H), or None of

these (n)?

If none, does SCADA report volume (or % full) rather than

level?

Spreadsheet is not set up for shapes other than cylindrical, hydropillar, & rectangular unless SCADA reports tank volume!

Instructions: Enter tank fill data (obtained from plant SCADA) for up to 15 fill periods. Data inputted by the user are shown in red.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00

2

4

6

8

10

12

Tank #10 Graph

Time (days)

Leve

l (ft

/gal

)

Page 76: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Fill period Low/Min Level High/Max Level Vol at start Vol added Volume drawn Ave Tank Vol Mixing calculationsof fill cycle during fill cycle during drain cycle during fill cycle Actual Req'd Fill Time

(ft) (ft) (MG) (MG) (MG) (MG) (days)### 1 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 2 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 3 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 4 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 5 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 6 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 7 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 8 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 9 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 10 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 11 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 12 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 13 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 14 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a### 15 0.00 0.00 error error n/a #VALUE! #DIV/0! #DIV/0! n/a

Turnover Summary Mixing SummaryAvg Vol Added in One Fill Period #DIV/0! MG Avg Min Water Level #DIV/0! ftAvg Vol Drawn in One Drain Period #DIV/0! MG Avg Actual VEF #VALUE!Avg Fill Time #DIV/0! days Avg VEF Needed for Good Mixing #DIV/0!Avg Draw Time #DIV/0! days Avg Measured Water Level Change #DIV/0! ft

Avg Fill Rate #DIV/0! gpm #DIV/0! ft

Avg Draw Rate #DIV/0! gpm #DIV/0!

Avg Duration (Fill + Draw Time) #DIV/0! days Inlet Diameter Needed for Good Mixing #DIV/0! inchesAvg Flow Rate into tank #DIV/0! MGD

#DIV/0!

Avg Tank Vol #DIV/0! MGTurnover Time #DIV/0! days

#DIV/0!

Dimension-less Mixing

TimeVolume Exchange

Fraction (VEF)Volume Exchange

Fraction (VEF)

Desired Water Level Change Needed for Good MixingMixing Performance Ratio (Measured/Desired)

L51
Function of diameter of the inlet pipe and the volume at the beginning of the fill cycle.
C76
Average time between the end of last fill cycle and the beginning of the the next fill cycle.
Page 77: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Step 2: Turnover Time & Mixing Analysis

Instructions: Five scenarios are available for experimenting with changing tank operations to improve turnover time. Experiment with lowering the both the Max and Min levels,

These five scenarios are also available for experimenting with reducing inlet diameter to improve mixing. Note that improving the level change will also improve mixing.

No Changes Scenario A Scenario B Scenario C Scenario D Scenario E0 0 0 0 0 0 ft0 0 0 0 0 0 ft

Inlet Diameter 0.00 ftHigh/Max Level 0.00 ftLow/Min Level 0.00 ft

Actual Level Change #DIV/0!

Dimensionless Mixing Time #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0!

0.0 0.0 0.0 0.0 0.0Fill rate/ Pumping rate #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpm

Draw rate/ consumer demand #DIV/0! #DIV/0! #DIV/0! #DIV/0! gpmAvg fill time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Avg volume added during fill #DIV/0! MGAvg Duration (fill +draw) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAve Flow Rate #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! MGDAve Tank Vol #DIV/0! MG

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

Step 3: Chlorine Residual Analysis

Instructions: Five scenarios are available for estimating the minimum chlorine concentration exiting a completely mixed or plug flow tank during a drain cycle. This analysis may be able to 1) identify if the performance problem at the tank is due to incomplete mixing, 2) determine the chlorine concentrationneeded to enter the tank in order to achieve target chlorine residuals leaving the tank, or 3) determine the chlorine decay rate needed at the tank in order to

Scenario A Scenario B Scenario C Scenario D Scenario EHigh/Max Level 0.00 0.00 0.00 0.00 0.00 0.00 ftLow/Min Level 0.00 0.00 0.00 0.00 0.00 0.00 ft

Mixing Performance Ratio #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!Turnover Time #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! error error error error error MG

only the Min level, and only the Max level. Modify data shown in red. Do not use this analysis if the turnover time equations are not applicable!

Modify data shown in red. Do not use this analysis if the mixing equations are not applicable (H/D>1)!

Desired Level Change Needed for Good Mixing

Pressure Drop After Change in Min Water Level

Mixing Performance Ratio (Measured/Desired)

achieve target chlorine residuals leaving the tank. Remember - ideal tank performance is complete mixing! Modify data shown in red.

No Changes - Estimated Current

Conditions

Chlorine Decay Rate Constant (determined from bottle test) (k) day-1

Volume at Start of Fill Cycle (Ve)

Page 78: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

#DIV/0! error error error error error MGAvg fill time (Tf) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! daysAvg draw time (Te) #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! days

mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L

#DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! mg/L1. Equation from p. 211 - Water Quality Modeling in DS Storage Tanks" AWWARF study

Volume at end of fill period (or at the start of the draw period) (Vf)

Maximum time that a water parcel stays in a plug flow tank (Tmax)

Concentration entering the tank (from field data) (Ce)Complete Mixing: Minimum concentration leaving the tank1, 2

Plug Flow: Minimum concentration leaving the tank1, 2

2. The user should assume that when the tank is well mixed (mixing PR >= 1) the minimum concentration leaving the tank is close to the completely mixed result. If the tank is poorly mixed (mixing PR < 1) the user should be cautious about using the plug flow result to determine the minimum concentration leaving the tank. Tanks can operate in many different and unpredictable ways. If the tank is not baffled (like a clearwell) or specifically designed to be plug flow, then the tank operation is probably not plug flow. In most cases, if the tank is not well mixed (mixing PR < 1) there may be some areas of the tank volume that are mixed (e.g., close to the inlet zone) and other areas (i.e., dead-zones) that are unmixed and probably have an undetectable chlorine residual. If this is the case, neither the plug flow nor completely mixed result for minimum concentration leaving the tank is applicable.

Page 79: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank #10 Worksheet

Page 80: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Draw Time

(days)n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

Page 81: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 82: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 83: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank GlossaryTank Shape:

Tank Dimensions:Cylindrical or Hydropillar Tanks Rectangular Tanks

Cylindrical Hydropillar

CylindricalCylindrical

HydropillarHydropillar

RectangularRectangular

Water

Inlet diameter (d)

Tank Diameter (D) Max

imum

Ope

ratin

g W

ater

Dep

th (H

)

Water

Inlet diameter (d)

Dry riser

Wet riser

Tank Diameter (D) Max

imum

Ope

ratin

g W

ater

Dep

th (H

)

Longest Sidewall length (D)

Inlet diameter (d)

NOTE: If the tank is a hydropillar, the tank spreadsheetcan approximate the tank turnover and mixing, but the tank must operate in the range of the tank that has a cylindrical shape, not the cone-shaped bottom section.As shown below:

Water

Page 84: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Tank Glossary

Longest Sidewall length (D)

Shortest Sidewall length (L)

Max

imum

Ope

ratin

gW

ater

Dep

th (H

)

Water

Inlet diameter (d)

NOTE: If the tank is a hydropillar, the tank spreadsheetcan approximate the tank turnover and mixing, but the tank must operate in the range of the tank that has a cylindrical shape, not the cone-shaped bottom section.As shown below:

Tank spreadsheet will not appropriately

estimate turnover and mixing for hydropillars

operating in this range.Water

Tank must operatewithin this range

Page 85: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Helpful Hints

1. Determine Volume vs Water Level Relationship for the Tank

38 100000037 99885436 97974435 95859134 93567233 91119932 88534731 85826730 83009629 80095228 77096727 74024426 70888925 67700524 64469123 61204522 57916321 54613920 51306819 48004418 447162 * note this relationship may not always be linear.17 41451616 38220215 35031814 318963

1. Determine the maximum (100%) tank volume and maximum water level. 2. Convert Percent Full to Water level (feet) and Volume (gallons).

Cylindrical Tank Date100% tank volume = 1000000 gallons 04/07/05

Tank diameter = 32 ft 04/07/05

Hint 1: When tank shape is irregular (elliptical, spherical, etc), enter the tank water levels in volume rather than feet (since the volume per foot relationship may not be linear) in order to determine the tank turnover time. Note than in these cases the mixing equations may not be applicable. See Example below:

Water Level (ft)

Volume Remaining

in Tank (gallons)

Hint 2: When SCADA is reported in percent full, these values can be converted to tank volumes or feet in order to determine the tank turnover time.

If the tank shape is rectangular or cylindrical, then the volume vs water level relationship is linear, and the percent full values can be easily converted to water level in feet or volume. If the tank shape is elliptical, cylindrical, etc and the volume vs water level is not linear, then the volume vs percent full relationship will need to be determine (as described above), then converted to feet/ volume. See Example below:

10 15 20 25 30 35 400

200000

400000

600000

800000

1000000

1200000

f(x) = 29834.7369230769 x − 81937.6399999999

Example: Volume vs Water Level Relationship*

Water Level (ft)

Volu

me

(gal

lons

)

Page 86: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Therefore… 04/07/05Max Water Level = 166 ft 04/07/05

04/07/0504/07/0504/08/0504/08/0504/08/0504/08/0504/08/0504/08/05

3. Verify H/D ratio < 1 (i.e., mixing equation is applicable)

Maximum 62 28Minimum 56.6 15

Hint 3: At systems that have strip charts or no SCADA water level data, it may be helpful to record tank water level changes with a pressure recorder. The pressure data will have to be converted to water level changes in feet in order to be entered into the spreadsheet.

1. Determine the approximate Pressure to Water Level Relationship for the Tank when the pressure recorder elevation is unknown.

Pressure (psi)

Water Level (ft)

10 20 30 40 50 60 700

5

10

15

20

25

30

f(x) = 2.40740740740741 x − 121.259259259259

Example: Pressure to Water Level Relationship

Pressure (psi)

Wat

er L

evel

(ft)

Page 87: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions
Page 88: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

Helpful Hints

2. Convert Water Level to Volume using the Relationship

Date Time01/11/07 10:45 PM 27.06 72539301/12/07 10:17 AM 35.39 97391901/12/07 10:03 PM 30.20 81907501/13/07 3:25 PM 31.86 86860101/13/07 10:55 PM 22.25 58188701/14/07 11:55 AM 32.60 89067901/14/07 3:46 PM 28.24 76059801/15/07 7:17 AM 40.00 111145801/15/07 10:41 PM 21.96 57323501/16/07 3:46 PM 38.19 105745701/16/07 11:03 PM 20.59 53236101/17/07 4:26 PM 38.14 105596501/17/07 11:07 PM 18.05 45658001/18/07 4:59 PM 31.74 86502101/18/07 11:44 PM 19.80 50879101/19/07 3:23 PM 38.05 105328001/20/07 12:11 AM 20.77 53773101/20/07 5:16 PM 38.28 106014201/20/07 10:42 PM 22.33 58427401/21/07 7:17 AM 28.48 76775901/21/07 8:26 PM 17.94 45329801/22/07 5:33 AM 38.10 105477201/22/07 11:08 PM 25.72 68541401/23/07 11:31 AM 38.22 1058352

2. Convert Percent Full to Water level (feet) and Volume (gallons).

Time8:12 AM 0.168 27.9 1678409:09 AM 0.171 28.5 171450

When tank shape is irregular (elliptical, spherical, etc), enter the tank water levels in volume rather than feet (since the volume per foot relationship may not be linear) in order Note than in these cases the mixing equations may not be applicable. See Example below:

Min Water Level (ft)

Max Water Level (ft)

Min Volume

(gal)

Max Volume

(gal)

When SCADA is reported in percent full, these values can be converted to tank volumes or feet in order to determine the tank turnover time.

If the tank shape is rectangular or cylindrical, then the volume vs water level relationship is linear, and the percent full values can be easily converted to water level in feet or volume. If the tank shape is elliptical, cylindrical, etc and the volume vs water level is not linear, then the volume vs percent full relationship will need to be determine (as described above), then converted to

Min Percent

Full

Max Percent

FullMin Water Level (ft)

Max Water Level (ft)

Min Volume

(gal)

Max Volume

(gal)

Page 89: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

1:54 PM 0.162 27.0 1624263:49 PM 0.172 28.6 1720517:50 PM 0.162 27.0 162426

10:51 PM 0.173 28.7 1726536:30 AM 0.162 27.0 1624268:40 AM 0.172 28.6 1720512:44 PM 0.161 26.7 1606215:00 PM 0.172 28.6 1720518:50 PM 0.162 27.0 162426

11:26 PM 0.172 28.6 172051

3. Verify H/D ratio < 1 (i.e., mixing equation is applicable)H/D (water depth to tank diameter) ratio =

Maximum water depth (H) = 28.7 ftTank diameter (d) = 32 ft

H/D = 0.90

2. Convert Pressure to Water Level using the Relationship

Date Time08/10/06 9:00 AM 58.68 20.0008/10/06 5:00 PM 61.88 27.7008/11/06 11:00 AM 58.84 20.4008/11/06 6:30 PM 61.67 27.2008/12/06 11:00 AM 59.05 20.9008/12/06 7:00 PM 62.00 28.0008/13/06 1:00 PM 58.93 20.6008/13/06 7:00 PM 61.50 26.8008/14/06 7:00 AM 59.09 21.0008/14/06 5:00 PM 61.83 27.6008/15/06 9:00 AM 58.80 20.3008/15/06 5:00 PM 62.00 28.0008/16/06 9:00 AM 58.93 20.6008/16/06 5:00 PM 61.88 27.7008/17/06 7:00 AM 58.80 20.3008/17/06 3:00 PM 61.96 27.9008/18/06 7:00 AM 59.38 21.7008/18/06 11:00 AM 61.83 27.6008/19/06 2:30 AM 58.68 20.0008/19/06 3:00 PM 61.79 27.5008/20/06 6:00 AM 58.97 20.7008/20/06 10:00 AM 61.54 26.9008/20/06 6:00 PM 58.89 20.50

At systems that have strip charts or no SCADA water level data, it may be helpful to record tank water level changes with a pressure recorder. The pressure data will have to be converted to water level changes in feet in order to be entered into the spreadsheet.

Min Pressure

(psi)

Max Pressure

(psi)

Min Water

Level (ft)

Max Water

Level (ft)

Page 90: [XLS]dep.ky.govdep.ky.gov/formslibrary/Documents/TankSpreadsheetv6a.xls · Web viewHints Glossary Tank#10 Tank#9 Tank#8 Tank#7 Tank#6 Tank#5 Tank#4 Tank#3 Tank#2 Tank#1 Summary Instructions

08/20/06 9:00 PM 60.92 25.40